I.1.3 Projects Not Covered per CriteriaRequirements:i Project Description (DAO 30, Series of 2003)ii Application Form to include criteria checklistI.1.4 Environmental Enhancement or Direct MitigationRequirements:i Project Description (DAO 30, Series of 2003)ii Environmental Management PlanI.1.5 Projects unlikely to cause adverse <strong>environmental</strong> <strong>impact</strong>sRequirements:i Project Description (DAO 30, Series of 2003)2


Steps/Procedure:1. Secure/Fill up application <strong>for</strong>m from EMB regional offices.2. Submit filled up <strong>for</strong>m and supporting documents to EMB <strong>for</strong> initialscreening (3 sets). To determine if the project covered by EIS sytem ornot3. If documents are complete, pay the required filling and processing fee, ifnot complete return to the proponent4. Submit the documents to the receiving clerk where application will beofficially received and recorded.Note: Processing time will be 15 working days4


Department of Environment and Natural ResourcesEnvironmental Management BureauRegion ______CERTIFICATE OF NON-COVERAGEThis _______________________________________ has been issued this certificate of Non-Coverage No. __________ on ______________________ in accordance with P.D. 1586, theEnvironmental Impact Assessment System._____________________________EIA Division Chief__________________________Regional DirectorNote: Covering letter will also be given to the proponent <strong>for</strong> the exactcoverage and scope of the project6


I.2 ECC Application <strong>for</strong> IEE Checklists (For new single project locatedwithin ECA or Non- ECP)Requirements:a. Accomplished IEE checklist (to be provided by RO’s <strong>for</strong> specific type ofproject or can be downloaded at www.emb.gov.phb. Proof of Social Acceptability-Favorable endorsement from the LGU (Barangay or Municipality/City)and/or those specific <strong>requirements</strong> as specified in the IEE Checklists;c. Proof of Ownership or Right Over the Applied Area (any of the following)-OCT No.-in case of Tax Declaration, provide duly notarized Affidavit of Ownershipor No Adverse Claimant-Contract of Lease, Operating Agreement, Deed of Assignment-Others as deemed appropriated. Zoning Certification from DZA and/or HLRB or Locational Viability asdeemed appropriatee. Project Plans-Location/Vicinity Map-Site Development Plan7


IEE CHECKLIST PROJECTSType of ProjectsBatching PlantCommunity Based Forest ResourcesUtilizationFisheryGasoline stationHousing, land development and otherbuilding development projects thatinclude the following:? Residential structures? Commercial and business centersIrrigation? Institutional? Housing and land developmentLand TransportationLPG Storage/RefillingLimitsNoneAreas Less than 500 ha.Inland-based fishery project with waterspread area from 300 sq. m to 10 ha.Nonea. Apartments - livable floor area ofabove 1,000 sq. mb. Condominiums and apartelle -regardless of areac. Motels and hotels - 1,000 sq. mlivable area and belowa. Food Handling/Services – 1,000 sq.m of floor facilities area and below(except <strong>for</strong> kiosk type and mobilefastfood)b. Funeral Parlors – regardless of areac. Others (offices, retailers,wholesalers, etc) – above 1,000 sq.m to 10,000 sq. m of floor facilityareaIrrigation <strong>system</strong>s with a service areagreater than 300 ha. and less than orequal to 700 ha.a. Educational/school structures -above 1,000 sq. m to 10,000 sq. mof floor facility areab. Religious Building facilities – 1,000sq. m of floor facility areac. Hospital and medicalbuildings/facilities and belowa. Resettlement – 10 ha. of land areaand belowb. Economic and Socialized Housing –less than 10 ha. of land areac. Open Market Housing – less than10 ha. of land aread. Projects under CommunityMortgage Program (CMP) – offsiteCMPsBus/Jeepney TerminalStorage capacity of 5000 tons andabove shall be required to conductEnvironmental Risk Assessment8


