20 <strong>Handbook</strong> <strong>of</strong> <strong>Electrical</strong> <strong>Installation</strong> <strong>Practice</strong><br />

Fig. 1.6 High voltage consumer with switchable reactors.<br />

near that <strong>of</strong> the switchgear rating. Switchable reactors may be required to<br />

overcome this problem; one such arrangement is shown in Fig. 1.6. There is<br />

also a problem <strong>of</strong> earthing the generators should they become separated<br />

from the power system and its source earth point.<br />

This method <strong>of</strong> supply seems a good one for the application <strong>of</strong> microprocessors.<br />

On the metering side they could calculate the value <strong>of</strong> the<br />

units on an incremental worth basis to suit a time/load/power factor agreement.<br />

On the control side they could monitor the number <strong>of</strong> generators<br />

and reactors to contain the short-circuit level within limits. They could<br />

be used to control voltage and reactive power generated, and also for<br />

protection.<br />

(3) Standby generation. Load shedding due to shortage <strong>of</strong> fuel or other industrial<br />

action caused an upsurge in the installation <strong>of</strong> small generators by those consumers<br />

whose business could not stand the risk <strong>of</strong> loss <strong>of</strong> supply, ranging from<br />

just a few kilowatts at low voltage to several thousand kilowatts switched at<br />

high voltage.These cause some anxiety on safety grounds as cases have occurred<br />

where the generator has been started up and connected to the installation<br />

without the latter being disconnected from the incoming supply.<br />

It is easy to imagine a small l.v. generator being plugged in to supply a milking<br />

machine on a farm at the end <strong>of</strong> a line and a linesman repairing the fault receiving<br />

a shock and being thrown to the ground. Problems have also occurred on<br />

large sets due to incorrect changeover arrangements, for example, in one case<br />

a loss <strong>of</strong> supply on one phase only brought in the standby set without the normal<br />

feed being disconnected.<br />

The local DNO is generally pleased to give advice on appropriate changeover<br />

arrangements.