Transform your PDFs into Flipbooks and boost your revenue!
Leverage SEO-optimized Flipbooks, powerful backlinks, and multimedia content to professionally showcase your products and significantly increase your reach.
International Golf Course Architects<br />
The <strong>2016</strong> <strong>Review</strong>
The <strong>2016</strong> <strong>Review</strong><br />
This year’s review is packed with more than just photographs. There are videos included<br />
as well which does lengthen the viewing time but you can always shorten the videos by<br />
grabbing the scroll bar at the bottom of the screen to fast forward through them more<br />
quickly. You can also flick to the next slide if you do not want to view a video.<br />
Happy viewing!
The <strong>2016</strong> <strong>Review</strong><br />
<strong>2016</strong> continued as 2015 ended for <strong>Mackenzie</strong> & <strong>Ebert</strong> – rather busy!<br />
Some highlights included:-<br />
Trump Turnberry<br />
The Ailsa Course opened on target with the members playing the first rounds on 30 th May <strong>and</strong> hotel guests on 1 st<br />
June as scheduled. This was an incredible feat with work on the reconstruction of every green, every tee, every<br />
bunker <strong>and</strong> 5 new holes only starting at the end of September 2015. Everyone involved must be congratulated on<br />
such an achievement. Mr Trump flew in for the Gr<strong>and</strong> Opening of the Ailsa <strong>and</strong> the Hotel in the middle of June. At the<br />
end of the year, the course received the award of No. 1 ranking in Golf Monthly’s Top 100 courses in UK & Irel<strong>and</strong> <strong>and</strong><br />
the award for International Renovation of the Year by GOLF magazine.<br />
Once the Ailsa project was completed, the focus shifted to the Kintyre Course. The completely new holes at the far<br />
end of the course, on Bains Hill, will be the equal of the coastal holes of the Ailsa Course in terms of their setting. The<br />
redesigned course is to be opened again on the birth date of Robert the Bruce, the first King of Scotl<strong>and</strong>, on 11 th July.
The <strong>2016</strong> <strong>Review</strong>
The <strong>2016</strong> <strong>Review</strong><br />
Royal Portrush<br />
The Dunluce Course now has two new holes which will be open for play in the early summer of 2017. They were<br />
actually playable by the end of <strong>2016</strong> but some extra months will allow the fairways to be refined even further. The<br />
new par five 7 th <strong>and</strong> par four 8 th holes look as though they have been there forever which is a testament to the<br />
construction work as both holes had to be shaped from tee to green. The new 2 nd , 3 rd <strong>and</strong> 8 th (to be the 10 th green in<br />
the new layout) were opened early in the playing season of <strong>2016</strong> as were all of the other changes to the course.<br />
The Royal Portrush members <strong>and</strong> the Rathmore members have already enjoyed the new 15 th , 16 th , 17 th <strong>and</strong> 18 th holes<br />
on the Valley Course which opened for play in May <strong>2016</strong>. The opening of these holes allowed a start to be made on<br />
the two new Dunluce holes. The par 3 Skerries Course reopened shortly afterwards with two stunning new holes with<br />
views down onto the beach.
The <strong>2016</strong> <strong>Review</strong><br />
Channel - Royal Portrush New 7 th Hole<br />
Click here to watch Golf Channel Piece on Royal Portrush
The Open Venues<br />
As well as the major projects at Turnberry <strong>and</strong> Royal Portrush, input has also been provided to 5 of the other Open<br />
venues. Advisory visits were made before <strong>and</strong> after The Open at Royal Troon, a dune construction plan put out to<br />
tender at Royal Lytham, the 2 iconic bunkers on the 4 th hole at Royal St. George’s were reconstructed, work got<br />
underway at Carnoustie on adjustments to the 3 rd hole <strong>and</strong> Open practice facilities <strong>and</strong> the adjustment of two green<br />
surrounds at Royal Liverpool (below) was implemented in the autumn.<br />
<strong>2016</strong> Notable Projects
<strong>2016</strong> Notable Projects<br />
Some other notable projects were:-<br />
St Andrews – New Course<br />
The company was delighted to be invited to provide input at the Home of Golf, St Andrews in <strong>2016</strong>, advising on the<br />
New Course. The project has involved converting areas of rough, which were formerly covered by gorse, into bare<br />
s<strong>and</strong> areas. This has followed similar work at Royal Troon, Turnberry <strong>and</strong> Royal Portrush.<br />
Prestwick<br />
Another historic course to be advised is Prestwick, the venue of the first Open Championship. A bunker strategy<br />
report has been produced for the Club. More detail will be added to this in 2017.<br />
Portmarnock & The Isl<strong>and</strong>, Dublin, Irel<strong>and</strong><br />
This wonderful pair of classic links courses will host The Amateur Championship in 2019 with Portmarnock hosting<br />
the matchplay part of the event. Portmarnock has been advised for a number of years but The Isl<strong>and</strong> is a new<br />
commission in <strong>2016</strong>. Back tees, bunkering adjustments <strong>and</strong> dune construction are being implemented at<br />
Portmarnock. At The Isl<strong>and</strong>, proposals have been developed for a more extensive set of changes. Assuming that these<br />
are approved by the Club, the implementation will be split either side of The Amateur.
