22.12.2016 Views

Mackenzie and Ebert 2016 Review

Transform your PDFs into Flipbooks and boost your revenue!

Leverage SEO-optimized Flipbooks, powerful backlinks, and multimedia content to professionally showcase your products and significantly increase your reach.

International Golf Course Architects<br />

The <strong>2016</strong> <strong>Review</strong>


The <strong>2016</strong> <strong>Review</strong><br />

This year’s review is packed with more than just photographs. There are videos included<br />

as well which does lengthen the viewing time but you can always shorten the videos by<br />

grabbing the scroll bar at the bottom of the screen to fast forward through them more<br />

quickly. You can also flick to the next slide if you do not want to view a video.<br />

Happy viewing!


The <strong>2016</strong> <strong>Review</strong><br />

<strong>2016</strong> continued as 2015 ended for <strong>Mackenzie</strong> & <strong>Ebert</strong> – rather busy!<br />

Some highlights included:-<br />

Trump Turnberry<br />

The Ailsa Course opened on target with the members playing the first rounds on 30 th May <strong>and</strong> hotel guests on 1 st<br />

June as scheduled. This was an incredible feat with work on the reconstruction of every green, every tee, every<br />

bunker <strong>and</strong> 5 new holes only starting at the end of September 2015. Everyone involved must be congratulated on<br />

such an achievement. Mr Trump flew in for the Gr<strong>and</strong> Opening of the Ailsa <strong>and</strong> the Hotel in the middle of June. At the<br />

end of the year, the course received the award of No. 1 ranking in Golf Monthly’s Top 100 courses in UK & Irel<strong>and</strong> <strong>and</strong><br />

the award for International Renovation of the Year by GOLF magazine.<br />

Once the Ailsa project was completed, the focus shifted to the Kintyre Course. The completely new holes at the far<br />

end of the course, on Bains Hill, will be the equal of the coastal holes of the Ailsa Course in terms of their setting. The<br />

redesigned course is to be opened again on the birth date of Robert the Bruce, the first King of Scotl<strong>and</strong>, on 11 th July.


The <strong>2016</strong> <strong>Review</strong>


The <strong>2016</strong> <strong>Review</strong><br />

Royal Portrush<br />

The Dunluce Course now has two new holes which will be open for play in the early summer of 2017. They were<br />

actually playable by the end of <strong>2016</strong> but some extra months will allow the fairways to be refined even further. The<br />

new par five 7 th <strong>and</strong> par four 8 th holes look as though they have been there forever which is a testament to the<br />

construction work as both holes had to be shaped from tee to green. The new 2 nd , 3 rd <strong>and</strong> 8 th (to be the 10 th green in<br />

the new layout) were opened early in the playing season of <strong>2016</strong> as were all of the other changes to the course.<br />

The Royal Portrush members <strong>and</strong> the Rathmore members have already enjoyed the new 15 th , 16 th , 17 th <strong>and</strong> 18 th holes<br />

on the Valley Course which opened for play in May <strong>2016</strong>. The opening of these holes allowed a start to be made on<br />

the two new Dunluce holes. The par 3 Skerries Course reopened shortly afterwards with two stunning new holes with<br />

views down onto the beach.


The <strong>2016</strong> <strong>Review</strong><br />

Channel - Royal Portrush New 7 th Hole<br />

Click here to watch Golf Channel Piece on Royal Portrush


The Open Venues<br />

As well as the major projects at Turnberry <strong>and</strong> Royal Portrush, input has also been provided to 5 of the other Open<br />

venues. Advisory visits were made before <strong>and</strong> after The Open at Royal Troon, a dune construction plan put out to<br />

tender at Royal Lytham, the 2 iconic bunkers on the 4 th hole at Royal St. George’s were reconstructed, work got<br />

underway at Carnoustie on adjustments to the 3 rd hole <strong>and</strong> Open practice facilities <strong>and</strong> the adjustment of two green<br />

surrounds at Royal Liverpool (below) was implemented in the autumn.<br />

<strong>2016</strong> Notable Projects


<strong>2016</strong> Notable Projects<br />

Some other notable projects were:-<br />

St Andrews – New Course<br />

The company was delighted to be invited to provide input at the Home of Golf, St Andrews in <strong>2016</strong>, advising on the<br />

New Course. The project has involved converting areas of rough, which were formerly covered by gorse, into bare<br />

s<strong>and</strong> areas. This has followed similar work at Royal Troon, Turnberry <strong>and</strong> Royal Portrush.<br />

Prestwick<br />

Another historic course to be advised is Prestwick, the venue of the first Open Championship. A bunker strategy<br />

report has been produced for the Club. More detail will be added to this in 2017.<br />

Portmarnock & The Isl<strong>and</strong>, Dublin, Irel<strong>and</strong><br />

This wonderful pair of classic links courses will host The Amateur Championship in 2019 with Portmarnock hosting<br />

the matchplay part of the event. Portmarnock has been advised for a number of years but The Isl<strong>and</strong> is a new<br />

commission in <strong>2016</strong>. Back tees, bunkering adjustments <strong>and</strong> dune construction are being implemented at<br />

Portmarnock. At The Isl<strong>and</strong>, proposals have been developed for a more extensive set of changes. Assuming that these<br />

are approved by the Club, the implementation will be split either side of The Amateur.


