Applic<strong>at</strong>ion expressing interest by the Bidders:[To be submitted on the printed letter head <strong>of</strong> the bidderalongwith the cost <strong>of</strong> Tender Documents in <strong>for</strong>m <strong>of</strong> DD]D<strong>at</strong>ed /2010ToThe Managing Director,Gujar<strong>at</strong> Mineral Development Corpor<strong>at</strong>ion Ltd.,Khanij Bhavan, 132 ft. Ring Road,Near University Ground, Vastrapur,Ahmedabad.Subject:Tender No. HARD STRATA BHV – 1 /10-11 <strong>Contract</strong> <strong>for</strong> <strong>breaking</strong> <strong>of</strong> <strong>Hard</strong><strong>Str<strong>at</strong>a</strong> <strong>at</strong> <strong>Bhavnagar</strong> <strong>lignite</strong> mineSir,I/We are interested to particip<strong>at</strong>e in the above tender <strong>for</strong> the work rel<strong>at</strong>ed <strong>for</strong> <strong>breaking</strong> <strong>of</strong>hard str<strong>at</strong>a <strong>of</strong> <strong>lignite</strong> <strong>at</strong> <strong>Bhavnagar</strong> Lignite mine. I/We have experience in similar type <strong>of</strong>work and have adequ<strong>at</strong>e machinery. We have sound financial position to buy additionalmachinery if required to carry out the work to the entire s<strong>at</strong>isfaction <strong>of</strong> the Corpor<strong>at</strong>ion.We also enclose herewith a crossed demand draft <strong>for</strong> Rs. 5,000/- (Rupees Five Thousand)only / cash towards the cost <strong>of</strong> the tender documents and request you to please issueme/us a set <strong>of</strong> the same.Thanking you,Yours faithfully,----------------------(Authorised sign<strong>at</strong>ory)3


Chapter IBrief Introduction:1. <strong>GMDC</strong>:Gujar<strong>at</strong> Mineral Development Corpor<strong>at</strong>ion Limited (<strong>GMDC</strong>), a Government <strong>of</strong>Gujar<strong>at</strong> Enterprise, is a pioneer institution in the field <strong>of</strong> mining <strong>for</strong> more than threedecades, c<strong>at</strong>ering to the needs <strong>of</strong> the minerals and solid fuel <strong>for</strong> the industriesbased in and outside Gujar<strong>at</strong>. <strong>GMDC</strong>’s mining activities are spread over in Kutch,Jamnagar, Bharuch, Sur<strong>at</strong>, Baroda and Banaskantha districts <strong>of</strong> the St<strong>at</strong>e. It iscurrently dealing in minerals like Bauxite, Fluorspar, Ball Clays, Silica sand andLignite. The Corpor<strong>at</strong>ion has set up a 250 MW <strong>lignite</strong> based Thermal Power St<strong>at</strong>ion<strong>at</strong> Nani Chher in Kutch, The Corpor<strong>at</strong>ion has annual turn over <strong>of</strong> more than 1111Crores, with a net pr<strong>of</strong>it <strong>of</strong> Rs. 280 Crores during the year 2009-10.The Corpor<strong>at</strong>ion is oper<strong>at</strong>ing Lignite mines, Panandhro and M<strong>at</strong>a no Madh in Kutch,Tadkeshwar in Sur<strong>at</strong>, Rajpardi in Bharuch and Surkha North in <strong>Bhavnagar</strong> district.The demand <strong>of</strong> <strong>lignite</strong> is growing <strong>at</strong> a r<strong>at</strong>e <strong>of</strong> about 15% every year. Last year total<strong>lignite</strong> production was 8.4 million tonnes.2. Loc<strong>at</strong>ionThe <strong>Bhavnagar</strong> <strong>lignite</strong> mine <strong>of</strong> <strong>GMDC</strong> is loc<strong>at</strong>ed in village Surkha North, Dist.<strong>Bhavnagar</strong> (Gujar<strong>at</strong> St<strong>at</strong>e). The project (Tagadi village) is loc<strong>at</strong>ed about 12 kmsfrom <strong>Bhavnagar</strong>. The nearest Railway St<strong>at</strong>ion and Airport are loc<strong>at</strong>ed <strong>at</strong> a distance<strong>of</strong> about 12-20 kms. resp. from the lease area <strong>at</strong> <strong>Bhavnagar</strong>.3. Description <strong>of</strong> the Work:The Corpor<strong>at</strong>ion proposes to engage contractor to break the hard str<strong>at</strong>aencountered during excav<strong>at</strong>ing overburden and above <strong>lignite</strong> seams <strong>at</strong> <strong>Bhavnagar</strong><strong>lignite</strong> Mine. The approxim<strong>at</strong>e quantity to be broken during the currency <strong>of</strong> thecontract is approx. 15 lac M 3 may be increased depending upon the acceptability <strong>of</strong><strong>lignite</strong> in the market.The thickness <strong>of</strong> the hard str<strong>at</strong>a ranges from 1.00 meter to 4.5 meter dependingupon the loc<strong>at</strong>ion.4. Current St<strong>at</strong>us:-This mine is in oper<strong>at</strong>ion since last 2008 and its production capacity is about 3million tonnes per year. The <strong>lignite</strong> production from <strong>Bhavnagar</strong> <strong>lignite</strong> mine in theyear 2008-09 was 3.86 lac tonnes and 6.48 lac tonnes in the year 2009-10. In thecurrent year it is expected to go somewhere 8 to 10 lac MT. <strong>GMDC</strong> is setting upPyrite removal plant <strong>at</strong> <strong>Bhavnagar</strong> <strong>lignite</strong> plant to make <strong>lignite</strong> further industrial4


friendly which will definitely increase the <strong>lignite</strong> production from its existing level to amaximum <strong>of</strong> 30 lac tonnes per year in the next one or two years.5


