Annual Plan 2016-17 - Approved by Council 27 June 2016
Kingborough Council 2016-17 Annual Plan
Kingborough Council 2016-17 Annual Plan
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
It has been identified that substantial upgrade work is required on the stormwater network due to<br />
significant capacity constraints resulting from new developments. A study is underway to review the<br />
stormwater system and determine the priority areas for upgrade.<br />
Major projects include:<br />
$614,000 stormwater upgrade Illawarra Road stage 2;<br />
<br />
<br />
<br />
<br />
<br />
$330,000 stabilisation works to Margate Esplanade;<br />
$225,000 stormwater upgrade to Ewing Avenue;<br />
$114,000 stormwater upgrade to Beach Road, Middleton;<br />
$110,000 stormwater upgrade to Taronga Road stage 2; and<br />
$105,000 stormwater upgrade and coastal protection at Tinderbox Reserve.<br />
8.1.4 <strong>Plan</strong>t and Equipment ($1.<strong>27</strong>4M)<br />
<strong>Plan</strong>t and equipment includes heavy vehicles, light vehicles and small plant.<br />
Vehicles replacement is covered <strong>by</strong> policy. Small plant replacement is determined <strong>by</strong> adequacy of<br />
equipment.<br />
Major replacements include:<br />
<br />
<br />
<br />
<br />
<br />
<br />
<br />
$<strong>27</strong>5,000 replacement of the Flocom road maintenance unit;<br />
$200,000 replacement of the 24 tonne tip truck;<br />
$80,000 replacement of the 85hp tip truck;<br />
$80,000 replacement truck for Bruny Island;<br />
$63,000 replacement flat tray truck for signage team;<br />
$53,000 replacement flat tray truck for the workshop; and<br />
$53,000 replacement dual cab truck for Twin Ovals.<br />
8.1.5 Other ($0.13M)<br />
Other infrastructure includes waste management and projects related to internal improvements to<br />
<strong>Council</strong> owned infrastructure and assets.<br />
Major projects include:<br />
<br />
<br />
<br />
$33,000 Bruny Island cat holding facility;<br />
$20,000 Depot dog pound waste management system; and<br />
$50,000 design and survey work on future projects.<br />
Kingborough <strong>Council</strong> <strong>Annual</strong> <strong>Plan</strong> <strong>2016</strong>/<strong>17</strong> Page | 56<br />
<strong>Approved</strong> <strong>by</strong> <strong>Council</strong> on <strong>27</strong> <strong>June</strong> <strong>2016</strong>