Digital Urban Simulation : Documentation of the Teaching Results from the Autumn Semester 2015
You also want an ePaper? Increase the reach of your titles
YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.
<strong>Documentation</strong> <strong>of</strong> <strong>the</strong> teaching results <strong>from</strong> <strong>the</strong> fall semester <strong>2015</strong><br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong><br />
Reinhard König, Estefania Tapias, and Gerhard Schmitt<br />
Chair <strong>of</strong><br />
Information<br />
iAArchitecture
Chair <strong>of</strong> Information Architecture<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong><br />
<strong>Documentation</strong> <strong>of</strong> teaching results<br />
Reinhard König, Estefania Tapias, and Gerhard Schmitt<br />
iA<br />
Chair <strong>of</strong> Information Architecture<br />
<strong>Teaching</strong><br />
Reinhard König, Estefania Tapias, and Gerhard Schmitt<br />
Syllabi<br />
http://www.ia.arch.ethz.ch/category/teaching/hs<strong>2015</strong>-digital-urban-simulation/<br />
Seminar<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong><br />
Students<br />
Published by<br />
Swiss Federal Institute <strong>of</strong> Technology in Zurich (ETHZ)<br />
Department <strong>of</strong> Architecture<br />
Chair <strong>of</strong> Information Architecture<br />
Wolfgang-Pauli-Strasse 27, HIT H 31.6<br />
8093 Zurich<br />
Switzerland<br />
Zurich, January 2016<br />
Layout & Editing<br />
Brigitte M. Clements<br />
Contact<br />
reinhard.koenig@arch.ethz.ch | http://www.ia.arch.ethz.ch/koenig/<br />
Cover picture:<br />
Front side: Alberto Oliver Mercado, Segment Analysis, Zurich
Course Description and Program<br />
DIGITAL URBAN SIMULATION<br />
Mondays 14:00 – 18:00<br />
063-1357-15L | 4 ECTS*<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong><br />
In this course students analyze architectural and urban design using<br />
current computational methods. Based on <strong>the</strong>se analyses <strong>the</strong> effects<br />
<strong>of</strong> planning can be simulated and understood.<br />
An important focus <strong>of</strong> this course is <strong>the</strong> interpretation <strong>of</strong> <strong>the</strong> analysis<br />
and simulation results and <strong>the</strong> application <strong>of</strong> <strong>the</strong>se corresponding<br />
methods in early planning phases.<br />
The students learn how <strong>the</strong> design and planning <strong>of</strong> cities can be<br />
evidence based by using scientific methods. The teaching unit convey<br />
knowledge in state-<strong>of</strong>-<strong>the</strong>-art and emerging spatial analysis and<br />
simulation methods and equip students with skills in modern s<strong>of</strong>tware<br />
systems. The course consists <strong>of</strong> lectures, associated exercises,<br />
workshops as well as <strong>of</strong> one integral project work.<br />
Where<br />
HIT H 31.4 (Video wall)<br />
21.09.<strong>2015</strong> Introduction to <strong>the</strong> course<br />
Rhino/Grasshopper tutorial<br />
28.09.<strong>2015</strong> Space syntax I<br />
E1 - Convex Map, Axial Map <strong>of</strong> a small area<br />
05.10..<strong>2015</strong> Space syntax II<br />
E2 - Depthmap & GIS: Prepare data -> Import data –><br />
Analysis methods<br />
12.10.<strong>2015</strong> Empirical studies<br />
E3 - Collect data (evaluate existing materials)<br />
19.10.<strong>2015</strong> Seminar week (No lecture)<br />
26.10..<strong>2015</strong> Microclimate analysis I<br />
E4 - Ecotect Tutorial I. Analysis <strong>of</strong> a small urban area.<br />
02.11.<strong>2015</strong> Microclimate analysis II<br />
E5 - Ecotect Tutorial I. Analysis <strong>of</strong> a small urban area.<br />
09.11.<strong>2015</strong> Best practice examples -<br />
Guest lecture, consultation<br />
16.11.<strong>2015</strong> Workshop<br />
E6 - Data Analysis (Matthias Standfest)<br />
Supervision<br />
Dr. Reinhard König<br />
Estefania Tapias<br />
reinhard.koenig@arch.ethz.ch<br />
tapias@arch.ethz.ch<br />
23.11.<strong>2015</strong> Final consultation<br />
30.11.<strong>2015</strong> Final iA critique<br />
Combined critique with <strong>the</strong> o<strong>the</strong>r iA courses (14:00 - 18:00)<br />
* Total 120 h = 4 ECTS<br />
3 Exercises 25% (documentations)<br />
Presentation 25% (project at <strong>the</strong> end)<br />
Written documentation 50%<br />
The most recent outline will be found on www.ia.arch.ethz.ch
Content<br />
Atmosphere<br />
Student: Alberto Oliver Mercado<br />
Limmat Loop<br />
Student: Alexandra Meuche<br />
Analysis <strong>of</strong> a park’s design<br />
Student: Alice Chevrier<br />
Hochschulgebiet Zentrum<br />
Student: Jonas Landolt & Stefan Caranovic<br />
Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
Student: Natalia Daukszewicz & Philippe Blarer<br />
p.9<br />
p.25<br />
p.43<br />
p.55<br />
p.85
Zurich - Historic City & City Blocks<br />
Student: Ricardo Joss<br />
Optimisation <strong>of</strong> agriculture<br />
in an urban environment<br />
Student: Romain Masson<br />
A school in Cambodia<br />
Student: Stéphane de Weck<br />
Olympic Legacy<br />
Student: Thorben Westerhuys<br />
Uster 2035<br />
Student: Vincent Hischier<br />
p.105<br />
p.117<br />
p.127<br />
p.141<br />
p.163
Atmosphere<br />
Student: Alberto Oliver Mercado
Summary<br />
Impressionist museum at My<strong>the</strong>nquai<br />
The main topic for this semester is ATMOSPHERE. Although generally in any project factors as transit<br />
and sun light are basic, Final Examination <strong>the</strong> attempt to convey a particular feeling to a user, <strong>the</strong>se become crucial.<br />
Fur<strong>the</strong>rmore, <strong>the</strong> program Name: Alberto to Oliver develop is a MUSEUM, making <strong>the</strong> search for a correct atmosphere<br />
even tougher. There Date: are 30.11.<strong>2015</strong> 4 different sites and 5 different collections; each team is assigned a single<br />
combination that won’t be repeated. The ultimate goal is to generate <strong>the</strong> most adequate solution for<br />
Summary<br />
Motivation<br />
each team’s specific site and collection.<br />
The main topic for this semester is ATMOSPHERE. Although generally in any project factors as transit and sun<br />
light are basic, in <strong>the</strong> attemp to convey a particular feeling to a user, <strong>the</strong>se become crucial. Fur<strong>the</strong>rmore, <strong>the</strong><br />
program to develop is a MUSEUM, making <strong>the</strong> search for a correct atmosphere even tougher. There are 4<br />
The generation <strong>of</strong> a good architectural solution in re<br />
plishment; when combined with very particular need<br />
ideas with o<strong>the</strong>r tools.<br />
The following analysis different tries sites and to 5 prove different collections; <strong>the</strong> level each team <strong>of</strong> is understanding assigned a single combination <strong>of</strong> that <strong>the</strong> won’t project be repeated. and its surrounding area<br />
The ultimate goal is to generate <strong>the</strong> most adecuate solution for each team’s specific site and collection.<br />
