Views
3 years ago

pdf&pageCount=1&appid=1001

pdf&pageCount=1&appid=1001

new doorway in blockwork

new doorway in blockwork wall734 20130926-Heritage Statement - Planning7.0 PROPOSED ALTERATIONS7.2 Works to the Gala - First FloorProposed Internal Demolitions: (See plan left)20GALA BINGO HALLNew floor at proposed first floor level(+29.20). Existing floors removed.The 1930’s reinforced concrete balcony is demolished as part ofthe general demolition works. This includes the toilet and formerbar area under the balcony on the north elevation. The first floor ofthe dressing room block is demolished. Within the retained hall thepart of the gallery from the 1930’s and its 1950’s extension at thesouthern end are demolished.Proposed Alterations: (See plan below)REGENCY GARAGEA new concrete floor is proposed over the hall supported on thecolumns noted on the ground floor plan. A large opening is providedwithin the floor for the tenant staircase installation. This floor extendsat a higher level in the new build casino area to the north.GALA FOYERFloor removed in this area to enableconstruction of staircase and lift.First Floor: DemolitionsRefer to Clarkebond structural engineers drawings and schedule ofworks.Assessment of Significance & ImpactMARKET PHCut out in floor to provide verticalservice riser. Size TBC.opening blockedThe internal demolitions are to the 1930’s and 1950’s structureswhich are mostly of technical interest only. There are a few Art Decodetails in the skirtings and planning of the old bar area but thesehave limited significance and there is nothing of interest elsewhere.Casino25.40opening in floor fornew stair by tenantB 24.09.13 PGM Planning application submissionA 12.06.13 PGM Party wall between Market and Regency garage modified. Wall between Market and Gala modified. In response to Casino fit-outproposals.REVISIONSCLIENTDeeley Freed (Penhalt) Ltd.DRWG NO734 -1072 BPROJECTSaw Close, BathSCALE1:100 @ A1TITLEFirst Floor DemolitionsDATEMar. 13DRAWNRNCHK'DKMlift car andAaron Evans Architects Ltd • 3 Argyle Street Pulteney Bridge Bath BA2 4BA • office@aaronevans.com • www.aaronevans.com • t: (01225) 466234 f: (01225) 444364This drawing is copyright • Only figured dimensions to be used • Contractors to check all dimensions before proceedingmechanismby tenantfixed ladder escape removedSaw Close: Design & Access StatementFirst Floor: Proposals

void over Casino First Floordoor removed and opening blockedwindow removed andopening blocked with734 20130926-Heritage Statement - Planning7.0 PROPOSED ALTERATIONS7.2 Works to the Gala - Second Floor / RoofProposed Internal Demolitions: (See plan left)The 1930’s reinforced concrete balcony extends to the northelevation and is demolished as part of the general demolition works.21GALA BINGO HALLProposed Alterations: (See plan below)An existing high level opening providing maintenance access tothe Komedia roof next door is blocked up. The existing timber roofstructure is strengthened and the roof slopes extended to form anew ridge line.REGENCY GARAGERefer to Clarkebond structural engineers drawings and schedule ofworks.240249242250241251GALA ATTIC252approx position of a/c ductwork shown do ted(not surveyed)210Outline of proposed lift shaftShaded area - over existing fireescape below, floor replaced levelwith adjacent new Casino floor(-190mm)Second Floor: Demolitionsventilator removed andwindow removed andopenings blocked withopening blocked withbath stone rubblebath stone rubblefacingfacingAssessment of Significance & ImpactOnly on the ceiling is there any interest at the upper level of thebalcony. At the junction between the two ceiling sections is anArt Deco corbel and beam detail, which is repeated at the ceilingjunction with the retained roof structure. It is intended to retain thelatter feature which would mitigate the loss of the former.bath stone rubblefacing216215MARKET PH214213212211party wall line indicativesubject to site surveypost demolitionB 24.09.13 PGM Planning application submissionA 12.06.13 PGM Previously proposed opening in wall between Market and Gala omitted. New opening between Market and Regency Garage proposed.Modifications to floor and roof over part of Market to facilitate installation of Casino lift. Wall around Market stair (by Gala) shown asdemolishedREVISIONSCLIENTDeeley Freed (Penhalt) Ltd.DRWG NO734 -1073 BPROJECTSaw Close, BathSCALE1:100 @ A1TITLESecond Floor DemolitionsDATEMar. 13DRAWNRNCHK'DKMAaron Evans Architects Ltd • 3 Argyle Street Pulteney Bridge Bath BA2 4BA • office@aaronevans.com • www.aaronevans.com • t: (01225) 466234 f: (01225) 444364This drawing is copyright • Only figured dimensions to be used • Contractors to check all dimensions before proceedingwith bath stone facing to match adjacentSecond Floor: ProposalsSaw Close: Design & Access Statement

pdf&pageCount=1&appid=1001
Constructive Conservation in Practice | PDF - English Heritage
Architects - Volume 1 [pdf, 770kb] - Historic Scotland
Plans guidance note (PDF) - Lake District National Park
to download the complete Design Statement in PDF format - Rove
Understanding Historic Buildings - Part 1 | PDF - English Heritage
Annual Report (PDF, opens in new window, 1.9MB) - Newcastle City ...
Heritage Statement - Historic Baseline Report Appendix .1 - Gosport ...
1 shrub place (shrubhill) leith walk, edinburgh - Broughton Spurtle
March 1, 2010.pdf - Watrous Heritage Centre
1 case studies pdf 37 mb - Kerstinhoeger.com
4_Weiss_Thurs session 1.pdf - Laguna de Santa Rosa Foundation
Designation_Yearbook_2013-14_final
Plans guidance note (PDF) - Lake District National Park
Block 1 Section 25 and Blocks 7 & 12 Section 26 - DCP No. 10/04 PDF
Holt Part 1 of 2 - PDF format 2.6Mb - Wrexham County Borough ...
Download part 1 of the guide - BD
Volume 1 Part 7.pdf - Port of San Francisco