Marble SlabMarble slab processing plantMini-hydroMOA with DOE 1-10 MW; Less than20million cubic meter waterimpoundmentOrganic Fertilizer Manufacturing With an annual production capacity(Composting) Facilitiesexceeding 10,000 bags (50kg/bag)Plastic RecyclingNonePoultry1,001 – 40,000 birdsPublic marketNonePower bargeLess than 10 MW capacityPower transmission lines & substationsthan 20 km in lengthGreater than 230kv to 138kv w/ lessPrivate land timber utilization (PLTU) IEE checklist is applicable only <strong>for</strong>PLTU projects which employ thecutting of 11 to 100 primary orsecondary growth trees ofcorresponding volume less than orequal to 200 cu.m in private titled landSmall-water impounding project (SWIP) With not more than 20,000,000 cu. Mof waterReclamationNo checklist set guidelines <strong>for</strong> anacceptable reclamation project incoastal and lakeshore areasRicemillMore than 1 ton/hr. w/o multiple passRoads and Bridgesa. Construction of major/national roadnetwork <strong>system</strong>s with a total lengthequal to or less than three (3)kilometers traversing an area ofcritical slope construction ofmajor/national road network<strong>system</strong>s with a total length equal toor less than 10 km outside criticalslopeb. Rehabilitation of existing city andnational roads which traverse an<strong>environmental</strong>ly critical area (ECA),<strong>for</strong> Presidential Proclamation 2146c. Major rehabilitation of existingand/or national road network<strong>system</strong>s which will require theacquisition of additional 50% of theoriginal right of waySand and gravelNot more than 5 ha.Sewage (collection, transport, Nonetreatment and disposal)SlaughterhouseNoneSmall scale lime extraction project Limited to an area of not more than 5ha. beehive <strong>for</strong> cooking and simpleprocessing such as classifierTelecommunication antennae mobile .phone, cell sites and similar facilitiesexcept <strong>for</strong> those:a. Located on top building(rented/leased space) and onlyinclude mounting pole/s (not standalone towers); andb. Facilities located as “Co-locator”9


(antennae/dishes are attached totowers owned by other companies).TourismPiggery farmCold chainGrains highwayRo-ro terminalPort expansiona. “Boracay” proponentsb. Beach resort projectsc. Hotels, inns and similaraccomodations within or nearurban centers or built up areas withless than 20 rooms with eatingfacilities(hotels, cottages,motels,and lodging houses with 10-15rooms with minimumfacilities/amenities <strong>for</strong> resting andeating and some recreation; andecotourism located in uniquearea/historical-culturalsites/protected areas under NIPASAct)100 heads and aboveStationary/fixed facility used <strong>for</strong> storingagricultural products and shall be acomponent of Sustainable LogisticsDev’t Program of DBPHighways used <strong>for</strong> transporting thefarmers’ goods from the farm to thesatellite aggregating/processingcenters with a greater than 1 ton/hrwhere mechanical shelling, drying, andstoring of grains in bulk take place.Then, through bulk trucks, the grainsare transported to the mainaggregating facilities where grains aredried and stored in silos and grains aretransferred to the mechanicalloading/unloading facilities in the portthrough the use of bulk carriers.Under the Sustainable Logistics Dev’tProgram (SLDP) of DBP with AccessRoads (= or less than 10 kilometers)and Terminal Facilities (= and above1,000 sq. m. to 10,000 sq. m. of floorarea)Rehabilitation and Expansion of PortFacility <strong>for</strong> use of the SLDP10


