13.07.2015 Views

The Cost of Rehabilitating Our Nation's Dams. A Methodology ...

The Cost of Rehabilitating Our Nation's Dams. A Methodology ...

The Cost of Rehabilitating Our Nation's Dams. A Methodology ...

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

programs for dam rehabilitation projects. FEMA and the SDSR called on the Association <strong>of</strong> StateDam Safety Officials (ASDSO) to establish this committee. Its nine members were charged with:1) researching and estimating the total dam rehabilitation costs for the United States;2) collecting information on existing funding programs;3) developing recommendations for the establishment <strong>of</strong> federal dam restoration grant and/orloan programs; and4) drafting model state legislation, rules, and guidelines for state dam restoration grant and/orloan programs.It is was hoped that the findings <strong>of</strong> the committee would be utilized by Congress, individual states,FEMA, ASDSO, and the dam safety community in an effort to increase the availability <strong>of</strong> fundingsources.<strong>The</strong> committee began its work in October 2000 and completed its initial report—entitled <strong>The</strong> <strong>Cost</strong><strong>of</strong> <strong>Rehabilitating</strong> <strong>Our</strong> Nation’s <strong>Dams</strong>: A <strong>Methodology</strong>, Estimate and Proposed Funding Mechanisms—in December 2002. A revised version <strong>of</strong> this report was published in October 2003.2000­2002 Rehabilitation <strong>Cost</strong>s Study<strong>The</strong> committee’s intensive two‐year, peer‐reviewed study considered the number <strong>of</strong> stateregulateddams, the size <strong>of</strong> the dams, the costs <strong>of</strong> deferred maintenance (any maintenanceactivity that does not require formal engineered plans or the approval <strong>of</strong> a pr<strong>of</strong>essionalengineer), the cost <strong>of</strong> engineering evaluation and design, the cost <strong>of</strong> rehabilitation (whetherrepair, replacement or removal), and the cost <strong>of</strong> increasing storage capacity or structuralupgrades. Estimates did not include costs for administration <strong>of</strong> a funding mechanism; nor didthey take into account the increasing number <strong>of</strong> high‐hazard‐potential dams, those whosefailure would cause loss <strong>of</strong> human life.<strong>The</strong> committee concluded that:<strong>The</strong> cost <strong>of</strong> upgrading or repairing all non‐federal dams in the U.S. would exceed $36 billion.Almost one‐third <strong>of</strong> this amount—$10.1 billion—would be needed for the nation’s most criticaldams, the more than 10,000 non‐federal dams across the nation whose failure would cause loss <strong>of</strong>human life.It recommended the creation <strong>of</strong> a national dam rehabilitation loan program. Subsequently, ASDSOworked with lawmakers to draft the Dam Rehabilitation and Repair Act that would providefunding for repairs to high‐hazard‐potential dams. Congress has not yet passed this legislation.9

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!