01.12.2012 Views

Tender No.: 465S/2011/12 - City of Cape Town

Tender No.: 465S/2011/12 - City of Cape Town

Tender No.: 465S/2011/12 - City of Cape Town

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

<strong>Tender</strong> <strong>No</strong>.: <strong>465S</strong>/<strong>2011</strong>/<strong>12</strong><br />

1. SCOPE OF SPECIFICATION<br />

1.1 Work provided by this specification involves the design, manufacturing, supply, installation, connection,<br />

disconnection, disassembling and maintenance <strong>of</strong> festive motifs, set-pieces, Christmas trees and other<br />

electrical installation activities associated with the various Festive Illumination Program projects within<br />

the boundaries <strong>of</strong> the <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong>.<br />

1.2 The <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services is divided into 3 Service Areas (<strong>No</strong>rth, East and South) the<br />

present boundaries <strong>of</strong> which are indicated on the attached plan (Addendum A). The boundaries may be<br />

subject to change.<br />

1.3 All materials unless otherwise specified will be supplied by the contractor.<br />

1.4 The tendered rate shall be an all-inclusive rate i.e. the tendered rates shall include all vehicles, plant,<br />

tools, labour, overhead costs, supervision, equipment etc. to execute the work.<br />

1.5 Work shall be done in accordance with this specification but shall be read in conjunction with the<br />

applicable standards listed below.<br />

1.6 The <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services may order any material as stated in the pricing schedule in<br />

this tender as and whenever required.<br />

1.7 All new designs will be based on the theme as presented by the <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong> Electricity Services.<br />

1.8 Samples <strong>of</strong> all materials must be submitted within 3 days <strong>of</strong> request. Failure to submit will render your<br />

<strong>of</strong>fer <strong>No</strong>n-Responsive.<br />

2. APPLICABLE STANDARDS<br />

Work shall be in accordance with the following standards where applicable:<br />

2.1 Occupational Health and Safety Act, 1983<br />

2.2 SABS 0198 - The selection, handling and installation <strong>of</strong> electrical cables<br />

2.3 SABS <strong>12</strong>00 - Standardised specification for civil engineering construction<br />

2.4 Site Manual: Safety at Roadwork’s in urban areas (latest edition)<br />

2.5 Standard Specification for Roadwork’s: <strong>City</strong> <strong>of</strong> <strong>Cape</strong> <strong>Town</strong>, Municipal Services<br />

2.6 Design and Maintenance Standards for the provision <strong>of</strong> Public Lighting Services<br />

2.7 ARP 035: Guidelines for installation and maintenance <strong>of</strong> street lighting<br />

2.8 SANS 10142 – The wiring <strong>of</strong> premises Part 1 Low-voltage installations<br />

3. DESCRIPTION OF WORK<br />

3.1 The Contractor must ensure that the Motifs and Set-pieces are positioned in the correct position, at the<br />

correct height and with the correct side <strong>of</strong> the motif or set-piece facing the street. The Contractor will be<br />

liable for all costs incurred if the motifs or set-pieces have to be moved or turned around, if not done as<br />

instructed, after being installed.<br />

3.2 The Contractor must ensure that the Belt Lights (Streamers) are positioned in the correct position and<br />

at the correct height. The Contractor will be liable for all costs incurred if the Belt Lights (Streamers)<br />

have to be moved or repositioned, if not done as instructed, after being installed.<br />

3.3 The Contractor must ensure that the Big Christmas Tree decorations are in the correct position, at the<br />

correct height and in the correct sequence. The Contractor will be liable for all costs incurred if the<br />

decorations are not done as instructed after being installed.<br />

17

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!