<strong>Investments</strong> <strong>in</strong> <strong>Transport</strong> <strong>Infrastructure</strong><strong>Projects</strong>S<strong>in</strong>iša Hajdaš Dončić, PhDM<strong>in</strong>ister of Maritime Affairs, <strong>Transport</strong> and <strong>Infrastructure</strong>London, October 24, 2013
Strategy of <strong>Transport</strong>DevelopmentKey facts• Draft of Strategy of <strong>Transport</strong>Development expected at thebeg<strong>in</strong>n<strong>in</strong>g of November• F<strong>in</strong>al Strategy deadl<strong>in</strong>e <strong>in</strong> February2014• Based on 6 sectoral strategies(railway, road, maritime, air, <strong>in</strong>landwaterways, urban transport)• Def<strong>in</strong>es development and projects <strong>in</strong>key modes of transport and <strong>in</strong>different areas of Croatia <strong>in</strong>accordance with TEN-T EuropeanNetwork• Basis for structural funds and private<strong>in</strong>vestmentsVision beh<strong>in</strong>d the Starategy• Development of modern <strong>in</strong>frastructurethat serves economy, tourism andcitizens and <strong>in</strong>tegrates Croatia <strong>in</strong>European territory• Enhancement of transport services <strong>in</strong> allmodes of transport• Def<strong>in</strong><strong>in</strong>g railway sector, sea and riverports and road bottlenecks as priorities• Increas<strong>in</strong>g standards <strong>in</strong> <strong>in</strong>frastructure andservices• Adopt<strong>in</strong>g Strategy that will be the basisfor comprehensive, <strong>in</strong>tegrative,<strong>in</strong>termodal, develop<strong>in</strong>g and sociallyresponsible transport system
Monetization of theCroatian highwaycompanies HAC and ARZProject overviewProject scope:Toll collection, operation and ma<strong>in</strong>tenance ofthe HAC and ARZ motorway networks wouldbe leased out to a concessionaire.• The Project will <strong>in</strong>clude the full tollmotorway <strong>in</strong>frastructure of HAC Ltd. andARZ which consists of total 1,024 km• Motorway parts currently underconstruction will also be <strong>in</strong>cluded <strong>in</strong> theProject with the total of 51.5 km.Expected timetable• The tender was launched <strong>in</strong> October 2013and is open until November 15, 2013• Public procurement process is expected tolast until June 30, 2014• Commercial close: July 2014• F<strong>in</strong>ancial close: September 2014Concession period: 30 – 50 yearsConcession fee: estimated t at EUR 3 billionThe total concessionaire’s <strong>in</strong>vestment is estimated at EUR 3 billionTender for <strong>in</strong>vestors: open until November 15, 2013
Cargo Airport OsijekOverview• Project Cargo scope: term<strong>in</strong>al is located on the area sizeToll of collection, 1,500 m² and operation separated and on ma<strong>in</strong>tenancethree parts:of the truck HAC disposition, and ARZ direct motorway access to networks the apronwouldfor trucksbe leasedand coolersout to a concessionaire.• Passenger term<strong>in</strong>al area is 1,500 m²;• capacity The Project of 200 will – 400 <strong>in</strong>clude pax per the hour full toll• Vic<strong>in</strong>ity motorway of developed <strong>in</strong>frastructure road <strong>in</strong>frastructure of HAC Ltd. andDanube and ARZ corridor which consists of total 1,024km• Close to Hungarian and Serbian borderMotorway parts currently under• Two construction and half hours will from also the be <strong>in</strong>cluded capital of <strong>in</strong> theCroatia Project with the total of 51.5 km.Concession period: 30 – 50 yearsConcession fee: estimated at EUR 3billionStatus and outlook• Market<strong>in</strong>g study and New Bus<strong>in</strong>ess Plan <strong>in</strong>development• New <strong>in</strong>vestment expected <strong>in</strong> cargo,warehouse facilities and passenger build<strong>in</strong>g• Investment <strong>in</strong> depart<strong>in</strong>g gate is the priority tokeep the status of <strong>in</strong>ternational airport and<strong>in</strong>crease safety of traffic, passengers andgoods <strong>in</strong> the near future.• The future concessionaire / strategic partnerwould be expected to participate <strong>in</strong>modernisation of exist<strong>in</strong>g and construction ofnew capacities.• Three options: recapitalization repurchase of exist<strong>in</strong>g stockholders concession with the features of theproject public-private partnership orconcession contracttThe company has already <strong>in</strong>itiated discussions with foreign partners and decided toThe company has already <strong>in</strong>itiated discussions with foreign partners and decided tofocus its core activity as a cargo centre.
