September 2012

ARTC’s Competency ManagementSystem12/09/2012 ARTC Competency Management System 1


Discussing today….• Implementation timings• Recap of ARTC’s competence requirements• Special procedures around:– Signals– Structures– Safeworking• 30 days till compliance due date12/09/2012 ARTC Competency Management System 2


Implementation Dates Victoria• Enabling competency matrices – 30 September 2012• Full compliance – 31 March 2013To continue doing rail safety work for ARTC beyond30 th September contractors completing roles in theenabling competency matrices must hold a RSW card.12/09/2012 ARTC Competency Management System 3


Enabling CompetenciesMust be compliant by 30 th September 2012:• Plant and Equipment• Track and Civil• Communications• Safeworking• Network Control12/09/2012 ARTC Competency Management System 4


Enabling CompetenciesMust be compliant by 30 th September 2012:• Plant and Equipment– Cat 3 medical– TSA/TTSA– White card– WorkSafe licence (high risk) or equivalent• Track and Civil• Communications• Network Control• Safeworking12/09/2012 ARTC Competency Management System 5


Enabling CompetenciesMust be compliant by 30 th September 2012:• Plant and Equipment• Track and Civil– Cat 3 medical– TSA/TTSA– White card– Role specific qualifications eg welding/track certifiersand constructors• Communications• Safeworking• Network Control12/09/2012 ARTC Competency Management System 6


Enabling CompetenciesMust be compliant by 30 th September 2012:• Plant and Equipment• Track and Civil• Communications– Cat 3 medical– TSA/TTSA– White card– ACMA cabling registration– Certificate 3/4 Telecommunications• Safeworking• Network Control12/09/2012 ARTC Competency Management System 7


Enabling CompetenciesMust be compliant by 30 th September 2012:• Plant and Equipment• Track and Civil• Communications• Safeworking– Cat 1 medical– TSA/TTSA– Current safeworking competencies issued by an approvedRTO/Rail Operator• Network Control12/09/2012 ARTC Competency Management System 8


Full competenciesMust be fully compliant by 31 March 2013:• Plant and Equipment• Track and Civil• Communications• Network Control• Engineering• Project Management• Signals• Safeworking• Structures12/09/2012 ARTC Competency Management System 9


Full competenciesMust be fully compliant by 31 March 2013:• Plant and Equipment/Track andCivil/Communications/Network Control– Enabling competencies– All other competencies in matrices• Engineering• Project Management• Signals• Safeworking• Structures12/09/2012 ARTC Competency Management System 10


Full competenciesMust be fully compliant by 31 March 2013:• Plant and Equipment/Track and Civil/Communications/NetworkControl• Engineering & Project Management– AQF qualifications– Record of relevant experience– Current CV– Note: select around the track personnel if going ontrack• Signals• Safeworking• Structures12/09/2012 ARTC Competency Management System 11


Engineering & Project Management• Assessment of applications for RSW cards• 2 methods:– Submission of application to Onsite and completedonline by contracted provider– Completed prior to upload of evidence by in-companyapproved external assessor• Applications to become approved external assessors aresubmitted to ARTC as an application for a RSW card12/09/2012 ARTC Competency Management System 12


Signals• Working to a different timetable• Signals matrices and competencies in Onsite• Competency information on existing SOC holders will be transferred toOnsite without need to be supplied again• ARTC will require evidence if SOC competencies are not current or held• Exceptions:– Medical must be by an approved authorised health professional– All current SOC holders must complete a new 100point ID check at Australia Post -except overseas holders• Timings:– 1 September 2012 – cutoff date for issue of SOCs and all applications are to be viaOnsite for RSW cards– 1 September – 1 January – all SOC holders transitioned to RSW cards– 1 January 2013 – all signals RSW to hold new cards• Note – select around the track personnel if going on track12/09/2012 ARTC Competency Management System 13


Safeworking• Working to a different timetable• Required by 30 September - Cat 1 medical/TSA/TTSA/ currentsafeworking competencies issued by an approved RTO/Rail Operator• New role titles and training requirements have been amended toreflect commonality with Metro Trains Melbourne• Contractors holding safeworking qualifications are required toupgrade to the relevant units from the Transport and Logistics 2010Version 2 training package. These upgrades will happen during recertifications,and are due by 30 September 2015• Note this is a different schedule to MTM12/09/2012 ARTC Competency Management System 14


Structures• Working to a different timetable• New pathways and training requirements summarised in table belowto achieve required competencies• Contractors will be individually contacted to arrange trainingPathway CompetencyMaintainer/repairerVisualexaminer/inspectorEngineeringinspectorDemonstratedexperiencerequired1 TLI Certificate 2 X1 TLI Certificate 3 X X2 Other Certificate 3 X X X X3 Degree X12/09/2012 ARTC Competency Management System 15


Summary• Enabling compliance required by 30 September2012• Major changes to safeworking and structures• Start applying now for engineering and projectmanagement roles• Transfer of signals SOC holders12/09/2012 ARTC Competency Management System 16