<strong>Islamorada</strong>,<strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Wastewater Collection &Transmission ProjectMonthly Project ReportPeriod 2/25/13 through 3/30/13April 15, 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project<strong>TAB</strong>LE OF CONTENTS1.0 INTRODUCTION ........................................................................................................................... 12.0 EXECUTIVE SUMMARY .............................................................................................................. 23.0 PROGRAM PROGRESS STATUS ............................................................................................... 33.1 Owner’s Representative Services ............................................................................................. 33.2 Owner’s Representative Budget Analysis ................................................................................. 33.3 Owner’s Representative Tasks Performed this Period .............................................................. 43.3.1 Owner’s Representative Services ..................................................................................... 43.3.2 Design Management Services .......................................................................................... 53.3.3 Construction Management Services.................................................................................. 53.3.4 Project Controls Management Services ............................................................................ 63.4 DBO Contractor Services .......................................................................................................... 64.0 LAND AND EASEMENT ACQUISITIONS.................................................................................... 84.1 Land Acquisitions ...................................................................................................................... 84.2 Private Road Easement Acquisitions ........................................................................................ 85.0 DESIGN ........................................................................................................................................ 96.0 CURRENT PROJECT STATUS ................................................................................................. 106.1 Summary <strong>of</strong> Projects ............................................................................................................... 106.2 North Plantation Key (NPK)..................................................................................................... 116.3 Middle Plantation Key .............................................................................................................. 126.4 Key Largo Conveyance Force Main (CFM1.A) ....................................................................... 127.0 COMMUNICATIONS, OPERATIONS & 30-DAY LOOK AHEAD .............................................. 147.1 Communications ...................................................................................................................... 147.2 Operations ............................................................................................................................... 147.3 30-Day Look Ahead................................................................................................................. 158.0 APENDICESAppendix I. Technical Submittal LogAppendix II. Request for Information LogAppendix III. Reynolds <strong>Islamorada</strong> Status ReportAppendix IV Progress MapsAppendix V. Homeowner Interaction LogAppendix VI. Operations & Maintenance LogPage | i April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project1.0 INTRODUCTIONThe State <strong>of</strong> Florida, as part <strong>of</strong> Chapter 380 <strong>of</strong> 2010 Florida Statutes, identified the Florida Keys as anarea <strong>of</strong> critical concern to land and water management. The associated Administration CommissionRule requires installing a sanitary sewer system to meet advanced wastewater treatment for thecommunity by December 2015. <strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong> (<strong>Village</strong>) procured the services <strong>of</strong> aDesign-Build-Operate (DBO) firm to perform all services