12.07.2015 Views

Water Cooled Modules OPERATION & MAINTENANCE - Multistack

Water Cooled Modules OPERATION & MAINTENANCE - Multistack

Water Cooled Modules OPERATION & MAINTENANCE - Multistack

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

a water to refrigerant leak the seals on the water side should expand.Following are the step’s for field replacement of a failed condenser or evaporatorheat exchanger.1. If the refrigerant has not been lost on the failed circuit, you should firstdo a standard refrigerant recovery.2. Begin by isolating the chiller and draining water from the side to beworked on.3. Remove the 6” water header pipes by unbolting the Victauliccouplings.4. Support the underneath of the defective heat exchanger and the othercircuit heat exchanger if applicable. A 2x4 and 1x4 should fit perfectlyunderneath.5. Using a saws all you can now cut the refrigerant piping to remove theheat exchanger. Cut on the bottom side of the elbow and sweat offremaining portion of old elbow.6. Remove the red support brace that holds both heat exchangers in place.Once this is removed you can remove the defective exchanger.7. Set the new heat exchanger in place and re-install the support brace.8. Fit the couplings and refrigerant piping into the heat exchanger. Youmay need to loosen the rotolock at the compressor at this time.9. Braze in the new exchanger while purging with a low pressure ofnitrogen.10. After brazing leak check and evacuate to a maximum of 500 microns.Charge the circuit according to the name plate charge.If the heat exchanger failure has caused water to enter into the refrigerant side, thecompressor and opposite side heat exchanger should also be checked for possiblecontamination. If water has entered into the compressor it is recommended thecompressor be replaced, as removing all the moisture from the oil is very difficult.Replacement of the other contaminated heat exchanger, the expansion valve, andinstallation of a suction drier with a water core cartridge is also recommended.Evacuate the circuit to a maximum of 500 microns and let stand for 20 minutes.Charge the circuit and run 2-3 weeks with the high water core cartridge and thenreplace with a standard core.15.0 Special Components Servicing<strong>Modules</strong> are available with several variations of valves for different applications.Most common is the use of solenoid valves between the heat exchangers andheader manifolds for variable flow applications. Replacement or servicing ofthese valves will normally require shutting off flow to the chiller and drainingwater / glycol. Normally the remaining circuits will carry the load until a shutdown can be scheduled. For critical applications where shutting down is notpossible <strong>Multistack</strong> can install manual ball valves between the solenoid valves sothey can be serviced while the other available modules are still running.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!