BD LSR Fortessa Standard Operation Protocol --- Turn on and turn ...
BD LSR Fortessa Standard Operation Protocol --- Turn on and turn ...
BD LSR Fortessa Standard Operation Protocol --- Turn on and turn ...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<str<strong>on</strong>g>BD</str<strong>on</strong>g> <str<strong>on</strong>g>LSR</str<strong>on</strong>g> <str<strong>on</strong>g>Fortessa</str<strong>on</strong>g> <str<strong>on</strong>g>St<strong>and</strong>ard</str<strong>on</strong>g> <str<strong>on</strong>g>Operati<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>Protocol</str<strong>on</strong>g>--- <str<strong>on</strong>g>Turn</str<strong>on</strong>g> <strong>on</strong> <strong>and</strong> <strong>turn</strong> off system (experienced user <strong>on</strong>ly)<str<strong>on</strong>g>Turn</str<strong>on</strong>g> <strong>on</strong> system:• Refill sheath tank <strong>and</strong> empty waste tank if necessary.• Please make sure all tubing are c<strong>on</strong>nected properly <strong>on</strong> sheath tank <strong>and</strong> wastetank.• <str<strong>on</strong>g>Turn</str<strong>on</strong>g> <strong>on</strong> main switch of <str<strong>on</strong>g>Fortessa</str<strong>on</strong>g> (wait for at least 20min before CST)• Stabilize fluidics: load 3ml of H2O then set “RUN” <strong>and</strong> “LO”.• <str<strong>on</strong>g>Turn</str<strong>on</strong>g> <strong>on</strong> computer <strong>and</strong> log in with Administrator• Unplug the internet cable (blue color)• Double click Cytometer Status <strong>and</strong> <str<strong>on</strong>g>BD</str<strong>on</strong>g> FACS Diva Software ic<strong>on</strong>s <strong>on</strong> desktop• Remove air bubbles from the sheath filter.• Log into FACS Diva software with your own login name <strong>and</strong> password.• The system is ready to use when it shows “Cytometer c<strong>on</strong>nected”• Please refer to SOP of CST if CST is needed.• Rec<strong>on</strong>nect the internet cable for data transfer.<str<strong>on</strong>g>Turn</str<strong>on</strong>g> off system:• Make sure the proper cleaning procedure has been completed.• Log out Diva software.• Quite Diva software <strong>and</strong> close cytometer status window.• <str<strong>on</strong>g>Turn</str<strong>on</strong>g> off computer.• <str<strong>on</strong>g>Turn</str<strong>on</strong>g> off main switch of <str<strong>on</strong>g>Fortessa</str<strong>on</strong>g>.• Refill sheath tank.• Empty waste tank.
<str<strong>on</strong>g>BD</str<strong>on</strong>g> <str<strong>on</strong>g>LSR</str<strong>on</strong>g> <str<strong>on</strong>g>Fortessa</str<strong>on</strong>g> <str<strong>on</strong>g>St<strong>and</strong>ard</str<strong>on</strong>g> <str<strong>on</strong>g>Operati<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>Protocol</str<strong>on</strong>g>--- CST (experienced user <strong>on</strong>ly)• Click “Cytometer” > “CST” in Diva Software• Prepare CST beads (350ul FACS flow + 1 drop of CST beads)Note: please vortex CST beads before use <strong>and</strong> put CST beads bottleback to Fridge immediately after use.• Label CST beads tube with date <strong>and</strong> “CST” <strong>and</strong> Lot Number.• Press “RUN” <strong>and</strong> “LO” <strong>on</strong> Fluid c<strong>on</strong>trol panel.• Check the beads lot number in Diva to make sure it is the same withthe beads you prepared.• Click “run” in Diva software.• CST will take about 7-10min. Please do not let CST beads run out.• Unload CST beads tube when finish <strong>and</strong> reload H2O tube.• Click “File” > “Exit”.If CST is not passed, please try the following steps <strong>and</strong> try CST again:1. Prepare <strong>on</strong>e tube of 2ml FACS Rinse2. Prime X3 with FACS Rinse3. Run 10 min at “HI” flow rate4. Prime X1 with DI H2O5. Run CST again
<str<strong>on</strong>g>BD</str<strong>on</strong>g> <str<strong>on</strong>g>LSR</str<strong>on</strong>g> <str<strong>on</strong>g>Fortessa</str<strong>on</strong>g> <str<strong>on</strong>g>St<strong>and</strong>ard</str<strong>on</strong>g> <str<strong>on</strong>g>Operati<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>Protocol</str<strong>on</strong>g>--- Empty Waste Tank• Verify that the flow cytometer is in st<strong>and</strong>by mode. Press theSTNDBY butt<strong>on</strong> <strong>on</strong> the c<strong>on</strong>trol panel if necessary.• Click “Cytometer” > “st<strong>and</strong>by” in Diva Software.• Disc<strong>on</strong>nect the orange waste tubing <strong>and</strong> the black level sensorline from the waste c<strong>on</strong>tainer.• Take the waste tank to the sink.• Remove the lid of waste tank.• Empty the waste c<strong>on</strong>tainer.• Add approximately 0.5-1L of bleach to the waste c<strong>on</strong>tainer <strong>and</strong>tighten the lid of it.• Rec<strong>on</strong>nect the orange waste tubing <strong>and</strong> level sensor line.• Rec<strong>on</strong>nect Diva software with workstati<strong>on</strong> by click “Cytometer”> “C<strong>on</strong>nect”
<str<strong>on</strong>g>BD</str<strong>on</strong>g> <str<strong>on</strong>g>LSR</str<strong>on</strong>g> <str<strong>on</strong>g>Fortessa</str<strong>on</strong>g> <str<strong>on</strong>g>St<strong>and</strong>ard</str<strong>on</strong>g> <str<strong>on</strong>g>Operati<strong>on</strong></str<strong>on</strong>g> <str<strong>on</strong>g>Protocol</str<strong>on</strong>g>--- Refill the sheath c<strong>on</strong>tainer• Verify that the flow cytometer is in st<strong>and</strong>by mode. Press the STNDBYbutt<strong>on</strong> <strong>on</strong> the c<strong>on</strong>trol panel if necessary.• Click “Cytometer” > “st<strong>and</strong>by” in Diva Software• Disc<strong>on</strong>nect the air line (green) <strong>and</strong> fluid line (Blue) from the sheathc<strong>on</strong>tainer.• Depressurize the sheath c<strong>on</strong>tainer by pulling up <strong>on</strong> the vent valve.• Remove the sheath c<strong>on</strong>tainer lid. Unscrew the clamp knob <strong>and</strong> pushdown to loosen, if necessary. Tilt the cap to the side to remove it fromthe tank.• Add sheath fluid to the sheath c<strong>on</strong>tainer (please use the blue bottle).• Replace the sheath c<strong>on</strong>tainer lid. Close the sheath lid <strong>and</strong> tighten theclamp knob to finger-tight.• Rec<strong>on</strong>nect the air line (green) <strong>and</strong> fluid line (Blue).Please pay attenti<strong>on</strong> to fluid line (Blue) to make sure it is not twisted orstretched.• Rec<strong>on</strong>nect Diva software with workstati<strong>on</strong> by click “Cytometer” >“C<strong>on</strong>nect”.• Remove air bubbles from the sheath filter.