<strong>Nuna</strong> Group of Companies<strong>Nuna</strong> <strong>Logistics</strong> Limited<strong>Nuna</strong> Contracting Ltd.<strong>Nuna</strong> Drilling FALC Ltd.Committed to Northern DevelopmentDependable Project DevelopmentNUNA Groupof Companies<strong>Nuna</strong> Site Services Ltd.<strong>Nuna</strong> M & T Services Ltd.<strong>Nuna</strong> Innovations Inc.<strong>Nuna</strong> Winter Road Services Ltd.<strong>Nuna</strong> Training Technologies Ltd.Partnerships & Joint Venturesas at June 2011Bathurst Inlet Port andRoad Joint Venture Ltd.CSN - CS <strong>Nuna</strong> Joint VentureDeton’Cho / <strong>Nuna</strong> Joint VentureDenesoline / <strong>Nuna</strong> Joint VentureKANU LLCKivalliq Services Ltd.Lac de Gras ConstructorsServices offeredAll-Weather Road ConstructionContract MiningDam & Frozen Core Dam ConstructionDike ConstructionEarthworks & Site DevelopmentExploration SupportHeavy Equipment FleetIce Road Construction, Maintenance, DispatchingLarge Diameter DrillingMine Reclamation - Care & MaintenanceRemote Infrastructure PlanningRunway Construction (all-weather & ice)Site Services & CrushingTraining - Heavy Equipment (field/simulator)Mining ProductsCold AsphaltIndustrial LightingConcrete Canvas Cloth & SheltersNAAG / <strong>Nuna</strong> Joint Venture -North American AboriginalGroup Projects<strong>Nuna</strong> Okanagan Indian BandJoint VentureMahiihkanuk / <strong>Nuna</strong>Joint VentureMatachewan/<strong>Nuna</strong> Joint VentureMatachewan / <strong>Nuna</strong> / MillerJoint VentureNuBa Equipment Ltd.PBN / <strong>Nuna</strong> Joint VentureWestarc Drilling and BlastingServices Ltd.NUNA <strong>Logistics</strong> LimitedExecutive Office340 Park Place, 666 Burrard StreetVancouver, British Columbia V6C 2X8T 604.682.4667 or 1.888.734.5773F 604.682.4473 or 1.888.734.5771Operations & AdministrationHuman Resources Offices9839 - 31 AvenueEdmonton, Alberta T6N 1C5T 780.434.9114 or 1.877.499.9114F 780.434.7758 or 1.888.734.5770Regional OfficesYellowknife, Northwest TerritoriesRankin Inlet, <strong>Nuna</strong>vutThunder Bay, OntarioNUNA Training Technologies Ltd.77 - 15 Street EastPrince Albert, Saskatchewan S6V 1E9T 306.763.7794 or 306.763.7795F 306.763.7796NUNA Innovations Inc.Unit 104, 39149 Discovery WaySquamish, British Columbia V8B 0E5T 604.815.4385 or 1.855.815.4385F 604.815.0098www.nunalogistics.comWe’re at work on top of your world!<strong>Nuna</strong> provides dependable and comprehensive construction and earthworks services, contract mining,infrastructure planning, large diameter drilling, heavy equipment contract training, mining support services andrelated products to Canada’s mining industry. Established in 1993, <strong>Nuna</strong>’s success can be directly attributed to theknowledge, expertise and operational skills of our diverse team and Inuit and Aboriginal partners.Photo: NASA