Royal County Down, Newcastle, Northern Irel<strong>and</strong><br />
Following the addition of the three new holes to the Annesley Links, which weaves its way through the No.1 Course,<br />
the focus moved onto the new practice ground <strong>and</strong> the formation of dunes to the right of the 17 th hole on the<br />
Championship Course in <strong>2016</strong>. These dunes were intended to divide the 17 th from the practice area <strong>and</strong> have really<br />
improved the character of the 17 th . Once again, the technique of lifting <strong>and</strong> relaying rough vegetation, called<br />
translocation, has proved itself in allowing changes to look as though they have been in place forever.<br />
<strong>2016</strong> Notable Projects
Trevose Golf <strong>and</strong> Country Club, Cornwall, Engl<strong>and</strong><br />
Work on this glorious Harry Colt layout continued in <strong>2016</strong> with focus turning to the renowned 4 th hole as well as the<br />
10 th <strong>and</strong> 18 th . The 4 th is one of the most photogenic holes in the UK with Constantine Bay in the background but,<br />
despite that, the hole did not live up to expectations. It has been the subject of a complete overhaul with new tees,<br />
bunkers <strong>and</strong> a huge new rolling green from which the glorious backdrop is now visible unlike the old green.<br />
<strong>2016</strong> Notable Projects
<strong>2016</strong> Notable Projects<br />
Saunton West Course, North Devon, Engl<strong>and</strong><br />
Despite having two excellent links courses, Saunton is not content with sitting back <strong>and</strong> doing nothing. It has a<br />
progressive policy to re-invest in its courses <strong>and</strong> this year’s focus was on the West Course with an extensive<br />
programme completed. Back tees were added on 7 holes; 8 bunkers were inserted on the 3 rd , 8 th , 10 th <strong>and</strong> 12 th holes<br />
on this lightly bunkered course; a ditch was re-routed on the 12 th ; fairway softening on the 6 th <strong>and</strong> 12 th <strong>and</strong> green<br />
surrounds reshaping undertaken on the 11 th .<br />
The goal is to create two courses of a similar test that are both capable of hosting top class national amateur events.
<strong>2016</strong> Notable Projects<br />
Royal Automobile Club, Old Course, Woodcote Park, Surrey, Engl<strong>and</strong><br />
All of the bunkers on 12 holes of Herbert Fowler’s Old Course were revamped during <strong>2016</strong> with the remaining holes<br />
to be completed in early 2017. Bunkers were renovated, new ones added <strong>and</strong> others filled in, often replaced with<br />
closely mown green surround areas. The overall s<strong>and</strong> area has been significantly decreased, while the visual impact of<br />
the bunkers has been significantly improved <strong>and</strong> their strategic impact greatly increased.<br />
It demonstrates what can be done relatively quickly to transform the appearance <strong>and</strong> playing characteristics of a<br />
course in a short construction period.
Golf At Goodwood, West Sussex, Engl<strong>and</strong><br />
After a break of a year, Golf At Goodwood has now completed the revamp of all of the bunkers on its Downs Course.<br />
The work has involved rationalising bunker numbers, easing off certain areas to make the course more enjoyable for<br />
the regular golfer <strong>and</strong> stiffening up the driving test for better players. The bunkers have been sculpted to blend in<br />
harmoniously with the downl<strong>and</strong> l<strong>and</strong>scape.<br />
<strong>2016</strong> Notable Projects
<strong>2016</strong> Notable Projects<br />
Effingham Golf Club, Surrey, Engl<strong>and</strong><br />
Effingham’s rolling bunker renovation continued with the 1 st , 9 th <strong>and</strong> 18 th holes complete, leaving 6 to do. This<br />
downl<strong>and</strong> Harry Colt layout is coming to life again with bunkers that have more shape to them, sited to test the better<br />
players more thoroughly, inspired by the words of the great man himself:-<br />
“For testing the long driver, <strong>and</strong> also for putting a premium upon accuracy, it is highly desirable to include a number of<br />
long optional carries in the round, <strong>and</strong> also to provide opportunities for the bold <strong>and</strong> straight driver to play close past<br />
the edge of a hazard which he cannot carry. In all such cases it will be arranged so that the player who has brought off<br />
the drive successfully should gain a substantial advantage over his more timid or less skilful opponent.”
<strong>2016</strong> Notable Projects<br />
Oakmere Golf Club, Nottinghamshire, Engl<strong>and</strong><br />
Intent on consolidating its position in Notts golf, Oakmere Golf Club continued its heavy investment in its golf<br />
facilities. A new irrigation system has been installed, 10 holes on the Admiral’s Course have been fully re-bunkered<br />
<strong>and</strong> three new greens complete on the Comm<strong>and</strong>er’s Course. Work resumes in early 2017.<br />
Kedleston Park Golf Club, Derbyshire, Engl<strong>and</strong><br />
Having rebuilt every bunker over 3 winters, Kedleston Park re-launched its course in <strong>2016</strong>. In that period, it has filled<br />
its membership list again, re-introduced entrance fees <strong>and</strong> funded the renovation project through the additional<br />
income generated by the increase in membership activity. All in all, a positive outcome for all involved. It remains at<br />
top spot in the county in the Top 100 rankings.
<strong>2016</strong> Notable Projects<br />
Canadian Projects<br />
Advice has continued to be provided at a number of Canadian courses during <strong>2016</strong> – Angus Glen, Goodwood <strong>and</strong><br />
Hamilton Golf & Country Club.<br />
Angus Glen, Markham, Ontario<br />
The South Course was renovated in the off season of 2014 / 2015 <strong>and</strong> hosted the PanAm Games very successfully in<br />
July 2015. <strong>2016</strong> saw drought conditions affect the Toronto area so a focus has been to reduce the areas covered by<br />
irrigation by increasing the areas of fescue rough.<br />
Goodwood, Ontario<br />
This ultra private course continues to draw great reviews from the lucky few who get to play. The possibility of<br />
lengthening the par 5 18 th hole was looked at during <strong>2016</strong>.<br />
Hamilton Golf & Country Club, Hamilton, Ontario<br />
Harry Colt designed this great course in 1914 but a further 9 holes were added much later. The Club has hosted the<br />
Canadian Open on a number of occasions. A Masterplan was produced for the Club in 2015 <strong>and</strong> a presentation was<br />
made to the members at the end of <strong>2016</strong> regarding these proposals. This involved representing the changes on drone<br />
video footage of each of the three loops of nine holes – a new <strong>and</strong> effective form of presentation.
