3.- Industrial building

delineacion

Catalogue

Industrial building


INDEX:

1.- Industrial building.

1.1.- Iron and steel industry.

1.2.- Logistics.

1.3.- Food industry.

1.4.- Chemical and pharmaceutical.

1.5.- Several.

1.6.- Energy.


Catalogue

Industrial Construction

1.- INDUSTRIAL CONSTRUCTION.

The chapter of industrial buildings is that within the whole of the building sector is oriented so

specialized to the construction of buildings intended for industrial use, in order to

accommodate the production or storage of industrial goods, as well as the means for their

manufacture: employees, machinery and equipment, etc.

Requirements and types of construction that must have the ship or building vary depending on

countless economic activities can be developed in its interior, which has led to the

development of a large number of constructive solutions, which encompass all the elements of

the same: structural type, Foundation, enclosure, soils, cover, etc.

Ship for casting of metals, Heras (Cantabria).


1.1. Iron and Steel industry

1.‐ Industrial construction


Catalogue

Industrial Construction

NUEVA FÁBRICA PARA LA FABRICACIÓN DE BARRA CALIBRADA EN SANTANDER

Performance surface: 4.520 m²

Year of implementation: 2015

Execution time :

5 meses

Construction of new factory calibrated bar located in the facilities of Global Steel Wire in

Santander.

Rectangular dimensions in plant 113 x 44 mtrs. The constructed area is 4.520 m². Metal

structure of gantry and two outstanding 10%. Gable and sandwich panel lacquered steel with

insulation of polyurethane foam with Ridge Cap cover, gasket sealed exterior e interior and

stainless steel screws. The closure of the facades will also with lacquered steel with

polyurethane foam insulation sandwich panel.

New factory for Global Steel Wire, Santander (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction

NEW FACTORY FOR MANUFACTURING OF STAINLESS STEEL TUBES

Performance Surface : 5.232 m²

Year of implementation : 2014

Execution time :

5months

Construction of new factory of stainless steel pipe with a treatment of ceramic finish in the

Industrial Park of Marina and Medio Cudeyo.

The ship develops on ground floor with a total area of 5.232,10 m², made up of a main body of

rectangular shape of 100 x 50 mts and a local townhouse of 220 m. The structure is metal and

the enclosure has a base perimeter of concrete panels and on this sandwich panel, as well as

covering also features alveolated domes. The height of the nave is 13 meters, except in a front

facade in an area which has 25 mts in which is has a singular facility representative building

with an area of 625 square metres. The inner urbanization is equipped with 54 seats of parking

and roads accessible for trailers up to 18 meters. Running also networks of supply, sanitation,

electricity, gas, ventilation, PCI, and telecommunications.

New factory for Tubacex in the marine industrial park and Medio Cudeyo (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction

NEW FACTORY OF SPECIAL STEEL CASTINGS

Performance Surface : 8.995 m²

Year of implementation : 2006

Execution time :

6months

Construction of new warehouse for factory castings of special steels for Faed in Requejada.

Rectangular Assembly dimensions 80 x 41 ml, and offices module attached to the former

dimensions 20 x 9 ml, situated on a plot of 8.995 m².

New ship's casting of special steels (FAED), Requejada (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction


1.2. LOGISTICS

1.‐ Industrial construction


Catalogue

Industrial Construction

NUEVA NAVE PARA ALMACÉN LOGÍSTICO POLIVALENTE

Performance Surface : 30.000 m²

Year of implementation : 2008

Execution time :

9months

Construction of Industrial building for Multipurpose logistics warehouse for ASPLA, with a

performance on an area of 30,000 m², of which 12,000 m² correspond to the ship itself and the

remainder to outside warehouse, roads and parking lots. The dimensions of the ship are 110 ml

long and 105 ml of width, separated into 3 compartments of 110 x 35 ml. The heights ranged

from 11,20 ml under beam to 13.45 ml in coronation. The structure is prefabricated reinforced

concrete façade with panel prefabricated with Chinese wash and separation between

departments grey panel smooth finish. The cover is bend with sandwich panel. The logistics

ship carries attached to its sides a ship for trucks of 400 m² and a ship's office of 300 m2 with 2

heights with offices, dressing rooms and bathrooms. Since the estate has been built on a mining

fill more than 100 meters, was a PRELOAD of 30.000 m³.

Warehouse logistics of Aspla in the Business Park Besaya (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction

NEW FACTORY FOR PRODUCTION OF FORKLIFT TRUCKS

Performance Surface : 18.707 m²

Year of implementation : 2006

Execution time :

6months

Construction of new factory for the production of forklift trucks in the Besaya Business Park, in

the municipality of Reocín.

The installation is carried out on a plot of 62.905 m² and has been required the excavation of

some 20,000 m³ of Earth.