required to bring a fully functional wastewatersystem into operation.The Project involves the design, construction and 20 year operation <strong>of</strong> a <strong>Village</strong>-wide wastewatercollection and transmission system using vacuum sewer and low pressure technology. Wastewater flowwill be transmitted to the Key Largo Wastewater Treatment District (KLWTD) wastewater treatmentplant for treatment and disposal. Phases <strong>of</strong> the Work will be delivered via two methods: Contractordesign/build/operate and Contractor build/operate. <strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong> (the <strong>Village</strong>) holdscontracts with:Reynolds Water <strong>Islamorada</strong> (RWI) - Design Build Operate (DBO) ContractorWade Trim and Weiler Engineering- Owner’s Representative Team (ORT).The DBO scope <strong>of</strong> work included is as follows: Interim Operation and Maintenance <strong>of</strong> existing North Plantation Key (NPK) WastewaterTreatment Plant and Collection Systems. Decommissioning <strong>of</strong> existing NPK Wastewater Treatment Plant. Build/Operate NPK Vacuum Sewer Improvements, Middle Plantation Key (MPK) CollectionSystem and Vacuum Pump Station Improvements, and NPK Fontaine Road Collection Systemusing issued plans and specifications. Design/Build/Operate South Plantation Key Collection System and Vacuum Pump Station,Windley Key Collection System, Upper Matecumbe Key Collection System and Vacuum PumpStation, and Lower Matecumbe Key Collection System and Vacuum Pump Station. Design/Build/Operate transmission mains to the KLWTD.The contract Notice to Proceed (NTP) was issued to RWI on September 28, 2012 and has a term <strong>of</strong>1,174 days for the Design-Build elements <strong>of</strong> the contract.The <strong>Village</strong> has engaged in an Owner’s Representative to assist in managing the DBO Project. TheORT provides pr<strong>of</strong>essional engineering services as described in their Work Authorization No. 10,effective May 1, 2012 through December 31, 2015. The four (4) primary pr<strong>of</strong>essional services include:Owner’s Representative ServicesDesign Management ServicesConstruction Management ServicesProject Controls Management ServicesPage | 1 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project2.0 EXECUTIVE SUMMARYTo summarize the content <strong>of</strong> this monthly report, the following “Snapshot” is provided. The “Snapshot”includes a summary <strong>of</strong> the key tasks planned for the upcoming period, the key tasks completed duringthe past period, items scheduled to come before the <strong>Village</strong> Council in the upcoming period, andcurrent budget expenditures through the current period for ORT services.Page | 2 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project3.0 PROGRAM PROGRESS STATUS3.1 Owner’s Representative ServicesIt is the goal <strong>of</strong> the ORT to manage the design and construction <strong>of</strong> the project so that it is constructedsafely, on time, and with managed costs to serve the <strong>Village</strong>. Further, it is the ORT’s goal to provide acompleted construction Project that satisfies the design intent, complies with all applicable regulatorycodes and permits, and provides for a smooth transition from construction to operation. This is to beaccomplished with only minimal disruption to residents and business owners <strong>of</strong> the <strong>Village</strong> whilemaintaining full wastewater services during the duration <strong>of</strong> the project.3.2 Owner’s Representative Budget AnalysisPart <strong>of</strong> the Fiscal Year 2012-2013 budget appropriation for the ORT’s Work Authorization No. 10 beganon October 1, 2012. Through March 30, 3013, 50% <strong>of</strong> the schedule for Work Authorization No. 10 haselapsed for the authorized amount for Fiscal Year 2012-2013, and 42% <strong>of</strong> the budget was expended.The graph below indicates the amount <strong>of</strong> budget expended to date as compared to the planned budgetover the Fiscal Year’s schedule.