).c).The evalu<strong>at</strong>ion <strong>of</strong> <strong>of</strong>fers will be made on the basis <strong>of</strong> the lowest <strong>of</strong>ferreceived. However, the management reserves the right to accept or overlookor rejecting any lower single r<strong>at</strong>e <strong>of</strong>fered by the bidder and / or split the workbetween more than one bidders without assigning any reason there<strong>of</strong> .The bidder is required to quote the r<strong>at</strong>e strictly as per the terms andconditions mentioned in the tender documents. The conditional tender willnot be entertained and will be rejected. The r<strong>at</strong>e quoted should beinclusive <strong>of</strong> all items.6. ACCEPTANCE OF LOI:If the successful bidder does not accept the Letter <strong>of</strong> Intent issued by <strong>GMDC</strong> withinone week <strong>of</strong> its receipt, the amount <strong>of</strong> the EMD paid by him will be <strong>for</strong>feited.7. COMMENCEMENT OF WORK :The successful bidder will have to start the work within 10 (ten) days <strong>of</strong> the d<strong>at</strong>e <strong>of</strong>acceptance <strong>of</strong> the Letter <strong>of</strong> Intent, by deploying adequ<strong>at</strong>e nos. <strong>of</strong> machineriesrequired to carry out the job.In case <strong>of</strong> failure to commence the work within 10 days <strong>of</strong> the d<strong>at</strong>e <strong>of</strong> receipt<strong>of</strong> the LOI the contract may be termin<strong>at</strong>ed, <strong>at</strong> the discretion <strong>of</strong> <strong>GMDC</strong>.8. CONTRACT AGREEMENT:The successful bidder will have to enter into an agreement within 30 (thirty) days <strong>of</strong>the receipt <strong>of</strong> LOI, with the Corpor<strong>at</strong>ion on appropri<strong>at</strong>e Stamp Paper (to be providedby the <strong>Contract</strong>or) in token <strong>of</strong> acceptance <strong>of</strong> the terms and conditions <strong>of</strong> thecontract. In case <strong>of</strong> failure, the contract is liable to be termin<strong>at</strong>ed and the Securitydeposit may be <strong>for</strong>feited.9. GENERAL:a) <strong>GMDC</strong> will not be responsible <strong>for</strong> any postal delay wh<strong>at</strong>soever.b) If the tender documents and <strong>for</strong>ms referred to in the tender are not submitted orare submitted but not found duly filled in and unsigned, will result in rejection <strong>of</strong>the tender.c) In the event <strong>of</strong> space being insufficient <strong>for</strong> furnishing required in<strong>for</strong>m<strong>at</strong>ion,additional sheets may be used and signed.d) Canvassing in any <strong>for</strong>m may lead to rejection <strong>of</strong> the <strong>of</strong>fer.8


Chapter IIICriteria <strong>for</strong> Evalu<strong>at</strong>ion <strong>of</strong> Technical Bids1. The intending tenderer must have in its name as a prime contractor experience <strong>of</strong>having successfully executed works <strong>of</strong> similar n<strong>at</strong>ure (such as Breaking <strong>of</strong> hard rock/ stone / Shale etc.). The average quantity <strong>of</strong> 5 lac M 3 <strong>of</strong> the hard str<strong>at</strong>a should havebeen broken by the bidders <strong>for</strong> the years 2008-09 and 2009-10.2. Ownership <strong>of</strong> a fleet <strong>of</strong> minimum 2 Rock breaker or other similar machine <strong>for</strong><strong>breaking</strong> the rock <strong>for</strong> the annualised work.4. Joint Venture : Joint Venture with other party is not allowed.5. To qualify <strong>for</strong> award <strong>of</strong> the contract :-( a ) The intending tenderer must have in its name as a prime contractorexperience <strong>of</strong> having successfully executed works <strong>of</strong> similar n<strong>at</strong>ure such asBreaking <strong>of</strong> hard rock / stone / Shale etc.) The average quantity <strong>of</strong> 5 lac M 3<strong>of</strong> the hard str<strong>at</strong>a should have been broken by the bidders <strong>for</strong> the years2008-09 and 2009-10.( b ) Ownership <strong>of</strong> a fleet <strong>of</strong> minimum 2 Rock breaker or other similar machine <strong>for</strong><strong>breaking</strong> the rock <strong>for</strong> the annualised work.(c)(d)Sub contractors experience and resources will not be taken into account indetermining the Bidders’ compliance with qualifying criteria.Even though the bidders meet the above qualifying criteria, they are subjectto be disqualified if they have:i. made misleading or false represent<strong>at</strong>ions in the <strong>for</strong>ms, st<strong>at</strong>ements and<strong>at</strong>tachments submitted in pro<strong>of</strong> <strong>of</strong> the qualific<strong>at</strong>ion requirements; and/orii.record <strong>of</strong> poor per<strong>for</strong>mance such as abandoning the works, not properlycompleting the contract, inordin<strong>at</strong>e delays in completion, litig<strong>at</strong>ion historyor financial failures etc.6. SOLVENCY CERTIFICATEThe bidder should submit l<strong>at</strong>est Solvency Certific<strong>at</strong>e <strong>for</strong> a value <strong>of</strong> Rs. 15,00,000/-(Rupees fifteen lac only) issued from any N<strong>at</strong>ionalised Bank (not being a cooper<strong>at</strong>ivebank) with in last 12 months along with the technical bid.9


7. ACCEPTANCE OF GENERAL TERMS AND CONDITIONS:8. EMDThe bidder should unconditionally accept all the terms and conditions <strong>of</strong> thecontract by signing on each page <strong>of</strong> the technical bid document <strong>of</strong> the tenderincluding annexures.The bidder should enclose a crossed demand draft worth Rs. 10,00,000/- (Rupeesten lac only) towards Earnest Money Deposit along with the technical bid in thecover so super-scribed. In absence <strong>of</strong> the DD <strong>for</strong> EMD or inadequ<strong>at</strong>e amount <strong>of</strong>EMD, the <strong>of</strong>fer will be rejected.9. DECLARATIONThe bidder should give a declar<strong>at</strong>ion along with the technical bid th<strong>at</strong> it has notenclosed any conditional <strong>of</strong>fer.10. BLACK-LISTING OF THE BIDDER:The Bidder or its directors should have not been black listed by any GovernmentOrganis<strong>at</strong>ion, nor should have any litig<strong>at</strong>ion be pending against any <strong>of</strong> them. Thebidder will submit declar<strong>at</strong>ion to this effect along with the technical bid. If <strong>at</strong> any timesuch declar<strong>at</strong>ion is found false, the bid will be rejected or if the contract work isalready awarded, it will be termin<strong>at</strong>ed <strong>for</strong>thwith without payment <strong>of</strong> anycompens<strong>at</strong>ion and the EMD/SD will be <strong>for</strong>feited.CHAPTER - IVTERMS AND CONDITIONS OF THE TENDERM/s Gujar<strong>at</strong> Mineral Development Corpor<strong>at</strong>ion Ltd., (herein after referred to as <strong>GMDC</strong>)proposes to award work <strong>for</strong> <strong>breaking</strong> <strong>of</strong> hard str<strong>at</strong>a encountered during excav<strong>at</strong>ing <strong>of</strong>overburden and above <strong>lignite</strong> seams <strong>at</strong> <strong>Bhavnagar</strong> <strong>lignite</strong> mine., <strong>at</strong> the following terms andconditions.1. SCOPE OF WORK(a)(b)The work involves <strong>breaking</strong> <strong>of</strong> hard str<strong>at</strong>a encountered during excav<strong>at</strong>ing <strong>of</strong>overburden and above <strong>lignite</strong> seams <strong>at</strong> <strong>Bhavnagar</strong> <strong>lignite</strong> mine.The work has to be carried out by deploying adequ<strong>at</strong>e number <strong>of</strong> machinerylike Rock breaker or similar machine which can break the rock etc.10


