13.07.2015 Views

General Terms and Conditions - Port of Rotterdam

General Terms and Conditions - Port of Rotterdam

General Terms and Conditions - Port of Rotterdam

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

HARBOUR TOWAGE FAIRPLAY TOWAGEprices in euro’sASSISTANCE TO SEA-GOING VESSELS FROM RIVER TO BERTH OR VICE VERSAVessel’s length over all in meters <strong>Rotterdam</strong>, harbour nrs < 5000 (a) Europoort, harbour nrs > 5120 (b)< - 130131 - 160161 - 190191 - 220221 - 250251 - 280281 - 310311 - 340341 - 370371 - >1,000 1,2001,125 1,4001,475 1,8001,800 2,3252,050 2,6252,475 3,0502,875 3,3753,400 3,8253,500 3,9753,975 4,200rates in euro’s per tug(a) from <strong>Rotterdam</strong> Erasmusbridge(b) including BrittanniëhavenSHIFTING1 at same quay: rate as above, no surcharge2 within same area: rate as above plus 30% *3 from one area to another: rates <strong>of</strong> respective areas as above ** In case tug(s) remain(s) connected: plus hourly rates for net transit time(s)HOURLY RATESHourly rates (from / to tugs’ berth): € 615 per commenced hour.Towage beyond areas as above: at hourly rates or prices on request.MISCELLANEOUS1 No surcharges for night-, weekend-, holiday work, drift ice or fog.2 Assistance <strong>of</strong> dead ships: 50% surcharge on applicable rates.3 In case our bunker purchase price exceeds € 160 per cbm:a bunker surcharge as per actual price <strong>and</strong> average consumption will be charged(copies <strong>of</strong> bunker surcharge table available upon request).4 The above rates are not applicable for rendering emergency-services.5 Waiting prior to start <strong>of</strong> harbour assistance (in excess <strong>of</strong> 30 minutes): 50% <strong>of</strong> hourly rate.Holding astream: at hourly rate.6 In case <strong>of</strong> tug cancellation less than one hour prior to anticipated commencement: 50% <strong>of</strong> applicable rate.7 Payments: within 14 days after receipt <strong>of</strong> invoice.8 The ‘Dutch Harbour Towage <strong>Conditions</strong> 2007’ apply (copies available upon request).9 For vessels calling Maasvlakte 2 a surcharge <strong>of</strong> 25% on the ‘Area B’ tariff will be levied.32 TARIFFS OF THIRD PARTIES 2014

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!