<strong>Islamorada</strong> WastewaterOwner's Rep & Construction Management BudgetThru March 2013Percent Complete605040302010010/01/12 11/01/12 12/01/12 01/01/13 02/01/13 03/01/13 04/01/13TimeActual Budget Planned BudgetThrough the reporting period, the ORT services are currently being delivered below planned budgetaryamounts. The following table summarizes the amount <strong>of</strong> funds being expended toward the varioustasks under the four primary pr<strong>of</strong>essional services categories.Page | 3 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission ProjectORT Budget SummaryServicesAmount Expended Amount ExpendedThis PeriodTo DateOwner’s Representative Service $24,532.25 $177,262.95Design Management Services $112,613.75 $308,849.99Construction Management Services $163,411.25 $695,160.50Project Controls Management Services $52,590.50 $230,091.00Totals $353,147.75 $1,411,364.44ORT fees for this reporting period trended upward from last period in order to properly cover the workthat required completion. Effort contributing to the upward trend included: 1) the effort required to redesignthe Middle Plantation Key Vacuum Pump Station to site the structure on a parcel <strong>of</strong> propertyowned by Monroe County; 2) the effort required to cover the increase in design submittals that werereceived and reviewed during the period; 3) the effort required to cover the field inspection due to theincreased level <strong>of</strong> construction activity during the period. This reporting period also covered a five-weekperiod, longer than the typical four-week reporting periods that have been evident. It is anticipated thateffort covering the next period should trend downward due to the expected completion <strong>of</strong> the MiddlePlantation Key Vacuum Pump Station re-location work in early April 2013 as well as going back to afour-week reporting period.3.3 Owner’s Representative Tasks Performed this PeriodDuring the reporting period, the ORT has performed various tasks under the four primary pr<strong>of</strong>essionalservices categories discussed earlier. A summary <strong>of</strong> the major tasks being worked on or completedduring this reporting period are summarized below.3.3.1 Owner’s Representative ServicesSeveral coordination meetings and discussions have taken place during the period between the ORT,<strong>Village</strong> staff, and DBO Contractor. On February 28, 2013, the monthly Project Status Meeting was heldbetween the ORT, <strong>Village</strong>, and DBO Contractor to review project progress and to discuss and resolvecurrent issues facing the project. Key tasks accomplished during the period under this category include: Monthly Report for period January 28, 2012 through February 24, 2013 was completed anddistributed at the March 28, 2013, <strong>Village</strong> Council Meeting. Prepared for and attended the February 27, 2013 Sewer Connection and AbandonmentWorkshop hosted by the FDEP and <strong>Village</strong> staff for package wastewater plant owners andcommercial property owners. Prepared for and attended the March 5, 2013 South Plantation Key Residents’ meeting toreview the 30% design drawings for the area’s collection system. Prepared for and attended the March 21, 2013 Windley Key Residents’ meeting to review the30% design drawings for the area’s collection system. Chaired a Wastewater Utility Policy review meeting with <strong>Village</strong> staff and the <strong>Village</strong> Attorney toreview the current document and develop action items to complete the Wastewater Utility Policyfor <strong>Village</strong> Council review at a future <strong>Village</strong> Council Meeting.Page | 4 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project3.3.2 Design Management ServicesReceived several design packages over the period. Set up and monitored design submittals andreview schedules, prepared design review assignments, and produced consolidated sets <strong>of</strong> commentsfor each design review. Key tasks performed this period include the following: Reviewed the 60% design drawings for the Conveyance Force Main Phase 1.B which willcomplete the work along US-1 in Key Largo. Reviewed the 30% design drawings for the Middle Plantation Key Low Pressure Force Main. Reviewed the 30% design drawings <strong>of</strong> the South Plantation Key vacuum collection system. Reviewed the 30% design drawings <strong>of</strong> the Windley Key Low Pressure Force Main. Received and began review <strong>of</strong> the 60% design drawings for the North Plantation Key