2. SUBLETTING OF THE WORK(a)(b)The <strong>Contract</strong>or shall not directly or indirectly transfer / assign/ sublet thework or to carry out any part there<strong>of</strong>, to any other <strong>Contract</strong>or/ agency.Subletting <strong>of</strong> services, not included in the scope <strong>of</strong> work in clause 1 above,may be permitted with prior approval from the Competent Authority.3. DURATION AND QUANTITY OF WORK(a)(b)(c)(d)The period <strong>of</strong> the contract will be 2 year (24 months) from the d<strong>at</strong>e <strong>of</strong>commencement <strong>of</strong> the work or 10 th day after the receipt <strong>of</strong> letter <strong>of</strong> intent(LOI) by the <strong>Contract</strong>or, whichever is earlier. The <strong>Contract</strong>or shall have tobreak the hard str<strong>at</strong>a 15 lac M 3 during the currency <strong>of</strong> contract period.The monthly quantity may varies as per str<strong>at</strong>a found above the <strong>lignite</strong> benchand accordingly the contractor has to arrange the machineries required toexecute the work.The quantities mentioned in clause (b) will be indic<strong>at</strong>ive quantities only. The<strong>Contract</strong>or will normally be allowed vari<strong>at</strong>ion upto +10% in quantities.Loss on <strong>breaking</strong> <strong>of</strong> hard str<strong>at</strong>a on account <strong>of</strong> <strong>for</strong>ce majeure, n<strong>at</strong>uralcalamities, rains, strike or reasons beyond <strong>GMDC</strong>’s control will not becompens<strong>at</strong>ed.4. RATES:(a)(b)The contractor shall quote firm r<strong>at</strong>e in Rs. per M 3 <strong>of</strong> the hard str<strong>at</strong>a beingbroken.R<strong>at</strong>e quoted shall remain valid <strong>for</strong> 180 days from the d<strong>at</strong>e <strong>of</strong> opening <strong>of</strong> thetechnical bid, which shall have to be extended unconditionally <strong>for</strong> furthermaximum <strong>of</strong> period 60 days, as deem fit by Corpor<strong>at</strong>ion.c) The firm r<strong>at</strong>e quoted by the successful tenderer shall be valid <strong>for</strong> the entirecurrency <strong>of</strong> the contract. No escal<strong>at</strong>ion in the r<strong>at</strong>es will be allowed on anyaccount.(d)The r<strong>at</strong>es quoted by the tenderer shall be free from corrections and overwritings. Tenders containing over writing, erased r<strong>at</strong>e(s), corrections orillegible r<strong>at</strong>es shall be liable <strong>for</strong> rejection.6. EARNEST MONEY DEPOSIT :(a)A non-interest bearing Earnest Money Deposit <strong>of</strong> Rs. 10,00,000/- (Rupeesten lac only) shall be paid along with the tender, enclosed with Technical Biddocuments in seal cover superscribed “TECHNICAL BID”, in <strong>for</strong>m <strong>of</strong> CrossedDemand Draft in favour <strong>of</strong> <strong>GMDC</strong> Ltd. payable <strong>at</strong> Ahmedabad from11


N<strong>at</strong>ionalised or Scheduled bank ( not Co-oper<strong>at</strong>ive Bank). Any tendersubmitted without Earnest Money shall be summarily rejected and no claimshall be entertained on such rejected tenders.(b)(c)The unsuccessful bidders will be refunded the EMD amount by way <strong>of</strong>crossed cheque within 15 days <strong>of</strong> finalis<strong>at</strong>ion <strong>of</strong> the bids.The EMD <strong>of</strong> the successful bidders (the <strong>Contract</strong>or) shall either be adjustedas a part <strong>of</strong> security deposit, if desired by the contractor or shall be refundedby way <strong>of</strong> crossed cheque on receipt <strong>of</strong> security deposit amount as stipul<strong>at</strong>edin clause No. 7.6. SECURITY DEPOSIT(a)The successful <strong>Contract</strong>or shall pay security deposit (SD) @ 5% <strong>of</strong> the totalcontract value in the following manner.i. 2.5% <strong>of</strong> the total contract value (including EMD) be<strong>for</strong>e thecommencement <strong>of</strong> the contract work in <strong>for</strong>m <strong>of</strong> a Crossed DemandDraft in favour <strong>of</strong> <strong>GMDC</strong> Ltd. payable <strong>at</strong> Ahmedabad or a BankGuarantee, from any N<strong>at</strong>ionalised Banks in the <strong>for</strong>m and manneracceptable to the <strong>GMDC</strong>.ii.The balance 2.5 % amount <strong>of</strong> the Security Deposit will be recoveredfrom <strong>Contract</strong>or’s Running Account Bills by deducting it <strong>at</strong> a r<strong>at</strong>e <strong>of</strong>5% <strong>of</strong> RA bill amount and built up till the full amount <strong>of</strong> SD is realised.b) However, if the amount <strong>of</strong> the total work done exceeds the total contractvalue, deduction against SD will be continued @ 5% <strong>of</strong> the bill amount, tillthe currency <strong>of</strong> the contract period / extended period, to m<strong>at</strong>ch with the value<strong>of</strong> excess quantity.c) Security deposit shall not bear any interest.d) It shall be refunded to the <strong>Contract</strong>or, within a period <strong>of</strong> three months afters<strong>at</strong>isfactory completion <strong>of</strong> the work and the due fulfillment <strong>of</strong> all the termsand conditions <strong>of</strong> the contract. The <strong>Contract</strong>or shall obtain a certific<strong>at</strong>e tothis effect from the General Manager [Project] / Project-in-Charge and shallsubmit the same to the General Manager [LP & S] <strong>at</strong> HO, who afterverific<strong>at</strong>ion <strong>of</strong> the fact will arrange <strong>for</strong> refund <strong>of</strong> SD.e) The SD deposited by the <strong>Contract</strong>or will be <strong>for</strong>feited if the contractor fails tomobilise its machinery and manpower to start the work within 10 days <strong>of</strong>receipt <strong>of</strong> LOI by the <strong>Contract</strong>or.f) <strong>GMDC</strong> reserves the right to recover the charges or the penalty from theSecurity Deposit in the following circumstances-i. If the contractor or its employees causes any damage or destroy anyproperty belonging to <strong>GMDC</strong>.12