PROCEDURAL FLOWECC APPLICATION FOR IEE CHECKLISTProponent SubmitsApplication to EIAMDivision <strong>for</strong> ScreeningScreening OfficerScreens ECC applicationNoComplete?YesPayment of Filing andProcessing Fee by theproponent2 daysRecords Section receive applicationto be <strong>for</strong>warded to the C, EIAMDivisionREDS FocalCase Handler? Evaluation? Site inspection/verification? Request <strong>for</strong> AI (max. of 2AI) if necessaryYesIf with AIProponentSubmit AINoIssue NOV?YesLegal <strong>for</strong> resolutionof NOV/decideamount of penalty23 days (Checklist)Case Handler preparesNoreport, denialletter, and draft ECC to be <strong>for</strong>wardedto the C, EIAMDNoOkYesFinalized ECC or Denial Letter<strong>for</strong>warded to the RD5 days (Checklist)NoOkApproval or Denial of ECC by the RDDeliberationReleasing of ECC or Denial letter bythe Records Officer11


STEPS/PROCEDURES: (IEE Checklist)1. Proponent submits ECC application to EMB Regional Office concerned.2. Screening Officer from EIAM Division initially screens the application <strong>for</strong>completeness.- If complete: Proponent pays the application fee.- If not complete: ECC application returned to the proponent3. Records Section receives the application and stamps the indicativeprocessing timeframe of ECC application.4. Application <strong>for</strong>warded to EIAM Division.5. REDS focal person enters database.6. C,EIAM assigns ECC application to case handler <strong>for</strong> appropriate action.7. Case handler conducts site inspection/verification;*If OK, Draft ECC <strong>for</strong> comments of C, EIAMD*If not and with violation: Draft AI letter (maximum of 2 request only)and/or Notice of Violation <strong>for</strong> comments of C, EIAMD and C, LegalDivision. Prepare inspection report and submit to the C, EIAM8. C, EIAM review and endorses application to the RD <strong>for</strong> final comment.9. Regional Director approves or denies the application.10. Deliberation of ECC to the proponent prior to release.11. Release of ECC by the Records Section.NOTE:- Submitted AI will be <strong>for</strong>warded directly to the C, EIAMD copy furnish thecase handler. If no submission within the given processing timeframe,application will be returned without final action. Refer NOV to the LegalDivision <strong>for</strong> resolution and imposition of penalty.- Processing time will be 30 working days12


Department of Environment and Natural ResourcesEnvironmental Management BureauRegion __________APPLICATION FOR ECC(IEE CHECKLIST)(to be submitted in 4 complete sets)Name of Proponent : ________________________________________Contact No.: _______________________________________Type of Project: : _____________________________________________Project Location : _____________________________________________1. Duly Accomplished IEE Checklist2. Supporting Documents? Proof of Social Acceptability? Favorable endorsement <strong>for</strong>m the Brgy of Municipality? Proof of Ownership? OCT No. : ________________? OCT No. : ________________? TD : ________________? Contract of Lease? Others YES (pls. specify)? Zoning Certification/Viability from HLURB? Project Plans:? Location/Vicinity Map? Site Development Plan? GIR <strong>for</strong> Housing Projects_______________________________Signature of Proponent__________________________________Designation____________________________13


I.3 ECC Application <strong>for</strong> IEE Report (For new non-Environmentally Critical Project or located in ECAs)Requirements:a. Proof of Social Acceptability-Resolution from Sangguniang Barangay/Bayan/Panlunsod and Proof ofconsultation conducted by the proponentb. Proof of Ownership or Right Over the Applied Area (any of the following)-OCT No.-in case of Tax Declaration, provide duly notarized Affidavit of Ownershipor No Adverse Claimant-Contract of Lease, Operating Agreement, Deed of Assignment-Others as deemed appropriatec. Zoning Certification from DZA and/or HLRB or Locational Viability asdeemed appropriated. Accountability Statement of the IEE Preparere. Project Plans-Location/Vicinity Map-Site Development Planf. Geohazard Identification Report from Mines and Geosciences officesconcerned <strong>for</strong> Projects located as per DAO 28, S. 2000g. Endorsement from PAMB if deemed appropriateh. Area clearance <strong>for</strong> Mining Project from MGB/PMRBNOTE: For projects located within the Industrial Estate/Parks/Special ECOZONEand other areas specially declared as such by concerned authority, <strong>requirements</strong>on social acceptability and zoning are no longer necessary of which acertification from the administrator shall be submitted that the proposed project iswithin the development plan as deemed necessary.Other Categories of NON-ECPs or Project within ECAs (p.8 ofDAO 30-2003)I.4 Category B2 (<strong>for</strong> Expansion Projects)Requirements:I.4.1 Environmental Per<strong>for</strong>mance Report and Management Plan (singleproject)I.4.2 Programmatic Environmental Per<strong>for</strong>mance Report and ManagementPlan (co-located project)I.5 Category B3 (Existing w/o ECC)Requirements:I.5.1 Environmental Per<strong>for</strong>mance Report and Management Plan (singleproject)I.5.2 Programmatic Environmental Per<strong>for</strong>mance Report and ManagementPlan (co-located projects)I.5.3 For non-availability of checklist, adopt <strong>requirements</strong> under Art. 2,Sec. 5.2.5 of DAO 2003-3014