<strong>2016</strong> Notable Projects
<strong>2016</strong> Notable Projects<br />
Existing Course Projects In Finl<strong>and</strong><br />
The company’s long history of experience of advising courses in Finl<strong>and</strong> has continued in <strong>2016</strong>.<br />
Pickala<br />
The new 1 st <strong>and</strong> 2 nd greens on the Seaside Course bedded in during <strong>2016</strong> <strong>and</strong> the new putting green was opened <strong>and</strong><br />
proved very popular. The Short Game Area was the focus for construction during the year with a new target green<br />
being built.<br />
Tuusula<br />
Tuusula was the first course in Finl<strong>and</strong> which the company advised. Tee projects were assessed during <strong>2016</strong> along<br />
with discussion regarding the long term strategy for the course.<br />
Vierumäki<br />
The green reconstruction project has continued in <strong>2016</strong> with the 6 th , 8 th , 12 th <strong>and</strong> 13 th greens opening for play <strong>and</strong><br />
the 2 nd <strong>and</strong> 14 th green being rebuilt. The project will be completed in 2017.
Vantaa, Helsinki, Finl<strong>and</strong><br />
The front nine was played by the share holders by the end of the playing year on this new course very close to<br />
Helsinki Airport. The course is being built in two phases with the front nine completed during <strong>2016</strong> <strong>and</strong> the back nine<br />
awaiting l<strong>and</strong>fill before the golf construction can commence. A huge Himalayas putting green (shown below) has<br />
been built at the clubhouse which joins onto the 9 th green.<br />
<strong>2016</strong> Notable Projects
<strong>2016</strong> Notable Projects<br />
Golf Terramar, Sitges, Spain<br />
The original nine hole course at Terramar, just south of Barcelona, was designed by Tom Simpson in 1927. This was<br />
extended to 18 holes but, more recently, a new 3 rd hole with a green right on the coast was built. Work on this hole<br />
was completed during <strong>2016</strong> <strong>and</strong> a plan for a major reorganisation of the back nine was the subject of a number of<br />
planning visits throughout the year.<br />
Noordwijkse, Holl<strong>and</strong><br />
This tremendous links course to the south west of Amsterdam now has a new Green Committee. <strong>2016</strong> has been<br />
spent discussing the way forward for a number of projects including bunker <strong>and</strong> green reconstruction.
The <strong>2016</strong> <strong>Review</strong><br />
Once again this year, we have been entrusted to work on many of the great courses across the British Isles,<br />
Europe <strong>and</strong> also in Canada. Working sensitively on courses where the great old architects have plied their trade<br />
is part of what we have always done in our careers.<br />
Harry Colt<br />
Herbert Fowler<br />
Architect<br />
Courses With Direct M&E Involvement In <strong>2016</strong><br />
Where The Great Old Architects Worked<br />
Cannes Mougin, Effingham, Hamilton, Prestbury, Royal Belfast, Royal Lytham <strong>and</strong> St.<br />
Annes, Royal Portrush, Royal Wimbledon, Rye, Trevose <strong>and</strong> Worthing<br />
RAC Woodcote Park <strong>and</strong> Saunton<br />
Dr A MacKenzie<br />
Philip <strong>Mackenzie</strong> Ross<br />
Old Tom Morris<br />
John Morrison<br />
Tom Simpson<br />
James Braid<br />
Bruntsfield Links, Royal Troon (Old)<br />
Turnberry (Ailsa)<br />
Askernish, Prestwick, Royal County Down, Royal Dornoch <strong>and</strong> St Andrews New<br />
Fulwell, Kedleston Park, Prestbury <strong>and</strong> Trevose<br />
Club de Golf Terramar <strong>and</strong> Cruden Bay<br />
Edzell, Exeter, Goodwood <strong>and</strong> Mortonhall<br />
Willie Park Junior Royal Wimbledon, Gullane No 1 <strong>and</strong> No 3<br />
Tom Simpson
The <strong>2016</strong> <strong>Review</strong><br />
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
No. 1 In Golf Monthly’s Top 100 Courses In The UK & Irel<strong>and</strong>
<strong>Mackenzie</strong> & <strong>Ebert</strong> Are The Current Advisers At These Highlighted Courses In<br />
Golf Monthly’s Top 100 Courses In The UK & Irel<strong>and</strong> for 2017<br />
The <strong>2016</strong> <strong>Review</strong>
An Unexpected And Welcome Accolade From Golf World But The Results At<br />
Turnberry Were The Product Of A Great Team Following A Once In A Lifetime Brief<br />
The <strong>2016</strong> <strong>Review</strong>
<strong>2016</strong> Chris Huggett<br />
Chris Huggett & His UAV (Drone)<br />
Chris Huggett has been a key member of <strong>Mackenzie</strong> & <strong>Ebert</strong> since the formation of the company in 2005. He has<br />
been responsible for producing all of the plans <strong>and</strong> visualisations which have assisted with virtually every project, as<br />
well as artwork for all of our publications such as the booklets which have featured the proposals for Turnberry <strong>and</strong><br />
Royal Portrush <strong>and</strong> the changes made to Royal Troon for The 144 th Open this year.<br />
Now Chris has added another string to his bow by earning a qualification from the Civil Aviation Authority to fly a UAV<br />
(Unmanned Aerial Vehicle or Drone) on a commercial basis. This has already allowed the company to illustrate<br />
proposals in an even more interesting way <strong>and</strong> finished changes in even greater detail.<br />
The other service which <strong>Mackenzie</strong> & <strong>Ebert</strong> now offers is producing drone fly throughs of existing courses. The<br />
services extend to editing the final video footage to the requirements of the club.