achieved throughout <strong>the</strong> semester. Just as <strong>the</strong> semester, <strong>the</strong> analysis develops <strong>from</strong> a very wide<br />
The following analysis tries to prove <strong>the</strong> level <strong>of</strong> understanding <strong>of</strong> <strong>the</strong> project and its surrounding area achieved<br />
perspective into <strong>the</strong> throughout way <strong>of</strong> <strong>the</strong> moving semester. Just through as <strong>the</strong> semester, <strong>the</strong> analysis building, develops <strong>from</strong> and a very lastly, wide perspective <strong>the</strong> influence into <strong>the</strong> way <strong>of</strong> <strong>the</strong> openings in <strong>the</strong><br />
<strong>of</strong> moving through <strong>the</strong> building, and lastly, <strong>the</strong> influence <strong>of</strong> <strong>the</strong> openings in <strong>the</strong> rooms.<br />
rooms.<br />
t My<strong>the</strong>nquai<br />
Right now, <strong>the</strong> project is already set into an architectu<br />
with this, <strong>the</strong> attempt is to check if <strong>the</strong> changes that t<br />
to <strong>the</strong> concept being developed. During <strong>the</strong> resting w<br />
to an optimal atmosphere in each room according t<br />
being developed by each team. Currently, <strong>the</strong> window<br />
correctly placed; with this analysis, it is expected to g<br />
locate <strong>the</strong> windows could be.<br />
Site<br />
any project factors as transit and sun<br />
ese become crucial. Fur<strong>the</strong>rmore, <strong>the</strong><br />
tmosphere<br />
uai<br />
even tougher. There are 4<br />
combination that won’t be repeated.<br />
m’s specific site and collection.<br />
Motivation<br />
IMAGE<br />
The generation <strong>of</strong> a good architectural solution in regards with a particular topic is already a difficult accomplishment;<br />
when combined with very particular needs to be fullfilled, it is always helpful to complement <strong>the</strong><br />
ideas with o<strong>the</strong>r tools.<br />
Right now, <strong>the</strong> project is already set into an architectural floor plan that will not be modified anymore. In regards<br />
with this, <strong>the</strong> attempt is to check if <strong>the</strong> changes that <strong>the</strong> floor plan underwent were an improvement according<br />
to <strong>the</strong> concept being developed. During <strong>the</strong> resting weeks <strong>of</strong> <strong>the</strong> semester <strong>the</strong> goal is to reach <strong>the</strong> closest state<br />
to an optimal atmosphere in each room according to what is required by <strong>the</strong> project itself and <strong>the</strong> concept<br />
ject and its surrounding area achieved<br />
m a very wide perspective into <strong>the</strong> way<br />
in <strong>the</strong> rooms.<br />
being developed by each team. Currently, <strong>the</strong> windows are <strong>the</strong> main and most difficult part <strong>of</strong> <strong>the</strong> spaces to be<br />
2.<br />
Motivation<br />
Motivation<br />
correctly placed; with this analysis, it is expected to get have a better understanding <strong>of</strong> what <strong>the</strong> best place to<br />
New Methods locate in <strong>Urban</strong> <strong>the</strong> windows Analysis and <strong>Simulation</strong> could be. | Impressionist museum at My<strong>the</strong>nquai<br />
ion<br />
d sun<br />
The generation <strong>of</strong> a good <strong>of</strong> architectural a good solution architectural in regards with a solution particular topic in is regards already a difficult with accomplishment;<br />
when combined with very particular needs to be fullfilled, it is always helpful to complement <strong>the</strong><br />
a particular topic is already a difficult<br />
re, <strong>the</strong><br />
neration are 4 <strong>of</strong> accomplishment; ideas a good with o<strong>the</strong>r architectural tools. solution when in Site regards combined with a particular with very topic particular is already a difficult needs accomnt;<br />
when combined with very particular needs to be fullfilled, it is always helpful to complement <strong>the</strong><br />
to be fulfilled, it is always helpful to<br />
eated.<br />
complement <strong>the</strong> ideas with o<strong>the</strong>r tools.<br />
ith o<strong>the</strong>r Right tools. now, <strong>the</strong> project is already set into an architectural floor plan that will not be modified anymore. In regards<br />
with this, <strong>the</strong> attempt is to check if <strong>the</strong> changes that <strong>the</strong> floor plan underwent were an improvement according<br />
hieved<br />
ow, <strong>the</strong> project<br />
to <strong>the</strong> concept<br />
is already<br />
being<br />
set<br />
developed.<br />
into an architectural<br />
During <strong>the</strong> resting<br />
floor plan<br />
weeks<br />
that<br />
<strong>of</strong> <strong>the</strong><br />
will<br />
semester<br />
not be modified<br />
<strong>the</strong> goal is<br />
anymore.<br />
to reach <strong>the</strong><br />
In<br />
closest<br />
regards<br />
state<br />
e way<br />
s, <strong>the</strong> attempt is to check if <strong>the</strong> changes that <strong>the</strong> floor plan underwent were an improvement according<br />
oncept being developed. During <strong>the</strong> resting weeks <strong>of</strong> <strong>the</strong> semester <strong>the</strong> goal is to reach <strong>the</strong> closest state<br />
ptimal atmosphere in each room according to what is required by <strong>the</strong> project itself and <strong>the</strong> concept<br />
eveloped by each team. Currently, <strong>the</strong> windows are <strong>the</strong> main and most difficult part <strong>of</strong> <strong>the</strong> spaces to be<br />
ly placed; with this analysis, it is expected to get have a better understanding <strong>of</strong> what <strong>the</strong> best place to<br />
he windows could be.<br />
Right to an optimal now, atmosphere <strong>the</strong> project in each room is already according to set what into is required an architectural by <strong>the</strong> project itself floor and <strong>the</strong> plan concept that will not be modified anymore.<br />
In being regards developed by with each team. this, Currently, <strong>the</strong> attempt <strong>the</strong> windows is are <strong>the</strong> to main check and most if difficult <strong>the</strong> changes part <strong>of</strong> <strong>the</strong> spaces that to be <strong>the</strong> floor plan underwent were an<br />
correctly placed; with this analysis, it is expected to get have a better understanding <strong>of</strong> what <strong>the</strong> best place to<br />
improvement locate <strong>the</strong> windows could according be. to <strong>the</strong> concept being developed. During <strong>the</strong> resting weeks <strong>of</strong> <strong>the</strong> semester <strong>the</strong><br />
goal is to reach <strong>the</strong> closest state to an optimal atmosphere in each room according to what is required<br />