PROCEDURAL FLOWECC APPLICATION FOR IEE REPORTProponent SubmitsApplication to EIAMDivision <strong>for</strong> ScreeningScreening OfficerScreens ECC applicationNoComplete?YesPayment of Filing andProcessing Fee by theproponent2 daysRecords Section receive applicationto be <strong>for</strong>warded to the C, EIAMDivisionREDS FocalCase Handler? Evaluation? Site inspection/verification? Request <strong>for</strong> AI (max. of 2AI) if necessaryYesIf with AIProponentSubmit AINoIssue NOV?YesLegal <strong>for</strong> resolutionof NOV/decideamount of penaltyCase Handler prepares report, denialNoletter, and draft ECC to be <strong>for</strong>wardedto the C, EIAMD50 days (Report)NoOkYesFinalized ECC or Denial Letter<strong>for</strong>warded to the RDNoOkApproval or Denial of ECC by the RD8 days (Report)DeliberationReleasing of ECC or Denial letter bythe Records Officer15


STEPS/PROCEDURES: (IEE Report)1. Proponent submits ECC application to EMB Regional Office concerned.2. Screening Officer from EIAM Division initially screens the application <strong>for</strong>completeness.If complete: Proponent pays the application fee.If not complete: ECC application returned to the proponent3. Records Section receives the application and stamps the indicativeprocessing timeframe of ECC application.4. Application <strong>for</strong>warded to EIAM Division.5. REDS focal person enters database.6. C,EIAM assigns ECC application to case handler <strong>for</strong> appropriate action.7. Case handler conducts site inspection/verification;*If OK, Draft ECC <strong>for</strong> comments of C, EIAMD*If not and with violation: Draft AI letter (maximum of 2 request only)and/or Notice of Violation <strong>for</strong> comments of C, EIAMD and C, LegalDivision. Prepare inspection report and submit to the C, EIAM .8. C, EIAM review and endorses application to the RD.9. Regional Director approves or denies the application.10. Deliberation of ECC to the proponent prior to release.11. Release of ECC by the Records Section.NOTE:- Submitted AI will be <strong>for</strong>warded directly to the C, EIAMD copy furnish thecase handler. If no submission within the given processing timeframe,application will be returned without final action. Refer NOV to the LegalDivision <strong>for</strong> resolution and imposition of penalty.- Processing time will be 60 working days16


Department of Environment and Natural ResourcesEnvironmental Management BureauRegion _______APPLICATION FOR ECC(IEE REPORT)(to be submitted in 4 complete sets)Name of Proponent : ________________________________________Contact No.: ________________________________________Type of Project: : ____________________________________________Project Location : ____________________________________________1. IEE REPORT2. Supporting documents? Proof of Social Acceptability? Favorable endorsement <strong>for</strong>m the Brgy of Municipality? Proof of Ownership? OCT No. : ________________? OCT No. : ________________? TD : ________________? Contract of Lease? Others (pls. specify)? Zoning Certification/Viability from HLURB? Sworn Accountability Statement of Project Proponent (duly notarized);? Sworn Accountability Statement of Project Proponent (duly notarized);? Panoramic View of the Proposed Project Site;? Project Plans:? Location/Vicinity Map? Site Development Plan? GIR <strong>for</strong> Housing Projects? PAMB Clearance, if project is located within core protected areas_______________________________Name and Signature__________________________________Destination______________________________17


