- Page 1: The Islamic University Of GazaFacul
- Page 6 and 7: ملخص البحثتعتبر صن
- Page 8 and 9: Group 3: Study on relationship betw
- Page 10 and 11: List of TablesTable 1: Nonfatal Occ
- Page 12 and 13: List of FiguresFigure 1: Costs and
- Page 14 and 15: Chapter one: Introduction1.1 Constr
- Page 16 and 17: safety. Safety culture contributes
- Page 18 and 19: CHAPTER TWO: LITERATURE REVIEWThe p
- Page 20 and 21: The construction industry is often
- Page 22 and 23: Table 1 shows nonfatal occupational
- Page 24 and 25: centered exclusively on the technic
- Page 26 and 27: 3. Small size of most construction
- Page 28 and 29: • Quality management: is that asp
- Page 30 and 31: of project management that is requi
- Page 32 and 33: organizational programs aiming at m
- Page 34 and 35: 2.2.3 Construction quality in devel
- Page 36 and 37: 5. The designers do not consider th
- Page 38 and 39: 2.3 Construction ProductivityProduc
- Page 40 and 41: Real Wage TrendsConstruction Traini
- Page 42 and 43: Rework for correcting unsatisfactor
- Page 44 and 45: the importance of measurement as
- Page 46 and 47: productivity sector, because of its
- Page 48 and 49: 2.3.7 Construction productivity in
- Page 50 and 51: achieved, with the highest quality,
- Page 52 and 53: Figure 2: Methodology Flowchart39
- Page 54 and 55:
Correction for Finite PopulationSS
- Page 56 and 57:
nominal and ordinal scales. Nominal
- Page 58 and 59:
e. If respondent responses disagree
- Page 60 and 61:
Part IV: Linkage between Productivi
- Page 62 and 63:
3.7 Pilot StudyWhenever a researche
- Page 64 and 65:
Group 1# ItemsP-ValuePearsonSignifi
- Page 66 and 67:
Group 1# ItemsP-ValuePearsonSignifi
- Page 68 and 69:
Group 2# Itemstime schedule prepara
- Page 70 and 71:
Group 3# Itemspsychological pressur
- Page 72 and 73:
Group 5# ItemsP-ValuePearsonSignifi
- Page 74 and 75:
Group 7to apply safety regulations4
- Page 76 and 77:
Local conditions 0.485 0.01Worker p
- Page 78 and 79:
Group# of statementsBeforemodificat
- Page 80 and 81:
CostTimeReligionImportanceof StudyR
- Page 82 and 83:
2. The study is limited to the cont
- Page 84 and 85:
This results from the fact that the
- Page 86 and 87:
4.2.4 Capital of CompanyTable 4.2 s
- Page 88 and 89:
Employees' background may vary acco
- Page 90 and 91:
Respondents might have also not bee
- Page 92 and 93:
70.00%60.00%42Percentage of respond
- Page 94 and 95:
4.3 Part II: Company's policy, safe
- Page 96 and 97:
obligatory to provide safety progra
- Page 98 and 99:
Percentage of respondents80.00%60.0
- Page 100 and 101:
Projects that are planned taking in
- Page 102 and 103:
e aware of importance of accident r
- Page 104 and 105:
4.3.1 Part III: Linkage between occ
- Page 106 and 107:
Safety and quality factors# ofRespo
- Page 108 and 109:
Results also show how much importan
- Page 110 and 111:
good safety attitudes in people but
- Page 112 and 113:
y him mostly well understood and ap
- Page 114 and 115:
costs and increased loss-control. T
- Page 116 and 117:
project as of high quality in case
- Page 118 and 119:
group with RII = 0.717 and was rank
- Page 120 and 121:
8. Emergency Preparedness# ofRespon
- Page 122 and 123:
general contractor and subcontracto
- Page 124 and 125:
"Safety committee is formed to moni
- Page 126 and 127:
For a safety program to be properly
- Page 128 and 129:
low factor that affects quality (45
- Page 130 and 131:
"Many change orders during implemen
- Page 132 and 133:
safer. A new worker when oriented w
- Page 134 and 135:
"Inclusion of safety into contract
- Page 136 and 137:
management can be achieved through
- Page 138 and 139:
‘Project Implementation” group
- Page 140 and 141:
4.3.2 Part IV: Linkage between occu
- Page 142 and 143:
GROUP 1: Factors improving producti
- Page 144 and 145:
more unsafely. Productive workers a
- Page 146 and 147:
GROUP 3: Local conditionsTable 4.30
- Page 148 and 149:
nonworking days rarely occur in Gaz
- Page 150 and 151:
warn workers to avoid them. Workers
- Page 152 and 153:
ut also when the crew does return t
- Page 154 and 155:
from a change in worksite condition
- Page 156 and 157:
Comprehensive worker education thro
- Page 158 and 159:
directions of safe actions cannot b
- Page 160 and 161:
"Safety expenditures are very much
- Page 162 and 163:
ecovering their bankruptcy. Under t
- Page 164 and 165:
4.3.4 Part VI: Linkage between occu
- Page 166 and 167:
is referred to as heat stress. In a
- Page 168 and 169:
job. They can cover work practices,
- Page 170 and 171:
"Islam has strengthened principle o
- Page 172 and 173:
"Decreasing accidents during work a
- Page 174 and 175:
CHAPTER FIVE: CONCLUSION AND RECOMM
- Page 176 and 177:
position. This factor belongs to sa
- Page 178 and 179:
5.2.3 Safety and CostThis part of t
- Page 180 and 181:
5.3 RecommendationsRecommendations
- Page 182 and 183:
losing contracts because bids that
- Page 184 and 185:
Table 5. 6: Mean and standard devia
- Page 186 and 187:
degree support that there is a rela
- Page 188 and 189:
Relationshipbetween safetyand costR
- Page 190 and 191:
Table 5. 12: Mean and standard devi
- Page 192 and 193:
Relationship betweenYes 15 2.4623 0
- Page 194 and 195:
5.5 Characteristics of Basic Model
- Page 196 and 197:
safety rules, safety inspection, pr
- Page 198 and 199:
Arditi, D., and Mochtar, K., 2000,
- Page 200 and 201:
Herrero, S., Saldana, M., Del Campo
- Page 202 and 203:
Koehn, E., Kothari, R., and Pan, C.
- Page 204 and 205:
Salminen, S. and Saari, J., 1995. M
- Page 206 and 207:
Annex 1: Questionnaire in English19
- Page 208 and 209:
14. Years of experience in the fiel
- Page 210 and 211:
22. If Yes, indicate periodweekly b
- Page 212 and 213:
Study on relationship between safet
- Page 214 and 215:
Study on relationship between safet
- Page 216 and 217:
PART VI: LINKAGE BETWEEN OCCUPATION
- Page 218 and 219:
5) Safety program for each project6
- Page 220 and 221:
بسم االله الرحمن ال
- Page 222 and 223:
الجزء الأول:السي
- Page 224 and 225:
12. إذا كان الجواب ن
- Page 226 and 227:
أ)دراسة العلاقة
- Page 228 and 229:
دراسة العلاقة بين ا
- Page 230 and 231:
الجزءالخامس: علاق
- Page 232 and 233:
"10.لا يتعارض مب
- Page 234 and 235:
Annex 3: Images of safety problems
- Page 236 and 237:
Figure 5: Exacavation activities wh
- Page 238 and 239:
Figure 8: Worker is fixing house co
- Page 240 and 241:
Figure 12: Piping works without saf