Royal County Down, Newcastle, Northern Irel<strong>and</strong><br />

Following the addition of the three new holes to the Annesley Links, which weaves its way through the No.1 Course,<br />

the focus moved onto the new practice ground <strong>and</strong> the formation of dunes to the right of the 17 th hole on the<br />

Championship Course in <strong>2016</strong>. These dunes were intended to divide the 17 th from the practice area <strong>and</strong> have really<br />

improved the character of the 17 th . Once again, the technique of lifting <strong>and</strong> relaying rough vegetation, called<br />

translocation, has proved itself in allowing changes to look as though they have been in place forever.<br />

<strong>2016</strong> Notable Projects


Trevose Golf <strong>and</strong> Country Club, Cornwall, Engl<strong>and</strong><br />

Work on this glorious Harry Colt layout continued in <strong>2016</strong> with focus turning to the renowned 4 th hole as well as the<br />

10 th <strong>and</strong> 18 th . The 4 th is one of the most photogenic holes in the UK with Constantine Bay in the background but,<br />

despite that, the hole did not live up to expectations. It has been the subject of a complete overhaul with new tees,<br />

bunkers <strong>and</strong> a huge new rolling green from which the glorious backdrop is now visible unlike the old green.<br />

<strong>2016</strong> Notable Projects


<strong>2016</strong> Notable Projects<br />

Saunton West Course, North Devon, Engl<strong>and</strong><br />

Despite having two excellent links courses, Saunton is not content with sitting back <strong>and</strong> doing nothing. It has a<br />

progressive policy to re-invest in its courses <strong>and</strong> this year’s focus was on the West Course with an extensive<br />

programme completed. Back tees were added on 7 holes; 8 bunkers were inserted on the 3 rd , 8 th , 10 th <strong>and</strong> 12 th holes<br />

on this lightly bunkered course; a ditch was re-routed on the 12 th ; fairway softening on the 6 th <strong>and</strong> 12 th <strong>and</strong> green<br />

surrounds reshaping undertaken on the 11 th .<br />

The goal is to create two courses of a similar test that are both capable of hosting top class national amateur events.


<strong>2016</strong> Notable Projects<br />

Royal Automobile Club, Old Course, Woodcote Park, Surrey, Engl<strong>and</strong><br />

All of the bunkers on 12 holes of Herbert Fowler’s Old Course were revamped during <strong>2016</strong> with the remaining holes<br />

to be completed in early 2017. Bunkers were renovated, new ones added <strong>and</strong> others filled in, often replaced with<br />

closely mown green surround areas. The overall s<strong>and</strong> area has been significantly decreased, while the visual impact of<br />

the bunkers has been significantly improved <strong>and</strong> their strategic impact greatly increased.<br />

It demonstrates what can be done relatively quickly to transform the appearance <strong>and</strong> playing characteristics of a<br />

course in a short construction period.


Golf At Goodwood, West Sussex, Engl<strong>and</strong><br />

After a break of a year, Golf At Goodwood has now completed the revamp of all of the bunkers on its Downs Course.<br />

The work has involved rationalising bunker numbers, easing off certain areas to make the course more enjoyable for<br />

the regular golfer <strong>and</strong> stiffening up the driving test for better players. The bunkers have been sculpted to blend in<br />

harmoniously with the downl<strong>and</strong> l<strong>and</strong>scape.<br />

<strong>2016</strong> Notable Projects


<strong>2016</strong> Notable Projects<br />

Effingham Golf Club, Surrey, Engl<strong>and</strong><br />

Effingham’s rolling bunker renovation continued with the 1 st , 9 th <strong>and</strong> 18 th holes complete, leaving 6 to do. This<br />

downl<strong>and</strong> Harry Colt layout is coming to life again with bunkers that have more shape to them, sited to test the better<br />

players more thoroughly, inspired by the words of the great man himself:-<br />

“For testing the long driver, <strong>and</strong> also for putting a premium upon accuracy, it is highly desirable to include a number of<br />

long optional carries in the round, <strong>and</strong> also to provide opportunities for the bold <strong>and</strong> straight driver to play close past<br />

the edge of a hazard which he cannot carry. In all such cases it will be arranged so that the player who has brought off<br />

the drive successfully should gain a substantial advantage over his more timid or less skilful opponent.”


<strong>2016</strong> Notable Projects<br />

Oakmere Golf Club, Nottinghamshire, Engl<strong>and</strong><br />

Intent on consolidating its position in Notts golf, Oakmere Golf Club continued its heavy investment in its golf<br />

facilities. A new irrigation system has been installed, 10 holes on the Admiral’s Course have been fully re-bunkered<br />

<strong>and</strong> three new greens complete on the Comm<strong>and</strong>er’s Course. Work resumes in early 2017.<br />

Kedleston Park Golf Club, Derbyshire, Engl<strong>and</strong><br />

Having rebuilt every bunker over 3 winters, Kedleston Park re-launched its course in <strong>2016</strong>. In that period, it has filled<br />

its membership list again, re-introduced entrance fees <strong>and</strong> funded the renovation project through the additional<br />

income generated by the increase in membership activity. All in all, a positive outcome for all involved. It remains at<br />

top spot in the county in the Top 100 rankings.


<strong>2016</strong> Notable Projects<br />

Canadian Projects<br />

Advice has continued to be provided at a number of Canadian courses during <strong>2016</strong> – Angus Glen, Goodwood <strong>and</strong><br />

Hamilton Golf & Country Club.<br />

Angus Glen, Markham, Ontario<br />

The South Course was renovated in the off season of 2014 / 2015 <strong>and</strong> hosted the PanAm Games very successfully in<br />

July 2015. <strong>2016</strong> saw drought conditions affect the Toronto area so a focus has been to reduce the areas covered by<br />

irrigation by increasing the areas of fescue rough.<br />

Goodwood, Ontario<br />

This ultra private course continues to draw great reviews from the lucky few who get to play. The possibility of<br />

lengthening the par 5 18 th hole was looked at during <strong>2016</strong>.<br />

Hamilton Golf & Country Club, Hamilton, Ontario<br />

Harry Colt designed this great course in 1914 but a further 9 holes were added much later. The Club has hosted the<br />

Canadian Open on a number of occasions. A Masterplan was produced for the Club in 2015 <strong>and</strong> a presentation was<br />

made to the members at the end of <strong>2016</strong> regarding these proposals. This involved representing the changes on drone<br />

video footage of each of the three loops of nine holes – a new <strong>and</strong> effective form of presentation.


