17.07.2015 Views

update NewS from dNv to the tANker INduStry No 02 2011 - Hays

update NewS from dNv to the tANker INduStry No 02 2011 - Hays

update NewS from dNv to the tANker INduStry No 02 2011 - Hays

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CO2 emissions <strong>from</strong> shipsPho<strong>to</strong>: Geos<strong>to</strong>ckcarbon content cannot easily be determined.There are no indications regardingif and when guidelines for biofuelswill be developed.Fur<strong>the</strong>r work A number of guidelinesare going <strong>to</strong> be developed during <strong>the</strong> nextfew years, with <strong>the</strong> most important beingissued before <strong>the</strong> EEDI and SEEMP enterin<strong>to</strong> force in 2013:■■February 2012 – MEPC 63: Guidelinesfor minimum propulsion power■■■■■■Oc<strong>to</strong>ber 2012 – MEPC 64: Guidelines onvoluntary structural enhancementJuly 2013 – MEPC 65: Guidelines forCO2 abatement technologiesMarch 2014 – MEPC 66: Guidelines forcalculation of EEDI for roro, passenger,diesel-electric and hybrid propulsionshipsThe requirements and dates are subject<strong>to</strong> two reviews: <strong>the</strong> first is on <strong>the</strong> requirementsfor small ships and large bulkersand tankers and is due in July 2013. Thesecond review allows for a discussion ofboth <strong>the</strong> requirements and <strong>the</strong> time linefor when Phases 2 and 3 are <strong>to</strong> enter in<strong>to</strong>force, and is due in January 2015. Tanker <strong>update</strong> NO. 2 <strong>2011</strong> | 7

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!