by<br />
Site<br />
<strong>the</strong> project itself and <strong>the</strong> concept being developed by each team. Currently, <strong>the</strong> windows are <strong>the</strong><br />
1.<br />
main and most difficult part <strong>of</strong> <strong>the</strong> spaces to be correctly placed; with this analysis, it is expected to get<br />
have a better understanding <strong>of</strong> what <strong>the</strong> best place to locate <strong>the</strong> windows could be.<br />
1.<br />
1.<br />
1.<br />
1.<br />
1.<br />
1.<br />
2.<br />
2.<br />
y<strong>the</strong>nquai<br />
1/8<br />
10<br />
2.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
2.<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
nquai<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
11
Segment Segment analysis: analysis: choice choice<br />
The site is located right at in <strong>the</strong> intersection <strong>of</strong> what used to be <strong>the</strong> original entrance to <strong>the</strong> city. The choice<br />
analysis conveys <strong>the</strong> importante that this place has even nowadays as <strong>the</strong> starting point <strong>of</strong> <strong>the</strong> main flow that<br />
will later become <strong>the</strong> busiest street beside <strong>the</strong> lake. It is important to note that both streets delimiting <strong>the</strong> site<br />
have a similar level <strong>of</strong> choice, however it is My<strong>the</strong>nquai <strong>the</strong> one that in <strong>the</strong> end tends to have a higher choice;<br />
The site is located right at in <strong>the</strong> intersection <strong>of</strong> what used to be <strong>the</strong> original entrance to <strong>the</strong> city. The<br />
currently, <strong>the</strong> buildings’ main facades are facing this street.<br />
choice analysis conveys <strong>the</strong> important that this place has even nowadays as <strong>the</strong> starting point <strong>of</strong> <strong>the</strong><br />
main flow that will later become <strong>the</strong> busiest street beside <strong>the</strong> lake. It is important to note that both<br />
streets delimiting <strong>the</strong> site have a similar level <strong>of</strong> choice, however it is My<strong>the</strong>nquai <strong>the</strong> one that in <strong>the</strong> end<br />
tends to have a higher choice; currently, <strong>the</strong> buildings’ main facades are facing this street.<br />
S<br />
J<br />
s<br />
in<br />
a<br />
s<br />
in<br />
It<br />
in<br />
s<br />
c<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Impressionist museum at My<strong>the</strong>nquai<br />
12<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Segment Segment analysis: analysis: integration integration<br />
Just like in <strong>the</strong> choice analysis, <strong>the</strong> integration analysis shows that this exact intersection is a highly integrated<br />
space in relation with <strong>the</strong> rest <strong>of</strong> <strong>the</strong> city centre. Probably because <strong>of</strong> <strong>the</strong> size <strong>of</strong> <strong>the</strong> analysed area, <strong>the</strong> highest<br />
integrated streets are located North, right beside <strong>the</strong> Quaibrücke. It is possible that if <strong>the</strong> analysis contemplates<br />
a larger space, <strong>the</strong>se streets will become less relevant. It would be expected, however, that <strong>the</strong> My<strong>the</strong>nquai<br />
Just like in <strong>the</strong> choice analysis, <strong>the</strong> integration analysis shows that this exact intersection is a highly<br />
street keeps its integration level due to its extention and location in <strong>the</strong> city, as well as <strong>the</strong> fact that it merges<br />
integrated space in relation with <strong>the</strong> rest <strong>of</strong> <strong>the</strong> city centre. Probably because <strong>of</strong> <strong>the</strong> size <strong>of</strong> <strong>the</strong> analysed<br />
into <strong>the</strong> General-Guisan-Quai street.<br />
area, <strong>the</strong> highest integrated streets are located North, right beside <strong>the</strong> Quaibrücke. It is possible that if<br />
It is important to note as well that <strong>the</strong> Belvoirpark is becoming isolated in between a set <strong>of</strong> high and medium<br />
<strong>the</strong> analysis contemplates a larger space, <strong>the</strong>se streets will become less relevant. It would be expected,<br />
integrated streets. Currently our project seeks to generate a park-extension like area in <strong>the</strong> nor<strong>the</strong>st part <strong>of</strong> <strong>the</strong><br />
however, that <strong>the</strong> My<strong>the</strong>nquai street keeps its integration level due to its extension and location in <strong>the</strong><br />
site, which might actually work due to <strong>the</strong> high integration, yet lower choice level <strong>of</strong> <strong>the</strong> Alfred-Escher strasse<br />
compared<br />
city, as<br />
to<br />
well<br />
My<strong>the</strong>nquai<br />
as <strong>the</strong> fact<br />
strasse.<br />
that it merges into <strong>the</strong> General-Guisan-Quai street.<br />
It is important to note as well that <strong>the</strong> Belvoirpark is becoming isolated in between a set <strong>of</strong> high and<br />
medium integrated streets. Currently our project seeks to generate a park-extension like area in <strong>the</strong><br />
nor<strong>the</strong>ast part <strong>of</strong> <strong>the</strong> site, which might actually work due to <strong>the</strong> high integration, yet lower choice level<br />
<strong>of</strong> <strong>the</strong> Alfred-Escher strasse compared to My<strong>the</strong>nquai strasse.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
3/8<br />
13
In<br />
A<br />
p<br />
a<br />
M<br />
w<br />
b<br />
T<br />
w<br />
la<br />
o<br />
w<br />
Insovists analysis<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Impressionist museum at My<strong>the</strong>nquai<br />
As mentioned before, at <strong>the</strong> left side <strong>of</strong> <strong>the</strong> site <strong>the</strong>re is <strong>the</strong> Belvoirpark. Due to <strong>the</strong> fact that this is a<br />
basic positive-negative plan, <strong>the</strong>re are no trees interrupting <strong>the</strong> view, transmitting <strong>the</strong> idea <strong>of</strong> it being a<br />
large open area. Still, even without trees being taken into account, it is again <strong>the</strong> intersection and mainly<br />
<strong>the</strong> side on <strong>the</strong> My<strong>the</strong>nquai <strong>the</strong> one that enables <strong>the</strong> highest amount <strong>of</strong> visual relations with <strong>the</strong> rest <strong>of</strong><br />
<strong>the</strong> area. If vegetation would be taken in consideration <strong>the</strong> Belvoirpark wold have a lower isovist level,<br />
making <strong>the</strong> contrast between it and <strong>the</strong> project site even more evident.<br />