<strong>2016</strong> Notable Projects


<strong>2016</strong> Notable Projects<br />

Existing Course Projects In Finl<strong>and</strong><br />

The company’s long history of experience of advising courses in Finl<strong>and</strong> has continued in <strong>2016</strong>.<br />

Pickala<br />

The new 1 st <strong>and</strong> 2 nd greens on the Seaside Course bedded in during <strong>2016</strong> <strong>and</strong> the new putting green was opened <strong>and</strong><br />

proved very popular. The Short Game Area was the focus for construction during the year with a new target green<br />

being built.<br />

Tuusula<br />

Tuusula was the first course in Finl<strong>and</strong> which the company advised. Tee projects were assessed during <strong>2016</strong> along<br />

with discussion regarding the long term strategy for the course.<br />

Vierumäki<br />

The green reconstruction project has continued in <strong>2016</strong> with the 6 th , 8 th , 12 th <strong>and</strong> 13 th greens opening for play <strong>and</strong><br />

the 2 nd <strong>and</strong> 14 th green being rebuilt. The project will be completed in 2017.


Vantaa, Helsinki, Finl<strong>and</strong><br />

The front nine was played by the share holders by the end of the playing year on this new course very close to<br />

Helsinki Airport. The course is being built in two phases with the front nine completed during <strong>2016</strong> <strong>and</strong> the back nine<br />

awaiting l<strong>and</strong>fill before the golf construction can commence. A huge Himalayas putting green (shown below) has<br />

been built at the clubhouse which joins onto the 9 th green.<br />

<strong>2016</strong> Notable Projects


<strong>2016</strong> Notable Projects<br />

Golf Terramar, Sitges, Spain<br />

The original nine hole course at Terramar, just south of Barcelona, was designed by Tom Simpson in 1927. This was<br />

extended to 18 holes but, more recently, a new 3 rd hole with a green right on the coast was built. Work on this hole<br />

was completed during <strong>2016</strong> <strong>and</strong> a plan for a major reorganisation of the back nine was the subject of a number of<br />

planning visits throughout the year.<br />

Noordwijkse, Holl<strong>and</strong><br />

This tremendous links course to the south west of Amsterdam now has a new Green Committee. <strong>2016</strong> has been<br />

spent discussing the way forward for a number of projects including bunker <strong>and</strong> green reconstruction.


The <strong>2016</strong> <strong>Review</strong><br />

Once again this year, we have been entrusted to work on many of the great courses across the British Isles,<br />

Europe <strong>and</strong> also in Canada. Working sensitively on courses where the great old architects have plied their trade<br />

is part of what we have always done in our careers.<br />

Harry Colt<br />

Herbert Fowler<br />

Architect<br />

Courses With Direct M&E Involvement In <strong>2016</strong><br />

Where The Great Old Architects Worked<br />

Cannes Mougin, Effingham, Hamilton, Prestbury, Royal Belfast, Royal Lytham <strong>and</strong> St.<br />

Annes, Royal Portrush, Royal Wimbledon, Rye, Trevose <strong>and</strong> Worthing<br />

RAC Woodcote Park <strong>and</strong> Saunton<br />

Dr A MacKenzie<br />

Philip <strong>Mackenzie</strong> Ross<br />

Old Tom Morris<br />

John Morrison<br />

Tom Simpson<br />

James Braid<br />

Bruntsfield Links, Royal Troon (Old)<br />

Turnberry (Ailsa)<br />

Askernish, Prestwick, Royal County Down, Royal Dornoch <strong>and</strong> St Andrews New<br />

Fulwell, Kedleston Park, Prestbury <strong>and</strong> Trevose<br />

Club de Golf Terramar <strong>and</strong> Cruden Bay<br />

Edzell, Exeter, Goodwood <strong>and</strong> Mortonhall<br />

Willie Park Junior Royal Wimbledon, Gullane No 1 <strong>and</strong> No 3<br />

Tom Simpson


The <strong>2016</strong> <strong>Review</strong><br />

Turnberry South Ayrshire, Scotl<strong>and</strong><br />

No. 1 In Golf Monthly’s Top 100 Courses In The UK & Irel<strong>and</strong>


<strong>Mackenzie</strong> & <strong>Ebert</strong> Are The Current Advisers At These Highlighted Courses In<br />

Golf Monthly’s Top 100 Courses In The UK & Irel<strong>and</strong> for 2017<br />

The <strong>2016</strong> <strong>Review</strong>


An Unexpected And Welcome Accolade From Golf World But The Results At<br />

Turnberry Were The Product Of A Great Team Following A Once In A Lifetime Brief<br />

The <strong>2016</strong> <strong>Review</strong>


<strong>2016</strong> Chris Huggett<br />

Chris Huggett & His UAV (Drone)<br />

Chris Huggett has been a key member of <strong>Mackenzie</strong> & <strong>Ebert</strong> since the formation of the company in 2005. He has<br />

been responsible for producing all of the plans <strong>and</strong> visualisations which have assisted with virtually every project, as<br />

well as artwork for all of our publications such as the booklets which have featured the proposals for Turnberry <strong>and</strong><br />

Royal Portrush <strong>and</strong> the changes made to Royal Troon for The 144 th Open this year.<br />

Now Chris has added another string to his bow by earning a qualification from the Civil Aviation Authority to fly a UAV<br />

(Unmanned Aerial Vehicle or Drone) on a commercial basis. This has already allowed the company to illustrate<br />

proposals in an even more interesting way <strong>and</strong> finished changes in even greater detail.<br />

The other service which <strong>Mackenzie</strong> & <strong>Ebert</strong> now offers is producing drone fly throughs of existing courses. The<br />

services extend to editing the final video footage to the requirements of the club.


