13.07.2015 Views

CENTRAL MARKS DEPARTMENT – II Our Ref: CMD-II/16 ... - BIS

CENTRAL MARKS DEPARTMENT – II Our Ref: CMD-II/16 ... - BIS

CENTRAL MARKS DEPARTMENT – II Our Ref: CMD-II/16 ... - BIS

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

) Acceptance of revised STI.c) Test report indicating conformity of the product to the revisedspecification.3. Stoppage of marking shall be imposed in case sample fails in factory/ independenttesting as per the revised version at the time of verification on the routine periodicinspection and further actions are to be taken as per Operation CertificationManual.4. Action shall be taken as per OM 2004, if the licensee fails to submit theacceptance of STI in stipulated time.For Applicants:1. All new applications may be recorded and processed as per revised IS 1084:2005.2. In case applicant sample is yet to be tested by Lab, necessary action may be takenimmediately by BO for considering the case as per IS 1084:2005 after consultingthe applicant.3. New licence granted during this period as per IS 1084:1994. ROs/BOs shallensure that new licensee shall implement the revised standard and STI within thestipulated period.REVISED STANDARD IS 1084:2005 AND NEW STI DOC:STI/1084/3, Feb 2006WILL BE EFFECTIVE FROM 15 APRIL 2006.All RO’s/BO’s are requested to take appropriate necessary action.STI is already available on <strong>BIS</strong> internet site and can be downloaded.Sc.F&H(<strong>CMD</strong>-<strong>II</strong>)(N.K. Bansal)Joint Director (<strong>CMD</strong>-<strong>II</strong>)Circulated to all RO’sBO’s, <strong>CMD</strong>-ICc:TXD - with a request to gazette it w.e.f. 15 April 2006.

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!