Dams & DikesPhotos: (l-r) J. Herman, J. Herman, DiavikFrozen Core DamsFrozen core dams are a type of earth filled dam typicallyconstructed in <strong>high</strong> latitudes with permafrost conditions.Coolant circulates through thermosyhons to maintain awater-tight region of the permafrost within.NUNA has designed and assembled its own plants forthe construction of frozen core dams. The plants can accuratelymonitor the moisture content and temperature of core granularmaterial prior to placement and produce up to 4,000 tonnesper 24-hour shift.Bhp Billiton Diamonds Inc.EKATI Diamond Mine, Northwest Territories, CanadaNUNA has been involved as a contractor with BHP fromthe early stages of devel op ment of its $1 billion EKATIDiamond Mine.One challenge for the EKATI Mine was to build an800 m long frozen core dam to contain 100 million m 3 ofprocessed kimberlite in an area where there was no source of lowpermeable soil and a number of other soils constraints such assand, gravel, boulders, permafrost and an unfrozen zone belowthe boulder creek bed.The solution – EBA Engineering designed and NUNAconstructed the award-winning Leslie Long Lake Frozen CoreDam with a core created of saturated, processed sand and gravelplaced in layers during the winter so that each layer froze beforesubsequent material was added. Thermosyphons, which arepassive devices, were installed to keep the structure and theotherwise permeable creek bed frozen.The success of this dam resulted in 3 other similar damsat EKATI’s satellite site, Misery, which NUNA constructed.DikesDikes serve to isolate portions of lake beds from the main lakebody providing accessibility for open pit mining.Rio Tinto, Diavik Diamond Mines inc.Diavik Diamond Mine, Northwest Territories, CanadaLac de Gras Constructors (LDGC) is a joint venture betweenNUNA and Peter Kiewit Sons, formed to construct Diavik DiamondMines’ A154 dike, North Inlet dike, A418 dike, and raising of thePKC dams. LDGC’s A154 and A418 dike contract comprised dikeconstruction, dewatering and pre-stripping.The A154 dike is the first dike of its kind constructedin Canada and was completed ahead of schedule. The A154kimberlite pipe, located 20 m below water off an island in Lacde Gras, required the construction of a 3.9 km long and up to25 m <strong>high</strong> dike to enclose an area of 1.5 km 2 . Construction of thedike involved placing 2.2 million m 3 of zoned rock fill and a plasticconcrete diaphragm wall which extended through both the fill andthe till foundation. The wall was joined to the granite bedrock bya continuous barrier of jet-grouted columns.A418’s water retaining dike and cut-off wall is1.2 km long, required approximately 1.1 million cubic metersof rockfill and was built in water up to 32 m deep. A418 dikejoins the existing A154 dike with construction methods similar toA154 – various sizes of rockfill, a central plastic concrete cut-offwall, jet and curtain grouting and installation of instrumentation.A significant crushing facility prepared much of the rock obtainedfrom A154 open pit.www.nunalogistics.com


Committed to Northern DevelopmentDependable Project DevelopmentLarge DiameterDrillingPhoto: Shore Gold Inc.<strong>Nuna</strong> Drilling provides large diameter drilling using the Bauer BG 36, a state of the art drillrig capable of augering to a depth of 85 m and flooded reverse circulation drilling (1,200 mmdiameter) to an ultimate depth of over 350 m.


Large Diameter DrillingPhotos: NUNA<strong>Nuna</strong> Drilling ServicesNUNA Drilling’s Bauer BG 36 drill rig systems are capable ofdrilling 1,200 mm (4') diameter holes to a depth of 350 m(1,150'). These diesel-powered electric/hydraulic units utilizeCaterpillar-powered crawler units with retractable masts. After aunit is walked to a large diameter drill (LDD) location, overburden toa maximum depth of 85 m (279') is augered using a Kelly systemwith a selection of excavation tools. A Bauer-supplied oscillator isused to set and recover double-walled casing to as much as 40m (131') depth. Beyond that depth, or in harder formations, thesystem is reconfigured to use reverse circulation drilling.In reverse circulation mode, 6 m (20') long sections of9-5/8" double-walled drill pipe are added to the drill string utilizinga manipulator which enables an operator to handle pipe whilesafely removed from the suspended load. Compressed air issupplied down the hole between the inner and outer pipe walls.Air valves which form part of the drill string allow <strong>high</strong>-pressureair to enter the inner pipe at a distance above the hole bottomand to escape to surface; the vacuum created lifts slurry from thehole bottom. Holes are drilled in flooded conditions utilizing drilling“muds” to stabilize open holes below the casing.A variety of drill bits are employed to suit conditionswhich range from soft soils to rock with <strong>high</strong> compressivestrengths. Drill data is electronically recorded for later analysis.Sampling for diamonds in kimberlite is accomplishedthrough the use of a desanding unit which separates drilling fluidsfrom the sample, washes the sample and recovers materialsgreater than a specified size. The samples are bagged andtransported to a designated area.Drilling operations are 24 hours per day, year-round.Successful Projects by NUNA & PartnersShore Gold Inc.Star Diamond Project, Prince Albert, Saskatchewan, CanadaBulk Sample 184 Holes (39,000 m) (128,000')Shore Gold Inc.’s Star Diamond Project lies in Fort à la Corne,Saskatchewan, hosting one of the most extensive kimberlite fieldsin the world. The kimberlite is overlain by as much as 120 m(394') of overburden consisting of sand, mudstone, bouldersand glacial till.NUNA Drilling was chosen to conduct a large diameterdrill program, with an initial target of 72 holes, to collect bulksamples from the extensive area. Holes were 1,200 mm indiameter (4') with depths ranging to over 300 m (984').Working with Bauer Maschinen GmbH, NUNA Drillingdeveloped new equipment and techniques to drill holes in 2 stages.The process used 2 sets of fully-equipped mobile BG 36 drill rigs,bentonite and polymer solutions and primary support equipment;all provided by NUNA Drilling. Holes were “Kelly drilled” through thefirst 85 m of overburden and then the rigs were switched to reversecirculation drilling and geologists were provided sampling intervals.Rigs were walked between holes and the skid-mounted supportequipment was repositioned with support equipment. Operationscontinued year-round on a 24 hour basis.NUNA Drillings’ work for Shore Gold extended onto theFALC Joint Venture ground where a series of similar holes weredrilled. Accumulated drill program covered 184 holes (39,000 m)(128,000').www.nunalogistics.com


