13.07.2015 Views

(CIE) Guide - Building Energy Codes

(CIE) Guide - Building Energy Codes

(CIE) Guide - Building Energy Codes

SHOW MORE
SHOW LESS
  • No tags were found...

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

8. Manual D duct design specific to the building.9. Documentation must be submitted verifyingwhether a blower door test will be done inaccordance with Section 402.4.2.1 or the visualinspection option according to Section 402.2.2.10. Documentation verifying that at least 50% of thelamps in permanently installed lighting fixtures willbe high-efficacy lamps in accordance with Section404.1.Total UA Alternative PathThe Total UA Alternative Path method of showingcompliance is found in Section 402.1.4 of theIECC. This method is commonly known by users ofREScheck. The 2009 IECC code option in REScheck isavailable as a free download from the BECP website athttp://www.energycodes.gov.The building plan must clearly define and delineatethe building thermal envelope.REScheck submittal must include the followinginformation:1. Site-specific address, project type, climate zone,and code version.2. Insulation type, R-value for all areas, and specifywhere the insulation is being used (e.g., attic, floorover unconditioned space, and exterior walls). Thisinformation must be specific. Merely listing Wall 1,Wall 2, etc. will not be sufficient to allow the plansexaminer and building inspector to be able todetermine which wall you considered to be “Wall1,” etc. You must also specify if this is continuousor cavity insulation.3. Using orientation: “unspecified” will not beacceptable when describing a wall, window, ordoor location. Please specify orientation as “front,back, left, or right” and the square footage of thewall, window, or door on each orientation.4. Fenestration U-factors.5. Accurate square footages.For now, ______________(jurisdiction) will requiresite-specific submittal. We do not have the historicalevidence to show that you may use “worst casescenario” and make this path work.Other details are required as listed below:1. Duct sealing and insulation.2. Manual J specific to the site.3. Manual D duct design specific to the building.4. Documentation must be submitted verifyingwhether a blower door test will be done inaccordance with Section 402.4.2.1 or the visualinspection option per Section 402.2.2.Simulated Performance Alternative Path(Performance)The Simulated Performance Alternative Path is foundonly in the 2009 IECC in Section 405. This path stillrequires mandatory compliance with air leakage(402.4), maximum fenestration U-factor (402.5), andsystems (portions of Section 403) requirements.The Performance Path method of compliance requiresthe submittal of energy compliance documents andcould have the additional task of on-site inspectionsto be performed by a certified rater. The rater must becertified by RESNET® if using the REM/Rate softwareto verify compliance with this path.50COMPLIANCE IMPLEMENTATION AND EVALUATION (<strong>CIE</strong>) GUIDE

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!