5No<str<strong>on</strong>g>Comments</str<strong>on</strong>g>: R4 should be clarified that the 100 MW limit applies to <strong>UFLS</strong> entitiesper Planning Coordinator. For example, a <strong>UFLS</strong> entity with 1000 MW in <strong>on</strong>e PCand 95 MW in another PC should be allowed to use the less stringent criteria inthe PC that it <strong>on</strong>ly has 95 MW in.