Dependable Project DevelopmentCommitted to Northern DevelopmentContract MiningPhoto: NUNAWith a large heavy equipment fleet and comprehensive support facilities, NUNA deliversa complete turnkey package for site construction and contract mining.


Contract MiningPhotos: NUNANUNA Performance and SafetyWhen it comes to turnkey packages for site construction andcontract mining, NUNA is equipped to provide the people, theexpertise and the equipment required to get the job done on time,within budget and without compromising safety or the environment.NUNA’s fleet includes 50 to 190-ton rock trucks withthe appropriate complement of shovels, loaders, dozers andgraders; as well as crushing plants, on-site shops, fuel storage,service trucks, offices, camps and other facilities essentialfor efficient and complete self-supporting operations. A largeportion of NUNA’s labour is made up of skilled Northern residentsaccustomed to working under the most demanding and difficultconditions, thus ensuring efficient operation and reliableperformance.NUNA has an excellent safety record and wasacknowledged during our involvement at BHP Billiton’s EKATI,De Beers’ Snap Lake and former Tahera’s Jericho Mine – wherewe received awards for “Zero Lost Time Accidents”.NUNA continues to be involved with the majority of theresource companies operating in the Northwest Territories and<strong>Nuna</strong>vut providing pre-strip and complete turnkey contract miningservices when and as required. NUNA’s clients have confidencethat the work program will be completed in the manner and timeframe discussed with them and have immediate and direct accessto all members of our management team and site supervisors.Successful Projects by NUNA & PartnersBHP BILLITON DIAMONDS INC.EKATI Diamond Mine, Northwest Territories, CanadaContract mining services for the Panda pit pre-strip program.NUNA’s personnel moved 1.2 million tonnes per month duringthis pre-strip program that commenced early-1997 and finishedin late-1998. A total of 40 million tonnes of kimberlite and wasterock were moved in 33 months. NUNA was also retained for thepre-strip of the Koala North pit and complete turnkey contractmining of the Misery satellite pit.Rio tinto, DIAVIK DIAMOND MINES inc.Diavik Diamond Mine, Northwest Territories, CanadaLac de Gras Constructors, a partnership of NUNA and Peter KiewitSons Ltd., successfully completed the water-retaining dikes, cutoffwalls and pre-stripping of the A154 and A418 pits.TAHERA DIAMOND CORPORATIONJericho Diamond Mine, <strong>Nuna</strong>vut, CanadaNUNA assisted in the initial advanced exploration/undergroundbulk sample of the Jericho mine providing operationssupport, planning, purchasing and construction of civil siteinfrastructure including airstrip, site earthworks, dam construction,raw water intake causeway and diversion ditches. NUNA continuedon site providing contract mining of the starter pit to expose orefor commissioning of the process plant and long term open pitcontract mining.BAFFINLAND IRON MINES CORPORATIONMary River Iron Ore Project, <strong>Nuna</strong>vut, CanadaThe Mary River project started in 2007 and NUNA became theGeneral Contractor responsible for the successful delivery of a120,000 ton bulk sample from Mary River to Milne Inlet. NUNAconstructed a 9 km road up a mountain to the ore body; drilled,blasted and hauled material to the crusher and hauled crushedproduct to the coast at Milne Inlet for transfer onto ships.www.nunalogistics.com


Dependable Project DevelopmentCommitted to Northern DevelopmentIce Roads & AirstripsPhoto: TCWR/DiavikNUNA has constructed the majority of <strong>Nuna</strong>vut’s and the Northwest Territories’ exploration andearly-mine operations access ice roads and Hercules aircraft capable ice airstrips.