Airport RijekaOverview• Project 200,000 scope: passengers annually• Toll Fast collection, access to operation Central and and Eastern ma<strong>in</strong>tenance Europeof the as well HAC as and other ARZ EU countries motorway networkswould be leased out to a concessionaire.• The best location for Adriatic dest<strong>in</strong>ations• The Top resort Project area will with <strong>in</strong>clude over 100 the hotels full toll andmotorway resorts <strong>in</strong> 50 <strong>in</strong>frastructure km radius of HAC Ltd.• and Operational ARZ which airport consists throughout of the total whole 1,024year kmMotorway parts currently under• Vic<strong>in</strong>ity to Port of Rijeka and its conta<strong>in</strong>erconstruction will also be <strong>in</strong>cluded <strong>in</strong> theterm<strong>in</strong>alProject with the total of 51.5 km.• Well developed <strong>in</strong>frastructure• Concession Vic<strong>in</strong>ity to Rijeka period: – Zagreb 30 – 50 highway yearsandRijeka railway nodeConcession fee: estimated at EUR 3• Well developed bus<strong>in</strong>ess zones networkbillion and <strong>in</strong>frastructure• Outstand<strong>in</strong>g service of logistics sectorStatus and outlook<strong>Projects</strong> <strong>in</strong> pipel<strong>in</strong>e:• Reconstruction and expansion of thepassenger build<strong>in</strong>g and airplane park<strong>in</strong>gplatform• Construction of storage and manipulationfacilities for management of goods• Addition and reconstruction of the exist<strong>in</strong>gairplane taxiway• The future concessionaire / strategic partnerwould be expected to participate <strong>in</strong> the<strong>in</strong>vestment of reconstruction, modernizationand development• Transaction currently envisages 3 options: Option one: recapitalization Option two: repurchase of exist<strong>in</strong>gstockholders Option three: (concession with thefeatures of the project public-privatepartnership or concession contract)The Company is look<strong>in</strong>g for equity <strong>in</strong>vestment, PPP or concessionaireTotal <strong>in</strong>vestment of EUR 16 million
Zagreb Conta<strong>in</strong>erTerm<strong>in</strong>al – Port ofRijekaOverview• Project Increase scope: of capacity: 250 KTEU• Toll Planned collection, capacity operation with exist<strong>in</strong>g: and ma<strong>in</strong>tenance350 KTEUof the per HAC year and ARZ motorway networkswould be leased out to a concessionaire.• Expected start of construction: 2014• The Project will will allow <strong>in</strong>clude the Port the of full Rijeka toll tomotorway attract 5th and <strong>in</strong>frastructure 6th generation of HAC vessels Ltd. andand supplement ARZ which the extended consists conta<strong>in</strong>er of total 1,024kmhandl<strong>in</strong>g capacity of the Brajdica Term<strong>in</strong>al• Motorway parts currently underconstruction will also be <strong>in</strong>cluded <strong>in</strong> theProject with the total of 51.5 km.Concession period: 30 – 50 yearsConcession fee: estimated at EUR 3billionStatus and outlook• Initial Phase 1 length of 400m, expand<strong>in</strong>gultimately up to the projected maximumlength of 680m• The PRA shall construct Phase 1 of theTerm<strong>in</strong>al under the Design & Build Contractand shall create, <strong>in</strong> terms of permitt<strong>in</strong>g anddesign<strong>in</strong>g• The PRA has contracted the construction ofthe quay wall of 400 m <strong>in</strong> length with theassociated landfill• The future concessionaire/strategic partnerwould be expected to prepare Phase 1works for commercial operations anddevelop, if deemed necessary, Phase 1Aand Phase 2 of the Term<strong>in</strong>alThe total concessionaire’s <strong>in</strong>vestment is estimated at EUR 60 millionThe total concessionaire s <strong>in</strong>vestment is estimated at EUR 60 millionTender for <strong>in</strong>vestors: expected Q4 / 2013