It is divided into 2 ships of steel structure of straight columns 81 and recessed, Gable with three

intermediate pillars of dimensions 211 and 101 meters long and 16 meters wide, with a height

to the eaves of 9 meters and height of 8 meters. Slope of 10% cover. With a modulation of 12

and10meterslongitudinalandtransverse20and16meters.2bridgescrane10Tn,15meters

wide and tour of 54 meters and 1 bridge crane 5 tons, 12 meters wide and 60 meters.

The roof is formed by enclosure type "in‐situ" sandwich hiding straps.

Factory production of forklift trucks for Haulotte in the Business Park Besaya (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction

SANTANDER CITY TRANSPORT (CANTABRIA)

Performance Surface : 120.000 m²

Year of implementation : 2005

Execution time :

12 months

Construction of the Santander transportation hub that is home to more than 40 companies in

the sector of transport and logistics with 45,000 m² of ships and 44 office modules, exterior

parking for heavy vehicles with 230 seats and underground parking for 250 vehicles.

City transport, Santander (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction


1.3. FOOD INDUSTRY

1.‐ Construcción industrial


Catalogue

Industrial Construction

EXPANSION OF WAREHOUSE FOR DAIRY ANDROS (CANTABRIA)

Performance Surface : 2.429 m²

Year of implementation : 2010

Execution time :

9months

Expansion and renovation of Arenas de Iguña dairy owned by the French multinational Andros

performing a new ship silo‐frigorifico of 2.429,17 m² of occupation on the ground, attached to

the halls 14 and 15 existing, high cornice of 13,74 m, rectangular floor which consists of ground

floor and first, reinforced concrete, structure metal, metal of galvanized steel and precast

concrete panel cladding roof.

Expansion of warehouse for dairy Andros, Arenas de Iguña (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction


1.‐ Industrial construction


Catalogue

Industrial Construction

NEST SHIPS OF SALTING (FISHERY), INDUSTRIAL POLYGON OF THE MARSHES

OF SANTOÑA (CANTABRIA)

Performance Surface : 12.676 m²

Year of implementation : 2000

Execution time :

10 months

Construction of 22 industrial buildings modulated with cabrete dedicated to the production and

processing of canned, salted products and semi‐preserved fish, with a total of 12.676,58 m² built,

prefabricated reinforced concrete structure, as well as the development of the plot.

Nest ships of salting in Santoña (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction

INDUSTRIAL NAVE WILL RETAIN IN POLÍGONO DE MORERO (EL ASTILLERO) PARA

CONSERVAS ISLAS CIES.

Performance Surface : 24.174 m²

Year of implementation : 2007

Execution time :

6months

Construction of ship intended for the production of preserves with a total of 12.174 m²

constructed, formed by:

Production of structure Hall prefabricated 64 x 68 m with beams of up to 16 meters length and

1.42 meters from singing with plant basement (which houses stores, tanks, boilers, pumps and

electrical equipment rooms), and plant production with 3 lines (pre‐cooked smoked salmon and

anchovy).

Appended to the production Hall buildings executed in‐situ reinforced concrete structure, being

thefirstof23x13meterswhereislocatedthemainPier;andthesecondof25x40meters

where the offices of production, dressing rooms, laboratory and main entrance; and the

mezzanine with offices and dining room.

On the other hand the urbanization of the 12,000 sqm plot, contains 56 squares of parking, a

control booth and a sewage treatment plant to collect residues from the ship.

Industrial warehouse for canned Cies Islands, El Astillero (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction


1.4. CHEMICAL - PHARMACEUTICAL

1.‐ Industrial construction


Catalogue

Industrial Construction

PHARMACEUTICAL FACTORY MOEHS, REQUEJADA (CANTABRIA)

Performance Surface : 51.500 m²

Year of implementation : 2000

Execution time :

18 months

The total area of the plant of Moehs Cántabra, S.L. is 51,500 m², of which 8,000 m² are finished

and occupied by the production unit. Wastewater treatment plant occupies 6,500 m² allowing

the present needs and in anticipation of the imminent enlargements of the complex.

Administrative buildings, warehouses and analysis services, complement the facilities the plant,

which is surrounded by a pleasant green area of 17.000 m².

Pharmaceutical factory Moehs, Requejada (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction

NEW FACILITIES FOR PHARMACEUTICAL CENTER NORTH

Performance Surface : 4.800 m²

Year of implementation : 2014

Execution time :

5 meses

Construction of new facilities for Center pharmacist in North Cenfarte in the Candina in

Santander.

It has an automatic dispenser of last generation that brings speed and efficiency to processes of

reception of goods and implementation of orders to pharmacies in Cantabria.

The most noteworthy features are:

• prefabricated piles 7.678, 70 ml.

• 289.185,04 kg steel B500S.

• 1,500 m³ concrete pillars and solera.

• 7.560, 91 m² concrete polishing.

• 2,391, 80 m² precast panel cover.

• 1230 m² wall structural silicone curtain.

• Fire complete installation, electricity, low voltage, air conditioning, natural gas and

ventilation.