<strong>2016</strong> Chris Huggett
<strong>2016</strong> Mike Howard<br />
Mike Howard – The Newest Member of <strong>Mackenzie</strong> & <strong>Ebert</strong><br />
Mike Howard started working for the company in <strong>2016</strong>. Mike studied Environmental Geography at Stirling University,<br />
whilst part of the golf scholarship programme <strong>and</strong> then at the University of Edinburgh where he gained a Masters<br />
degree in L<strong>and</strong>scape Architecture. He was also an R&A scholar for six years.<br />
Mike has immediately provided valuable input to a number of projects carrying out historic research, produced<br />
visualisations <strong>and</strong> provided input into layout design <strong>and</strong> detailed design. He has also marked out new <strong>and</strong> redesigned<br />
bunkers for a number of projects.
The next 200 or so pages takes you on a photographic review of the year!<br />
The <strong>2016</strong> <strong>Review</strong>
JANUARY
Royal St. George’s Kent, Engl<strong>and</strong><br />
Dismantling of the huge sleepered bunkers begins<br />
January<br />
The 4 th hole
Royal St. George’s Kent, Engl<strong>and</strong><br />
Restoring the bunkers to rough edged hazards<br />
January<br />
The 4 th hole
Royal St. George’s Kent, Engl<strong>and</strong><br />
Stripped off <strong>and</strong> now to put them back together again<br />
Fully bedded in by the end of the year<br />
November<br />
January<br />
The 4 th hole
Royal Cinque Ports Kent, Engl<strong>and</strong><br />
<strong>Review</strong> of bunker work carried out by the greenstaff<br />
January<br />
The 10 th hole
Oakmere Nottinghamshire, Engl<strong>and</strong><br />
New bunkering is transforming the course<br />
January<br />
The short par four 17 th
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
There is a great hole there somewhere!<br />
January<br />
The new par 5 7 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
Restoring the beach l<strong>and</strong>scape in the carry<br />
The completed hole<br />
April<br />
January<br />
4 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
Rebunkering for the straightened championship hole<br />
January<br />
The 18 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Natural <strong>and</strong> created dunes<br />
January<br />
The new par 5 7 th hole
Royal Automobile Club Surrey, Engl<strong>and</strong><br />
The Old Course re-bunkering gets underway<br />
January<br />
6th greenside bunker
Portmarnock Dublin, Irel<strong>and</strong><br />
Planning visit<br />
January<br />
15 th hole
The Isl<strong>and</strong> Dublin, Irel<strong>and</strong><br />
An initial visit to assess the course<br />
January<br />
The alternative 4 th hole
Trevose Cornwall, Engl<strong>and</strong><br />
<strong>Review</strong> of Phase One Work<br />
January<br />
View of 9 th hole before
Trevose Cornwall, Engl<strong>and</strong><br />
<strong>Review</strong> of Phase One Work<br />
January<br />
View of 9 th hole after
Royal County Down Newcastle, Northern Irel<strong>and</strong><br />
<strong>Review</strong> of the new holes on the Annesley Links<br />
January<br />
The 9 th tee shot
Oakmere Nottinghamshire, Engl<strong>and</strong><br />
New bunkering is transforming the course<br />
January<br />
The short par four 17 th
Royal Automobile Club Surrey, Engl<strong>and</strong><br />
The Old Course re-bunkering continues<br />
January<br />
3 rd greenside bunkers
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Fine tuning the green surface<br />
January<br />
The new par 5 7 th hole
FEBRUARY
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Turfing almost completed<br />
February<br />
The new par 5 7 th hole
Luffness New Aberlady, Scotl<strong>and</strong><br />
Setting out the boundaries of the new 15 th green<br />
February<br />
15 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Fairway shaped <strong>and</strong> top soiling about to start<br />
February<br />
The new 8 th hole
Royal Automobile Club Surrey, Engl<strong>and</strong><br />
The Old Course re-bunkering continues<br />
February<br />
6 th drive bunker
Kedleston Park Derbyshire, Engl<strong>and</strong><br />
Bunker programme nears completion<br />
February<br />
17 th approach shot
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
Looking like a finished golf hole<br />
February<br />
The new 11 th hole
Rye East Sussex, Engl<strong>and</strong><br />
Assessment of the 10 th <strong>and</strong> 17 th holes<br />
February<br />
The view from the 18 th tee
Milltown Dublin, Irel<strong>and</strong><br />
Bunker lining project starts<br />
February<br />
The Par 5 14th
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
An early review in Open year<br />
February<br />
10 th tee shot
Trevose Cornwall, Engl<strong>and</strong><br />
Phase One Work Draws To A Close<br />
February<br />
View of 2 nd hole before
Trevose Cornwall, Engl<strong>and</strong><br />
Phase One Work Draws To A Close<br />
February<br />
View of 2 nd hole after
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The green was only turfed in November but the hole looks ready for play<br />
February<br />
Par 3 11th hole
MARCH
Bolton Lancashire, Engl<strong>and</strong><br />
General advisory visit<br />
March<br />
2 nd hole
Burghley Park Lincolnshire, Engl<strong>and</strong><br />
General advisory visit<br />
March<br />
3 rd hole
Victoria Golf & Country Resort Rajawella, Sri Lanka<br />
Desk based review of the Masterplan for the Resort carried out<br />
March<br />
An aerial view of this beautiful resort
Exeter Devon, Engl<strong>and</strong><br />
Grow in visit<br />
March<br />
New 10 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
The hollow cored <strong>and</strong> seeded fairway is establishing well<br />
March<br />
15 th hole on the Valley Course
