Baton Rouge SSO Program
March 2011 Monthly Progress Report - Baton Rouge Department of ...
March 2011 Monthly Progress Report - Baton Rouge Department of ...
- No tags were found...
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Baton</strong> <strong>Rouge</strong> Sanitary Sewer Overflow (<strong>SSO</strong>) <strong>Program</strong><br />
Projects Under<br />
Construction<br />
64<br />
964<br />
37<br />
18<br />
AVE<br />
CENTRAL<br />
67<br />
GREENWEL R L SPRINGS D<br />
SAMUELS RD<br />
17 22<br />
19<br />
PLANK RD<br />
5<br />
SCOTLAND AVE<br />
6<br />
12<br />
19<br />
<strong>Baton</strong> <strong>Rouge</strong><br />
Metropolitan<br />
67<br />
Airport<br />
110<br />
9<br />
26<br />
4<br />
29<br />
23 28<br />
190<br />
408<br />
SPRINGS GREENWELL RD<br />
HOOPER RD<br />
2<br />
RIVER RD<br />
R<br />
ACADIAN<br />
20 14<br />
12<br />
61<br />
426<br />
3 24<br />
10<br />
FLORIDA BLVD<br />
AIRLINE HWY<br />
SHARP RD<br />
HAMMOND HWY<br />
OLD<br />
30<br />
BRIGHTSIDE DR<br />
KENILWORTH PKWY<br />
HIGHLAND RD<br />
NICHOLSON DR<br />
21<br />
42<br />
427<br />
1,8<br />
15<br />
RING LN<br />
16<br />
BURBANK DR<br />
BLVD<br />
BLUEBONNET<br />
SIEGEN<br />
Mall of<br />
Louisiana<br />
10<br />
PERKINS RD<br />
27 7<br />
42<br />
25 11<br />
1 SWWTP IAPs Combined<br />
11 Highland Road – Buchanan St<br />
21 Kenilworth Blvd – Boone Drive<br />
2 Sullivan Rd/Lovett Rd/Wax Rd<br />
12 Capitol Lake Dr – Gayosa St/<br />
22 Zachary Area Transmission Network (Phase 3)<br />
3 Oak Villa Blvd – Choctaw Street<br />
25th St – N. Acadian Thruway<br />
23 Brookstown Road – Evangeline Street (Phase 1)<br />
4 Comite Drive – Foster Road (Phase 2) 13 Emergency Generators Purchasing & Installation* 24 Choctaw Storage and PS Facility<br />
5 Scotland Avenue – Progress Road<br />
14 Foster Drive – Government Street (Phase A) 25 Highland Road – Burbank Drive<br />
6 Elm Grove Garden Road – Harding Blvd 15 Staring Lane FM (PH2 – Highland to Perkins) 26 Group Project 1A (Veterans Parkway – Gravity<br />
7<br />
8<br />
Group Project 2 – Small Pump Stations<br />
SWWTP Wet Weather Improve (Phase 1)<br />
16<br />
17<br />
Citiplace/Essen Area<br />
Zachary Area Transmission Network (Phase 1) 27<br />
Mains)<br />
Nicholson Dr – Highland Rd – Perkins Rd (Phase A)<br />
9 South Blvd-St. Joseph St/25th St – 18 Zachary Area Transmission Network (Phase 4) 28 Brookstown Road – Evangeline Street (Phase 2)<br />
N. Acadian Thruway<br />
19 Downtown Area –PS15, PS19, PS59, PS60 29 Silverleaf Road – Ford Street<br />
10 Sharp Road – Florida Blvd<br />
20 Foster Drive – Government St (Phase B)<br />
* Throughout the City – Parish<br />
4