Department of Environment and Natural ResourcesEnvironmental Management BureauRegion ____ENVIRONMENTAL COMPLIANCE CERTIFICATEIn accordance with P. D. 1586, the Philippine Environmental Impact Assessment System, this______________________________________, has been issued ECC No.______________ dated_______________, subject to the conditions specified in the ECC Document.__________________________EIA Division Chief___________________________EMB, DirectorNote : Covering letter will also be given to the proponent18


Format of ECCECC-RO-yr&month-application no.-industry type codeENVIRONMENTAL COMPLIANCE CERTIFICATEThe Department of Environment and Natural Resources – EnvironmentalManagement Bureau, Region No. ________ hereby issues this guidelines to theNAME OF PROJECT located at LOCATION OF PROPOSEDPROJECT after complying with the Environmental Impact Assessment (EIA)requirement as prescribed in the promulgated guidelines implementing Section 3 (b) of P.D.1121, Section 4 of P.D. 1151, Section 2 of P.D. 1586 and DENR Administrative Order No.2003-30.This Certificate is not a permit and is being issued subject to the followingconditions/guidelines/<strong>requirements</strong>:CONSTRUCTION/OCCUPANCY PHASE :1. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;2. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;3. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;4. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;5. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;6. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;7. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;___________________ECC-___-____-___-___(Name of Proponent )Reference Code: RO__-___19


II. OTHERS:squirements1. ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________;2. ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________;3. __________________________________________________________________________________________________________________________________________________________________________________________________________________________________;4. __________________________________________________________________________________________________________________________________________________________________________________________________________________________________;It is understood that the <strong>requirements</strong> of other concerned government agenciesshall be complied with by the herein grantee.Non-compliance with any of the above conditions shall be sufficient cause <strong>for</strong> thesuspension or cancellation of this Certificate and/or payment of fine in an amount not toexceed FIFTY THOUSAND PESOS (P 50,000.00) <strong>for</strong> every violation thereof, at thediscretion of the DENR- EMB Region ___ pursuant to Section 9 of P.D. 1586 and Section16, Article IV of DENR Administrative Order No. 2003-30.ECC fee duly paid as evidenced by O.R. No. _____________ dated ___________.Given this ________________.Recommending Approval:_____________________________OIC Chief, EIAM DivisionCon<strong>for</strong>me:__________________________OIC, Regional DirectorEMB- Region _______Proponentcc: EMBPENRO, ___________________________________________ECC-__-____-____-_____(Name of Proponent )Reference Code: RO__-10120


EMB CENTRAL OFFICEECC Application <strong>for</strong> Environmentally Critical Projects (ECPs)(new single project)Must Document Requirements:? Environmental Impact Statement (EIS) Report? Accountability Statement from EIS Consultant and Project Proponent? DA Certificate of Viability <strong>for</strong> Conversion (if in agricultural land and conversionis necessary)? Land Title/Proof of Land Jurisdiction/Ownership? PAWB Endorsement (if within protected area)? SEC Registration? NWRB Water Use Permit/Certificate of Water Availability? Review Fund? Electronic File of the EIS? Environmental Tract Record (<strong>for</strong> expansion projects)? Photocopy of TCT/OCT/CLT? Zoning/Certificate of Locational Viability? Barangay or Municipal of City Council Resolution/Proof of consultation withLGUsOther Catergories (see p 8 of DAO 30-2003)Category A1 (<strong>for</strong> new co-located projects))Requirements:-Programmatic Environmental Per<strong>for</strong>mance Report and ManagementPlan (new co-located project)Category A2(<strong>for</strong> expansion projects)Requirements:-Programmatic Environmental Per<strong>for</strong>mance Report and ManagementPlan (co-located projects)-Environmental Per<strong>for</strong>mance Report and Management Plan (singleproject)Category A3 (<strong>for</strong> existing projects without ECC)Requirements:-Programmatic Environmental Per<strong>for</strong>mance Report and ManagementPlan (co-located projects)-Environmental Per<strong>for</strong>mance Report & Management Plan (single project)21