Taking both <strong>the</strong> segment and <strong>the</strong> isovists analysis toge<strong>the</strong>r, it is clear <strong>the</strong> importance <strong>of</strong> this space in<br />
relation with its surrounding area. Any project to be executed in it should be carefully placed and will<br />
require particular attention to <strong>the</strong> way it opens itself towards <strong>the</strong> intersection and <strong>the</strong> My<strong>the</strong>nquai street.<br />
Also, due to <strong>the</strong> openness <strong>of</strong> <strong>the</strong> site, vegetation plays a crucial role to create a barrier between <strong>the</strong><br />
street and <strong>the</strong> project, as well as to convey a clear way through <strong>the</strong> site itself.<br />
14<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
However, as most <strong>of</strong> <strong>the</strong> areas in <strong>the</strong> city, <strong>the</strong> low sun during <strong>the</strong> winter casts a shadow<br />
long enough to keep <strong>the</strong> area cold for a few hours. However, during <strong>the</strong> summer, A<strong>the</strong><br />
buildings at <strong>the</strong> nor<strong>the</strong>rn part <strong>of</strong> <strong>the</strong> area are tall enough to cover <strong>the</strong> site <strong>from</strong> <strong>the</strong> hottest<br />
ummer<br />
Summer<br />
Summer solstice<br />
solstice<br />
solstice sun hours.<br />
Winter<br />
Winter<br />
Winter solstice<br />
solstice<br />
solstice<br />
ummer solstice<br />
Winter solstice<br />
ummer<br />
er solstice<br />
Summer<br />
solstice<br />
solstice<br />
Winter solstice<br />
In <strong>the</strong> end, Solar <strong>the</strong> radiation site is and indeed shadows ideal to place an architectural element with very comfortable Winter solstice<br />
Winter solstice<br />
Solar Solar radiation radiation and shadows and shadows<br />
temperature Solar radiation and and shadow shadows situations during most <strong>of</strong> <strong>the</strong> year. Fur<strong>the</strong>rmore, <strong>the</strong> fact that it<br />
Summer is Solar an solstice<br />
Winter solstice<br />
Solar radiation<br />
Solar open Being radiation radiation space at <strong>the</strong> and<br />
and shadows<br />
and enables end shadows<br />
<strong>of</strong> a <strong>the</strong> series possibilty <strong>of</strong> buildings to modify and right or add beside vegetation a park would in order suggest to make that <strong>the</strong> this<br />
Being Being Solar at <strong>the</strong> radiation at end <strong>the</strong> <strong>of</strong> end a and series <strong>of</strong> shadows<br />
series <strong>of</strong> buildings <strong>of</strong> buildings and right and beside right beside a park would park would suggest suggest that this that this<br />
Summer solticeplace Being even is<br />
is <strong>the</strong> at <strong>the</strong><br />
ideal <strong>the</strong> more ideal<br />
place end place <strong>of</strong> comfortable. a developing series developing <strong>of</strong> buildings Not only a project.<br />
is <strong>the</strong> ideal place developing a project.<br />
project. and for right conceptual beside a park reasons, would but suggest also that for this shadow Winter soltice<br />
05.00<br />
Summer solstice<br />
Being at <strong>the</strong> end <strong>of</strong> a series buildings Solar radiation and right and beside shadows<br />
Winter solstice<br />
Summer solsticereasons, is However, Being <strong>the</strong> However, ideal at <strong>the</strong> at <strong>the</strong> as <strong>the</strong> place best end as<br />
most for place <strong>of</strong> most<br />
<strong>of</strong> a developing series to <strong>of</strong> locate <strong>the</strong> <strong>of</strong> areas<br />
<strong>the</strong> areas buildings in a project.<br />
in <strong>the</strong> and and city, right right is <strong>the</strong> closer beside low a sun<br />
a park<br />
to park a <strong>the</strong> park during would<br />
would<br />
sou<strong>the</strong>rnmost would suggest winter suggest that casts<br />
suggest that<br />
tip this that<br />
this<br />
<strong>of</strong> a <strong>the</strong> this shadow<br />
However, site, 09.00<br />
Being at <strong>the</strong> as most end <strong>of</strong> <strong>of</strong> a <strong>the</strong> series areas <strong>the</strong> <strong>of</strong> buildings in city, <strong>the</strong> <strong>the</strong> city, low and <strong>the</strong> sun right low during sun beside during <strong>the</strong> a park winter would winter casts suggest casts a shadow<br />
shadow that this<br />
Summer solstice<br />
Winter<br />
Winter<br />
solstice<br />
solstice<br />
is <strong>the</strong> avoiding However, is is <strong>the</strong> <strong>the</strong> long<br />
long ideal enough ideal place a as enough<br />
constant place most<br />
for to developing keep for <strong>of</strong> to developing shadow <strong>the</strong> keep<br />
<strong>the</strong> areas <strong>the</strong> a project. <strong>from</strong> area<br />
cold a <strong>the</strong> project. cold<br />
for <strong>the</strong> city, for<br />
a following few <strong>the</strong> a low few<br />
hours. sun hours.<br />
building, However, during However, <strong>the</strong> but during winter during<br />
taking <strong>the</strong> casts <strong>the</strong><br />
advantage summer, a summer, shadow A<strong>the</strong><br />
long is <strong>the</strong> enough ideal place to keep for developing <strong>the</strong> area cold a project. for few hours. However, during <strong>the</strong> summer, A<strong>the</strong> <strong>of</strong> A<strong>the</strong><br />
as Being at <strong>the</strong> end <strong>the</strong> <strong>of</strong> low a series sun <strong>of</strong> buildings <strong>the</strong> winter and casts right beside a shadow a park would suggest that this<br />
However, surrounding long buildings However, enough buildings<br />
as most at as<br />
buildings’ <strong>the</strong> to most at keep <strong>the</strong> <strong>of</strong> nor<strong>the</strong>rn<br />
Solar <strong>of</strong> nor<strong>the</strong>rn radiation areas shadows part areas part<br />
and in Solar <strong>the</strong> <strong>of</strong> cold in<br />
city, during<br />
<strong>the</strong> <strong>of</strong><br />
<strong>the</strong> for <strong>the</strong><br />
radiation area city, a<br />
<strong>the</strong> few area <strong>the</strong><br />
low and tall summer. hours. are low tall<br />
sun shadows enough sun However, enough during to<br />
during to <strong>the</strong> cover <strong>the</strong> during cover<br />
winter <strong>the</strong> winter<br />
casts site <strong>the</strong> casts <strong>from</strong> summer, site <strong>from</strong> a shadow<br />
a shadow <strong>the</strong> hottest A<strong>the</strong> hottest<br />
buildings However, at as most nor<strong>the</strong>rn <strong>of</strong> part areas <strong>of</strong> <strong>the</strong> <strong>the</strong> area city, are <strong>the</strong> tall low enough sun during to cover <strong>the</strong> <strong>the</strong> winter site <strong>from</strong> casts a shadow hottest<br />