i. The shortfall amount <strong>of</strong> all compens<strong>at</strong>ions, penalties and other sums<strong>of</strong> money payable by the contractor or recoveries to be made underthe terms <strong>of</strong> this contract which is due but not paid by the contractor infull , etc.7. RUNNING ACCOUNT BILLS.a) The <strong>Contract</strong>or shall submit monthly Running account bills <strong>for</strong> the workexecuted during the period within 7 days <strong>of</strong> the completion <strong>of</strong> the month.(b)Monthly Running Account Bill shall be submitted to the <strong>of</strong>fice <strong>of</strong> the Minesmanger with following documents :i. The quantity <strong>of</strong> the hard str<strong>at</strong>a broken duly certified by <strong>GMDC</strong>’sSurveyor.ii.iii.Copies <strong>of</strong> Muster Roll and Payment Sheets showing amount <strong>of</strong> PFdeducted from salaries <strong>of</strong> the labour and employees, amount <strong>of</strong>contribution <strong>of</strong> the <strong>Contract</strong>or.Copy <strong>of</strong> the challans <strong>for</strong> the amount deposited in RPFC <strong>for</strong> theprevious month.8. MODE OF PAYMENT:The Running Account bills, submitted <strong>at</strong> the <strong>of</strong>fice <strong>of</strong> Mines Manager will beprocessed there considering following deductions.a) Income tax as per provision <strong>of</strong> Income Tax Act, and other Taxes (and surcharges)applicable in <strong>for</strong>ce from time to timeb) Security Deposit @ 5% <strong>of</strong> the gross amount <strong>of</strong> the RA bill as per clauseNo. 6.c) Penalty leviable as per clause No.14.,d) Other deductions, if any.An adhoc payment @ 80% <strong>of</strong> the net payable amount arrived after consideringthese deduction, will be paid by <strong>of</strong>fice <strong>of</strong> the G.M. [Project], within 7 days <strong>of</strong>submission <strong>of</strong> the bill.Balance 20% amount <strong>of</strong> Running account bills shall become payable by ProjectOffice, after approval from Head <strong>of</strong>fice within 20 days <strong>of</strong> the d<strong>at</strong>e <strong>of</strong> the receipt <strong>of</strong>the bill <strong>at</strong> Head Office, after verific<strong>at</strong>ion and deduction <strong>of</strong> adhoc payment made bythe project.13


9. MEASUREMENTSa) Be<strong>for</strong>e start <strong>of</strong> the work in a particular month, the surface RL will bemeasured, after <strong>breaking</strong> the same again surface RL will be measured by<strong>GMDC</strong>’s Surveyor. The difference will be considered <strong>for</strong> the basis <strong>of</strong>calcul<strong>at</strong>ion <strong>of</strong> volume <strong>of</strong> the hard str<strong>at</strong>a so broken.b) An authorised represent<strong>at</strong>ive <strong>of</strong> the CONTRACTOR may remain present <strong>at</strong>the time <strong>of</strong> measurement <strong>for</strong> recording, verific<strong>at</strong>ion and certific<strong>at</strong>ion <strong>of</strong> thequantity being broken.c) The measurement and the comput<strong>at</strong>ions provided by the Management shallbe final and binding to the CONTRACTOR.d) The payment to the CONTRACTOR shall be based on the volume <strong>of</strong> thehard str<strong>at</strong>a being broken only.e) Measurement <strong>of</strong> the volume <strong>of</strong> excav<strong>at</strong>ed area will be carried out as per theIS standards and with the use <strong>of</strong> Total St<strong>at</strong>ion and comput<strong>at</strong>ion will becarried out with D<strong>at</strong>a Mine S<strong>of</strong>tware available with the project and theCorpor<strong>at</strong>ion. The contractor has to accept the volume so calcul<strong>at</strong>ed.10. LIQUIDATED DAMAGES ( L.D.)a) If the <strong>Contract</strong>or fails to mobilise the required machinery and manpower tocommence the work within 30 days <strong>of</strong> receipt <strong>of</strong> LOI, as required underChapter-2, clause No.8, a penalty @ Rs. 2,500/- per day shall be leviable, <strong>for</strong>a maximum period <strong>of</strong> 15 days. If the contractor fails to start work even after15 days, the <strong>GMDC</strong> will be free to take action stipul<strong>at</strong>ed under Clause No.14.b) The Liquid<strong>at</strong>ed damages shall be leviable after end <strong>of</strong> every month on theshortfall in the monthly targeted quantity <strong>of</strong> the hard str<strong>at</strong>a to be broken,counted from the d<strong>at</strong>e <strong>of</strong> commencement <strong>of</strong> work till the relevant RA Billperiod, <strong>at</strong> the following r<strong>at</strong>esShortfallUp to 5% <strong>of</strong> the monthly targetMore than 5% up to15% <strong>of</strong> themonthly target.More than 15% <strong>of</strong> the monthlytargetR<strong>at</strong>e <strong>for</strong> Liquid<strong>at</strong>ed damages<strong>for</strong> shortfall quantityNil10% <strong>of</strong> the contract r<strong>at</strong>e perTonne.15% <strong>of</strong> the contract r<strong>at</strong>e perTonnec) However, shortfall/excess in the annual targeted quantities shall be reviewed<strong>at</strong> the end <strong>of</strong> every year and if the CONTRACTOR meets the annual targets,the liquid<strong>at</strong>ed damages deducted during the year will be adjusted in the nextRA Bill.14


