Axor Starck ShowerCollection Shower Planning

jhplumb.com

Axor Starck ShowerCollection Shower Planning

Installation pathof the shower modules forceiling installation.In ambience no. 3, we haveshown another field of use for theshower module. In addition totheir installation for a body ora neck shower, the showermodule can also be used withseveral others as a head shower.In this case, 6 shower modulesare combined.1 Align the installationplate with the 6 showermodules.2 Pipe the connectors andinstall the threaded bars into theceiling to secure the installationplate.3 Hold the installationplate with the piping againstthe desired location on theceiling and screw it on usingthe threaded bars and alignit. After that, check the linesfor leaks.4 Install the intermediate ceilingand prepare the 6 borings for the½" connectors. After that, screwthe ½" connectors into theinstallation plate.5 Align the shower moduleswith the flat side of the ½"-connector.6 Secure the shower modulecartridges to the ½" connectors.Then install the cover plate on thecartridge and secure by looseningthe socket head screws.7 Perform a functional test.32 Axor Starck ShowerCollection

More magazines by this user
Similar magazines