PROCEDURAL FLOWECC APPLICATION FOR ENVIRONMENTALLY CRITICAL PROJECTSPROPONENT SUBMITS 1 EISFOR PROCEDURALSCREENINGEMB RECORDS OFFICE FORWARDSEIS TO EIA DIV. TO DETERMINECOMPLETENESS OF DOCUMENTS5WORKINGDAYSRETURN TOPROPONENTNOComplete?YESPREPARES ORDER OF PAYMENT, PAYS FILING ANDPROCESSING FEE TO CASHIER OF EMB AND REVIEWFUND TO THE NRDC OR FUND MANAGERPROPONENTS SUBMITS O.R. TOSCREEENING OFFICER THEN SUBMITSAPPLICATION TO RECEIVINGDIVISIONCASE OFFICER: CONVENES EIARC FORSUBSTA NTIVE REVIEW INCLUDING SITEINSPECTION AND REQUESTS FOR ADDITIONALINFORMATION (MAX. OF 2 REQUESTS ONLY)DOCUMENTS, AND PUBLIC HEARINGDAY 1 - 90NOA.I. SUBMITTED ?SITE INSPPECTIONOK?YESEIARC PREPARES AND SUBMITS REPORTAND RECOMMENDATION, EIA CHIEFREVIEWS PROCESS DOCUMENTATIONAND REPORTS OF EIARCDAY 106-120FORWARDED TO OSEC FOR REVIEW AND FINALDECISION ON ECC ISSUANCE/DENIALFORWARDED TO EMB DIRECTORAND EIA DIVISION RELEASES ECCOR DENIAL LETTEREMB DIRECTOR REVIEWS REPORTS ANDRECOMMENDATIONNONOOK?YESOK?YESYESAPPROVES / DENIES ECCAND SIGNS LETTERAPPROVES / DENIES ECC ANDSIGNS LETTERFORWARDED TOEIA DIVISION FORRELEASE OF ECCOR DENIALLETTER 22DAY 91-105


Steps/Procedure: (ECP’s)1. Proponent consults EMB (EIAD) re: his project. (screening)2. EIAD schedules scoping meeting.2.1. Assigns case handler2.2. Determines and notifies members of EIARC2.3. Meets proponent, case handler and members of EIRC <strong>for</strong> project scopingor <strong>requirements</strong> checklist2.4. Second level scoping – Public consultation3. Proponent conducts EIA and prepares EIS based on the scoping or<strong>requirements</strong> checklist and second level scoping.3.1. Deposits EIA review fund with NRDC3.2. EIAD Case Handler determines completeness of documents.START OF ONE HUNDRED TWENTY (120) DAY PROCESSING PERIOD4. Proponent pays filing and processing fee with EMB Cashier.4.1. Proponent submits complete, procedurally screened EIS together withsupporting documents to EMB record and <strong>for</strong>wards to EIAD.4.2. EIAD schedules RC meeting.5. EIARC meets to review EIS (Several meetings).5.1. May request <strong>for</strong> additional in<strong>for</strong>mation (up to 2 times)5.2. Conducts site inspection5.3. Conducts public hearing5.4. Prepares and submit final report and recommendation to EMB Directorthru EIA Division Chief6. EMB Director reviews final report and recommendation.6.1. If not OK, returns it to EIARC thru EIADC6.2. If OK;6.2.1. Signs / Approves ECC or6.2.2. Recommends ECC to the Secretary7. Secretary either approves or denies ECC within 15 days.Note: Processing time will be 120 working days23