New Passenger, Busand Cruise Term<strong>in</strong>al –Port of DubrovnikOverview• Project Length scope: for cruise/ferry: 1,350 m• Toll Water collection, depth alongside operation wharfs: and ma<strong>in</strong>tenance8 - 11 mof the HAC and ARZ motorway networkswould• Passengerbe leasedoperativeout toarea:a concessionaire.88,000 sq. m• Total GBA <strong>in</strong> port separated <strong>in</strong> few zones is• The about Project 120,000 will sq. <strong>in</strong>clude m the full toll• motorway Future mar<strong>in</strong>e <strong>in</strong>frastructure term<strong>in</strong>al is to of become HAC Ltd. theand ma<strong>in</strong> ARZ passenger, which shopp<strong>in</strong>g consists and of total transport 1,024facility km <strong>in</strong> Dubrovnik which will be able to• Motorway accommodate parts approximately currently under 12,000passengers, construction customers, will also be service <strong>in</strong>cluded users<strong>in</strong> theProject with the total of 51.5 km.Concession period: 30 – 50 yearsStatus and outlook• Current spatial development plan envisages3 zones with specific facilities necessary forfunction<strong>in</strong>g of the port: new passenger, busand cruise term<strong>in</strong>al with additional facilitiesserv<strong>in</strong>g city, citizens and tourists.• Prelim<strong>in</strong>ary project design and feasibilitystudy f<strong>in</strong>ished• Space - traffic study <strong>in</strong> preparation• The future concessionaire / strategic partnerwould be expected to participate <strong>in</strong> the<strong>in</strong>vestment of ‘’New Passenger Mar<strong>in</strong>e, Busand Cruise Term<strong>in</strong>al” for its commercialoperations.Concession fee: estimated at EUR 3billionThe total concessionaire’s or strategic partnerThe total concessionaire s or strategic partner<strong>in</strong>vestment is estimated at EUR 40 million.
New Passenger, Ferryand Cruise Term<strong>in</strong>al –Port of ZadarOverview• Project Total <strong>in</strong>vestment scope: of EUR 190 million• Toll Phase collection, one – LOT operation I has already and ma<strong>in</strong>tenancebeenof the developed HAC and – EUR ARZ 45 motorway millionnetworkswould be leased out to a concessionaire.• Phase II – LOT II and LOT IIIa are <strong>in</strong>construction and currently 80% of the• The Project will <strong>in</strong>clude the full tollphase is f<strong>in</strong>ished - EUR 110 millionmotorway <strong>in</strong>frastructure of HAC Ltd.• and Phase ARZ III – which construction consists of the of Passenger, total 1,024kmCruise and Ferry Term<strong>in</strong>al is to bedeveloped by the potential <strong>in</strong>vestor• Motorway parts currently underconstruction will also be <strong>in</strong>cluded <strong>in</strong> theProject with the total of 51.5 km.Concession period: 30 – 50 yearsConcession fee: estimated at EUR 3billionStatus and outlook• The construction of the new port<strong>in</strong>frastructure has started <strong>in</strong> May 2009 and isexpected to be completed <strong>in</strong> June 2014• The basic task for years 2013 and 2014 is tof<strong>in</strong>d a partner – concessioner by<strong>in</strong>ternational tender procurement who will,based on a long-term concessionagreement, develop port superstructure.• The Transaction currently envisages twooptions: Option 1: Build to suit under current adoptedand prepared ddocuments by the Port ofZadar Authority for the Term<strong>in</strong>al build<strong>in</strong>g Option 2: Construction of a new build<strong>in</strong>gaccord<strong>in</strong>g to operators/<strong>in</strong>vestorspreferences (preparation of this optionwould take at least 2 years)The total concessionaire’s or strategic partnerThe total concessionaire s or strategic partner<strong>in</strong>vestment is estimated at EUR 35 million under option 1.