buildings long long enough sun to Solar radiation is shadows <strong>the</strong> and ideal shadows<br />
place a few for developing a project. during <strong>the</strong> summer, A<strong>the</strong><br />
long enough sun hours. at hours.<br />
sun to keep <strong>the</strong> area cold for a few hours. However, during <strong>the</strong> summer, A<strong>the</strong><br />
long to hours. keep at enough <strong>the</strong> nor<strong>the</strong>rn<br />
<strong>the</strong> to area keep part cold <strong>the</strong> <strong>of</strong> <strong>the</strong><br />
However, for area area<br />
a few cold are<br />
as are most<br />
hours. for tall<br />
tall a enough<br />
<strong>of</strong> few<br />
<strong>the</strong><br />
However, hours. to cover<br />
areas to cover in<br />
during However, <strong>the</strong> site<br />
<strong>the</strong> <strong>the</strong> city,<br />
<strong>the</strong> site <strong>the</strong><br />
summer, <strong>from</strong> during <strong>from</strong><br />
low <strong>the</strong> <strong>the</strong> <strong>the</strong><br />
sun hottest during<br />
A<strong>the</strong> summer, hottest A<strong>the</strong><br />
sun buildings hours. at <strong>the</strong> nor<strong>the</strong>rn part <strong>the</strong> winter casts a shadow<br />
buildings at <strong>the</strong> nor<strong>the</strong>rn Being at part <strong>the</strong> end <strong>of</strong> <strong>of</strong> Being<br />
<strong>of</strong> <strong>the</strong><br />
a<br />
long area series at<br />
area<br />
enough are <strong>the</strong> <strong>of</strong> buildings tall end<br />
are enough <strong>of</strong><br />
tall<br />
a<br />
enough<br />
and series right<br />
keep <strong>the</strong> to area cover <strong>of</strong><br />
to<br />
beside buildings<br />
cover <strong>the</strong><br />
cold <strong>the</strong> a park<br />
for site and<br />
site<br />
would few <strong>from</strong> right<br />
<strong>from</strong><br />
suggest<br />
hours. <strong>the</strong> beside<br />
<strong>the</strong><br />
hottest that a<br />
hottest<br />
sun buildings hours. at <strong>the</strong> park this would suggest that this<br />
Being nor<strong>the</strong>rn at <strong>the</strong> end part <strong>of</strong> a <strong>of</strong> series <strong>the</strong> <strong>of</strong> area buildings are tall and enough right beside to a cover park would <strong>the</strong> site suggest <strong>from</strong><br />
However, that <strong>the</strong><br />
during this hottest<br />
sun hours. In <strong>the</strong> end, <strong>the</strong> site is indeed ideal to place an architectural element with very comfortable <strong>the</strong> summer, A<strong>the</strong><br />
sun hours. In <strong>the</strong> In sun end, <strong>the</strong> hours. <strong>the</strong> end, is <strong>the</strong> site <strong>the</strong> ideal is is <strong>the</strong> site indeed place ideal is indeed place for is ideal developing <strong>the</strong> a project. for developing a project.<br />
buildings for to ideal developing place to place an <strong>the</strong> nor<strong>the</strong>rn a project. architectural an architectural element element with very with comfortable very comfortable<br />
In<br />
part area are tall enough to cover <strong>the</strong> site <strong>from</strong> <strong>the</strong> hottest<br />
temperature <strong>the</strong> temperature end, <strong>the</strong> However, However, as most as However, <strong>of</strong> most <strong>the</strong> <strong>of</strong> areas <strong>the</strong> as areas most <strong>the</strong> city, <strong>of</strong> <strong>the</strong> <strong>the</strong> city, areas low sun low in during sun <strong>the</strong> during city, winter low winter casts sun casts during a shadow<br />
In <strong>the</strong> end, <strong>the</strong> and site and<br />
site shadow is indeed shadow<br />
is indeed situations ideal situations to place during<br />
a shadow <strong>the</strong> winter casts a shadow<br />
long enough to keep sun ideal hours. to place during an<br />
an most architectural most <strong>of</strong> <strong>the</strong><br />
architectural <strong>of</strong> <strong>the</strong> year. element year. Fur<strong>the</strong>rmore,<br />
element Fur<strong>the</strong>rmore, with very<br />
with very comfortable<br />
comfortable <strong>the</strong> fact that temperature and shadow situations during most <strong>of</strong> <strong>the</strong> year. Fur<strong>the</strong>rmore, fact <strong>the</strong> that fact it that it<br />
temperature In <strong>the</strong> is end, an open long enough long to keep enough area <strong>the</strong> cold area keep for cold a for few <strong>the</strong> a hours. few area hours. cold However, However, for a during few during hours. summer, However, summer, A<strong>the</strong> A<strong>the</strong> during <strong>the</strong> summer, A<strong>the</strong><br />
In <strong>the</strong> is end, temperature an open <strong>the</strong> site space <strong>the</strong> and site space<br />
buildings is and shadow is indeed enables<br />
indeed enables shadow situations ideal <strong>the</strong> to possibilty<br />
at <strong>the</strong> ideal nor<strong>the</strong>rn<br />
situations <strong>the</strong> to possibilty place an architectural element with very comfortable<br />
buildings buildings nor<strong>the</strong>rn part<br />
during during place an<br />
at <strong>of</strong> part <strong>the</strong><br />
most modify most to architectural modify<br />
<strong>of</strong> nor<strong>the</strong>rn area <strong>of</strong> <strong>of</strong><br />
area tall<br />
<strong>the</strong> or <strong>the</strong> add element with very comfortable<br />
part are enough<br />
year. year. or add<br />
vegetation Fur<strong>the</strong>rmore, Fur<strong>the</strong>rmore, vegetation in order<br />
tall <strong>of</strong> enough <strong>the</strong> to area cover to cover are tall site<br />
<strong>the</strong> <strong>the</strong> order enough <strong>from</strong><br />
fact to fact to<br />
site <strong>from</strong> <strong>the</strong><br />
that make that make<br />
to hottest<br />
it<br />
it <strong>the</strong><br />
is In an <strong>the</strong> open end, space <strong>the</strong> site enables is indeed <strong>the</strong> ideal possibilty to place to modify an architectural or add vegetation element with in order very to comfortable make <strong>the</strong><br />
is temperature and shadow situations during most <strong>of</strong> <strong>the</strong> year. Fur<strong>the</strong>rmore, <strong>the</strong> fact <strong>the</strong> cover that hottest <strong>the</strong> it site <strong>from</strong> <strong>the</strong> hottest<br />
temperature place an is an open place<br />
even open space even<br />
and shadow space more enables more comfortable.<br />
sun hours. comfortable. <strong>the</strong><br />
sun situations hours. In<br />
possibilty Not sun<br />
<strong>the</strong> during Not<br />
hours.<br />
end, only most <strong>the</strong> to to<br />
site for modify only for<br />
<strong>of</strong> is conceptual <strong>the</strong> indeed or conceptual<br />
year. add add<br />
ideal vegetation vegetation reasons,<br />