<strong>2016</strong> Chris Huggett


<strong>2016</strong> Mike Howard<br />

Mike Howard – The Newest Member of <strong>Mackenzie</strong> & <strong>Ebert</strong><br />

Mike Howard started working for the company in <strong>2016</strong>. Mike studied Environmental Geography at Stirling University,<br />

whilst part of the golf scholarship programme <strong>and</strong> then at the University of Edinburgh where he gained a Masters<br />

degree in L<strong>and</strong>scape Architecture. He was also an R&A scholar for six years.<br />

Mike has immediately provided valuable input to a number of projects carrying out historic research, produced<br />

visualisations <strong>and</strong> provided input into layout design <strong>and</strong> detailed design. He has also marked out new <strong>and</strong> redesigned<br />

bunkers for a number of projects.


The next 200 or so pages takes you on a photographic review of the year!<br />

The <strong>2016</strong> <strong>Review</strong>


JANUARY


Royal St. George’s Kent, Engl<strong>and</strong><br />

Dismantling of the huge sleepered bunkers begins<br />

January<br />

The 4 th hole


Royal St. George’s Kent, Engl<strong>and</strong><br />

Restoring the bunkers to rough edged hazards<br />

January<br />

The 4 th hole


Royal St. George’s Kent, Engl<strong>and</strong><br />

Stripped off <strong>and</strong> now to put them back together again<br />

Fully bedded in by the end of the year<br />

November<br />

January<br />

The 4 th hole


Royal Cinque Ports Kent, Engl<strong>and</strong><br />

<strong>Review</strong> of bunker work carried out by the greenstaff<br />

January<br />

The 10 th hole


Oakmere Nottinghamshire, Engl<strong>and</strong><br />

New bunkering is transforming the course<br />

January<br />

The short par four 17 th


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

There is a great hole there somewhere!<br />

January<br />

The new par 5 7 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

Restoring the beach l<strong>and</strong>scape in the carry<br />

The completed hole<br />

April<br />

January<br />

4 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

Rebunkering for the straightened championship hole<br />

January<br />

The 18 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Natural <strong>and</strong> created dunes<br />

January<br />

The new par 5 7 th hole


Royal Automobile Club Surrey, Engl<strong>and</strong><br />

The Old Course re-bunkering gets underway<br />

January<br />

6th greenside bunker


Portmarnock Dublin, Irel<strong>and</strong><br />

Planning visit<br />

January<br />

15 th hole


The Isl<strong>and</strong> Dublin, Irel<strong>and</strong><br />

An initial visit to assess the course<br />

January<br />

The alternative 4 th hole


Trevose Cornwall, Engl<strong>and</strong><br />

<strong>Review</strong> of Phase One Work<br />

January<br />

View of 9 th hole before


Trevose Cornwall, Engl<strong>and</strong><br />

<strong>Review</strong> of Phase One Work<br />

January<br />

View of 9 th hole after


Royal County Down Newcastle, Northern Irel<strong>and</strong><br />

<strong>Review</strong> of the new holes on the Annesley Links<br />

January<br />

The 9 th tee shot


Oakmere Nottinghamshire, Engl<strong>and</strong><br />

New bunkering is transforming the course<br />

January<br />

The short par four 17 th


Royal Automobile Club Surrey, Engl<strong>and</strong><br />

The Old Course re-bunkering continues<br />

January<br />

3 rd greenside bunkers


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Fine tuning the green surface<br />

January<br />

The new par 5 7 th hole


FEBRUARY


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Turfing almost completed<br />

February<br />

The new par 5 7 th hole


Luffness New Aberlady, Scotl<strong>and</strong><br />

Setting out the boundaries of the new 15 th green<br />

February<br />

15 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Fairway shaped <strong>and</strong> top soiling about to start<br />

February<br />

The new 8 th hole


Royal Automobile Club Surrey, Engl<strong>and</strong><br />

The Old Course re-bunkering continues<br />

February<br />

6 th drive bunker


Kedleston Park Derbyshire, Engl<strong>and</strong><br />

Bunker programme nears completion<br />

February<br />

17 th approach shot


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

Looking like a finished golf hole<br />

February<br />

The new 11 th hole


Rye East Sussex, Engl<strong>and</strong><br />

Assessment of the 10 th <strong>and</strong> 17 th holes<br />

February<br />

The view from the 18 th tee


Milltown Dublin, Irel<strong>and</strong><br />

Bunker lining project starts<br />

February<br />

The Par 5 14th


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

An early review in Open year<br />

February<br />

10 th tee shot


Trevose Cornwall, Engl<strong>and</strong><br />

Phase One Work Draws To A Close<br />

February<br />

View of 2 nd hole before


Trevose Cornwall, Engl<strong>and</strong><br />

Phase One Work Draws To A Close<br />

February<br />

View of 2 nd hole after


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The green was only turfed in November but the hole looks ready for play<br />

February<br />

Par 3 11th hole


MARCH


Bolton Lancashire, Engl<strong>and</strong><br />

General advisory visit<br />

March<br />

2 nd hole


Burghley Park Lincolnshire, Engl<strong>and</strong><br />

General advisory visit<br />

March<br />

3 rd hole


Victoria Golf & Country Resort Rajawella, Sri Lanka<br />

Desk based review of the Masterplan for the Resort carried out<br />

March<br />

An aerial view of this beautiful resort


Exeter Devon, Engl<strong>and</strong><br />

Grow in visit<br />

March<br />

New 10 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

The hollow cored <strong>and</strong> seeded fairway is establishing well<br />

March<br />

15 th hole on the Valley Course


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The new championship tee shot<br />