Re-PumpStation. Continued the redesign <strong>of</strong> the MPK vacuum pump station to the proposed location on MonroeCounty’s DPW property.3.3.3 Construction Management ServicesWeekly Construction Progress Meetings have occurred with the ORT, <strong>Village</strong>, and DBO Contractor.Work within Middle Plantation Key, North Plantation Key, and Fontaine Drive continues. The ORT hasinspected vacuum line installation in MPK, NPK, Fontaine Drive, and the CFM 1.A work within KeyLargo. Other key tasks performed this period include the following: Received and processed 30 new technical submittals, and reviewed and provided responses to28 technical submittals. Received and processed 5 new Requests <strong>of</strong> Information (RFI), and reviewed and providedresponses to 4 RFIs.There are currently nine FDOT projects the ORT is coordinating between the DBO Contractor andFDOT. The table below highlights the status <strong>of</strong> the Utility Work Schedules (UWS) being prepared forFDOT.FDOT Permit StatusFDOT Project Submitted to Approved byNumberFDOTFDOTComments432276-1 March 2013 March 2013 Letter <strong>of</strong> “No-conflict” instead <strong>of</strong> UWS425600-2 February 2013 Pending FDOT reviewing425600-3 March 2013 April 2013 Completed425600-6 March 2013 Pending FDOT reviewing425600-8 October 2012 March 2013 Completed425600-9 October 2012 March 2013 Completed425717-1 FDOT plans not yet available419848-1 March 2013 Pending FDOT reviewing419859-1 September 2012 September 2012 CompletedPage | 5 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project3.3.4 Project Controls Management ServicesThe Project Controls Management Team has received, logged, and distributed all incomingcorrespondence; and formatted, logged, and distributed all outgoing correspondence. Copies <strong>of</strong> thecurrent Technical Submittal Log and RFI Log are attached in Appendices I and II, respectively. Keytasks performed this period include:Developed and populated project changes log to monitor and track potential project changesPerformed review <strong>of</strong> the DBO Contractor’s draft baseline schedule submittal with the scheduleincluded in the DBO Agreement. Reviewed the DBO Contractor’s Pay Application No. 5, requested and obtained requiredpayment documentation, and ultimately recommended payment <strong>of</strong> the pay application to the<strong>Village</strong>.3.4 DBO Contractor ServicesThrough March 30, 2013, RWI has reached various levels <strong>of</strong> completion <strong>of</strong> the many different workitems included in the scope <strong>of</strong> work. Attached in Appendix III is “Reynolds <strong>Islamorada</strong> Status Report”which summarizes the DBO Contractor’s efforts through the current period. Shown on the table belowis a summary <strong>of</strong> the schedule <strong>of</strong> values with the completion percentages through March 30, 2013. TheDBO Contractor has submitted a revised draft project schedule that is currently under review by theORT. Discussions are ongoing between RWI and the ORT on the schedule.Work Value Completed-to-Date AnalysisPeriod Ending March 31, 2013DescriptionContract ValueValue Completedto-DatePercentComplete Value RemainingPayment and Performance Bonds $900,000.00 $900,000.00 100% $0.00Insurance $1,061,400.00 $1,061,400.00 100% $0.00Mobilization $1,850,000.00 $1,850,000.00 100% $0.00Record Drawings $150,000.00 $0.00 0% $150,000.00O&M Manuals $100,000.00 $0.00 0% $100,000.00Training $50,000.00 $0.00 0% $50,000.00PM, Supervision and General Conditions $14,595,300.00 $2,904,464.70 19.9% $11.690,835.30Design Services $8,362,500.00 $2,444,205.00 29.23% $5,918,295.00Permit Fees $499,700.00 $64,435.00 12.89% $435,265.00Materials and Equipment $9,475,000.00 $586,562.36 6.19% $8,888,437.64Construction Services $53,263,300.00 $6,155,302.00 11.56% $47,107,998.00KLWTD Meters, SCADA, Telemetry $242,800.00 $0.00 0% $242,800.00Demobilization $350,000.00 $0.00 0% $350,000.00Design Build Totals $90,900,000.00 $15,966,369.06 17.56% $74,933,630.94Stored Materials $26,418.52Contract Time for Design-Build Scope 1,174 days 185 days 15.76% 989 daysPage | 6 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission ProjectThe above table indicates that approximately 15.76% <strong>of</strong> the contract time has elapsed (versus 