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The new championship tee shot<br />
March<br />
18 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
Bare s<strong>and</strong> area creation<br />
March<br />
The carry of the 7 th hole
Royal Automobile Club Surrey, Engl<strong>and</strong><br />
The Old Course re-bunkering continues<br />
March<br />
New 2 nd bunkers
Carnoustie Angus, Scotl<strong>and</strong><br />
New green ready for hollow coring<br />
March<br />
16 th hole on the Burnside Course
Royal Wimbledon Surrey, Engl<strong>and</strong><br />
Comprehensive membership consultation on Course Audit<br />
March<br />
Full membership involvement
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Fairway completed <strong>and</strong> top soiling about to commence<br />
March<br />
The new par 5 7 th hole
Golf At Goodwood West Sussex, Engl<strong>and</strong><br />
Phase 2 of bunker renovation begins<br />
March<br />
Par 5 11 th after completion
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The entire fairway being turfed with grass from the Kintyre Course<br />
March<br />
The par 5 14 th hole
APRIL
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The tees are complete on this new <strong>and</strong> shorter par 3<br />
April<br />
6 th hole
Vantaa Helsinki, Finl<strong>and</strong><br />
The new course has come through the winter well<br />
April<br />
4 th tee shot
Pickala Golf Helsinki, Finl<strong>and</strong><br />
Planning visit<br />
April<br />
The 10 th hole on the Seaside Course
Royal Automobile Club Surrey, Engl<strong>and</strong><br />
The Old Course re-bunkering continues<br />
April<br />
6 th drive bunkers
Club de Golf Terramar Sitges, Spain<br />
Planning visit<br />
April<br />
The 18 th tee shot
Cannes Mougin Côte d’Azur, France<br />
Future plans discussed <strong>and</strong> course renovation reviewed<br />
April<br />
7 th Greenside Bunker
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
First shot from the new Big Nellie<br />
April<br />
The new par 5 7 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
Chris sets the drone off<br />
April<br />
6 th tee
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
Having a drone will assist with designs <strong>and</strong> marketing material for Clubs<br />
April<br />
10 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The restored approach bunker at the 10 th hole waiting for the isl<strong>and</strong> to be turfed<br />
April<br />
10 th green
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Spreading of hollow cores on the fairway<br />
April<br />
The new 8 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
The view towards the turfed green from the hollow cored fairway<br />
April<br />
The new 8 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
The green <strong>and</strong> surrounds are well established<br />
April<br />
The new par 5 7 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Testing by Mr Darren Clarke<br />
April<br />
The 8 th tee shot
Bruntsfield Links Edinburgh, Scotl<strong>and</strong><br />
Selection process underway<br />
April<br />
2 nd Interview
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
Course changes (many of them restorations) booklet produced for The R&A for The Open<br />
Please click here to view a digital version<br />
April
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
Final preparations<br />
April<br />
The 15 th hole
Royal Porthcawl Glamorgan, Wales<br />
The restored l<strong>and</strong>ing area fairway bunker<br />
April<br />
5 th hole
Royal County Down <strong>and</strong> Royal Belfast Northern Irel<strong>and</strong><br />
Both Clubs kindly host the EIGCA Annual Meeting<br />
April<br />
Tom’s Presidency of the European Institute of Golf Course Architects continues
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The final elements of the project – drainage to deal with any high water table issues<br />
April<br />
The 5 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
The new compound will be completely hidden<br />
The building is well on by September<br />
September<br />
April<br />
Greenkeepers’ Compound
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Grass just starting to show on the fairway<br />
April<br />
The new par 5 7 th hole
Fulwell Middlesex, Engl<strong>and</strong><br />
Bunker renovation projects moves towards the starting line<br />
April<br />
6 th hole
MAY
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The new bridge gets underway<br />
May<br />
The 16 th hole
Liphook Hampshire, Engl<strong>and</strong><br />
Long term planning exercise<br />
May<br />
Potential new hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
The new holes on the Valley Course open for play<br />
May<br />
18 th tee shot on the Valley Course
Tuusula Helsinki, Finl<strong>and</strong><br />
General review visit<br />
May<br />
2 nd hole
Vierumäki Finl<strong>and</strong><br />
Planning the next stages of the green reconstruction programme<br />
May<br />
10 th green
Vantaa Helsinki, Finl<strong>and</strong><br />
L<strong>and</strong>fill for the back nine l<strong>and</strong>scaping well underway<br />
May<br />
The view from the 18 th tee
St Andrews New Course Fife, Scotl<strong>and</strong><br />
The gorse has been removed<br />
The area shaped <strong>and</strong> rough vegetation<br />
translocated to give a natural appearance<br />
November<br />
May<br />
Area between the 11 th & 12 th holes
Prestbury Cheshire, Engl<strong>and</strong><br />
Appointed to prepare a Historic Research Study <strong>and</strong> Course Audit<br />
May<br />
A vintage Harry Colt layout
Cannes Mougin Côte d’Azur, France<br />
Future plans approved by the members<br />
May<br />
A redesign to make better use of the existing dramatic l<strong>and</strong>form
