Quick Start GuideIQ SENSOR NET System 184 XT4 Powering UpFor powering up, switch on the voltage supply of the MIQ power supply module. The system starts with thefollowing start-up sequence:Start-up sequence:1 In the initial start phase, all IQ SENSOR NETcomponents are automatically registered on theMIQ/C184 XT controller module and the terminalis initialized. Then, the system performs aself test. This process may last a few seconds.2 As soon as the terminal is successfully initialized,the measured value display appears (fourfolddisplay). In the case of IQ sensors that arenot yet providing measured values, "Init" appearstemporarily.3 When the start-up sequence is finished, themeasured values of all sensors appear on thedisplay. The system is now ready for measuring.18