Installation Guide Pulpmatic Ultima & Eco V3.0
Create successful ePaper yourself
Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.
1. Table of Contents<br />
1. Table of Contents ........................................................................................................ 2<br />
2. Copyright and disclaimer ............................................................................................ 4<br />
2.1 Copyright © 2015 ............................................................................................................... 4<br />
2.2 Disclaimer .......................................................................................................................... 4<br />
3. Application .................................................................................................................. 5<br />
3.1 Machine serial number ....................................................................................................... 5<br />
3.2 This manual is applicable to ............................................................................................... 6<br />
4. Delivery of the machine .............................................................................................. 7<br />
5. Cautionary notes ......................................................................................................... 8<br />
5.1 Safe operation .................................................................................................................... 9<br />
6. <strong>Installation</strong> process ................................................................................................... 10<br />
6.1 Plan the installation .......................................................................................................... 10<br />
6.2 Manual handling ............................................................................................................... 13<br />
6.3 Unpacking the machine .................................................................................................... 13<br />
6.4 Removal and fitting of foot cup assembly ......................................................................... 14<br />
6.5 Fitting plinth (optional base to raise machine by (100mm)................................................ 18<br />
6.6 (Optional) plinth with extended foot cup plate <strong>Installation</strong> ................................................. 21<br />
6.7 Remove materials from chamber ..................................................................................... 27<br />
6.8 Remove the protective film ............................................................................................... 27<br />
6.9 Check internal parts ......................................................................................................... 27<br />
6.10 Cold water connection ...................................................................................................... 27<br />
6.11 Waste outlet connection ................................................................................................... 30<br />
6.12 Machine plinths ................................................................................................................ 33<br />
6.13 Overflow connection ......................................................................................................... 33<br />
6.14 Electrical connections (must be compliant with IEC 60364) .............................................. 35<br />
6.15 3 Phase rotation test (only required on 3 phase machine) ................................................ 38<br />
6.16 Fix the machine to the floor .............................................................................................. 40<br />
6.17 Assemble the chemical system ........................................................................................ 41<br />
6.18 Boxing in .......................................................................................................................... 42<br />
6.19 Clean all outside surfaces ................................................................................................ 42<br />
6.20 Clear working area ........................................................................................................... 42<br />
6.21 Clean any scuff or marks on the floors or walls ................................................................ 42<br />
6.22 Fix the wall posters .......................................................................................................... 42<br />
Copyright © 2015 DDC Dolphin Ltd Page 2 of 50 October 15 IG-UECO-<strong>V3.0</strong>