Formby Hall Lancashire, Engl<strong>and</strong><br />
General advisory visit<br />
May<br />
10 th hole
Harewood Downs Buckinghamshire, Engl<strong>and</strong><br />
Appointed to advise on bunker configuration <strong>and</strong> course design<br />
May<br />
1 st hole
Royal Liverpool The Wirral, Engl<strong>and</strong><br />
Planning visit<br />
May<br />
1 st hole (Open routing) - 17 th hole (Club routing)
S<strong>and</strong>burn Hall York, Engl<strong>and</strong><br />
Masterplan review visit<br />
May<br />
18 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The Past Captains hit the first shots on the Reborn Ailsa Course<br />
May<br />
1 st tee
Royal Belfast County Down, Northern Irel<strong>and</strong><br />
<strong>Review</strong> of practice facilities <strong>and</strong> new bunkers<br />
May<br />
1 st hole
Mortonhall Edinburgh, Scotl<strong>and</strong><br />
Appointed to carry out course review<br />
May<br />
2 nd hole
JUNE
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The focus shifts to the Kintyre Course<br />
June<br />
The new 9 th hole
Noordwijkse Noordwijk, Holl<strong>and</strong><br />
Planning visit for bunker <strong>and</strong> practice facility proposals<br />
June<br />
11 th hole
Royal Worlington & Newmarket Suffolk, Engl<strong>and</strong><br />
General advisory visit<br />
June<br />
The 6 th hole
Aislaby Somerset, Engl<strong>and</strong><br />
General advisory visit<br />
June<br />
3 rd hole
Burnham & Berrow Somerset, Engl<strong>and</strong><br />
Assessment of the green shaping detail<br />
June<br />
6 th hole
Royal Porthcawl Glamorgan, Wales<br />
Visit during The Amateur Championship<br />
June<br />
1 st green
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Fully grown in by June<br />
June<br />
The new par 5 7 th hole
Prestwick South Ayrshire, Scotl<strong>and</strong><br />
General bunker review<br />
June<br />
The famous 3 rd hole – ‘Cardinal’
Effingham Surrey, Engl<strong>and</strong><br />
Planning future phases of bunker renovation<br />
June<br />
The revamped 11 th hole
The Isl<strong>and</strong> Dublin, Irel<strong>and</strong><br />
Masterplan review visit<br />
June<br />
The narrow fairway of the 14 th hole
Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />
11 th <strong>and</strong> 12 th project planning meeting<br />
June<br />
12 th to be re-aligned <strong>and</strong> old tees removed
Portmarnock Dublin, Irel<strong>and</strong><br />
Championship tee planning visit<br />
June<br />
The wonderful 15 th hole with its newly l<strong>and</strong>scaped carry
The Leicestershire Leicester, Engl<strong>and</strong><br />
Appointed to design new Short Game Area<br />
June<br />
An ideal piece of l<strong>and</strong> for the purpose
Royal County Down Newcastle, Northern Irel<strong>and</strong><br />
<strong>Review</strong> of the new Annesley holes & planning of the practice ground project<br />
June<br />
The 9 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The Gr<strong>and</strong> Opening<br />
June<br />
The 9 th championship tee
Vantaa Helsinki, Finl<strong>and</strong><br />
The seed is growing in the ideal mid summer conditions<br />
June<br />
The joint 9 th / Himalayas putting green
JULY
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The golfers are beginning to enjoy the new course<br />
July<br />
The 6 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The new bridge completes the picture<br />
July<br />
The 16 th hole
Cadmore Lodge Worcestershire, Engl<strong>and</strong><br />
Planning visit for redesign of the 9 hole course<br />
July<br />
Looking down onto the Lodge
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
An incredible final round from Henrik <strong>and</strong> Phil<br />
July<br />
The 72 nd hole
Galgorm Castle County Antrim, Northern Irel<strong>and</strong><br />
The academy facility opens for play at the Northern Irel<strong>and</strong> Open<br />
July<br />
Himalayas putting green
Redtail Ontario, Canada<br />
Return visit 25 years after the course was under construction<br />
July<br />
Tom <strong>and</strong> family celebrate various big birthdays <strong>and</strong> anniversaries
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
The foundations are in place<br />
July<br />
The players’ tunnel area – Spectators will walk over the top
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Fully grown in by July<br />
July<br />
The new par 5 7 th hole
Saunton West Course Devon, Engl<strong>and</strong><br />
Strengthening of the West Course being planned<br />
July<br />
8 th Hole
AUGUST
Wilmslow Cheshire, Engl<strong>and</strong><br />
Masterplan implementation planning visit<br />
August<br />
18 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The new holes continue to mature<br />
August<br />
10 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The green is ready for hollow coring<br />
August<br />
The new 10 th hole on the Kintyre Course
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The green was lowered to make it sit more comfortably in front of the clubhouse<br />
August<br />
18 th green on the Kintyre Course
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The Pitch & Putt Course has been enjoyed by many hotel guests<br />
August<br />
The Pitch & Putt Course
Bruntsfield Links Edinburgh, Scotl<strong>and</strong><br />
Appointed to produce ambitious development plan<br />
August<br />
Full bunker renovation <strong>and</strong> re-routing exercise
Gullane East Lothian, Scotl<strong>and</strong><br />
Planning to reshape 8 th green surrounds <strong>and</strong> other holes on No 1 <strong>and</strong> No 3 courses<br />
August<br />
Existing 8 th approach
Moor Hall West Midl<strong>and</strong>s, Engl<strong>and</strong><br />
Appointed to prepare a Course Audit<br />
August<br />
18 th hole