d) EMPLOYER reserves the right to termin<strong>at</strong>e the contract and get the balancework completed <strong>at</strong> the cost and risk <strong>of</strong> CONTRACTOR if cumul<strong>at</strong>ive shortfallis found more than 20% <strong>for</strong> three consecutive months/ RA bill period.11. NON FULFILMENT OF TERMS & CONDITION AND TERMINATION OF THECONTRACT.a) If the <strong>Contract</strong>or fails to carry out the work as per terms and conditions <strong>of</strong> thecontract to the s<strong>at</strong>isfaction <strong>of</strong> the <strong>GMDC</strong>, <strong>GMDC</strong> shall be entitled to <strong>for</strong>feit thesecurity deposit paid by the <strong>Contract</strong>or. This however, shall not absolve the<strong>Contract</strong>or from his oblig<strong>at</strong>ion to fulfill the contract. In such event, the <strong>GMDC</strong>shall have a right to complete and / or to get the work completed <strong>at</strong> the cost& risk <strong>of</strong> the <strong>Contract</strong>or and the <strong>Contract</strong>or shall be responsible to pay suchcost incurred by the <strong>GMDC</strong> to complete the work and / or to get the workcompleted.b) Likewise, if the <strong>Contract</strong>or does not fulfil the terms and conditions <strong>of</strong> thecontract and does not carry out the work up to the entire s<strong>at</strong>isfaction <strong>of</strong><strong>GMDC</strong>, <strong>GMDC</strong> has the right to <strong>for</strong>thwith termin<strong>at</strong>e the contract <strong>at</strong> its solediscretion, without assigning any reason, Under such events, the <strong>GMDC</strong>shall be entitled to <strong>for</strong>feit the security deposit paid by the <strong>Contract</strong>or and the<strong>GMDC</strong> shall have a right to complete the work and / or to get the workcompleted <strong>at</strong> the risk and cost <strong>of</strong> the <strong>Contract</strong>or.c) For any reasons, if it is required, <strong>GMDC</strong> reserves right to cancel, termin<strong>at</strong>e.amend and / or alter the contract and / or bifurc<strong>at</strong>e and / or reduce thecontract work <strong>at</strong> any time without giving any notice to the <strong>Contract</strong>or andwithout incurring any responsibility. For such cases, <strong>Contract</strong>or shall have totake away his labour, tools, tackles, machinery, equipment etc. and shallleave the site <strong>at</strong> once or shall have to carry out the instructions <strong>of</strong> the <strong>GMDC</strong>.12. COMPLIANCE OF STATUTESThe CONTRACTOR will strictly con<strong>for</strong>m to all the laws governing employment,payment, Safety and welfare <strong>of</strong> the labour and staff and provision <strong>of</strong> MinimumWages Act, PF/ Gr<strong>at</strong>uity Act, the Workmen’s Compens<strong>at</strong>ion Act, <strong>Contract</strong> labour(Abolition and Regul<strong>at</strong>ion) Act, The Coal Mine Regul<strong>at</strong>ions 1957, the Mines Act1952, Industrial Dispute Act, Bonus Act and all relevant rules, by-laws and otherSt<strong>at</strong>utory provisions as ones existing now or as may be introduced l<strong>at</strong>er as well asthose orders <strong>of</strong> Govt. <strong>of</strong> India or St<strong>at</strong>e applicable to EMPLOYER and the Rules andRegul<strong>at</strong>ions framed under the said Acts. If any amount becomes payable byEMPLOYER as a result <strong>of</strong> any claim or applic<strong>at</strong>ion in terms <strong>of</strong> the provisions <strong>of</strong> thesaid Acts and the Rules and Regul<strong>at</strong>ions, By-laws or the Orders made thereunder,such amounts shall be recoverable from the CONTRACTOR. Any consequencesarising out <strong>of</strong> non-compliance <strong>of</strong> Safety Provisions will be <strong>at</strong> the CONTRACTOR’ssole risk and cost. The CONTRACTOR will maintain all the st<strong>at</strong>utory registers underthe above Acts and Regul<strong>at</strong>ions and will submit the same on demand by the MinesManager / General Manager (Project).15


13. GENERAL CONDITONS1) As per the provision <strong>of</strong> mines V.T. Rules, all workers / oper<strong>at</strong>ors proposed tobe employed by the <strong>Contract</strong>or, will have to be trained be<strong>for</strong>e employment <strong>at</strong>recognised / approved VT Centre. Medical examin<strong>at</strong>ion shall also be carriedout as per the Mines Rules 1955 be<strong>for</strong>e deployment.2) All the machineries proposed to be used in the mines shall be physicallyexamined by <strong>GMDC</strong>'s Engineers <strong>for</strong> verifying its use-worthiness in the mines3) All the persons <strong>of</strong> the <strong>Contract</strong>or engaged inside the mining area must wearHelmet and Shoes. As and when required other personal protective wears shallalso be provided to them.4) The <strong>Contract</strong>or shall not change the constitution <strong>of</strong> the company/ firm duringthe currency <strong>of</strong> the contract.5) <strong>Contract</strong>or shall have to deploy their machineries in three shifts and by threedifferent relays. There will be no <strong>breaking</strong> <strong>of</strong> hard str<strong>at</strong>a on weekly days <strong>of</strong> restand on paid/public holidays.6) All the machineries to be deployed by the <strong>Contract</strong>or must be maintained inproper working order and be fitted with all the required safety devices en<strong>for</strong>cedby DGMS under Mines Act.7) For any dispute arising out <strong>of</strong> this Work Order or interpret<strong>at</strong>ion <strong>of</strong> any termsthere<strong>of</strong>, the decision <strong>of</strong> the Committee consisting <strong>of</strong> concerned Project Head(currently G.M.[LP&S] <strong>at</strong> H.O., concerned Head <strong>of</strong> the Project, and theconcerned Divisional Head <strong>at</strong> HO with the m<strong>at</strong>ter under dispute, subject toconcurrence <strong>of</strong> MD/CMD <strong>GMDC</strong>, shall be final and binding upon the tenderer.8) In case <strong>of</strong> any Central/St<strong>at</strong>e Government directives regarding <strong>breaking</strong> <strong>of</strong> hardstr<strong>at</strong>a and execution <strong>of</strong> work rel<strong>at</strong>ed thereto, the same shall have to be strictlyadhered to and binding upon the tenderer <strong>for</strong> implement<strong>at</strong>ion, <strong>for</strong> which <strong>GMDC</strong>will not be responsible <strong>for</strong> any compens<strong>at</strong>ion.9) The contractor shall abide by the provision <strong>of</strong> the Motor Vehicle Act <strong>for</strong> hisentire tyre mounted machinery. Any consequences arising out <strong>of</strong> noncompliance<strong>of</strong> said Provisions would be <strong>at</strong> the tenderer sole risk and cost, <strong>for</strong>which <strong>GMDC</strong> will not be responsible <strong>for</strong> any compens<strong>at</strong>ion.10) If the tenderer has to submit a copy <strong>of</strong> valid PF Registr<strong>at</strong>ion Certific<strong>at</strong>e, a copy<strong>of</strong> the same should be <strong>at</strong>tached with the technical bid: otherwise on award <strong>of</strong>contract, within 15 days <strong>of</strong> the issue <strong>of</strong> LOI it should be submitted to <strong>GMDC</strong>.The tenderer will have to submit to the Corpor<strong>at</strong>ion every month Muster Role,Wages/Salary sheet and PF Return and Challan regularly to the <strong>GMDC</strong>.11) The corpor<strong>at</strong>ion reserves the right to reject any or all the tenders or split thework between more than one bidders without assigning any reason there<strong>of</strong>.16


