12.07.2015 Views

WRF - Developmental Testbed Center

WRF - Developmental Testbed Center

WRF - Developmental Testbed Center

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Other physics optionsa. gwd_opt: Gravity wave drag option. Can be activated when grid size is greater than10 km. May be beneficial for simulations longer than 5 days and over a large domainwith mountain ranges.b. momix: Coefficient used in the calculation of momentum mixing tendency terms.Default mommix=0.5. Only used with SAS cumulus scheme.c. h_diff: Coefficient used in the calculation of horizontal momentum diffusion terms.Default h_diff=1.0. Only used when environment variable H<strong>WRF</strong> is set.d. sfenth: Enthalpy flux factor. Default sfenth=0.0. Only used with GFDL surfacescheme.Operational ConfigurationBelow is a summary of physics options that are well-tested for <strong>WRF</strong>-NMM and are usedoperationally at NCEP:&physicsIdentifying Physics optionsNumbermp_physics (max_dom) 5 Microphysics-Ferrierra_lw_physics 99 Long-wave radiation - GFDL(Fels-Schwarzkopf)ra_sw_physics 99 Short-wave radiation - GFDL (Lacis-Hansen)sf_sfclay_physics 2 Surface-layer: Janjic schemesf_surface_physics 2 Noah Land Surfacebl_pbl_physics 2 Boundary-layer - Mellor-Yamada-Janjic TKEcu_physics 2 Cumulus - Betts-Miller-Janjic schemenum_soil_layers 4 Number of soil layers in land surface modelDescription of Namelist VariablesThe settings in the namelist.input file are used to configure <strong>WRF</strong>-NMM. This fileshould be edited to specify: dates, number and size of domains, time step, physicsoptions, and output options. When modifying the namelist.input file, be sure to take intoaccount the following points:time_step: The general rule for determining the time step of the coarsest grid followsfrom the CFL criterion. If d is the grid distance between two neighboring points (indiagonal direction on the <strong>WRF</strong>-NMM's E-grid), dt is the time step, and c is the phasespeed of the fastest process, the CFL criterion requires that:<strong>WRF</strong>-NMM V3: User’s Guide 5-8

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!