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
While the gr<strong>and</strong>st<strong>and</strong>s <strong>and</strong> pathways are still in place a post Open study with The R&A<br />
August<br />
18 th hole
Askernish South Uist, Scotl<strong>and</strong><br />
The annual pilgrimage<br />
August<br />
The wonderful 11 th green
SEPTEMBER
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
An incredible green location<br />
The completed hole<br />
September<br />
August<br />
The new 9 th hole on the Kintyre Course
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The green base has been shaped<br />
The green has been turfed<br />
September<br />
August<br />
The new 9 th hole on the Kintyre Course
Heikirejoia Helsinki, Finl<strong>and</strong><br />
Initial assessment visit<br />
September<br />
2 nd tee shot on the short nine
Vantaa Helsinki, Finl<strong>and</strong><br />
The grass is maturing well<br />
September<br />
The Himalayas putting green
Vantaa Helsinki, Finl<strong>and</strong><br />
The first play of the front nine takes place<br />
September<br />
Par 3 5 th hole
Vierumäki Finl<strong>and</strong><br />
The new green opens for play<br />
September<br />
8 th hole
Worthing West Sussex, Engl<strong>and</strong><br />
Appointed to carry out Historic Research Study <strong>and</strong> Design <strong>Review</strong> of 8 th <strong>and</strong> 9 th holes<br />
September 16 th hole in 1946
The Isl<strong>and</strong> Dublin, Irel<strong>and</strong><br />
Refinement of the Masterplan proposals<br />
September<br />
6 th tee shot
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The seeded fairway is catching up with the turfed green<br />
September<br />
The new 8 th hole on the Kintyre Course
Pickala Golf Helsinki, Finl<strong>and</strong><br />
Construction visit<br />
September<br />
The Short Game Area
Vierumäki Finl<strong>and</strong><br />
A review of the base shaping<br />
September<br />
14 th green
Tuusula Helsinki, Finl<strong>and</strong><br />
General course advisory review visit<br />
September<br />
11 th hole
Hiekkaharju Helsinki, Finl<strong>and</strong><br />
A further assessment of the course for layout planning purposes<br />
September<br />
The 7 th hole
Vantaa Helsinki, Finl<strong>and</strong><br />
The bunker s<strong>and</strong>ing continues<br />
September<br />
4 th hole
Askernish South Uist, Scotl<strong>and</strong><br />
Lecturing R&A Scholars<br />
September<br />
7 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Fully grown in<br />
September<br />
The 8 th green
Royal Lytham & St Annes Lancashire, Engl<strong>and</strong><br />
Tender held for the creation of dunes instead of trees to right of green<br />
September<br />
9 th hole
Dedduwa Sri Lanka<br />
Desk based preliminary Masterplan drawn up for Malco Engineering<br />
September<br />
Possible new development in Sri Lanka
OCTOBER
Royal Mid Surrey Richmond, Engl<strong>and</strong><br />
<strong>Review</strong> of the hole<br />
October<br />
17 th hole
Minthis Hills Paphos, Cyprus<br />
Planned course extension <strong>and</strong> course review<br />
October<br />
17 th hole
Fulford York, Engl<strong>and</strong><br />
Construction planning visit<br />
October<br />
The 10 th hole
Northumberl<strong>and</strong> Newcastle upon Tyne, Engl<strong>and</strong><br />
Initial course assessment visit<br />
October<br />
The 18 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Grow in review visit<br />
October<br />
The new par 5 7 th hole
Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />
Grow in review visit<br />
October<br />
The new par 4 8 th hole
Royal Liverpool The Wirral, Engl<strong>and</strong><br />
Fine detail focused on<br />
October<br />
11 th green (Open routing) - 9 th green (Club routing)
Royal Liverpool The Wirral, Engl<strong>and</strong><br />
Softening of the approach <strong>and</strong> filling of the left rear bunker<br />
October<br />
1 st green (open routing) - 17 th green (Club routing)
Golf At Goodwood West Sussex, Engl<strong>and</strong><br />
Phase 2 of bunker renovation begins<br />
October<br />
3 rd green
S<strong>and</strong>burn Hall York, Engl<strong>and</strong><br />
Bunker marking out visit<br />
October<br />
1 st hole
Fulford York, Engl<strong>and</strong><br />
Construction visit<br />
October<br />
6 th hole
Royal County Down Newcastle, Northern Irel<strong>and</strong><br />
Dune construction to the right of the hole about to get underway<br />
October<br />
17 th hole
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
A stunning hole<br />
October<br />
New 9 th hole on the Kintyre Course
Turnberry South Ayrshire, Scotl<strong>and</strong><br />
The hollow cored green has matured well<br />
October<br />
The new 10 th green on the Kintyre Course
Royal Troon South Ayrshire, Scotl<strong>and</strong><br />
Planning visit for possible Portl<strong>and</strong> <strong>and</strong> Craigend Course adjustments<br />
October<br />
10 th hole on the Portl<strong>and</strong> Course
Golf At Goodwood West Sussex, Engl<strong>and</strong><br />
Phase 2 of bunker renovation continues<br />
October<br />
18 th before
Golf At Goodwood West Sussex, Engl<strong>and</strong><br />
Phase 2 of bunker renovation continues<br />
October<br />
18 th after
Hamilton Ontario, Canada<br />
Visit to present the Masterplan for this Harry Colt layout to the membership<br />
October<br />
1 st hole on the South Nine
Hamilton Ontario, Canada<br />
Great fall colours<br />
October<br />
7 th hole on the East Nine
Angus Glen Toronto, Canada<br />
<strong>Review</strong> of the South Course<br />
October<br />
18 th hole
Angus Glen Toronto, Canada<br />
Fescue grassing lines reviewed to reduce water consumption<br />
October<br />
11 th hole
Goodwood Ontario, Canada<br />
<strong>Review</strong> of the course<br />