13.12% lastperiod) and 17.56% <strong>of</strong> the contract work has been completed (versus 15.76% last period), generally indicatingthe project is trending slightly ahead <strong>of</strong> schedule. The difference between the elapse <strong>of</strong> contract time and workcompleted from this period to last period has grown, indicating the progress <strong>of</strong> work is further ahead <strong>of</strong> schedulethis reporting period than it was last reporting period.Comments on the 2nd schedule submittal were returned to RWI and revisions to the schedule arebeing administered. A revised “S”-curve has been developed by RWI <strong>of</strong> the revised schedule which isshown below. This “S”-curve illustrates the predicted drawdown <strong>of</strong> funds that will be required tocomplete the project. This curve will be progressed to reflect the progress <strong>of</strong> the work on a monthlybasis.Project “S” curveEach <strong>of</strong> the Project’s discrete areas <strong>of</strong> work is at various completion stages. The “Progress Maps”included in Appendix IV provide an illustration <strong>of</strong> the completion stage for each <strong>of</strong> the Project’s areasthrough the reporting period.The DBO Contractor has also been fielding resident phone calls and inquiries from some residentsinterested in relocating or extending their sewer service connection to make their overall connectioncosts more efficient, or to place their connections in a place that works more efficiently with theirproperty’s physical characteristics or landscape. Attached in Appendix V is the DBO Contractor’scurrent Homeowner Request Log Follow Up document for the current period.Page | 7 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project4.0 LAND AND EASEMENT ACQUISITIONS4.1 Land AcquisitionsThere are (5) sites needed to construct the wastewater facilities. The following summarizes the status<strong>of</strong> each <strong>of</strong> the proposed (5) sites:Land and Easement Acquisition StatusSite/Location Status Next StepsNPK – NPK WastewaterTreatment Plant siteReady for constructionNone requiredMPK – Monroe CountyPublic Works site MM 88.6SPK – <strong>Village</strong> AdministrativeCenterUMK – Islander PropertyLMK – Adjacent to FireStationPhase I Site Assessment andsurvey completedPhase I Site Assessment andsurvey completed, ready forconstructionProperty appraisal receivedProperty appraisal receivedComplete Phase II SiteAssessment<strong>Village</strong> Planning approvalRWI to provide final VPSlayouts to <strong>Village</strong>RWI to provide final VPSlayouts to <strong>Village</strong>4.2 Private Road Easement AcquisitionsIn addition to the land acquisitions discussed above, utility easements are required for private roadsand other private property that the sewer system may be installed on. The DBO Contractor is in theprocess <strong>of</strong> pursuing easements for all the private roads and private property that will require utilityeasements.Status: The ORT, RWI, <strong>Village</strong> staff, and <strong>Village</strong> Attorney are meeting weekly to identify projecteasement requirements and expedite the obtainment <strong>of</strong> easements.Page | 8 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project5.0 DESIGNThe design elements <strong>of</strong> the DBO Contract are divided into several packages. Each design packageinvolves four (4) milestone deliverables, including the preliminary design report, preliminary design(30%), intermediate design (60%) and final design (100%). The Preliminary Design Report has beenreceived and accepted. The following summarizes the status <strong>of</strong> the design packages which areexpected to be delivered next:Design Package Status30% Submittal Scheduled Date StatusCFM 88.6 – 90.6 February 18, 2013 Received April 1, 2013CFM 85.6 – 88.6 March 11, 2013 PendingCFM 85.0 – 85.6 April 15, 2013 PendingCFM 74.3 – 85.0 June 3, 2013 PendingMPK US-1 Collection February 14, 2013 Received February 26, 2013SPK Collection February 14, 2013 Received February 26, 2013WK Collection March 11, 2013 Received March 12, 2013UMK Phase 1 April 8, 2013 PendingUMK Phase 2 May 20, 2013 PendingUMK Phase 3 July 1, 2013 PendingUMK Phase 4 August 12, 2013 PendingLMK Phase 1 July 8, 2013 PendingLMK Phase 2 September 30, 2013 Pending60% Submittal