Item No. Item Description Est. Quant. Units 1 General Conditions ...

wpb.org
  • No tags were found...

Item No. Item Description Est. Quant. Units 1 General Conditions ...

SBE GOAL: 15%CITY OF WEST PALM BEACHITB No. 11-12-101 Structural Repairs of the Flow Equalization Basin for ECRWRFBid TabulationDecember 14, 2011 @ 3:00 p.m.ItemNo.Contractor's Bidding Hinterland Group, Inc.Worth Contracting, Inc.AM Construction GroupItem DescriptionEst.Quant. Units Unit Price Cost Unit Price Cost Unit Price Cost1 General Conditions, Bonds, and Indemnification 1 LS $ 12,000.00 $ 12,000.00 $ 60,000.00 $ 60,000.00 $ 39,224.00 $ 39,224.002 Mobilization/Demobilization 1 LS $ 4,500.00 $ 4,500.00 $ 14,000.00 $ 14,000.00 $ 36,078.00 $ 36,078.003 Basin Cleaning/Disinfecting 1 LS $ 8,000.00 $ 8,000.00 $ 32,000.00 $ 32,000.00 $ 226,248.00 $ 226,248.00Type 1A Repair - Column Base with Escutcheon4 Plate 10 EA $ 3,582.00 $ 35,820.00 $ 550.00 $ 5,500.00 $ 9,160.00 $ 91,600.005Type 1B Repair - Column Base with EpoxyAdhesive Injection 110 LF $ 500.00 $ 55,000.00 $ 50.00 $ 5,500.00 $ 40.00 $ 4,400.006789101112131415161718Type 2A Repair - Slab Crack Repair asSpecified 50 LF $ 120.00 $ 6,000.00 $ 200.00 $ 10,000.00 $ 112.00 $ 5,600.00Type 2B Repair - Slab Crack Repair with EpoxyInjection 10 LF $ 165.00 $ 1,650.00 $ 400.00 $ 4,000.00 $ 336.00 $ 3,360.00Type 2C Repair - Slab Crack Repair with EpoxyInjection 10 LF $ 185.00 $ 1,850.00 $ 100.00 $ 1,000.00 $ 168.00 $ 1,680.00Type 3A Repair - Slab Spalled Area Repair asSpecified 1,150 SF $ 73.00 $ 83,950.00 $ 100.00 $ 115,000.00 $ 44.80 $ 51,520.00Type 3B Repair - Slab Spalled Area Repair withReinforcing Bars 230 SF $ 80.00 $ 18,400.00 $ 125.00 $ 28,750.00 $ 84.00 $ 19,320.00Type 3C Repair - Slab Spalled Area Repair withEpoxy Injection 60 LF $ 95.00 $ 5,700.00 $ 100.00 $ 6,000.00 $ 112.00 $ 6,720.00Type 4A Repair - Beam Spalled Area Repair asSpecified 1,000 SF $ 73.00 $ 73,000.00 $ 200.00 $ 200,000.00 $ 140.00 $ 140,000.00Type 4B Repair - Beam Spalled Area Repair asSpecified 50 SF $ 80.00 $ 4,000.00 $ 225.00 $ 11,250.00 $ 168.00 $ 8,400.00Type 4C Repair - Beam Spalled Area Repairwith Epoxy Injection 10 LF $ 95.00 $ 950.00 $ 100.00 $ 1,000.00 $ 224.00 $ 2,240.00Type 5A Repair - Column Spalled Area Repairas Specified 500 SF $ 73.00 $ 36,500.00 $ 200.00 $ 100,000.00 $ 140.00 $ 70,000.00Type 5B Repair - Column Spalled Area Repairwith Reinforcing Bars 100 SF $ 80.00 $ 8,000.00 $ 250.00 $ 25,000.00 $ 280.00 $ 28,000.00Type 5C Repair - Column Spalled Area Repairwith Epoxy Injection 10 LF $ 95.00 $ 950.00 $ 125.00 $ 1,250.00 $ 308.00 $ 3,080.00Type 6A Repair - Expansion Joints Located onthe Basin Floor 100 LF $ 160.00 $ 16,000.00 $ 150.00 $ 15,000.00 $ 112.00 $ 11,200.00Page 1 of 2


SBE GOAL: 15%CITY OF WEST PALM BEACHITB No. 11-12-101 Structural Repairs of the Flow Equalization Basin for ECRWRFBid TabulationDecember 14, 2011 @ 3:00 p.m.ItemNo.19202122Contractor's Bidding Hinterland Group, Inc.Worth Contracting, Inc.AM Construction GroupItem DescriptionEst.Quant. Units Unit Price Cost Unit Price Cost Unit Price CostType 6B Repair - Expansion Joints Located onthe Basin Floor with Leaks 100 LF $ 190.00 $ 19,000.00 $ 200.00 $ 20,000.00 $ 168.00 $ 16,800.00Type 6C Repair - Expansion Joints Located onthe Basin Walls 100 LF $ 160.00 $ 16,000.00 $ 150.00 $ 15,000.00 $ 112.00 $ 11,200.00Type 6D Repair - Interface between the Top ofthe Concrete Overlay and Original ConcreteSlab 100 LF $ 160.00 $ 16,000.00 $ 300.00 $ 30,000.00 $ 168.00 $ 16,800.00Remove and Dispose of Old Aerator Supportson Basin Floor 15 EA $ 2,500.00 $ 37,500.00 $ 550.00 $ 8,250.00 $ 150.00 $ 2,250.0023 Remove and Dispose of Solids 3 TONS $ 500.00 $ 1,500.00 $ 10,500.00 $ 31,500.00 $ 390.00 $ 1,170.00TOTAL BID (Items 1 thru 23)CITY-CERTIFIED SBE PARTICIPATION (15%)BID BOND (Yes/No)Addendum #1 (Yes/No )Addendum #2 (Yes/No )$ 462,270.00$ 740,000.00$ 796,890.0015% 15.0% 100%YES YES YESYES YES YESYES YES YESSealed Bid Opened By: Maureen HansrajWitnessed By: Jackie MichelsPage 2 of 2

More magazines by this user
Similar magazines