Mine Reclamation Care & MaintenancePhotos: NUNA100+ years of experienceNUNA’s management team and northern operationpersonnel have a combined 100 + years of experience in thedesign and execution of remote arctic mining developments andreclamation projects such as the reclamation activities of PortRadium and Pine Point, located in the Northwest Territories.NUNA understands and adheres to the strict environmentalregulations that govern reclamation of mine sites including:handling of hazardous materials (hydrocarbon contaminated soils,reagents) tailings, reclamation and site rehabilitation. NUNA’s sitespecific procedures are based on our Integrated Health, Safety andEnvironment Management System (IHSEMS).NUNA establishes and implements hazardous materialshandling and disposal programs at all NUNA work sites.Successful Projects by NUNA & PartnersPublic Works Government Services CanadaGiant Mine, Yellowknife, Northwest Territories, CanadaIn 2004, NUNA, through a joint venture with the Deton’ChoCorporation, was contracted by Public Works Government ServicesCanada to provide care and maintenance at the Giant Mine site.The site carries pre-existing environmental conditions including237,000 tonnes of arsenic trioxide stored underground. NUNA’sservices at Giant Mine cover a wide range including maintainingsite facilities and equipment, underground access and hoisting andpumping equipment, site security, pipework upgrade and demolitionof bulk fuel storage and selected buildings. NUNA reconstructedthe nearby Baker Creek, specifically the rehabilitation of the existingchannel over a linear distance of 600 m (1,969'), creation of a newstream channel and construction of a 21 m (70') clear span steelbridge to support future heavy equipment traffic.Giant Mine Freeze Optimization StudyUnder the Giant Mine care and maintenance contract, Deton’Cho/<strong>Nuna</strong> Joint Venture provided construction services to support a trialproject designed to optimize methods of freezing the undergroundarsenic storage chambers. Our work included surface drilling bya variety of methods (mud rotary, coring and down hole hammer)and installation of piping for a mechanical freezing system,instrumentation installations, underground development required forhorizontal drilling and freeze pipe installation, surface civil works andsite grading and bulkhead construction.KINROSS GOLD CORPORATION (formerly Echo Bay Mines)Lupin Mine, <strong>Nuna</strong>vut, CanadaFirst phase tailings reclamation at Lupin Mine included the crushingand transportation of esker materials and backfill at the tailings site.BHP BILLITON DIAMONDS INC., EKATI Diamond Mine,Northwest Territories, CanadaContaminated soils reclamation and treatment (test).Successful Projects by NUNA’sManagement TeamECHO BAY MINES, Port Radium, Northwest Territories, CanadaSite reclamation.COMINCO LTD., Pine Point, Northwest Territories, CanadaPlant site reclamation and equipment purchase.Miramar Mining CorporationCon Mine Reclamation, Northwest Territories, CanadaReclamation work comprised site road and pad contouring.www.nunalogistics.com


Committed to Northern DevelopmentDependable Project DevelopmentHeavy EquipmentContract TrainingPhoto: NUNANUNA TRAINING TECHNOLOGIES delivers to your doorstep professional, cost effective andcomprehensive heavy equipment operator/instructor training and safety programs. NUNAutilizes classroom, simulator and field training methodologies meeting legislative andindustry best practices.


