Failures of main gas pipelines PJSC “UKRTRANSGAZ” during 2015-2016
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
Failure <strong>of</strong> <strong>main</strong> pipeline «Kramatorsk-Donetsk-Mariupol» DN<br />
1000 and <strong>gas</strong> pipeline branch to GMS «Donetsk-2» DN 500<br />
1. Failure caused by fighting<br />
2. The failure was eliminated in cooperation with military<br />
force <strong>of</strong> Ukraine including 49 workers and 21 special<br />
purpose vehicles:<br />
• 48 workers <strong>of</strong> Main Pipeline Division KHARKIVTRANSGAZ;<br />
• 1 worker <strong>of</strong> Centre for Technical Inspection<br />
TECHDIAGAS.<br />
3. Emergency recovery works:<br />
• start: 7 10 a.m 12.06.15<br />
• finish: 4 00 p.m 16.09.15<br />
• duration: 105 hours<br />
4. Gas leakage - 5,1 Mcm , <strong>gas</strong> cost UAH 29, 5 mln.