March<br />

18 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

Bare s<strong>and</strong> area creation<br />

March<br />

The carry of the 7 th hole


Royal Automobile Club Surrey, Engl<strong>and</strong><br />

The Old Course re-bunkering continues<br />

March<br />

New 2 nd bunkers


Carnoustie Angus, Scotl<strong>and</strong><br />

New green ready for hollow coring<br />

March<br />

16 th hole on the Burnside Course


Royal Wimbledon Surrey, Engl<strong>and</strong><br />

Comprehensive membership consultation on Course Audit<br />

March<br />

Full membership involvement


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Fairway completed <strong>and</strong> top soiling about to commence<br />

March<br />

The new par 5 7 th hole


Golf At Goodwood West Sussex, Engl<strong>and</strong><br />

Phase 2 of bunker renovation begins<br />

March<br />

Par 5 11 th after completion


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The entire fairway being turfed with grass from the Kintyre Course<br />

March<br />

The par 5 14 th hole


APRIL


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The tees are complete on this new <strong>and</strong> shorter par 3<br />

April<br />

6 th hole


Vantaa Helsinki, Finl<strong>and</strong><br />

The new course has come through the winter well<br />

April<br />

4 th tee shot


Pickala Golf Helsinki, Finl<strong>and</strong><br />

Planning visit<br />

April<br />

The 10 th hole on the Seaside Course


Royal Automobile Club Surrey, Engl<strong>and</strong><br />

The Old Course re-bunkering continues<br />

April<br />

6 th drive bunkers


Club de Golf Terramar Sitges, Spain<br />

Planning visit<br />

April<br />

The 18 th tee shot


Cannes Mougin Côte d’Azur, France<br />

Future plans discussed <strong>and</strong> course renovation reviewed<br />

April<br />

7 th Greenside Bunker


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

First shot from the new Big Nellie<br />

April<br />

The new par 5 7 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

Chris sets the drone off<br />

April<br />

6 th tee


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

Having a drone will assist with designs <strong>and</strong> marketing material for Clubs<br />

April<br />

10 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The restored approach bunker at the 10 th hole waiting for the isl<strong>and</strong> to be turfed<br />

April<br />

10 th green


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Spreading of hollow cores on the fairway<br />

April<br />

The new 8 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

The view towards the turfed green from the hollow cored fairway<br />

April<br />

The new 8 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

The green <strong>and</strong> surrounds are well established<br />

April<br />

The new par 5 7 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Testing by Mr Darren Clarke<br />

April<br />

The 8 th tee shot


Bruntsfield Links Edinburgh, Scotl<strong>and</strong><br />

Selection process underway<br />

April<br />

2 nd Interview


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

Course changes (many of them restorations) booklet produced for The R&A for The Open<br />

Please click here to view a digital version<br />

April


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

Final preparations<br />

April<br />

The 15 th hole


Royal Porthcawl Glamorgan, Wales<br />

The restored l<strong>and</strong>ing area fairway bunker<br />

April<br />

5 th hole


Royal County Down <strong>and</strong> Royal Belfast Northern Irel<strong>and</strong><br />

Both Clubs kindly host the EIGCA Annual Meeting<br />

April<br />

Tom’s Presidency of the European Institute of Golf Course Architects continues


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The final elements of the project – drainage to deal with any high water table issues<br />

April<br />

The 5 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

The new compound will be completely hidden<br />

The building is well on by September<br />

September<br />

April<br />

Greenkeepers’ Compound


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Grass just starting to show on the fairway<br />

April<br />

The new par 5 7 th hole


Fulwell Middlesex, Engl<strong>and</strong><br />

Bunker renovation projects moves towards the starting line<br />

April<br />

6 th hole


MAY


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The new bridge gets underway<br />

May<br />

The 16 th hole


Liphook Hampshire, Engl<strong>and</strong><br />

Long term planning exercise<br />

May<br />

Potential new hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

The new holes on the Valley Course open for play<br />

May<br />

18 th tee shot on the Valley Course


Tuusula Helsinki, Finl<strong>and</strong><br />

General review visit<br />

May<br />

2 nd hole


Vierumäki Finl<strong>and</strong><br />

Planning the next stages of the green reconstruction programme<br />

May<br />

10 th green


Vantaa Helsinki, Finl<strong>and</strong><br />

L<strong>and</strong>fill for the back nine l<strong>and</strong>scaping well underway<br />

May<br />

The view from the 18 th tee


St Andrews New Course Fife, Scotl<strong>and</strong><br />

The gorse has been removed<br />

The area shaped <strong>and</strong> rough vegetation<br />

translocated to give a natural appearance<br />

November<br />

May<br />

Area between the 11 th & 12 th holes


Prestbury Cheshire, Engl<strong>and</strong><br />

Appointed to prepare a Historic Research Study <strong>and</strong> Course Audit<br />

May<br />

A vintage Harry Colt layout


Cannes Mougin Côte d’Azur, France<br />

Future plans approved by the members<br />

May<br />

A redesign to make better use of the existing dramatic l<strong>and</strong>form


Formby Hall Lancashire, Engl<strong>and</strong><br />

General advisory visit<br />

May<br />

10 th hole


Harewood Downs Buckinghamshire, Engl<strong>and</strong><br />

Appointed to advise on bunker configuration <strong>and</strong> course design<br />

May<br />

1 st hole


Royal Liverpool The Wirral, Engl<strong>and</strong><br />

Planning visit<br />

May<br />

1 st hole (Open routing) - 17 th hole (Club routing)


S<strong>and</strong>burn Hall York, Engl<strong>and</strong><br />

Masterplan review visit<br />

May<br />

18 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The Past Captains hit the first shots on the Reborn Ailsa Course<br />

