12.07.2015 Views

INVITATION FOR BID (IFB) PREVENTATIVE MAINTENANCE ...

INVITATION FOR BID (IFB) PREVENTATIVE MAINTENANCE ...

INVITATION FOR BID (IFB) PREVENTATIVE MAINTENANCE ...

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

4. REQUIRED <strong>MAINTENANCE</strong>:Offerors shall submit proposals for semi-annual services (visual inspections andoperations as necessary to examine, adjust, calibrate as necessary, clean, and report thecondition of equipment per manufacturer's specifications). Offers shall also submitinformation on emergency services.4.01. Summary• Inspection and maintenance report with recommended repairs, fluidlevels, settings, condition, etc.• Operation of engine and generator• Control panel operations• Start and operate system (per manufacturer's specifications and notless than the minimum required to evaluate satisfactory performanceand condition of unit including load test, auto transfer, cool-down andauto shutdown)• Engine safety controls• General appearance• Cleanliness• Fire extinguisher-properly pressurized, located within 50 feet ofgenerator• Form-customer, location, date, technician, hour meter, generatormodel & serial# & AR #,engine model & serial # & AR #,transferswitch model & serial #• Other comments4.02. Cooling system• Core condition (inside-clean as necessary)• Core condition (outside-clean as necessary)• Radiator cap (inspect condition, seal and pressure)• Coolant level (inspect coolant level and add as necessary as requiredby manufacturer)• Condition (ppm-drain, flush & replace with new coolant as needed orrequired by manufacturer, usually once in year three)• Antifreeze (freeze point test)• Hoses & clamps (visual inspection and manually test)• Tubes and connectors• Fan belt/pulley• Fan belt adjustment-check and adjust as needed• Fan bearings/blades• Water pump (bearings & leaks)• Operating temperature• Engine block heater -left & right-operation temperature, cut-on/off,functioning• Louvers-proper operation and air flow[p. 5 – <strong>IFB</strong> – GENERATOR – Bid# 13-RB-300]

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!