Warehouse for pharmaceutical Center of North Santander (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction


1.‐ Industrial construction


Catalogue

Industrial Construction


1.5. SEVERAL

1.‐ Industrial construction


Catalogue

Industrial Construction

NEW FACTORY FOR THE PRODUCTION OF PANELS OF FIBROYESO

Performance Surface : 33.341 m²

Year of implementation : 2005

Execution time :

11 months

Construction of new factory for the production of panels of fibroyeso for use in the industry

such as walls, ceilings and floors, Orejo, municipality of Marina de Cudeyo. It currently belongs

to Fermacell.

In order to dimension the foundations of the ships and the urbanization of the plot, has been

excavating with a volume of more than 65.000 m³ excavation.

It consists of four industrial buildings with a total of 33.341,71 square meters, including offices,

changing rooms, laboratories, centers of transformation, etc. with metal structure, cladding of

walls and cover sheet sandwich panel and 2.40 meters of concrete block wall. Except in the

main facade of the production hall to be placed panels, precast concrete in their first 2.4 meters

then continue with sandwich panel and the ship's role in the area of storage that the closure

will be with prefabricated panels of concrete up to six meters high and then with the same

features sandwich panel.

Two types of Foundation, the direct first on the natural ground after excavation and the other

on the ground are used after being replaced by a structural fill. Pads will be reinforced concrete

braced longitudinally. Floor slab of reinforced concrete with double mesh in order to comply

with the tough conditions and union to prevent cracking of the upper layer. Also defined the

foundations of the machinery and galleries of services necessary for the production and

communication.


Premises for the manufacture of fibroyeso, Orejo panels (Cantabria).

1.‐ Industrial construction


Catalogue

Industrial Construction

CANTABRIA TECHNOLOGY CENTER. AUXILIARY BUILDINGS AND

COMMUNICATIONS TOWER.

Performance Surface : 3.390 m²

Year of implementation : 2010

Execution time :

14 months

Execution of the auxiliary buildings "Enterprice Command Center" (ECC) to Santander Global

Facilities, fully total built area of 2.945,60 m2, and "Center of interpretation technology" (ILC),

total floor area of 445,25 m2, administrative use and reception of visitors, each of two floors

without basement, connected by a footbridge, irregular polygonal‐shaped irregular structural

reinforced concrete system indoor plant of reinforced concrete and steel profiles covered with

steel cut, seen and colored concrete facade.

In addition to these two buildings were constructed other buildings such as the energy Central

(CEN), communications tower (TOR), logistic block (block) and Access Control (COA), as well as

all plants of the same.

Cantabria Technology Center. Auxiliary buildings

and communications in industrial estate Marina

Tower and Medio Cudeyo (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction

NAVES NIDO, POLÍGONO EMPRESARIAL BESAYA. REOCÍN (CANTABRIA).

Performance Surface : 22.260 m²

Year of implementation : 2010

Execution time :

10 months

Execution of 60 warehouses, divided into three groups of 21, 18 and 21 ships, with surfaces

ranging between 190 m2 and 400 m2. The three buildings are developed on one floor, no

defined initial use and the following relationship of surfaces of each of apples (including patios):

1. Grouping 21 ships 7.923 m².

2. Grouping 18 ships 6.276 m².

3. Grouping 21 ships 8.007 m².


1.‐ Industrial construction


Catalogue

Industrial Construction


1.6. ENERGETIC

1.‐ Industrial construction


Catalogue

Industrial Construction

PLANTA DE GENERACIÓN ELÉCTRICA CON BIOMASA

Performance Surface : 18.708 m²

Year of implementation 2010

Execution time :

12 months

Construction of new plant based on the production of electricity from energy recovery by combustion

of biomass of forest origin. These wastes are burned in the biomass boiler by transferring heat to the

water that turns into steam to drive a turbine coupled to an alternator whose purpose is the

production of electricity.

The plant was built on a plot of 113.45, 49 m² in the Besaya Business Park of Reocín. In this plot, the

space dedicated to the plant is 18.708 m², of which 1,100 m² will be built‐up area and 3,800 m²

surface corresponding to facilities.

The various buildings that make up the biomass plant are:

• Turbine building,

• Biomass storage silo,

• Buildings boiler and electric,

• Waste and water treatment buildings,

• Electrical substation,

• Screening,

• Building of reception and processing of biomass.

Power plant with biomass in the Business Park Besaya (Cantabria).


1.‐ Industrial construction


Catalogue

Industrial Construction

Power plant with biomass, in the Business Park Besaya (Cantabria).


WHEREWEARE?

Construction and Services, S.A.

Address: Paseo Julio Hauzeur, 45 B

39300 Torrelavega (Cantabria), Spain

e-mail: siecsa@siecsa.com

web:

www.siecsa.com

Phone: (+34) 942 89 24 11


Cantabria Spain Morocco

Paseo Julio Hauzeur, 45 Bajo | CP 39300 | TORRELAVEGA (Cantabria) | Tél. (+34) 942 892 411

www.siecsa.com | e‐mail: siecsa@siecsa.com

SIECSA, Construction and Services, S.A.

More magazines by this user
Similar magazines