14. DISPUTES & LEGAL JURISDICTIONAny dispute or difference concerning or arising from this agreement and or itsimplement<strong>at</strong>ion, breach or termin<strong>at</strong>ion wh<strong>at</strong>soever, including any difference ordispute as to the interpret<strong>at</strong>ion <strong>of</strong> any term(s) <strong>of</strong> this Agreement, shall be referred tothe arbitr<strong>at</strong>ion <strong>of</strong> a sole Arbitr<strong>at</strong>or to be appointed by <strong>GMDC</strong> and the selectedbidder.The Arbitr<strong>at</strong>ion shall be governed by Arbitr<strong>at</strong>ion and concili<strong>at</strong>ion Act 1996 (India).The se<strong>at</strong> <strong>of</strong> such arbitr<strong>at</strong>ion shall be Ahmedabad.The Parties shall share the cost <strong>of</strong> Arbitr<strong>at</strong>ion equally.15. FORCE MAJEUREForce majeure is here in defined as n<strong>at</strong>ural phenomena such as floods, draughts,cyclone, earthquakes and epidemics, declar<strong>at</strong>ion <strong>of</strong> war, accidents etc. In suchconditions <strong>of</strong> <strong>for</strong>ce majeure both the parties can claim <strong>for</strong>ce majeure but they areobliged to in<strong>for</strong>m the either party within 10 days in writing <strong>of</strong> the d<strong>at</strong>e <strong>of</strong>commencing and again ending <strong>of</strong> the <strong>for</strong>ce majeure.Under the circumstances <strong>of</strong> <strong>for</strong>ce majeure st<strong>at</strong>ed above, the contract terms <strong>of</strong>quantity and period shall be extended by period equivalent to the loss <strong>of</strong> time due to<strong>for</strong>ce majeure.The decision regarding the occurrence <strong>of</strong> <strong>for</strong>ce majeure to be considered shall betaken jointly by <strong>Contract</strong>or & <strong>GMDC</strong>.Period <strong>of</strong> such time loss due to <strong>for</strong>ce majeure will be considered <strong>for</strong> reducing themonthly target <strong>for</strong> calcul<strong>at</strong>ing the liquid<strong>at</strong>ed damages <strong>for</strong> the respective month inwhich such <strong>for</strong>ce majeure has occurred.17


FORM – ACHECK LIST OF DOCUMENTS ENCLOSED WITH TENDERTECHNICAL BIDSr.No.ParticularsDeclar<strong>at</strong>ion (Strikeout whichever is notapplicable)1 Check list <strong>of</strong> documents in the prescribed pro<strong>for</strong>ma, Form-A Yes / No2. Earnest Money deposit <strong>for</strong> the value as indic<strong>at</strong>ed in NoticeYes / NoInviting Tender,3. Form<strong>at</strong>s enclosed-dully filled in and signed along with all required enclosures , completeas per Instruction to tendererForm – B –( St<strong>at</strong>us <strong>of</strong> the Bidder, with documentary pro<strong>of</strong>)Yes / NoForm – C-(Details <strong>of</strong> the work carried out with copy <strong>of</strong> final bill)Yes / NoForm – D- (Details <strong>of</strong> the machinery owned by the bidder, withYes / Nodocumentary pro<strong>of</strong>)4. Other documents to be enclosed by the tenderer as per the instruction to tenderer.Power <strong>of</strong> authority <strong>of</strong> the sign<strong>at</strong>ory to the tendererYes / NoL<strong>at</strong>est Solvency certific<strong>at</strong>e from the n<strong>at</strong>ionalised bank <strong>for</strong> Rs. 15 Yes / Nolacs.Copy <strong>of</strong> P.F. Registr<strong>at</strong>ion details if available.Yes / NoDeclar<strong>at</strong>ion in prescribed <strong>for</strong>m<strong>at</strong> on letter head <strong>of</strong> the bidderYes / NoDeclar<strong>at</strong>ion by the Bidder indemnifying <strong>GMDC</strong>Yes / No5. Tender documents as issued by the <strong>GMDC</strong> duly signed byYes / Nocontractor on each page.6. Site visit certific<strong>at</strong>e issued by project authority Yes / NoPRICE BID1 Price quot<strong>at</strong>ion <strong>for</strong> Option –I in Form ‘AA’ Yes / No18


FORM - BSt<strong>at</strong>us <strong>of</strong> the TendererName <strong>of</strong> the Tenderer :Address :Registered <strong>of</strong>fice :For correspondence :Telephone No.Fax No.E-mail AddressWhether the firm is joint stock Co., HUF,individual, Partnership firm (Attestedcopies <strong>of</strong> Deeds, Articles <strong>of</strong> associ<strong>at</strong>ion tobe enclosed)Name <strong>of</strong> person holding power <strong>of</strong> <strong>at</strong>torney(Attested copy <strong>of</strong> power <strong>of</strong> <strong>at</strong>torney to beenclosed)Names <strong>of</strong> Partners with their Present andpermanent addressName <strong>of</strong> Bankers with full address andTelephone No.19


FORM –C(Part –I)DETAILS OF WORK CARRIED OUT DURING THE PAST THREE YEARS BY THE TENDERERSr.No.Description <strong>of</strong> work withWork place/mineName <strong>of</strong> client withpostal addressPeriodFrom ToQuantityawarded(D<strong>at</strong>e) (D<strong>at</strong>e)Actual quantityworkedWorkexperiencecertific<strong>at</strong>e<strong>at</strong>tachedYes/NoYes/NoYes/NoYes/No20


FORM - C(Part – II )DETAILS OF WORK CARRIED OUT DURING THE PAST THREE YEARS BY THETENDERERParticularsWhether enlisted in other deptt, if yes,then furnish the details pertaining toclass and the amount qualified to tenderWas the applicant or its partners orDirectors black listed in past by anyGovt. or any other body.Details pertaining to the workincomplete, if anyDetails <strong>of</strong> the litig<strong>at</strong>ion either completedor under progress during last 10 yearsby the company or anypartner/proprietor <strong>of</strong> present companywas associ<strong>at</strong>ed in any capacity.21


