1 2 3 4 5 6 7 8 9 10<br />

INFORMATION<br />

STANDBUILDING<br />

Interior Displays on Shell Scheme Sites<br />

Exhibitors are at liberty to engage a contractor of their choice to carry out the construction and<br />

installation of interior displays on shell scheme stands provided that the name of the contractor<br />

appointed is submitted to the Organisers by 7 September12 using the "Space Only"<br />

Contractor & Interior Decorator order form. The official shell scheme contractors, JOE<br />

MANBY LTD, will, of course, be pleased to provide estimates for such work. Please note<br />

that all materials used for the construction of displays must be of a non-inflammable<br />

nature or such that has been approved by the Local Council or other authority<br />

Non-Shell Scheme Stands<br />

The name of the contractor employed to undertake the complete stand construction must be<br />

submitted to the Organisers by not later than 7 September12. All non-shell scheme<br />

stands must provide a drawing/s in duplicate of the proposed design and structure<br />

showing the materials to be used, for approval. All contractors must provide proof<br />

of All Risks and Public/Products Liability Insurance.<br />

Please note that all materials used for construction, decoration and display work must be such<br />

as have been approved for use in exhibitions. Once again, the official contractor JOE MANBY<br />

LTD will be pleased to quote for individual stands.<br />

Standbuilding 'Rules & Regulations'<br />

1. Full dimensional drawings - showing all proposed constructional details and general<br />

arrangement must be submitted and approved by the Organisers before any work is<br />

started.<br />

2. All advertising and logos must be within the specific height limits and must not be<br />

sited on the back of dividing walls especially where they overhang an adjoining lower<br />

height stand. The Exhibitor cannot display name boards or signs over the sides of<br />

another adjacent Exhibitors back wall or sidewall other than on his own wall area.<br />

Any structures such as towers or signboards should be set in at least by half a metre<br />

from the common walls. All painting must be carried our in water-based paints.<br />

3. All stand structures, signs, etc. must be confined within the area allotted and must not<br />

project into or over the gangways.<br />

4. Where the stand abuts onto another stand, the walls of the adjacent stand may not be<br />

used by the exhibitor, ie every Exhibitor is responsible to build their own walls to<br />

separate their stand. The walls minimum height of 2.5m must be constructed.<br />