October<br />
Looking down onto the 14 th hole
Myopia Massachusetts, USA<br />
Another playing visit to this great old course<br />
October<br />
11 th green
NOVEMBER
St Augustine’s Kent, Engl<strong>and</strong><br />
Course extension plans are resurrected<br />
November<br />
L<strong>and</strong> for nine new holes
Royal Belfast Northern Irel<strong>and</strong><br />
Bunker construction visit<br />
November<br />
The 13 th hole
Golf At Goodwood West Sussex, Engl<strong>and</strong><br />
Phase 2 of bunker renovation continues<br />
November<br />
3 rd Approach Bunkers
Royal County Down Newcastle, Northern Irel<strong>and</strong><br />
Construction visit<br />
November<br />
The dunes are taking shape to the right of the 17 th hole
Little Aston Sutton Coldfield, Engl<strong>and</strong><br />
<strong>Review</strong> visit for the bunker style <strong>and</strong> 10 th <strong>and</strong> 12 th holes<br />
November<br />
12 th hole
Cadmore Lodge Worcestershire, Engl<strong>and</strong><br />
Marking out visit for the new layout<br />
November<br />
General view over the course
Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />
Construction visit – Moving the 12 th fairway further away from the 5th<br />
November<br />
5 th tee shot
St Andrews New Course Fife, Scotl<strong>and</strong><br />
Bare s<strong>and</strong> area creation between the holes<br />
The completed work<br />
November<br />
November<br />
Area between the 6 th <strong>and</strong> 7 th holes
Carnoustie Angus, Scotl<strong>and</strong><br />
Creating fairway to the right of the two reconfigured central bunkers<br />
November<br />
3 rd hole on the Championship Course
Saunton West Course Devon, Engl<strong>and</strong><br />
Work underway<br />
November<br />
12 th hole ditch re-alignment under construction
Saunton West Course Devon, Engl<strong>and</strong><br />
Work completed<br />
November<br />
12 th hole ditch re-alignment completed
Saunton West Course Devon, Engl<strong>and</strong><br />
Work underway<br />
November<br />
New drive bunkers on the 3 rd
Royal Automobile Club Surrey, Engl<strong>and</strong><br />
The Old Course re-bunkering continues<br />
November<br />
5 th hole before
Royal Automobile Club Surrey, Engl<strong>and</strong><br />
The Old Course re-bunkering continues<br />
November<br />
5 th hole after turfing
Princes S<strong>and</strong>wich, Engl<strong>and</strong><br />
Preliminary visit to this great former Open venue<br />
November<br />
The 9 th hole on the Shore Nine
Kasumigaseki Tokyo, Japan<br />
Playing visit during an R&A Rules School – It was an honour to<br />
play with Mr Tai Kawata, Japan’s foremost golf course architect<br />
November<br />
The 10 th hole on the East Course
Kasumigaseki Tokyo, Japan<br />
The East Course has recently been redesigned by Tom Fazio for the Olympics in 2020<br />
November<br />
The 18 th green on the East Course
Carnoustie Angus, Scotl<strong>and</strong><br />
Construction visit assessing the rough translocation on the dune system<br />
November<br />
Dunes behind the 17 th green
The Isl<strong>and</strong> Dublin, Irel<strong>and</strong><br />
Visit to present the initial proposals for the course to the Council<br />
November<br />
The 15 th hole
Portmarnock Dublin, Irel<strong>and</strong><br />
Visit to assess tee construction <strong>and</strong> other areas of the course<br />
November<br />
The par 3 15 th hole
Effingham Surrey, Engl<strong>and</strong><br />
Phase 4 starts<br />
November<br />
9 th hole before
Effingham Surrey, Engl<strong>and</strong><br />
Phase 4 starts<br />
November<br />
9 th hole during
Cruden Bay Aberdeenshire, Scotl<strong>and</strong><br />
Highest Riser in Golf Monthly’s Top 100 UK & Irel<strong>and</strong><br />
November<br />
New 9 th hole specifically mentioned as a reason
Trevose Cornwall, Engl<strong>and</strong><br />
The completed bunkers on the 10th hole<br />
November<br />
10 TH green
Oakmere Nottinghamshire, Engl<strong>and</strong><br />
2017 work being planned<br />
November<br />
Par 5 11th
Rothley Park Leicestershire, Engl<strong>and</strong><br />
Ongoing advice since 2008<br />
November<br />
Input on bridleway routing
DECEMBER
Gullane No 1 East Lothian, Scotl<strong>and</strong><br />
Work on 8 th <strong>and</strong> 9 th starts<br />
December<br />
Green surrounds completely reshaped
Fulford York, Engl<strong>and</strong><br />
Bunker layout changes nearing completion<br />
December<br />
6 th hole
Royal Automobile Club Surrey, Engl<strong>and</strong><br />
The Old Course re-bunkering continues<br />
December<br />
11 th bunkers shaped up
Carnoustie Angus, Scotl<strong>and</strong><br />
Construction visit<br />
December<br />
A new 18 th hole on the Buddon Course which will also be The Open Short Game Area
Royal County Down Newcastle, Northern Irel<strong>and</strong><br />
Construction visit<br />
December<br />
The dunes are almost complete to the right of the 17 th hole
Trevose Cornwall, Engl<strong>and</strong><br />
Work to the 4 th hole taking shape<br />
December<br />
Teeshot before
Trevose Cornwall, Engl<strong>and</strong><br />
Work to the 4 th hole taking shape<br />
December<br />
Revised teeshot
Trevose Cornwall, Engl<strong>and</strong><br />
New 4 th green which looks down over the famous Constantine Bay<br />
Quick progress<br />
December<br />
December<br />
Finishing touches being applied
Club de Golf Terramar Sitges, Spain<br />
Planning visit<br />
December<br />
The planned 16 th tee shot
Reykjavík Golf Club Reykjavík, Icel<strong>and</strong><br />
Project Planning Continues<br />
December
Metro House<br />
Chichester<br />
West Sussex<br />
PO191BE<br />
Telephone<br />
01243 531901<br />
pitch<strong>and</strong>run18@aol.com<br />
www.mackenzie<strong>and</strong>bert.com<br />
@mackenzie<strong>and</strong>ebert<br />
@golfarchitects