Heavy Equipment Contract TrainingPhotos: NUNAQuality & ValueNUNA provides heavy equipment training and safety programsto Canada’s mining and construction industries, government andeducational institutions. The foundation of our training is based onyears of experience gained as equipment operators, safety facilitatorsand as mining and construction contractors. NUNA’s instructorsunderstand that people learn by different means and that Canadacomprises various cultures and environments and have developedtraining programs accordingly.Companies that employ heavy equipment understand thatproper equipment training protects people and assets. Training canrepresent a significant amount of the operating budget. The fixedcosts of lost equipment productivity revenue, fuels and lubes, and thewear and tear a machine might receive in the initial training processare all good reasons to look for a better way.NUNA’s heavy equipment simulator training is valueadding by lower costs and risk to employees and equipment.Field & Simulator Contract Training custom designedspecific to training those who desire to work in themining and construction industry while meeting theneeds of mining and construction operations.Simulator Based Training ProgramsHaul Truck, Wheel Loader, Crawler, Dozer,Track Excavator, Motor GraderCombination Program Simulator and FieldField Based Training Programs (including valuableclassroom sessions), Skid Steer Loader, Forklift,Compact Equipment, Motor Grader, Flag Person,Diamond Drill Helper,NUNA’s mobile heavy equipment simulators offer a safer,faster and more economical means to test, train and retrain frontlineequipment operators and instructors.Designed to meet various operator levels, training programscan be customized to meet the unique requirements of a wide rangeof mining and construction operations. Within the simulator, the operatorsees, hears and feels everything in a realistic way – just as ifthey were operating the actual heavy equipment. Instruction in practicalterms on how to react to brake failures, tire fires, wet and slipperyconditions, fog and dust and night driving are just a few examples ofthis simulated reality training.NUNA’s simulator provides the trainers with selectablelesson levels that record the operator’s performance and themachine’s operation from start-up to shut-down. This importantfeature ensures unbiased evaluation. A new or pre-employmentoperator is exposed to all simulator lessons and error warnings,while experienced operators undergo refresher testing withoutassistance from the simulator trainer. Lessons make use ofadvanced multimedia including voice-over narration and graphics(in both English and local dialects) to get the correct method andmessage across. NUNA supplements this training with classroomvideo, manuals, study material and examination.The simulator’s inter changeable vehicle, site and dashcomponents provide complete flexible training on a wide rangeof equipment types, such as the full line of Caterpillar haul trucks,excavators and shovels; and Bell, Komatsu and Hitachi dozers,loaders, rope shovels and underground machinery.The simulator can be up and running within hours of arrivalat a mine/construction site, and is so cost-effective that companiescan recover training costs with the saving on fuels and lubes alone.www.nunalogistics.com


Committed to Northern DevelopmentDependable Project DevelopmentSite Services &CrushingPhoto: NUNACanada’s remote and harsh northern conditions and terrain requires specialized knowledgefor mineral exploration and mine development. NUNA provides expertise in mine constructionmethods, site planning, infrastructure construction, contract mining, site services and crushing.


Site Services & CrushingPhotos: NUNA/De BeerSite ServicesNUNA’s <strong>high</strong>-arctic experienced personnel are well equipped toprovide efficient site services comprising fully staffed infrastructures;camp, shops and facilities installations; aircraft freight handling; roadand runway clearing; and transportation of fuel and supplies.CrushingBeing open for business from Day 1 of Canada’s diamond discovery,NUNA was provided the opportunity to supplying the majority of theNorthwest Territories and <strong>Nuna</strong>vut mine developments vital crushingservices and site infrastructure construction for efficient mineoperations. By employing NUNA’s complete crushing plants, NUNAhas crushed natural esker and blasted rock and has constructed themajority of site runways (3,000' to 7,000'); site access roads 275 +km (8.2 m to 25 m wide x 2 m to 3 m <strong>high</strong>); pads for 100 to 350person camps, shops and tank farms; and dams and dikes.Successful Projects by NUNA & PartnersAgnico-Eagle Mines LimitedMeadowbank Gold Project, <strong>Nuna</strong>vut, Canada108 km Road - Baker Lake to Meadowbank ProjectThe longest all-weather road in <strong>Nuna</strong>vut employed NUNA’s heavyequipment construction fleet, crushing plant and crew of 60 + to drill,blast, crush, move and place over 1.7 million m 3 of ROQ material.BHP Billiton Diamonds Inc.EKATI Diamond Mine, Northwest Territories, CanadaNUNA crushed, moved and placed 100,000 tonnes of blastedgranite for the construction of EKATI’s 7,000' runway, plant site,31 km access and haulage road linking EKATI to Misery, plusadditional crush for road maintenance. Cumulative crush was300,000 + tonnes.De Beers Canada Inc.Snap Lake Diamond Mine, Northwest Territories, CanadaNUNA crushed, moved and placed rock for the construction ofSnap Lake’s 5,000' airstrip, facilities pad, tank farm, 2 kimberlitecontainment dams and site access roads.Diavik Diamond Mines LTD.Diavik Diamond Mine, Northwest Territories, CanadaLac de Gras Constructors, a partnership of NUNA and Peter KiewitSons, developed the site earthworks which involved the crushing ofmaterial for the construction of a 5,250' airstrip, haul roads, plantsite, kimberlite containment facilities, A154 and A418 water retainingdikes and cutoff wall and 200,000 + m 3 crush for PKC dams.Additional contracts included: jaw-only crush for 70,000 tonnesof kimberlite material to a finished product of 304 mm; and716,800 m 3 of crushed material to a finished product of19 mm up to 150 mm.Tahera Diamond CorporationJericho Diamond Mine, <strong>Nuna</strong>vut, CanadaCrushed, moved and placed rock for the construction of site accessroads, pads, dams, lay down areas, tank farm and camp.BAFFINLAND IRON MINES CORPORATIONMary River Iron Ore Project, <strong>Nuna</strong>vut, CanadaNUNA’s scope relating to the mining of a bulk sample and crushingservices comprised the construction of a 120 km access road anda 9 km all-weather mining road, site infrastructure pads, airstripand fuel tank farms. The bulk sample alone required NUNA to drill,blast, haul and crush raw ore to fine and lump product totaling120,000 tonnes.www.nunalogistics.com