FORM - D1. Details <strong>of</strong> machineries required <strong>for</strong> annualized work to be used <strong>for</strong> the work :a) Owned by the tenderer:Sl.NoRegistr<strong>at</strong>ion No.( copy <strong>of</strong> registr<strong>at</strong>ioncertific<strong>at</strong>e to beenclosed)Make and model.( TO BE FILLED UP AND SUBMITTED WITH PART-I )Details <strong>of</strong> additional equipment already ordered to be purchased new <strong>for</strong> the projectindic<strong>at</strong>ing delivery times required in the <strong>for</strong>m given below :Sl.NoRegistr<strong>at</strong>ion No.( copy <strong>of</strong> registr<strong>at</strong>ioncertific<strong>at</strong>e to be enclosed)Make and model22


DECLARATION(On letter head <strong>of</strong> the Bidder)FROM:DATE:To,The Managing Director,Gujar<strong>at</strong> Mineral Development Corpor<strong>at</strong>ion Ltd.,“Khanij Bhavan”, 132 ft. Ring Road,University Ground, Vastrapur,Ahmedabad-380015Dear Sir,I/we here by solemnly declare th<strong>at</strong> any <strong>of</strong> our Directors or Partners, jointly or severallyand/or individually or our firm/company have not been black listed by the Central Govt.or the St<strong>at</strong>e Govt. or its undertakings.I/we here by further declare th<strong>at</strong>, if the declar<strong>at</strong>ion is found untrue, the <strong>GMDC</strong> shall beentitled to take any action against us severally and/or individually or our firm/companyin this regard in any manner th<strong>at</strong> may be deemed fit by <strong>GMDC</strong>.Yours faithfully,_________________________Sign<strong>at</strong>ure and Stamp <strong>of</strong> the contractor23


(On Letter head <strong>of</strong> the Bidder)UNDERTAKINGTo,The Managing Director.Gujar<strong>at</strong> Mineral Development Corpor<strong>at</strong>ion Ltd.Khanij Bhavan132’ Ring Road, University Ground,Vastrapur,Ahmedabad.Dear Sir,We M/s. -------------------------------------------------- hereby undertake th<strong>at</strong>, we shall <strong>at</strong> alltimes, indemnify and keep indemnified th<strong>at</strong> <strong>GMDC</strong> Limited from any and all liability <strong>for</strong>damages resulting from or arising out <strong>of</strong> or in any way connected with the oper<strong>at</strong>ionscovered by the tender NO. HARD STRATA BHV – 1 /10-11. We shall be responsible <strong>for</strong>all risk arising in connection with or on account <strong>of</strong> the oper<strong>at</strong>ions covered by thecontract covered by the above tender and shall make good all losses and damagesarising there from. In case, the <strong>GMDC</strong> Limited shall incur any cost or expense or sufferany loss on account <strong>of</strong> any claim demand or course <strong>of</strong> action brought against us andarising out <strong>of</strong> the oper<strong>at</strong>ions covered by the contractor/tender, the <strong>GMDC</strong> Limited shallhave the power (without being bound to do so) to define, contest or compromise anysuch claim demand or cause <strong>of</strong> action. Any amount th<strong>at</strong> may become payable by<strong>GMDC</strong> Limited and any cost expense etc. th<strong>at</strong> may be incurred by the <strong>GMDC</strong> Limited inthis behalf, shall also be recoverable from us, without prejudice to your other rights.Yours faithfully,For ------(Sign<strong>at</strong>ure & Stamp <strong>of</strong> the <strong>Contract</strong>or)24


SPECIAL TERMS & CONDITIONS1.00 The contractor be<strong>for</strong>e starting the work, shall furnish to the GeneralManager/Project Officer the list <strong>of</strong> machineries proposed to be deployed <strong>for</strong> thework, with the rel<strong>at</strong>ed papers <strong>of</strong> registr<strong>at</strong>ion, fitness certific<strong>at</strong>e, permits, licenses,insurance, driving licenses etc. <strong>for</strong> inspection. No other machineries shall bedeployed <strong>for</strong> the work without the approval <strong>of</strong> the General Manager (P),<strong>Bhavnagar</strong>.2.00 The machineries deployed <strong>at</strong> project, shall not be diverted <strong>for</strong> the work withoutthe approval <strong>of</strong> the General Manager (P) <strong>GMDC</strong>.3.01 The contractor shall deploy adequ<strong>at</strong>e number <strong>of</strong> machineries <strong>for</strong> the s<strong>at</strong>isfactoryexecution <strong>of</strong> the work.3.02 Machineries in good and safe condition having valid fitness certific<strong>at</strong>epermits/licences etc. and in respect <strong>of</strong> which the required taxes/ fees have beendeposited and which are properly covered by insurance, shall be deployed <strong>for</strong>the work. The company shall have the right to inspect or arrange inspection <strong>of</strong>the vehicles/equipments deployed by the contractor <strong>for</strong> the work <strong>at</strong> any time anddeclare any vehicle/equipment unsafe and ask <strong>for</strong> its immedi<strong>at</strong>e withdrawal fromthe site/oper<strong>at</strong>ion. The contractor shall ensure prompt/ immedi<strong>at</strong>e compliance <strong>of</strong>the same.3.03 The contractor shall <strong>at</strong> his own cost, arrange <strong>for</strong> regular checking / maintenance/ repair <strong>of</strong> the machineries and keep them in good and safe conditions <strong>at</strong> alltimes. Proper records <strong>of</strong> such checking/maintenance/repair shall be maintainedin a Log Book kept on the vehicle <strong>for</strong> the purpose, which shall be readilyavailable <strong>for</strong> inspection whenever required.3.04 Only experience, skilled and disciplined oper<strong>at</strong>ors <strong>of</strong> sound health, goodbehavior and antecedents having valid and requisite driving licence shall bedeployed by the contractor. In no case any un-authorised driving <strong>of</strong> themachineries shall be permitted by the contractor.4.00 The contractor shall not have any claim wh<strong>at</strong>soever <strong>for</strong> the idleness <strong>of</strong> hismachineries <strong>for</strong> any reason <strong>at</strong>tributed to <strong>GMDC</strong> and/or <strong>for</strong> any other reason.5.01 The contractor shall <strong>at</strong> his own cost arrange <strong>for</strong> all m<strong>at</strong>erials, stores, spares,tools, tackles etc. and maintenance/repairs <strong>of</strong> the machineries/equipmentsrequired/ deployed <strong>for</strong> the work.The company shall have no liability wh<strong>at</strong>soever on this account.5.02 The contractor shall maintain proper records in Gujar<strong>at</strong>i / English / Hindi <strong>of</strong> themachineries /equipments persons, etc. deployed <strong>for</strong> the work, work done, <strong>of</strong> theemployees, payment to the employees etc, and the Company shall have theright <strong>of</strong> access to and inspection <strong>of</strong> these records or to call <strong>for</strong> any or all theserecords or ask the contractor to submit such reports as it considers necessaryand the contractor shall be bound to comply with such instructions.25


