27.10.2016 Views

Installation Guide Pulpmatic Ultima & Eco V3.0

Create successful ePaper yourself

Turn your PDF publications into a flip-book with our unique Google optimized e-Paper software.

1. Table of Contents<br />

1. Table of Contents ........................................................................................................ 2<br />

2. Copyright and disclaimer ............................................................................................ 4<br />

2.1 Copyright © 2015 ............................................................................................................... 4<br />

2.2 Disclaimer .......................................................................................................................... 4<br />

3. Application .................................................................................................................. 5<br />

3.1 Machine serial number ....................................................................................................... 5<br />

3.2 This manual is applicable to ............................................................................................... 6<br />

4. Delivery of the machine .............................................................................................. 7<br />

5. Cautionary notes ......................................................................................................... 8<br />

5.1 Safe operation .................................................................................................................... 9<br />

6. <strong>Installation</strong> process ................................................................................................... 10<br />

6.1 Plan the installation .......................................................................................................... 10<br />

6.2 Manual handling ............................................................................................................... 13<br />

6.3 Unpacking the machine .................................................................................................... 13<br />

6.4 Removal and fitting of foot cup assembly ......................................................................... 14<br />

6.5 Fitting plinth (optional base to raise machine by (100mm)................................................ 18<br />

6.6 (Optional) plinth with extended foot cup plate <strong>Installation</strong> ................................................. 21<br />

6.7 Remove materials from chamber ..................................................................................... 27<br />

6.8 Remove the protective film ............................................................................................... 27<br />

6.9 Check internal parts ......................................................................................................... 27<br />

6.10 Cold water connection ...................................................................................................... 27<br />

6.11 Waste outlet connection ................................................................................................... 30<br />

6.12 Machine plinths ................................................................................................................ 33<br />

6.13 Overflow connection ......................................................................................................... 33<br />

6.14 Electrical connections (must be compliant with IEC 60364) .............................................. 35<br />

6.15 3 Phase rotation test (only required on 3 phase machine) ................................................ 38<br />

6.16 Fix the machine to the floor .............................................................................................. 40<br />

6.17 Assemble the chemical system ........................................................................................ 41<br />

6.18 Boxing in .......................................................................................................................... 42<br />

6.19 Clean all outside surfaces ................................................................................................ 42<br />

6.20 Clear working area ........................................................................................................... 42<br />

6.21 Clean any scuff or marks on the floors or walls ................................................................ 42<br />

6.22 Fix the wall posters .......................................................................................................... 42<br />

Copyright © 2015 DDC Dolphin Ltd Page 2 of 50 October 15 IG-UECO-<strong>V3.0</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!