May<br />

1 st tee


Royal Belfast County Down, Northern Irel<strong>and</strong><br />

<strong>Review</strong> of practice facilities <strong>and</strong> new bunkers<br />

May<br />

1 st hole


Mortonhall Edinburgh, Scotl<strong>and</strong><br />

Appointed to carry out course review<br />

May<br />

2 nd hole


JUNE


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The focus shifts to the Kintyre Course<br />

June<br />

The new 9 th hole


Noordwijkse Noordwijk, Holl<strong>and</strong><br />

Planning visit for bunker <strong>and</strong> practice facility proposals<br />

June<br />

11 th hole


Royal Worlington & Newmarket Suffolk, Engl<strong>and</strong><br />

General advisory visit<br />

June<br />

The 6 th hole


Aislaby Somerset, Engl<strong>and</strong><br />

General advisory visit<br />

June<br />

3 rd hole


Burnham & Berrow Somerset, Engl<strong>and</strong><br />

Assessment of the green shaping detail<br />

June<br />

6 th hole


Royal Porthcawl Glamorgan, Wales<br />

Visit during The Amateur Championship<br />

June<br />

1 st green


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Fully grown in by June<br />

June<br />

The new par 5 7 th hole


Prestwick South Ayrshire, Scotl<strong>and</strong><br />

General bunker review<br />

June<br />

The famous 3 rd hole – ‘Cardinal’


Effingham Surrey, Engl<strong>and</strong><br />

Planning future phases of bunker renovation<br />

June<br />

The revamped 11 th hole


The Isl<strong>and</strong> Dublin, Irel<strong>and</strong><br />

Masterplan review visit<br />

June<br />

The narrow fairway of the 14 th hole


Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />

11 th <strong>and</strong> 12 th project planning meeting<br />

June<br />

12 th to be re-aligned <strong>and</strong> old tees removed


Portmarnock Dublin, Irel<strong>and</strong><br />

Championship tee planning visit<br />

June<br />

The wonderful 15 th hole with its newly l<strong>and</strong>scaped carry


The Leicestershire Leicester, Engl<strong>and</strong><br />

Appointed to design new Short Game Area<br />

June<br />

An ideal piece of l<strong>and</strong> for the purpose


Royal County Down Newcastle, Northern Irel<strong>and</strong><br />

<strong>Review</strong> of the new Annesley holes & planning of the practice ground project<br />

June<br />

The 9 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The Gr<strong>and</strong> Opening<br />

June<br />

The 9 th championship tee


Vantaa Helsinki, Finl<strong>and</strong><br />

The seed is growing in the ideal mid summer conditions<br />

June<br />

The joint 9 th / Himalayas putting green


JULY


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The golfers are beginning to enjoy the new course<br />

July<br />

The 6 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The new bridge completes the picture<br />

July<br />

The 16 th hole


Cadmore Lodge Worcestershire, Engl<strong>and</strong><br />

Planning visit for redesign of the 9 hole course<br />

July<br />

Looking down onto the Lodge


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

An incredible final round from Henrik <strong>and</strong> Phil<br />

July<br />

The 72 nd hole


Galgorm Castle County Antrim, Northern Irel<strong>and</strong><br />

The academy facility opens for play at the Northern Irel<strong>and</strong> Open<br />

July<br />

Himalayas putting green


Redtail Ontario, Canada<br />

Return visit 25 years after the course was under construction<br />

July<br />

Tom <strong>and</strong> family celebrate various big birthdays <strong>and</strong> anniversaries


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

The foundations are in place<br />

July<br />

The players’ tunnel area – Spectators will walk over the top


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Fully grown in by July<br />

July<br />

The new par 5 7 th hole


Saunton West Course Devon, Engl<strong>and</strong><br />

Strengthening of the West Course being planned<br />

July<br />

8 th Hole


AUGUST


Wilmslow Cheshire, Engl<strong>and</strong><br />

Masterplan implementation planning visit<br />

August<br />

18 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The new holes continue to mature<br />

August<br />

10 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The green is ready for hollow coring<br />

August<br />

The new 10 th hole on the Kintyre Course


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The green was lowered to make it sit more comfortably in front of the clubhouse<br />

August<br />

18 th green on the Kintyre Course


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The Pitch & Putt Course has been enjoyed by many hotel guests<br />

August<br />

The Pitch & Putt Course


Bruntsfield Links Edinburgh, Scotl<strong>and</strong><br />

Appointed to produce ambitious development plan<br />

August<br />

Full bunker renovation <strong>and</strong> re-routing exercise


Gullane East Lothian, Scotl<strong>and</strong><br />

Planning to reshape 8 th green surrounds <strong>and</strong> other holes on No 1 <strong>and</strong> No 3 courses<br />

August<br />

Existing 8 th approach


Moor Hall West Midl<strong>and</strong>s, Engl<strong>and</strong><br />

Appointed to prepare a Course Audit<br />

August<br />

18 th hole


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

While the gr<strong>and</strong>st<strong>and</strong>s <strong>and</strong> pathways are still in place a post Open study with The R&A<br />

August<br />

18 th hole


Askernish South Uist, Scotl<strong>and</strong><br />

The annual pilgrimage<br />

August<br />

The wonderful 11 th green


SEPTEMBER


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

An incredible green location<br />

The completed hole<br />

September<br />

August<br />

The new 9 th hole on the Kintyre Course


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The green base has been shaped<br />