Committed to Northern DevelopmentDependable Project DevelopmentEarthworks &Site DevelopmentPhoto: NUNANUNA’s in depth knowledge of northern operations and specialized equipment enable us tomobilize, build and maintain the reliable infrastructure required for continuous and cost-efficientoperations in isolated regions of Northern Canada and the world.


Earthworks & Site DevelopmentPhotos: NUNARemote Mine Site DevelopmentProper classification of Canada’s permafrost is essential to mineplanning, development and operation to ensure the location of mineinfrastructure will have the least impact on permafrost. NUNA’scombined management and site personnel have worked throughoutCanada’s North gaining a <strong>high</strong> level of experience with varyingpermafrost. Additionally, NUNA has the earthmoving fleet capacity toaddress the movement and placement of millions of cubic meters ofearth required for mine site development.Successful Projects by NUNA & PartnersAGNICO-EAGLE MINES LIMITEDMeadowbank Gold, <strong>Nuna</strong>vut, CanadaNUNA’s work primarily comprised the construction of an108 km all-weather road starting north of the Hamlet of BakerLake to the Meadowbank site. <strong>Nuna</strong> planned and mobilized allequipment and supplies to Baker Lake necessary for year-roundconstruction activities – with only 6 weeks to source and positionat Churchill, Manitoba for furtherance by barge to Baker Lake. Roadconstruction required the planning and development of 22 quarrylocations, crusher operation, drill and blast activities, survey controlfor layout and as-built preparation as well as installation of 9 bridgesto facilitate the river crossings and 119 culvert installations. NUNAalso carried out the construction and maintenance of all necessaryinfrastructure to support the operation.NEWMONT MINING CORPORATION(Formerly Miramar Mining Corporation)Hope Bay Gold Project (Doris North), <strong>Nuna</strong>vut, CanadaSince 1991 <strong>Nuna</strong> has worked closely with Miramar Mining(former owner) with respect to project planning, design andcosting estimates. <strong>Nuna</strong> continues that process under Hope Bay’snew owners, Newmont Mining. In 2007, <strong>Nuna</strong> mobilized, via barge,equipment, supplies and a crew of 37 into site and provided siteservices, construction of the Windy Lake 2,800' airstrip, camp pad,tote road, crushing and construction and maintenance of seasonalice access roads (Roberts Bay to the Doris North site). In 2010,<strong>Nuna</strong> became General Contractor, as well as part of the EPCDesign-Build Team, to optimize design and minimize total installedcosts. <strong>Nuna</strong> provides a full complement of services including safety,engineering, quality control and procurement and are involved inall planning, scheduling and execution of site civil infrastructures:roads, airstrips, jetty landings, quarry development, culvert andbridge installations, and site services support. <strong>Nuna</strong> provides heavyequipment, crushers, cranes, shops, concrete batch plants and drilland blast activities as necessary to support the work.BAFFINLAND IRON MINES CORPORATIONMary River Iron Ore Project, <strong>Nuna</strong>vut, CanadaThe Mary River project started in 2007 and NUNA became theGeneral Contractor responsible for the successful delivery of a120,000 ton bulk sample from Mary River to Milne Inlet. NUNAcarried out the planning and mobilization of all necessary equipmentand supplies for the: construction of a 120 km all-weather roadwith 4 major river crossings to the Mary River site; 9 km road upa mountain to the ore body; drilling, blasting and hauling of ore tothe crusher, crushing of fine and lump product and hauling crushedproduct to the coast at Milne Inlet for transfer onto ships. NUNAalso provided services for the construction and maintenance ofall necessary infrastructure to support the operation such as campsetup and operation, airstrip construction and maintenance, fuelcontainment construction and maintenance, shops andpower generation.www.nunalogistics.com