Views
2 years ago

Installation and operation guide - dpplastics.co.uk

Installation and operation guide - dpplastics.co.uk

Installation and operation guide -

Survey and InstallationGlazing / Toe and HeelingISSUE 1All openings must feature a lintel, noload is to be transferred to any part ofthe doorset.Doorset is to be securely fixed tothe structure using suitable fixings.Minimum of two per perimetermember, maximum 600mm centres,corner fixings to be 150 to 250mmfrom external corner.Perimeter of doorset to be continuouslysealed using low modulus, high elasticitysealant.Debris to be removed from all drainagechannels, track and rolling mechanisms.Installation to comply with all elementsof BS8213-4 Code of practice for thesurvey and installation of windows andexternal doorsets.Find your local Liniar stockist at:All glazing must fall in line with therequirements of BS6262 and anyrecommendations of the glassmanufacturers.The correct use of glazing packers iscritical to allow bi-fold doors tofunction correctly. The diagram to theright shows both a left and rightopening door and the position of theglazing packers. The dashed linesindicate the position of the loadbearing packers for all of the typicalassemblies.It is essential that the glass stays inposition and we therefore recommendthat where necessary, the packers aresiliconed into position. Ensure that allpackers do not obstruct any drainageholes.Load bearing packers tokeep door square and levelPacking to prevent glassmovement and providerigidity to the doorOperating and maintenanceOperationMaintenance1• Roller mechanisms carrying the door panelsare fitted with sealed stainless steel bearingsand require no lubrication.2• Ensure top and bottom tracks are kept freefrom debris or obstacles which may impairthe function of the product.t.01332 883 900sales@liniar.co.ukwww.liniar.co.ukLiniar Windows, Flamstead House,Denby Hall Business Park,Denby, Derbyshire, DE5 8JX3• Door locking mechanisms to be cleaned andany moving parts to be lubricated with a lightmachine oil at least once a year and morefrequently where appropriate.• For u-PVC parts clean regularly with soap andwater.DOORSInstallation andoperation guide

AJA FS1 Installation and Operation Guide
Easybar Glycol Chiller Installation and Operation
Armarac Installation Guide
Installation Guide - Smarthome
Maintenance & Installation Guide - Tsubaki Europe
installation, operation and maintenance guide - Clima-Comfort
Maintenance Guide Operation &B Installation ... - Alert Electrical
NSVI Installation Guide - IXL Masonry
AJA Ki Pro Rack Installation and Operation Guide - B&H Photo Video
P-DR Installation Guide - 20/20 Imaging
Installation, Programming and Operating Manual - Salvarani
Network Installation Guide - Xactware
Installation Guide - DATAQ Instruments
Marley Rainwater Design & Installation Guide - BHL.co.uk
ActiveSmart™ User Guide & Installation ... - Fisher & Paykel
M-Series Installation Guide - Flir Systems
Installation and Operating Instructions R.O.C.O.F ... - Crompton
Installation and Operation Guide - AJA
Installation and Operation Guide - Aja
Installation Guide - Evoba Ideas
Installation Guide V8.5.6.0 - ApexCCTV