The green has been turfed<br />

September<br />

August<br />

The new 9 th hole on the Kintyre Course


Heikirejoia Helsinki, Finl<strong>and</strong><br />

Initial assessment visit<br />

September<br />

2 nd tee shot on the short nine


Vantaa Helsinki, Finl<strong>and</strong><br />

The grass is maturing well<br />

September<br />

The Himalayas putting green


Vantaa Helsinki, Finl<strong>and</strong><br />

The first play of the front nine takes place<br />

September<br />

Par 3 5 th hole


Vierumäki Finl<strong>and</strong><br />

The new green opens for play<br />

September<br />

8 th hole


Worthing West Sussex, Engl<strong>and</strong><br />

Appointed to carry out Historic Research Study <strong>and</strong> Design <strong>Review</strong> of 8 th <strong>and</strong> 9 th holes<br />

September 16 th hole in 1946


The Isl<strong>and</strong> Dublin, Irel<strong>and</strong><br />

Refinement of the Masterplan proposals<br />

September<br />

6 th tee shot


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The seeded fairway is catching up with the turfed green<br />

September<br />

The new 8 th hole on the Kintyre Course


Pickala Golf Helsinki, Finl<strong>and</strong><br />

Construction visit<br />

September<br />

The Short Game Area


Vierumäki Finl<strong>and</strong><br />

A review of the base shaping<br />

September<br />

14 th green


Tuusula Helsinki, Finl<strong>and</strong><br />

General course advisory review visit<br />

September<br />

11 th hole


Hiekkaharju Helsinki, Finl<strong>and</strong><br />

A further assessment of the course for layout planning purposes<br />

September<br />

The 7 th hole


Vantaa Helsinki, Finl<strong>and</strong><br />

The bunker s<strong>and</strong>ing continues<br />

September<br />

4 th hole


Askernish South Uist, Scotl<strong>and</strong><br />

Lecturing R&A Scholars<br />

September<br />

7 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Fully grown in<br />

September<br />

The 8 th green


Royal Lytham & St Annes Lancashire, Engl<strong>and</strong><br />

Tender held for the creation of dunes instead of trees to right of green<br />

September<br />

9 th hole


Dedduwa Sri Lanka<br />

Desk based preliminary Masterplan drawn up for Malco Engineering<br />

September<br />

Possible new development in Sri Lanka


OCTOBER


Royal Mid Surrey Richmond, Engl<strong>and</strong><br />

<strong>Review</strong> of the hole<br />

October<br />

17 th hole


Minthis Hills Paphos, Cyprus<br />

Planned course extension <strong>and</strong> course review<br />

October<br />

17 th hole


Fulford York, Engl<strong>and</strong><br />

Construction planning visit<br />

October<br />

The 10 th hole


Northumberl<strong>and</strong> Newcastle upon Tyne, Engl<strong>and</strong><br />

Initial course assessment visit<br />

October<br />

The 18 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Grow in review visit<br />

October<br />

The new par 5 7 th hole


Royal Portrush County Antrim, Northern Irel<strong>and</strong><br />

Grow in review visit<br />

October<br />

The new par 4 8 th hole


Royal Liverpool The Wirral, Engl<strong>and</strong><br />

Fine detail focused on<br />

October<br />

11 th green (Open routing) - 9 th green (Club routing)


Royal Liverpool The Wirral, Engl<strong>and</strong><br />

Softening of the approach <strong>and</strong> filling of the left rear bunker<br />

October<br />

1 st green (open routing) - 17 th green (Club routing)


Golf At Goodwood West Sussex, Engl<strong>and</strong><br />

Phase 2 of bunker renovation begins<br />

October<br />

3 rd green


S<strong>and</strong>burn Hall York, Engl<strong>and</strong><br />

Bunker marking out visit<br />

October<br />

1 st hole


Fulford York, Engl<strong>and</strong><br />

Construction visit<br />

October<br />

6 th hole


Royal County Down Newcastle, Northern Irel<strong>and</strong><br />

Dune construction to the right of the hole about to get underway<br />

October<br />

17 th hole


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

A stunning hole<br />

October<br />

New 9 th hole on the Kintyre Course


Turnberry South Ayrshire, Scotl<strong>and</strong><br />

The hollow cored green has matured well<br />

October<br />

The new 10 th green on the Kintyre Course


Royal Troon South Ayrshire, Scotl<strong>and</strong><br />

Planning visit for possible Portl<strong>and</strong> <strong>and</strong> Craigend Course adjustments<br />

October<br />

10 th hole on the Portl<strong>and</strong> Course


Golf At Goodwood West Sussex, Engl<strong>and</strong><br />

Phase 2 of bunker renovation continues<br />

October<br />

18 th before


Golf At Goodwood West Sussex, Engl<strong>and</strong><br />

Phase 2 of bunker renovation continues<br />

October<br />

18 th after


Hamilton Ontario, Canada<br />

Visit to present the Masterplan for this Harry Colt layout to the membership<br />

October<br />

1 st hole on the South Nine


Hamilton Ontario, Canada<br />

Great fall colours<br />

October<br />

7 th hole on the East Nine


Angus Glen Toronto, Canada<br />

<strong>Review</strong> of the South Course<br />

October<br />

18 th hole


Angus Glen Toronto, Canada<br />

Fescue grassing lines reviewed to reduce water consumption<br />

October<br />

11 th hole


Goodwood Ontario, Canada<br />

<strong>Review</strong> of the course<br />

October<br />

Looking down onto the 14 th hole


Myopia Massachusetts, USA<br />

Another playing visit to this great old course<br />

October<br />

11 th green


NOVEMBER


St Augustine’s Kent, Engl<strong>and</strong><br />

Course extension plans are resurrected<br />

November<br />

L<strong>and</strong> for nine new holes


Royal Belfast Northern Irel<strong>and</strong><br />

Bunker construction visit<br />

November<br />

The 13 th hole


Golf At Goodwood West Sussex, Engl<strong>and</strong><br />

Phase 2 of bunker renovation continues<br />

November<br />

3 rd Approach Bunkers


Royal County Down Newcastle, Northern Irel<strong>and</strong><br />

Construction visit<br />

November<br />

The dunes are taking shape to the right of the 17 th hole


Little Aston Sutton Coldfield, Engl<strong>and</strong><br />

<strong>Review</strong> visit for the bunker style <strong>and</strong> 10 th <strong>and</strong> 12 th holes<br />

