Lifting OperatiOnS - TFSK.NO

16.45 RISK and Challenges with Crane Wires operated

in Active Heave - Next generation ropes

Mr. Steinar Ekrem and

Mr. Jan Frafjord, Viking Moorings

17.15 Subsea Module Handling

• Engineering of smaller lifts from IMR vessels

• Rules and regulations

• Operational challenges

• Hydrodynamic effects in moon pool

Mr. Inge Holme Grutle, DeepOcean

18.00 End of Day 1

20.00 Conference Dinner

Thursday 2 nd December

Chairs: Mr. Thore Grønvik, Acergy and

Mr. Martin Ahlbäck, Technip

08.30 Engineering optimization by the implementation

of the Simplified Method for Lifting through the

Splash Zone presented in DNV-RP H103

Mr. Arnstein Hosaas, Subsea 7

09.00 Sea Water corrosion on steel wire rope

termination

Mr. Knut Dorsey, W. Giertsen Services AS

12.45 Highlights of Deepwater Lifting Projects in the

GoM

• Blind faith

• Thunder hawk

• Thunder horse

Representative from AMC US Inc

13.30 Ekofisk HPS / SPS subsea structure installation

- marginal lift and transport using Skandi Arctic

Mr. Knut Johan Nedrelid, Technip

14.15 Coffee Break

14.30 Skarv - Subsea Installation Operations

• Field layout and status

• Contractors and vessels

• Vessel assurance, including crane assurance

• Lifting of subsea structures

• Lifting of rigid spools

Mr. David Brooks, BP Norge AS

15.15 Luva Project

• Project overview

• Installation challenges

Mr. Tore M. Tveit, Statoil ASA

15.45 Closing remarks

16.00 Bus transports to the airport

09.30 Coffee Break

10.00 Updated DNV SfC No. 2.7-3, Portable Offshore

Units

• Content of the Standard for Certification No. 2.7-3

• Assumptions and considerations including subsea

use

• Design load calculations

• Lift rigging design

Mr. Per Øystein Alvær, Det Norske Veritas

10.30 DP operations inside the installation safety zone

• Challenges to the planning and execution

• New governing documentation and work process

• Summary of some important requirements

Mr. Tom Eirik Eikanger, Statoil ASA

11.00 Deep water field developments

- Hybrid riser installation experience

Mr. Eric Waymel, Technip

11.45 Lunch