Scheduled Date StatusNPK Re-Pump Station February 28, 2013 Received March 25, 2013100% Submittal Scheduled Date StatusCFM 99.6 – 100.3 100% Submittal April 1, 2013 Received March 21, 2013Notes:1. Scheduled Dates were taken from RWI’s current Project Schedule2. CFM stands for Collection Force Main, the main conveyance line extending from LMK and connecting to the Key LargoTransmission MainAs evidenced in the above table, design efforts are tracking somewhat late and have been for the lastfew reporting periods. However design submittals have been catching up with the dates shown in theProject Schedule and continue to trend in a positive direction. Discussions continue weekly with theDBO Contractor and the ORT to meet design milestones and expedite the delivery <strong>of</strong> ORT reviewcomments.Page | 9 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project6.0 CURRENT PROJECT STATUS6.1 Summary <strong>of</strong> ProjectsThe table below provides a brief status update on the current design and/or construction projects.Work PhaseDescriptionKey Largo Pipelineand CollectionForce MainDeliveryMethodDesign / Build /OperateDesign StatusPortion <strong>of</strong>Construction Set,and60% DesignsubmittedEstimatedConstructionStatusLandAcquisitionStatusEasementStatus8% N/A N/ASummary <strong>of</strong> ProgressWork on CFM from MM 99.6 – MM100.3 is approximately 85%complete. 60% Design submittalsfor MM 90.6-MM 99.6 section <strong>of</strong> CFMwere returned to RWI on March 8,2013.ORT comments on NPK Re-pumpStation 30% design were returned toRWI on February 19, 2013. 60%Design for the NPK Re-Pump Stationwere submitted by RWI on March 25,2013.Channel CrossingsDesign / Build /Operate30% DesignSubmitted0% N/A N/AORT comments returned to RWI onFebruary 1, 2013.NPK VacuumSewerImprovementsBuild / Operate100%(By CPH)90% Completed N/ATesting <strong>of</strong> the sewer main and pitsare complete. Approval to place theNPK system into service wasrequested from FDEP.MPK CollectionSystem andVacuum PumpStationNPK FontaineRoad CollectionSystemWindley KeyCollection Systemand Vacuum PumpStationBuild / OperateBuild / OperateDesign / Build /Operate100%(By Wade Trim)100%(By Wade Trim)30% DesignSubmitted for theVPS and CollectionSystem45% Ongoing Ongoing99% Complete Complete0% Ongoing OngoingConstruction activities ongoing onNorth and South work phases.Preliminary testing and flushing <strong>of</strong>vacuum main is underway. Propertysurvey, environmental investigation,assessment for the MPK VPS weresubmitted to the <strong>Village</strong> on 1/25.Facility design revisions for the VPSalternate site have been submittedfor FDEP permits. Additionalproperty acquisition adjacent to theVPS site is being evaluation.Construction activities completed.Testing and completion <strong>of</strong> punch listitems is in progress.30% design submittal for the VPSwas returned to RWI on March 4,2013. 30% design submittal for thecollection system was returned toRWI on April 2, 2013. The 1 st publicmeeting was held on March 21, 2013.Windley Key ForceMainDesign / Build /OperateRevised PDRSubmitted0% Ongoing OngoingAnticipate RWI 30% design submittalApril 2013.Upper MatecumbeCollection Systemand Vacuum PumpStationDesign / Build /OperateDesign Submitted forthe VPS0% Ongoing Ongoing30% design submitted for the VPSwas returned to RWI on March 4,2013.Page | 10 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission ProjectWork PhaseDescriptionDeliveryMethodDesign StatusEstimatedConstructionStatusLandAcquisitionStatusEasementStatusSummary <strong>of</strong> ProgressUpper MatecumbeForce MainDesign / Build /OperateRevised PDRSubmitted0% Ongoing OngoingAnticipate RWI 30% design submittalApril 2013.Lower MatecumbeCollection Systemand Vacuum PumpStationDesign / Build /Operate30% DesignSubmitted for theVPS0% Ongoing Ongoing30% design submittal for the VPSreturned to RWI on March 4, 2013.Lower MatecumbeForce MainDesign / Build /OperateRevised PDRSubmitted0% Ongoing OngoingAnticipate RWI 30% submittal June2013.KLWTD Meters,SCADA, Telemetry Design / Build /and Design OperateCoordinationRevised PDRSubmitted0% Ongoing N/AORT comments on re-submitted PDRwere provided to RWI.Pavement OverlayProgram for NPK Design / Build /and MPK (Change OperateOrder No. 1)Submit DraftPavement OverlayInvestigation andDesign0% N/A N/AThe