13.07.2015 Views

General Terms and Conditions - Port of Rotterdam

General Terms and Conditions - Port of Rotterdam

General Terms and Conditions - Port of Rotterdam

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

ANNEX 1 PORT TARIFFSprices in euro’s2 RATES FOR INLAND PORT DUES*2.1 BASIC TARIFFSThe inl<strong>and</strong> port dues will be calculated per type <strong>of</strong> vessel with the use <strong>of</strong> the schedule printed below by multiplying theapplicable tariff by the applicable unit (a or b).Period Cargo ships (b) Passenger ships <strong>and</strong>Tugs (a)OtherVessels (a)7 days 0.092 0.092 0.09214 days 0.168 0.168 0.1681 month - - 0.2491 calendar quarter 0.930 0.930 0.6221 calendar year 3.196 3.196 2.211(a) Rate per m 2 surface area (b) Rate per Deadweight* The rates exclude VAT.2.2 RAISES AND DISCOUNTSThe different types <strong>of</strong> vessels are classified in the following categories. Depending on the applicable category either a raiseor a discount on the basic tariff will be applied. Raises are used for the funding <strong>of</strong> the Stimulation Program for cleaner Inl<strong>and</strong>Vessels <strong>and</strong> transferred by HbR NV to the Expertise- en InnovatieCentrum Binnenvaart (EICB). HbR NV automaticallyclassifies every type <strong>of</strong> vessel into category 1. If this classification is not right, the Client needs to apply for a differentclassification by filling out an application form that can be downloaded from [www.port<strong>of</strong>rotterdam.com/portdues].No. Description types <strong>of</strong> vessel Raise/Discount1 Does not meet emission st<strong>and</strong>ard CCR2 +10%2 Meets emission st<strong>and</strong>ard CCR2 n.a.3 Meets emission st<strong>and</strong>ard CCR2 <strong>and</strong> disposes <strong>of</strong> a Green Award Certificate -15%4 Surpasses emission st<strong>and</strong>ard CCR2 with 60% -30%5 No propulsion engine n.a.3 RATES FOR WASTE FEE3.1 RATESIn the <strong>Port</strong>, the amounts <strong>of</strong> the waste fee, the processing charges <strong>and</strong> the collection fee are based on the capacity <strong>of</strong> themain engine (MEC) as set out below in both schedules. The fees are owed to HbR NV wether or not waste is actually issued.APPENDIX I: FUEL RESIDUE/SLUDGE, USED MOTOR OIL, BILGE WATERLtr. Category (MEC in kW) Waste fee appendix I (€)A 1 - 1,999 25B 2,000 - 3,999 50C 4,000 - 6,999 100D 7,000 - 9,999 200E 10,000 - 14,999 300F 15,000 - 29,999 400G >30,000 550PORT TARIFFS 2014 21

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!