Fur<strong>the</strong>rmore, reasons, to place in an order but in architectural<br />
order but<br />
also to fact make to also<br />
for make for<br />
that shadow<br />
element<br />
<strong>the</strong> shadow<br />
05.00<br />
place temperature even more and shadow comfortable. situations Not during only for most conceptual <strong>of</strong> year. reasons, Fur<strong>the</strong>rmore, but also <strong>the</strong> it for fact shadow that with it very comfortable<br />
05.00 05.00<br />
place is<br />
is an open reasons, place an open reasons, even<br />
space even <strong>the</strong> space more <strong>the</strong><br />
enables best enables place comfortable. best place <strong>the</strong> to possibilty<br />
<strong>the</strong> to possibilty locate temperature Not locate <strong>the</strong> to only <strong>the</strong><br />
building to<br />
modify and for for building modify<br />
shadow conceptual or is add closer<br />
or is add closer situations vegetation to reasons, <strong>the</strong> vegetation reasons, to sou<strong>the</strong>rnmost<br />
sou<strong>the</strong>rnmost during but but<br />
order also in order also<br />
to <strong>of</strong> for make tip shadow for to <strong>of</strong> make year. shadow tip <strong>of</strong> <strong>the</strong> site, 09.00<br />
reasons, is an open <strong>the</strong> space best place enables to locate <strong>the</strong> possibilty <strong>the</strong> building to modify is closer or add to vegetation sou<strong>the</strong>rnmost in order <strong>the</strong> tip <strong>the</strong> to Fur<strong>the</strong>rmore, <strong>of</strong> site, make site,<br />
09.00<br />
<strong>the</strong> fact<br />
09.00<br />
that it<br />
05.00 05.00<br />
reasons, place<br />
place avoiding even avoiding even <strong>the</strong><br />
more a <strong>the</strong> constant more best In comfortable. a constant<br />
<strong>the</strong> place end, comfortable.<br />
In <strong>the</strong> shadow <strong>the</strong> end, to site locate shadow<br />
Not <strong>the</strong> is is<br />
In<br />
an site <strong>from</strong> indeed Not<br />
<strong>the</strong> only open <strong>the</strong> <strong>from</strong><br />
is indeed <strong>the</strong> building<br />
end, for ideal only <strong>the</strong><br />
space<br />
<strong>the</strong> conceptual following to for<br />
ideal place is<br />
site<br />
enables is following conceptual<br />
to closer place an building, architectural indeed<br />
<strong>the</strong> to an to<br />
reasons,<br />
<strong>the</strong><br />
building,<br />
architectural<br />
ideal<br />
possibilty <strong>the</strong> reasons, but sou<strong>the</strong>rnmost but<br />
element<br />
to place but taking to element also an<br />
modify<br />
but taking<br />
with advantage tip also<br />
architectural for with very or <strong>of</strong> tip advantage<br />
shadow very add <strong>the</strong> for <strong>of</strong> comfortable site, vegetation <strong>the</strong> shadow <strong>of</strong> site, <strong>of</strong><br />
<strong>the</strong> 09.00 <strong>the</strong><br />
avoiding<br />
09.00<br />
element with<br />
in order<br />
very comfortable<br />
to make <strong>the</strong><br />
05.00<br />
place even constant more comfortable. shadow <strong>from</strong> Not <strong>the</strong> only following for conceptual building, reasons, but taking but advantage also shadow <strong>of</strong> <strong>the</strong><br />
05.00<br />
avoiding reasons, <strong>the</strong> a temperature best place temperature and to locate reasons, <strong>the</strong> best place to locate place and <strong>the</strong><br />
<strong>the</strong> temperature building even situations building more situations during<br />
and is closer shadow<br />
comfortable. is during closer most most <strong>of</strong> to <strong>the</strong> <strong>the</strong> but<br />
to <strong>the</strong> situations sou<strong>the</strong>rnmost Not <strong>of</strong> year. <strong>the</strong> sou<strong>the</strong>rnmost taking<br />
during<br />
only year. for Fur<strong>the</strong>rmore, conceptual tip fact <strong>of</strong><br />
tip <strong>of</strong> year. site, reasons, <strong>the</strong> fact that site, that 09.00<br />
05.00<br />
surrounding<br />
surrounding reasons, a constant buildings’<br />
buildings’ <strong>the</strong> best shadows<br />
shadows place to <strong>from</strong> locate during <strong>the</strong> during<br />
<strong>the</strong> following <strong>the</strong> summer.<br />
surrounding buildings’ shadows during building summer. <strong>the</strong> summer. building, is closer but to taking sou<strong>the</strong>rnmost advantage tip <strong>of</strong> <strong>the</strong> it<br />
Fur<strong>the</strong>rmore, <strong>of</strong> but 09.00 site, also<br />
<strong>the</strong><br />
for 09.00<br />
fact<br />
shadow<br />
avoiding<br />
that it<br />
surrounding 05.00 a constant buildings’ is open is an space shadows open space reasons, enables <strong>from</strong> during enables <strong>the</strong> <strong>the</strong> possibilty <strong>the</strong> best following possibilty summer. place to modify to building, to locate modify or add <strong>the</strong> or but vegetation add building taking vegetation is in advantage closer order in order to to make to <strong>the</strong> make <strong>of</strong> sou<strong>the</strong>rnmost tip <strong>of</strong> <strong>the</strong> site, 09.00<br />
avoiding a avoiding constant place a shadow constant place even more even <strong>from</strong> shadow more is comfortable. an <strong>the</strong> open comfortable. following <strong>from</strong> space Not <strong>the</strong> only Not enables building, following for only conceptual for <strong>the</strong> but conceptual possibilty building, taking reasons, reasons, to but advantage modify but taking but also or also add for advantage <strong>of</strong> shadow for <strong>the</strong> vegetation shadow <strong>of</strong> in order to make <strong>the</strong><br />
surrounding buildings’ shadows<br />
05.00<br />
avoiding during a constant <strong>the</strong> summer. shadow <strong>from</strong> <strong>the</strong> following building, but taking advantage <strong>of</strong> <strong>the</strong><br />
surrounding 05.00 surrounding buildings’ reasons, shadows reasons, buildings’ <strong>the</strong> best <strong>the</strong> during place best shadows place to even <strong>the</strong> locate to summer. during more locate <strong>the</strong> building comfortable. <strong>the</strong> building summer. is closer is closer Not to <strong>the</strong> to only for sou<strong>the</strong>rnmost conceptual tip <strong>of</strong> tip <strong>the</strong> reasons, <strong>of</strong> <strong>the</strong> site, site, but 09.00 also 09.00 for shadow<br />
05.00<br />
surrounding<br />
reasons, <strong>the</strong><br />
buildings’<br />
best place<br />
shadows<br />
to locate<br />
during<br />
<strong>the</strong> building<br />
<strong>the</strong> summer.<br />