draft Investigation and DesignReport was returned to RWIon April 3, 2013.6.2 North Plantation Key (NPK)Vacuum main and vacuum pit installation has been completed, tested, and accepted for service by theFDEP. Asphalt milling and patching <strong>of</strong> the vacuum and gravity sewer trenches along South GardeniaStreet has been completed.North Plantation Key – Testing <strong>of</strong> aVacuum PitPage | 11 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project6.3 Middle Plantation Key and Fontaine DriveAt North MPK, installation <strong>of</strong> vacuum main pipe and vacuum pits are complete along Indian MoundTrail, Seminole Boulevard, Iroquois, Mohawk, Sioux, Pueblo, Navajo, and Apache Streets. Pretrenchingfor vacuum pipe continued along Tequesta and Caloosa Streets. Service lead relocationrequests by homeowners continue to be implemented by RWI.At MPK South, trenching and installation <strong>of</strong> vacuum pipe, most vacuum pits, and service stub-outs havebeen completed along Monroe, Cocoa, Sebring, Ocala, Tampa, Orlando, Key Heights Drive, HighPoint, Rolling Hills, and North Rolling Hills. Trenching for sewer main and vacuum pits continued alongAirstream Lane and <strong>Village</strong> Street.Installation <strong>of</strong> vacuum sewer, vacuum pits, laterals, and most <strong>of</strong> the punch-list items have beencompleted at Fontaine Drive. Final testing <strong>of</strong> the system is currently underway.Middle Plantation Key - Installation <strong>of</strong> Vacuum Pit and Cleaning Prior to Testing6.4 Key Largo Conveyance Force Main (CFM1.A)Installation <strong>of</strong> open-cut conveyance force main pipe in the US-1 right-<strong>of</strong>-way was completed this month.Work continues on the directional bore component <strong>of</strong> the force main. Restoration <strong>of</strong> curbs, asphaltpavement, and sod is underway. Heavy traffic volumes along US-1 required RWI to transition to nighttime work for work impacting traffic lanes.Page | 12 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission ProjectKey Largo Conveyance Force Main - DirectionDrilling <strong>of</strong> CFM at MM 99.6Key Largo Conveyance Force Main - RestrainedVertical Bend to Address Conflicts with ExistingUtilityKey Largo Conveyance Force Main - Trenching andInstalling Force MainPage | 13 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project7.0 COMMUNICATIONS, OPERATIONS & 30-DAY LOOK AHEAD7.1 CommunicationsResidents will have an opportunity to review the proposed location <strong>of</strong> their sewer service lateralconnections into the collection and transmission system. This opportunity will be afforded to residentsat public meetings prior to the completion <strong>of</strong> the 60% level. RWI has projected dates on their currentschedule submittal as to when these public meetings will be held for each phase <strong>of</strong> the project. RWI isalso scheduling Pre-Construction Meetings for each phase <strong>of</strong> the project so residents are informed priorto the start <strong>of</strong> construction. The table below provides a Resident Summary Schedule <strong>of</strong> when thesedates are currently proposed, and when construction in each area is expected to start and finish. Asthese dates may change during the course <strong>of</strong> the project, they will be updated in this report and onRWI’s website.LocationResident Summary ScheduleLayoutResidentMeetingPre-ConResidentMeetingEstimated StartConstructionEstimatedCompleteConstructionNorth Plantation Key N/A Held 10/23/12Started11/19/1205/21/13Middle Plantation Key N/A Held 10/24/12Started11/19/126/20/13South Plantation Key Held 3/5/13 6/12/13 6/26/13 1/13/14Windley Key Held 3/21/13 6/12/13 6/26/13 11/8/13Upper Matecumbe Key 5/30/13 7/29/13 7/29/13 5/1/15Lower Matecumbe Key 7/15/13 11/25/13 11/25/13 11/18/15Note: Bold indicates tasks completed.7.1.1 Key Largo Wastewater Treatment District CoordinationOn March 19, 2013, The Key Largo Wastewater Treatment District was formally notified <strong>of</strong> the schedulefor work within Key Largo. Vice Mayor Ted Blackburn, Councilman Mike Forster, <strong>Village</strong> staff, ORTstaff, and RWI staff presented to the KLWTD Board a summary <strong>of</strong> the proposed work activities andanticipated work schedule.7.2 OperationsThe