13.07.2015 Views

In-flight upset - 154 km west of Learmonth, WA, 7 October 2008,

In-flight upset - 154 km west of Learmonth, WA, 7 October 2008,

In-flight upset - 154 km west of Learmonth, WA, 7 October 2008,

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

involved continuity, short circuit, electrical bonding and shielding tests. Noproblems were found.• <strong>In</strong> November <strong>2008</strong>, the operator conducted integrity and time domainreflectometry tests on the aircraft’s ADIRU 1 databus wiring, and verification <strong>of</strong>databus signals using a bus analyser. No problems were found.• <strong>In</strong> May 2009, the aircraft manufacturer and the operator conducted additionalchecks <strong>of</strong> the ADIRU 1 installation and configuration. The checks includedventilation, electrical bonding to the aircraft structure, input and output databuswiring isolation, input and output databus waveforms, discrete input signals(power and mode selection), AOA input signal waveforms, and alternatingcurrent (AC) and direct current (DC) power supply waveforms. No faults werefound that were relevant to understanding the occurrence or otherwiseconsidered significant.• <strong>In</strong> May/June 2009, the aircraft underwent a scheduled C-check. No aircraftwiring or configuration problems were identified during that check.1.12.6 ADIRU examinationsService historyThe aircraft was fitted with three LTN-101 ADIRUs, manufactured by NorthropGrumman Corporation. The basic details <strong>of</strong> the ADIRUs are provided in Table 14.Table 14: Details <strong>of</strong> the aircraft’s ADIRUsADIRU 1 ADIRU 2 ADIRU 3Model number LTN-101 LTN-101 LTN-101Part number 465020-0303 465020-0303 465020-0303Serial number 4167 4687 4663Date <strong>of</strong> manufacture Aug 2002 Jan 2004 Dec 2003Date installed in QPA Feb 2004 Apr 2006 Jul <strong>2008</strong>Date installed in position Mar 2006 Apr 2006 Jul <strong>2008</strong>S<strong>of</strong>tware version 0316 0316 0316Total operating hours 30,282 26,985 25,423All three units had been removed from aircraft during their operational life due toreported faults, which was not abnormal for units with similar operating hours (seesection 3.9 for more details on ADIRU reliability). More specifically:• unit 4167 was examined and repaired in May 2003• unit 4687 was examined and repaired in February 2006• unit 4663 was removed for examination on two previous occasions (<strong>October</strong>2007 and May <strong>2008</strong>) but, on both occasions, no fault was found.None <strong>of</strong> those reported problems were related to the 7 <strong>October</strong> <strong>2008</strong> occurrence.A review <strong>of</strong> all the operator’s technical log entries related to ADIRUs identified oneprevious event involving similar ADIRU behaviour as that on 7 <strong>October</strong> <strong>2008</strong>. Thatevent occurred on 12 September 2006 and involved the same ADIRU (unit 4167) in- 51 -

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!