Liebert® PPC™ Precision Power Center - DCES

Liebert® PPC™ Precision Power Center - DCES

SHOW MORE
SHOW LESS
  • No tags were found...

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Maintenance4.2 Preventive Maintenance (Inspection & Cleaning)Air circulation through the cabinet may cause dust to accumulate on internal components. Cleaningshould be done as necessary during electrical inspections.Annual general system inspections, cleaning and operation checks are recommended to ensure systemperformance and long service life.! WARNINGOnly qualified service personnel should perform maintenance on the <strong>Liebert</strong> <strong>PPC</strong>. All voltagesources to the unit must be disconnected before inspecting or cleaning within the cabinet.4.2.1 Inspection Schedule• It is difficult to establish a schedule for periodic cleanings since conditions vary from site to site.Inspections after the first 24 hours, 30 days and 6 months of operation should help determine apattern for the inspection schedule.• Electrical connections and component mountings should be inspected after the first 24 hours,30 days and 6 months of operation. Inspections should be conducted annually thereafter.• Ventilation openings and grilles should be inspected and cleaned every six months to one year.• A complete inspection and operational checkout should be performed annually. This is best doneby performing the inspection and startup procedures outlined in 2.0 - Inspection and StartupChecklist.• <strong>Liebert</strong> Services offers a complete range of preventive maintenance services. These includethorough equipment performance checks and calibration of electronics. Contact <strong>Liebert</strong> Servicesat 1-800-543-2378 for details.26

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!