avoiding avoiding a constant a constant shadow shadow <strong>from</strong> <strong>from</strong> <strong>the</strong> following <strong>the</strong> following building, building, but taking but taking is closer advantage advantage to <strong>the</strong> <strong>of</strong> sou<strong>the</strong>rnmost <strong>of</strong> tip <strong>of</strong> <strong>the</strong> site, 09.00<br />
surrounding surrounding buildings’ avoiding buildings’ shadows shadows a constant during during <strong>the</strong> shadow summer. <strong>the</strong> summer. <strong>from</strong> <strong>the</strong> following building, but taking advantage <strong>of</strong> <strong>the</strong><br />
surrounding buildings’ shadows during <strong>the</strong> summer.<br />
12.00<br />
12.00<br />
12.00<br />
12.00 12.00<br />
12.00<br />
12.00<br />
12.00 12.00<br />
12.00<br />
12.00<br />
12.00<br />
12.00<br />
12.00 12.00<br />
12.00 12.00<br />
12.00<br />
12.00<br />
12.00<br />
12.00 12.00<br />
12.00<br />
12.00<br />
N<br />
20.00<br />
16.00<br />
ion | Impressionist museum at My<strong>the</strong>nquai<br />
20.00<br />
20.00 20.00<br />
ethods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Impressionist museum at My<strong>the</strong>nquai<br />
20.00<br />
in d <strong>Urban</strong> <strong>Simulation</strong> Analysis 20.00<br />
| and Impressionist<br />
20.00 <strong>Simulation</strong> museum | Impressionist at My<strong>the</strong>nquai museum 20.00at My<strong>the</strong>nquai<br />
20.00<br />
nd <strong>Simulation</strong> 20.00 | Impressionist Methods 20.00 | in Impressionist <strong>Urban</strong> 20.00<br />
museum at My<strong>the</strong>nquai<br />
nd <strong>Simulation</strong> Impressionist Analysis museum and <strong>Simulation</strong> museum My<strong>the</strong>nquai at | My<strong>the</strong>nquai<br />
Impressionist 20.00 museum at My<strong>the</strong>nquai<br />
ulation | Solar Impressionist radiation museum at and My<strong>the</strong>nquai shadows<br />
w ulation Methods | in Impressionist <strong>Urban</strong> Analysis museum and <strong>Simulation</strong> My<strong>the</strong>nquai | Impressionist museum at My<strong>the</strong>nquai<br />
nd n <strong>Simulation</strong> | Impressionist | Impressionist museum at My<strong>the</strong>nquai museum at My<strong>the</strong>nquai<br />
N<br />
N<br />
N<br />
N<br />
N<br />
N<br />
N<br />
N<br />
N<br />
16.00<br />
N<br />
16.00<br />
N16.00<br />
16.00<br />
16.00<br />
16.00<br />
16.00 16.00<br />
16.00<br />
16.00<br />
Being at <strong>the</strong> end <strong>of</strong> a series <strong>of</strong> buildings and right beside a park would suggest that this is <strong>the</strong> ideal<br />
place for developing a project.<br />
However, as most <strong>of</strong> <strong>the</strong> areas in <strong>the</strong> city, <strong>the</strong> low sun during <strong>the</strong> winter casts a shadow long enough<br />
to keep <strong>the</strong> area cold for a few hours. However, during <strong>the</strong> summer, all buildings at <strong>the</strong> nor<strong>the</strong>rn part <strong>of</strong><br />
<strong>the</strong> area are tall enough to cover <strong>the</strong> site <strong>from</strong> <strong>the</strong> hottest sun hours.<br />
In <strong>the</strong> end, <strong>the</strong> site is indeed ideal to place an architectural element with very comfortable temperature<br />
and shadow situations during most <strong>of</strong> <strong>the</strong> year. Fur<strong>the</strong>rmore, <strong>the</strong> fact that it is an open space enables<br />
<strong>the</strong> possibility to modify or add vegetation in order to make <strong>the</strong> place even more comfortable. Not only<br />
for conceptual reasons, but also for shadow reasons, <strong>the</strong> best place to locate <strong>the</strong> building is closer to<br />
<strong>the</strong> sou<strong>the</strong>rnmost tip <strong>of</strong> <strong>the</strong> site, avoiding a constant shadow <strong>from</strong> <strong>the</strong> following building, but taking<br />
advantage <strong>of</strong> <strong>the</strong> surrounding buildings’ shadows during <strong>the</strong> summer.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
15
In<br />
In<br />
C<br />
Proposal 1<br />
Proposal 1<br />
Choice<br />
Proposal 2<br />
Choice<br />
Choice<br />
Ch. 50<br />
Ch. 50<br />
Ch. 54<br />
Ch. 54<br />
Ch. 130<br />
Ch. 130<br />
Ch. 24<br />
Ch. 24<br />
Ch. 50<br />
Ch. 50<br />
Ch. 0<br />
Ch. Ch. 59<br />
Ch. 59<br />
Ch. 58<br />
Ch. 58<br />
Ch. 129<br />
Ch. 129<br />
Ch. 130<br />
Ch. 130<br />
Ch. 64<br />
Ch. 64<br />
Ch. 63 Ch. 74<br />
Ch. 63 Ch. 74<br />
Ch. 106<br />
Ch. 106<br />
Ch. 36<br />
Ch. 36<br />
Ch. 106<br />
Ch. 106<br />
Ch. 94<br />
Ch. 94<br />
Ch. 111<br />
Ch. 111<br />
Ch. 0 Ch. 0<br />
Ch. Ch. Ch. 0<br />
Ch. C<br />
Ch. 0<br />
Ch. Ch. 72<br />
Ch. 72<br />
Integration<br />
Integration<br />
Integration<br />
Int. 0.57<br />
Int. 0.57<br />
Int. 0.59<br />
Int. 0.59<br />
Int. 0.78<br />
Int. 0.78<br />
Int. 0.60<br />
Int. 0.60<br />
Int. 0.57<br />
Int. 0.57<br />
In<br />
In<br />
Int. 0.57<br />
Int. 0.57<br />
Int. 0.59<br />
Int. 0.59<br />
Int. 0.61<br />
Int. 0.61<br />
Int. 0.75<br />
Int. 0.75<br />
Int. 0.78<br />
Int. 0.78<br />
Int. 0.78<br />
Int. 0.78<br />
Int. 0.63<br />
Int. 0.63<br />
Int. 0.67<br />
Int. 0.67<br />
Int. 0.72<br />
Int. 0.72<br />
Int. 0.57<br />
Int. 0.57<br />
Int. 0.75<br />
Int. 0.75<br />
In<br />
In<br />
Int. 0.65<br />
Int. 0.65<br />
Int. 0.70<br />
Int. 0.70<br />
Int. 0.52 Int. 0.45<br />
Int. 0.52 Int. 0.45<br />
Int. 0.57<br />
Int. 0.57<br />
In<br />
In<br />
Int. 0.49<br />
Int. 0.49<br />
Int. 0.92<br />
Int. 0.92<br />
Single way through <strong>the</strong> building, <strong>the</strong>re is a high choice<br />
Single towards way <strong>the</strong> through largest <strong>the</strong> gallery, building, which <strong>the</strong>re is quite is a high convenient,<br />
choice<br />
towards but due <strong>the</strong> to largest <strong>the</strong> fact gallery, that it which is determined is quite convenient, as one <strong>of</strong> but <strong>the</strong><br />
due last spaces to <strong>the</strong> fact to be that experienced, it is determined <strong>the</strong> user as might one <strong>of</strong> already <strong>the</strong> last be<br />
spaces fatigued to by be that experienced, moment.<br />
<strong>the</strong> user might already be<br />
fatigued by that moment.<br />
Both <strong>the</strong> cho<br />
area <strong>of</strong> <strong>the</strong> bu<br />
is an uneven<br />
user, making h<br />
16<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Impressionist museum at My<strong>the</strong>nquai<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Proposal 2<br />
Proposal 2<br />
Proposal 3<br />
Choice<br />
Choice<br />
Ch.<br />
Ch.<br />
24<br />
24<br />
Ch.<br />
Ch.<br />
7<br />
7<br />
Ch.<br />
Ch.<br />
35<br />
35<br />
Ch.<br />
Ch.<br />
18<br />
18<br />
Ch.<br />
Ch.<br />
3<br />
3<br />
Ch.<br />
Ch.<br />
0<br />
0<br />
Ch.<br />
Ch.<br />
130<br />
130<br />
Ch.<br />
Ch.<br />
64<br />
64<br />
Ch.<br />
Ch.<br />
44<br />
44<br />
Ch.<br />
Ch.<br />
49<br />
49<br />
Ch.<br />
Ch.<br />
36<br />
36<br />
Ch.<br />
Ch.<br />
72<br />
72<br />
Ch.<br />
Ch.<br />
8<br />
8<br />
Ch.<br />