November<br />

12 th hole


Cadmore Lodge Worcestershire, Engl<strong>and</strong><br />

Marking out visit for the new layout<br />

November<br />

General view over the course


Royal Dornoch Sutherl<strong>and</strong>, Scotl<strong>and</strong><br />

Construction visit – Moving the 12 th fairway further away from the 5th<br />

November<br />

5 th tee shot


St Andrews New Course Fife, Scotl<strong>and</strong><br />

Bare s<strong>and</strong> area creation between the holes<br />

The completed work<br />

November<br />

November<br />

Area between the 6 th <strong>and</strong> 7 th holes


Carnoustie Angus, Scotl<strong>and</strong><br />

Creating fairway to the right of the two reconfigured central bunkers<br />

November<br />

3 rd hole on the Championship Course


Saunton West Course Devon, Engl<strong>and</strong><br />

Work underway<br />

November<br />

12 th hole ditch re-alignment under construction


Saunton West Course Devon, Engl<strong>and</strong><br />

Work completed<br />

November<br />

12 th hole ditch re-alignment completed


Saunton West Course Devon, Engl<strong>and</strong><br />

Work underway<br />

November<br />

New drive bunkers on the 3 rd


Royal Automobile Club Surrey, Engl<strong>and</strong><br />

The Old Course re-bunkering continues<br />

November<br />

5 th hole before


Royal Automobile Club Surrey, Engl<strong>and</strong><br />

The Old Course re-bunkering continues<br />

November<br />

5 th hole after turfing


Princes S<strong>and</strong>wich, Engl<strong>and</strong><br />

Preliminary visit to this great former Open venue<br />

November<br />

The 9 th hole on the Shore Nine


Kasumigaseki Tokyo, Japan<br />

Playing visit during an R&A Rules School – It was an honour to<br />

play with Mr Tai Kawata, Japan’s foremost golf course architect<br />

November<br />

The 10 th hole on the East Course


Kasumigaseki Tokyo, Japan<br />

The East Course has recently been redesigned by Tom Fazio for the Olympics in 2020<br />

November<br />

The 18 th green on the East Course


Carnoustie Angus, Scotl<strong>and</strong><br />

Construction visit assessing the rough translocation on the dune system<br />

November<br />

Dunes behind the 17 th green


The Isl<strong>and</strong> Dublin, Irel<strong>and</strong><br />

Visit to present the initial proposals for the course to the Council<br />

November<br />

The 15 th hole


Portmarnock Dublin, Irel<strong>and</strong><br />

Visit to assess tee construction <strong>and</strong> other areas of the course<br />

November<br />

The par 3 15 th hole


Effingham Surrey, Engl<strong>and</strong><br />

Phase 4 starts<br />

November<br />

9 th hole before


Effingham Surrey, Engl<strong>and</strong><br />

Phase 4 starts<br />

November<br />

9 th hole during


Cruden Bay Aberdeenshire, Scotl<strong>and</strong><br />

Highest Riser in Golf Monthly’s Top 100 UK & Irel<strong>and</strong><br />

November<br />

New 9 th hole specifically mentioned as a reason


Trevose Cornwall, Engl<strong>and</strong><br />

The completed bunkers on the 10th hole<br />

November<br />

10 TH green


Oakmere Nottinghamshire, Engl<strong>and</strong><br />

2017 work being planned<br />

November<br />

Par 5 11th


Rothley Park Leicestershire, Engl<strong>and</strong><br />

Ongoing advice since 2008<br />

November<br />

Input on bridleway routing


DECEMBER


Gullane No 1 East Lothian, Scotl<strong>and</strong><br />

Work on 8 th <strong>and</strong> 9 th starts<br />

December<br />

Green surrounds completely reshaped


Fulford York, Engl<strong>and</strong><br />

Bunker layout changes nearing completion<br />

December<br />

6 th hole


Royal Automobile Club Surrey, Engl<strong>and</strong><br />

The Old Course re-bunkering continues<br />

December<br />

11 th bunkers shaped up


Carnoustie Angus, Scotl<strong>and</strong><br />

Construction visit<br />

December<br />

A new 18 th hole on the Buddon Course which will also be The Open Short Game Area


Royal County Down Newcastle, Northern Irel<strong>and</strong><br />

Construction visit<br />

December<br />

The dunes are almost complete to the right of the 17 th hole


Trevose Cornwall, Engl<strong>and</strong><br />

Work to the 4 th hole taking shape<br />

December<br />

Teeshot before


Trevose Cornwall, Engl<strong>and</strong><br />

Work to the 4 th hole taking shape<br />

December<br />

Revised teeshot


Trevose Cornwall, Engl<strong>and</strong><br />

New 4 th green which looks down over the famous Constantine Bay<br />

Quick progress<br />

December<br />

December<br />

Finishing touches being applied


Club de Golf Terramar Sitges, Spain<br />

Planning visit<br />

December<br />

The planned 16 th tee shot


Reykjavík Golf Club Reykjavík, Icel<strong>and</strong><br />

Project Planning Continues<br />

December


Metro House<br />

Chichester<br />

West Sussex<br />

PO191BE<br />

Telephone<br />

01243 531901<br />

pitch<strong>and</strong>run18@aol.com<br />

www.mackenzie<strong>and</strong>bert.com<br />

@mackenzie<strong>and</strong>ebert<br />

@golfarchitects

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!