New Conta<strong>in</strong>er andDry Bulk CargoTerm<strong>in</strong>al – Port ofPločeOverview• Project Conta<strong>in</strong>er scope: Term<strong>in</strong>al• Toll First collection, phase f<strong>in</strong>ished operation and ma<strong>in</strong>tenanceof the HAC and ARZ motorway networkswould• Lengthbeofleased280 moutandto27amconcessionaire.width• Annual capacity of 66,000 TEUThe Project will <strong>in</strong>clude the full toll• Dry Bulk Cargo Term<strong>in</strong>almotorway <strong>in</strong>frastructure of HAC Ltd.• and The works ARZ commenced which consists <strong>in</strong> the of May total of 1,024 2012kmand the Term<strong>in</strong>al will be completed by 2015• Motorway Potential area parts for currently development underconstruction will also be <strong>in</strong>cluded <strong>in</strong> the• 500,000 m2 of unconcessioned spaceseparated Project with <strong>in</strong> more the total parcels of 51.5 km.Concession period: 30 – 50 yearsConcession fee: estimated at EUR 3billionStatus and outlook• At the f<strong>in</strong>al stage the term<strong>in</strong>al will occupy 23ha and have annual capacity for 500,000TEU• Dry Bulk Cargo Term<strong>in</strong>al will be built on thearea of 240,000 m2.• The whole term<strong>in</strong>al will have a f<strong>in</strong>al capacityof 6.2 million tons per year.• Whole area has the regime of free(customs) zone where the special <strong>in</strong>centivesand treatment may be applied especially to“non-EU” goods• Possible options for a Concessionaire or aStrategic t partner• Opportunity for strategic partner toconstruct the term<strong>in</strong>al on the rema<strong>in</strong><strong>in</strong>gwaterfront area, or to ask for the concessionfor the construction of the specialized multipurpose structures (warehouses and plantfacilities) <strong>in</strong> the port <strong>in</strong>land area for theirgoods.The term<strong>in</strong>al will be completed by 2015
New Port East Project– Port of VukovarOverview• Project The port scope: has capacity for manipulat<strong>in</strong>g withToll 1.500.000 collection, metric operation tons of and cargo ma<strong>in</strong>tenanceper yearof • the The HAC project and encompasses ARZ motorway the construction networkswould of <strong>in</strong>frastructural be leased out port to facilities, a concessionaire.road and railas well as communal <strong>in</strong>frastructure, port• The load<strong>in</strong>g Project and unload<strong>in</strong>g will <strong>in</strong>clude equipment, the full toll and theconstruction motorway <strong>in</strong>frastructure and purchase of HAC term<strong>in</strong>alrelatedand ARZ equipment which consists for: of total 1,024Ltd. bulk km cargo term<strong>in</strong>al <strong>in</strong>clud<strong>in</strong>g cereals• Motorway parts currently under multipurpose term<strong>in</strong>alconstruction will also be <strong>in</strong>cluded <strong>in</strong> the general Project and with palletized the total cargo of 51.5 term<strong>in</strong>al km. ship supply ppy management and collection ofConcession waste liquids period: from the 30 vessels – 50 years• Construction costs estimated: 24 mil €Concession fee: estimated at EUR 3billion • Invested costs: 6 mil € (land propertyissues, project documentation to build<strong>in</strong>gpermit)• Expected start of construction: 2014Status and outlook• The feasibility study for the project wasdeveloped <strong>in</strong> 2005• The prelim<strong>in</strong>ary design and theenvironmental impact analysis for theproject was completed <strong>in</strong> 2009 and hasbeen modified dur<strong>in</strong>g process of issu<strong>in</strong>glocation permit <strong>in</strong> June 2010.• This project is be<strong>in</strong>g put forward by the PortAuthority <strong>in</strong> Vukovar as the beneficiary,under the <strong>Transport</strong> Operational ProgrammePriority 2 - upgrad<strong>in</strong>g Croatia's <strong>in</strong>landwaterway system.• The future concessionaire / strategic partnerwould be expected to participate <strong>in</strong> the<strong>in</strong>vestment of ‘’Reconstruction of the Port ofVukovar - New Port East” for its commercialoperations and to develop, if deemednecessary, further development phases ofthe port.The total concessionaire’s <strong>in</strong>vestment is estimated at EUR 24 mil
THANK YOU!M<strong>in</strong>istry of Maritime Affairs, <strong>Transport</strong>and <strong>Infrastructure</strong>