22.06.2017 Views

CIBSE Australia and New Zealand 30th Anniversary

30 years and counting! Take a look back at CIBSE ANZ's accomplishments and achievements from the past 30 years.

30 years and counting! Take a look back at CIBSE ANZ's accomplishments and achievements from the past 30 years.

SHOW MORE
SHOW LESS

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

© AECOM, May 2017<br />

2015<br />

PRESERVING HISTORY<br />

The centrepiece of Perth’s new Cultural Precinct<br />

is a 32-storey, 5-star Green Star awarded Design<br />

<strong>and</strong> targeted 4.5 star NABERS Energy (Base Build)<br />

office tower. AECOM worked in close collaboration<br />

with developer <strong>and</strong> construction company Mirvac,<br />

providing a range of multi-discipline building services<br />

for the development <strong>and</strong> its four-storey annex. The<br />

tower also houses ancillary facilities for the luxury<br />

The Como hotel in the adjacent heritage listed Old<br />

Treasury Building (OTB).<br />

In addition to the challenges of designing mechanical,<br />

electrical, facade, acoustic, fire, hydraulics <strong>and</strong><br />

traffic engineering for the high rise building, AECOM<br />

ensured the energy efficiency <strong>and</strong> sustainability<br />

requirements of the project was paramount in<br />

the design process <strong>and</strong> included a number of<br />

sustainability initiatives. A significant portion of<br />

energy efficiency can be achieved with façade <strong>and</strong><br />

building services optimisation, therefore a detailed<br />

analysis was carried out on the facade which<br />

subsequently resulted in a double gazed façade<br />

system which incorporates vertical shading fins to<br />

maximise views out, whilst minimising direct solar<br />

radiation into the space.<br />

A circa 1,000kW gas powered tri-generation plant<br />

generates electricity for the building. The waste heat<br />

from the process is harnessed to produce hot water <strong>and</strong><br />

heating, as well as chilled water through an absorption<br />

chiller. The tri-generation plant services both l<strong>and</strong>lord<br />

<strong>and</strong> tenant’s services. Amongst other measures is a<br />

grey water recycling plant designed to minimise water<br />

wastage through treatment <strong>and</strong> re-use on site.<br />

The four-storey annex building accommodates hotel<br />

services, a gym, office & retail space <strong>and</strong> a swimming<br />

pool, which includes a BMS controlled motorised glazed<br />

façade louvre system providing mixed mode natural /<br />

mechanical ventilation deepening on external conditions.<br />

The project has been successfully completed <strong>and</strong> hosts<br />

various State Government Departments which occupy<br />

the 30,000 sq m of commercial space it provides.<br />

The project was awarded the Master Builders<br />

Association’s 2016 Bankwest Best Project. It also won<br />

MBA awards for Best State Government Building, Best<br />

Refurbishment or Renovation: Over $10m, Best Historic<br />

Restoration or Renovation <strong>and</strong> the Jim Saunders<br />

Memorial Judges Innovation Award.<br />

<strong>New</strong> <strong>and</strong> old<br />

Reactivated ground plane<br />

31

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!