22.08.2015 Views

Seawater Desalination Code

Seawater Desalination Code

Seawater Desalination Code

SHOW MORE
SHOW LESS

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

CC.5.8CC.5.8.1CC.5.8.2CC.5.8.3CC.5.8.4CC.5.8.5CC.5.9CC.5.9.1CC.5.9.2CC.5.9.3CC.5.10CC.5.10.1such modification. Where the DWTSO decides that the original Offer ofConnection must be suspended, the following shall apply:(a)(b)(c)(d)the date that the DWTSO issues the suspension notification inaccordance with Section ‎CC.5.7.2 shall be the ApplicationAcceptance Date;the DWTSO shall decide whether a System Study is required, and insuch case, the DWTSO shall prepare such System Study inaccordance with Sections ‎CC.5.4.2 to ‎CC.5.4.5;the DWTSO shall either issue a new Offer of Connection or notifythat Applicant User of its refusal in accordance with Section‎CC.5.6.1; andif that Applicant User withdraws its notification in regards to themodifications to the Preliminary Water Planning Data, thesuspended Offer of Connection shall be extended to the same validitydate as any new Offer of Connection in accordance with Section‎CC.5.7.2.Connection AgreementThe Connection Agreement shall be in a standard format prepared by theDWTSO and approved by ECRA.After the Offer of Connection has been accepted by that Applicant User,the draft Connection Agreement shall be finalised and agreed upon by thatApplicant User and the DWTSO.The Connection Agreement shall be executed by the DWTSO and thatApplicant User.The Connection Agreement shall include the Committed Water PlanningData.The Connection Agreement shall:(a)(b)require that Applicant User to comply with this SWDC, to the extentnecessary; andset out the responsibilities of the DWTSO and that Applicant User inrelation to the design, purchase, installation, testing, commissioning,operation and maintenance of the equipment to be installed at theConnection Point.Readiness to Connect StatementEach Applicant User shall prepare a Readiness to Connect Statement andsubmit this to the DWTSO after the completion of the Connection Activitiesin accordance with Section ‎CC.6.2.The Readiness to Connect Statement shall be in a standard format preparedby the DWTSO and approved by ECRA.The Readiness to Connect Statement shall include the Connected WaterData and the relevant test reports prepared as part of the ConnectionActivities.Connection CertificateThe DWTSO shall review and approve the Readiness to ConnectStatement.7561A01/FICHT-7235220-v22CC-13

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!