Department of Environment and Natural ResourcesEnvironmental Management BureauENVIRONMENTAL COMPLIANCE CERTIFICATEIn accordance with P. D. 1586, the Philippine Environmental Impact Assessment System, this______________________________________, has been issued ECC No.______________ dated_______________, subject to the conditions specified in the ECC Document.__________________________EIA Division Chief___________________________EMB, DirectorNote: Covering letter will also given to the proponent24


Format of ECCECC-___-____-___-___ENVIRONMENTAL COMPLIANCE CERTIFICATEThe Department of Environment and Natural Resources – EnvironmentalManagement Bureau, Region No. ________ hereby issues this guidelines to theNAME OF PROJECT located at LOCATION OF PROPOSEDPROJECT after complying with the Environmental Impact Assessment (EIA)requirement as prescribed in the promulgated guidelines implementing Section 3 (b) of P.D.1121, Section 4 of P.D. 1151, Section 2 of P.D. 1586 and DENR Administrative Order No.2003-30.This Certificate is not a permit and is being issued subject to the followingconditions/guidelines/<strong>requirements</strong>:CONSTRUCTION/OCCUPANCY PHASE :8. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;9. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;10. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;11. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;12. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;13. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;14. _____________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________;___________________ECC-__-___-___-___(Name of Proponent )Reference Code: EMB-___25


II. OTHERS:squirements5. ___________________________________________________________________________________________________________________________________________________________________________________________________________________________________;6. ____________________________________________________________________________________________________________________________________________________________________________________________________________________________________;7. __________________________________________________________________________________________________________________________________________________________________________________________________________________________________;8. __________________________________________________________________________________________________________________________________________________________________________________________________________________________________;It is understood that the <strong>requirements</strong> of other concerned government agenciesshall be complied with by the herein grantee.Non-compliance with any of the above conditions shall be sufficient cause <strong>for</strong> thesuspension or cancellation of this Certificate and/or payment of fine in an amount not toexceed FIFTY THOUSAND PESOS (P 50,000.00) <strong>for</strong> every violation thereof, at thediscretion of the DENR- EMB Region ___ pursuant to Section 9 of P.D. 1586 and Section16, Article IV of DENR Administrative Order No. 2003-30.ECC fee duly paid as evidenced by O.R. No. _____________ dated ___________.Given this ________________.Recommending Approval:_____________________________Chief, EIA Division__________________________DirectorCon<strong>for</strong>me:Proponentcc: EMBPENRO, ___________________________________________ECC-__-____-___-___(Name of Proponent )Reference Code: RO__-___26


Schedule of Fees (see DAO 2003-30)A. Application <strong>for</strong> ECC1. Category A-1 (Co-located Projects) P 10,000.000Procedural Screening Fee 1,500.00Database Management Fee 3,000.00Processing Fee 5,500.002. Category A-1(Single project), Category A-3(Co-located Project) P 6,000.00Procedural Screening Fee 600.00Database Management Fee 2,000.00Processing Fee 3,400.003. Category A-2, and B-1 P 4,000.00Procedural Screening Fee 300.00Database Management Fee 1,000.00Processing Fee 2,700.004. Category B-2 and B-3 P 3,000.00Procedural Screening Fee 300.00Database Management Fee 1,000.00Processing Fee 1,800.00B. Certification of Non-Coverage1. Category D P 100.002. Category C 600.00C. Post ECC Processing Services1. Request <strong>for</strong> minor ECC Amendment P 300.00/ application(Article II, sec. 3-B item 2.1)2. Request <strong>for</strong> major ECC Amendment P1,200.00/application(Article II, sec. 3-B item 2.2)D. Other Services1. Request <strong>for</strong> miscellaneous certifications P 50.00/certification2. Request <strong>for</strong> certified true/photocopy 25.00/document27