following provides a brief description <strong>of</strong> the work that was started and/or completed during thereporting period. The Operations & Maintenance Report for this period is included in appendix VI.RWI operations and maintenance staff continue to successfully maintain and operate the NorthPlantation Key WWTP within compliance with no exceedances.Approximately 3.943 MG was treated during the reporting period with maximum daily flows <strong>of</strong>0.186 MGD.Four service call outs were received and resolved.Page | 14 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly Program Report, Period: 2/25/13 to 3/30/13Wastewater Collection & Transmission Project7.3 30-Day Look AheadThe following summarizes many <strong>of</strong> the following tasks scheduled to be accomplished over the nextthirty days: Continue construction and testing <strong>of</strong> the MPK vacuum collection system and begin construction<strong>of</strong> the low pressure force main collection system along Old Highway. Continue restoration activities, and place into service the NPK collection system modifications. Complete the installation <strong>of</strong> the US-1 Conveyance Force Main to KLWTD from MM 99.6 to MM100.3 (CFM1.A), and commence with construction <strong>of</strong> the second phase <strong>of</strong> the US-1Conveyance Force Main from MM 99.6 to MM 90.9 (CFM1.B). Complete testing and secure acceptance <strong>of</strong> the Fontaine Drive collection system Secure FDEP permit for the relocated MPK Vacuum Pump Station Continue acquisition steps for procuring vacuum pump station sites and private road easements Continue the design <strong>of</strong> the remaining service areas Continue preparing and receiving/reviewing technical submittals and Requests for Information Submit and initiate review <strong>of</strong> design <strong>of</strong> the Conveyance Force Main to KLWTD from MM 91.1 toMM 99.6 (CFM1.B) addressing ORT and agency comments. Construction for this area isanticipated to begin the week <strong>of</strong> April 15, 2013, pending ORT and agency approval <strong>of</strong> the finaldesign Address ORT comments on 60% design on NPK Re-Pump Station Submit and initiate review <strong>of</strong> 60% design <strong>of</strong> Windley Key Collection System Submit and initiate review <strong>of</strong> the 60% design <strong>of</strong> the MPK US-1 Collection System Submit and initiate review <strong>of</strong> the 60% design <strong>of</strong> the SPK Collection System Submit and initiate review <strong>of</strong> the 60% design <strong>of</strong> the Conveyance Force Main from MM 88.6 toMM 90.8 Submit and initiate review <strong>of</strong> the 30% design <strong>of</strong> the Conveyance Force Main from MM 85 – MM85.6 Respond to Construction Change Requests (CCR) Implement homeowner requested service relocations as accepted Procure Owner Direct Purchase materials based on <strong>Village</strong> issued purchase orders Respond to ORT draft comments and submit final pavement survey and evaluation <strong>of</strong> fulloverlay over public and private paved roadways for Middle Plantation Key and North PlantationKey work phases based on Change Order No. 1Page | 15 April 2013


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly ReportWastewater Collection &Transmission ProjectAppendix ITechnical Submittal LogUpdated 4/3/13


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly ReportWastewater Collection &Transmission ProjectAppendix IIRequest for Information LogUpdated 4/3/13


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly ReportWastewater Collection &Transmission ProjectAppendix IIIReynolds <strong>Islamorada</strong> Status ReportUpdated 4/8/13


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly ReportWastewater Collection &Transmission ProjectAppendix IVProgress MapsUpdated 4/5/13


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly ReportWastewater Collection &Transmission ProjectAppendix VHomeowner Interaction Log2/19/13 – 4/1/13


<strong>Islamorada</strong>, <strong>Village</strong> <strong>of</strong> <strong>Islands</strong>Monthly ReportWastewater Collection &Transmission ProjectAppendix VIOperations & Maintenance LogUpdated March 2013


Wade Trim, Inc.88539 Overseas HighwaySuite 4<strong>Islamorada</strong>, FL 33070