6.00 The Company shall have no responsibility/liability wh<strong>at</strong>soever <strong>for</strong> anyaccident/damage to the contractor’s machineries / equipments in transit or whileengaged in the work.7.00 The contractor shall familiarize himself and fully comply with the provisions <strong>of</strong> allthe Acts/Rules/Regul<strong>at</strong>ions/Bye-laws and orders <strong>of</strong> the Local authority/Municipality/St<strong>at</strong>e Govt./Central Govt. applicable to the worker. Mines Act.Payment <strong>of</strong> Wages Act, Motor Vehicle Act, Workmen’s Compens<strong>at</strong>ion Act, etc.and shall be fully responsible and liable <strong>for</strong> due observance <strong>of</strong> the same. Thecompany shall have no responsibility/liability wh<strong>at</strong>soever on these accounts, andthe contractor shall fully indemnify the Company against anyclaim/dispute/reference Award, etc,. Arising out <strong>of</strong> the same.8.00 If the Company suffers any loss on account <strong>of</strong> suspension <strong>of</strong> production oridleness <strong>of</strong> its equipments/ employees or on any other account or damage to itsproperty, due to any failure on the part <strong>of</strong> the contractor or due to any act <strong>of</strong>omissions or commission on the part <strong>of</strong> his represent<strong>at</strong>ive/ employees or fromthe equipments <strong>of</strong> the contractor, the value <strong>of</strong> the same as assessed by theCompany, shall be recovered from the contractor’s bill/security deposit. Thedecision <strong>of</strong> the company in this regard shall be final and binding on thecontractor.9.01 The <strong>Contract</strong>or shall post adequ<strong>at</strong>e number <strong>of</strong> competent, experienced, skilledand disciplined persons having good antecedents <strong>for</strong> s<strong>at</strong>isfactory execution <strong>of</strong>the work. A list <strong>of</strong> all such persons shall be kept in the <strong>of</strong>fice <strong>of</strong> the contractorand a copy <strong>of</strong> the same shall be furnished to the General Manager (Project) asand when required. All these persons shall be in the direct employment andunder direct administr<strong>at</strong>ive control <strong>of</strong> the contractor and the management shallhave no responsibility/liability wh<strong>at</strong>soever in this regard.9.02 The contractor shall issue an identify card/employment card to each employeewith photograph duly <strong>at</strong>tested by him which the employee shall always carry withhim, while on work and produce <strong>for</strong> inspection whenever required.10.00 The contractor shall not engage any person <strong>of</strong> less than 18 years <strong>of</strong> age orfemales during night hours as required by relevant law.10.01 The contractor shall pay to his employees salary and wages as per Law <strong>of</strong> theland applicable to the workmen <strong>of</strong> the mine where he is working under thiscontract.10.02 The contractor shall make payment to his employees <strong>at</strong> the place(s) specified bythe General Manager (Project ) or and in the presence <strong>of</strong> Company’srepresent<strong>at</strong>ive authorized by General Manager/Project Officer who shall dulywitness all payments by the contractor to his employees. For the purpose thecontractor shall notify to the General Manager (Project) the wage period (s)day/d<strong>at</strong>e and time <strong>of</strong> payment.10.03 The contractor shall prepare the wages sheet <strong>for</strong> his employees in duplic<strong>at</strong>e, acopy <strong>of</strong> which shall be regularly submitted to the Project Officer.11.01 The contractor shall make timely payment <strong>of</strong> all salary/wages/dues to hisemployees shall also provide all benefits to his employees as per various26


Acts/Rules, Regul<strong>at</strong>ions, Orders applicable to the work e.g. bonus underPayment <strong>of</strong> Bonus Act. Sunday Wages, Overtime, Holiday Wages, LeaveWages, Sick Leave etc.11.02 The contractor shall also comply with the provisions <strong>of</strong> the Lignite / Coal MinesProvident Fund Scheme and regularly deposit the contributions in accordancewith the same. The Company shall have no liability wh<strong>at</strong>soever in the regard.11.03 The responsibility <strong>of</strong> the contractor in respect <strong>of</strong> all payments to his employeeswill be complete and absolute. The company shall have no liability wh<strong>at</strong>soever inthis regard and shall be fully indemnified by the <strong>Contract</strong>or against any claimarising out <strong>of</strong> any non-payment/short-payment/dispute/ award.12.00 The contractor shall arrange <strong>for</strong> the training <strong>of</strong> his employees ion accordancewith the Mines Voc<strong>at</strong>ional Training Rules, 1966 as amended from time to time <strong>at</strong>his own cost.13.00 In case any accident occurs or any injury is caused to any employee <strong>of</strong> theCompany by the vehicles/ equipments <strong>of</strong> the contractors or by any act <strong>of</strong>omission/commission on the part <strong>of</strong> the contractor’s represent<strong>at</strong>ive/employees,the compens<strong>at</strong>ion <strong>for</strong> the same, as provided in law or as assessed by thecompany shall be recovered from the contractor along with the costs andexpenses incurred by the company on the same.14.00 The contractor shall provide foot-wears, helmets and other protectiveequipments, to the employees as provided in the law, <strong>at</strong> his own cost. In case <strong>of</strong>failure on the part <strong>of</strong> the contractor to provide these protective equipments, thecompany may provide the same to the employees <strong>at</strong> the cost <strong>of</strong> contractor.27


FORM – AAPRICE BID / SCHEDULEPRICE BID TO BE FILLED ONLINEName <strong>of</strong> Work :Name <strong>of</strong> Bidder:Address:-Breaking <strong>of</strong> <strong>Hard</strong> <strong>Str<strong>at</strong>a</strong>encountered during mining <strong>of</strong><strong>lignite</strong> <strong>at</strong> Lignite mines<strong>Bhavnagar</strong>Quantity <strong>of</strong> 15 Lac M 3to be broken duringthe contract periodR<strong>at</strong>e(in Rs. per M 3 )The above r<strong>at</strong>e is inclusive <strong>of</strong> all except Service tax. If service tax is applicable, thesame shall be reimbursed to the contractor on actual being submitted / remitted to theconcerned department against submission <strong>of</strong> pro<strong>of</strong>. No escal<strong>at</strong>ion in the r<strong>at</strong>e will bepermitted during the currency <strong>of</strong> the contract period.D<strong>at</strong>e :__________________Sign<strong>at</strong>ure with seal28