Ch.<br />
2<br />
2<br />
Ch.<br />
Ch.<br />
0<br />
0<br />
Ch.<br />
Ch.<br />
167<br />
167<br />
Ch.<br />
Ch.<br />
72<br />
72<br />
Ch.<br />
Ch.<br />
53<br />
53<br />
Ch.<br />
Ch.<br />
60<br />
60<br />
Ch.<br />
Ch.<br />
143<br />
143<br />
Ch.<br />
Ch.<br />
51<br />
51<br />
Ch.<br />
Ch.<br />
27<br />
27<br />
Ch.<br />
Ch.<br />
0<br />
0<br />
Integration<br />
Integration<br />
Int.<br />
Int.<br />
0.60<br />
0.60<br />
Int.<br />
Int.<br />
0.60<br />
0.60<br />
Int.<br />
Int.<br />
0.70<br />
0.70<br />
Int.<br />
Int.<br />
0.60<br />
0.60<br />
Int.<br />
Int.<br />
0.51<br />
0.51<br />
Int.<br />
Int.<br />
0.45<br />
0.45<br />
Int.<br />
Int.<br />
0.78<br />
0.78<br />
Int.<br />
Int.<br />
0.78<br />
0.78<br />
Int.<br />
Int.<br />
0.78<br />
0.78<br />
Int.<br />
Int.<br />
0.71<br />
0.71<br />
Int.<br />
Int.<br />
0.71<br />
0.71<br />
Int.<br />
Int.<br />
0.78<br />
0.78<br />
Int.<br />
Int.<br />
0.63<br />
0.63<br />
Int.<br />
Int.<br />
0.56<br />
0.56<br />
Int.<br />
Int.<br />
0.57<br />
0.57<br />
Int.<br />
Int.<br />
1.19<br />
1.19<br />
Int.<br />
Int.<br />
0.92<br />
0.92<br />
Int.<br />
Int.<br />
0.92<br />
0.92<br />
Int.<br />
Int.<br />
0.87<br />
0.87<br />
Int.<br />
Int.<br />
1.11<br />
1.11<br />
Int.<br />
Int.<br />
0.87<br />
0.87<br />
Int.<br />
Int.<br />
0.92<br />
0.92<br />
Int.<br />
Int.<br />
0.75<br />
0.75<br />
h choice<br />
nient, but<br />
f <strong>the</strong> last<br />
lready be<br />
Both Both<br />
<strong>the</strong> choice<br />
<strong>the</strong> choice<br />
and integration<br />
and integration<br />
concentrate<br />
concentrate<br />
towards<br />
towards<br />
<strong>the</strong> front<br />
area <strong>the</strong><br />
<strong>of</strong> <strong>the</strong><br />
front<br />
building<br />
area <strong>of</strong><br />
as<br />
<strong>the</strong><br />
<strong>the</strong><br />
building<br />
stairs are<br />
as<br />
directly<br />
<strong>the</strong> stairs<br />
in <strong>the</strong><br />
are<br />
access.<br />
directly<br />
There<br />
in<br />
is an uneven distribution <strong>of</strong> attention which might misdirect <strong>the</strong> access. There an uneven distribution <strong>of</strong> attention <strong>the</strong><br />
user, making him miss <strong>the</strong> most important part <strong>of</strong> <strong>the</strong> which might misdirect <strong>the</strong> user, making him miss <strong>the</strong> exhibition. most<br />
important part <strong>of</strong> <strong>the</strong> exhibition.<br />
The addition<br />
open more o<br />
also to have<br />
However, th<br />
<strong>the</strong> galleries<br />
transition sp<br />
at <strong>the</strong> art..<br />
ssionist museum at My<strong>the</strong>nquai<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
17
Proposal 3<br />
Proposal 3<br />
Proposal 3<br />
Choice<br />
Choice<br />
Ch. 18<br />
Ch. 41<br />
Ch. 75<br />
Ch. 18<br />
Ch. 23<br />
Ch. 41<br />
Ch. 75<br />
Ch. 23<br />
Ch. 166 Ch. 153<br />
Ch. 166 Ch. 153<br />
Ch. 0<br />
Ch. 36<br />
Ch. 72<br />
Ch. 57<br />
Ch. 0<br />
Ch. 36<br />
Ch. 72<br />
Ch. 91<br />
Ch. 118<br />
Ch. 57<br />
Ch. 57<br />
Ch. 76<br />
Ch. 91<br />
Ch. 118<br />
Ch. 57<br />
Ch. 76<br />
Ch. 53<br />
Ch. 50<br />
Ch. 53<br />
Ch. 50<br />
Ch. 51<br />
Ch. 51<br />
Ch. 46<br />
Ch. 27 Ch. 49<br />
Ch. 46<br />
Ch. 27 Ch. 49<br />
Ch. 5<br />
Ch. 5<br />
Ch. 5<br />
Ch. 5<br />
Ch. 51<br />
Ch. 51<br />
Ch. 0<br />
Ch. 0<br />
Integration<br />
Integration<br />
Int. 0.60<br />
Int. 0.90<br />
Int. 0.93<br />
Int. 0.60<br />
Int. 0.51<br />
Int. 0.90<br />
Int. 0.93<br />
Int. 0.51<br />
Int. 1.25 Int. 1.18<br />
Int. 1.25 Int. 1.18<br />
Int. 0.45<br />
Int. 0.71<br />
Int. 0.78<br />
Int. 0.71<br />
Int. 0.45<br />
Int. 0.71<br />
Int. 0.78<br />
Int. 1.02<br />
Int. 1.15<br />
Int. 0.71<br />
Int. 0.91<br />
Int. 0.71<br />
Int. 1.02<br />
Int. 1.15<br />
Int. 0.91<br />
Int. 0.71<br />
Int. 0.93<br />
Int. 0.93<br />
Int. 0.90<br />
Int. 0.90<br />
Int. 0.87<br />
Int. 0.87<br />
Int. 0.92<br />
Int. 1.19<br />
Int. 0.92<br />
Int. 0.92<br />
Int. 1.19<br />
Int. 0.92<br />
Int. 0.87<br />
Int. 0.87<br />
Int. 1.11<br />
Int. 1.11<br />
Int. 0.87<br />
Int. 0.87<br />
Int. 0.75<br />
Int. 0.75<br />
<strong>the</strong> front<br />
s <strong>the</strong> front<br />
ess. There<br />
ess. There<br />
sdirect <strong>the</strong><br />
sdirect <strong>the</strong><br />
xhibition.<br />
xhibition.<br />
The addition <strong>of</strong> second staircase is <strong>the</strong> result <strong>of</strong> trying to not only<br />
The addition<br />
open The more addition <strong>of</strong> a second<br />
options <strong>of</strong> for a second staircase<br />
<strong>the</strong> user staircase is <strong>the</strong><br />
to move is result<br />
through <strong>the</strong> result <strong>of</strong> trying<br />
<strong>the</strong> <strong>of</strong> building, trying to not to only<br />
but<br />
open<br />
also to not more<br />
have only options open better more for <strong>the</strong><br />
distribution options user to for move<br />
<strong>of</strong> attention <strong>the</strong> through user to towards move <strong>the</strong> building, through but<br />
<strong>the</strong> back.<br />
also to<br />
However, <strong>the</strong> have building, a better<br />
<strong>the</strong>re is still but distribution desire also to even have <strong>of</strong> attention<br />
<strong>the</strong> a towards <strong>the</strong> back.<br />
choice better number distribution between <strong>of</strong><br />
However, <strong>the</strong>re is still a desire to even <strong>the</strong> choice number between<br />
<strong>the</strong> galleries, attention as towards well as generate <strong>the</strong> back. <strong>the</strong> However, highest <strong>the</strong>re choice is still number a desire in <strong>the</strong><br />
<strong>the</strong> galleries, as well as generate <strong>the</strong> highest choice number in <strong>the</strong><br />
transition to even spaces <strong>the</strong> choice in order number to give between sense <strong>of</strong> <strong>the</strong> privacy galleries, while as looking well<br />
transition spaces in order to give a sense <strong>of</strong> privacy while looking<br />
at <strong>the</strong> as art.. generate <strong>the</strong> highest choice number in <strong>the</strong> transition<br />
at <strong>the</strong> spaces art.. in order to give a sense <strong>of</strong> privacy while looking at<br />
<strong>the</strong> art..<br />
6/8<br />
6/8<br />
18<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Final<br />
Final<br />
proposal<br />
proposal<br />
Choice<br />
Choice<br />
Final proposal<br />
Ch. 35<br />
Ch. 35<br />
Ch. 29<br />
Ch. 29<br />
Ch. 41<br />
Ch. 41<br />
Ch. 48<br />
Ch. 48<br />
Ch. 105<br />
Ch. 105<br />
Ch. 81<br />
Ch. 81<br />
Ch. 88<br />
Ch. 88<br />
Ch. 152<br />
Ch. 152<br />
Ch. 69<br />
Ch. 69<br />
Ch. 0<br />
Ch. 0<br />
Ch. 107<br />
Ch. 107<br />
Ch. 126<br />
Ch. 126<br />
Ch. 167<br />
Ch. 167<br />
Ch. 0<br />
Ch. 0<br />
Ch. 128<br />
Ch. 128<br />
Ch. 113<br />
Ch. 113<br />
Ch. 85<br />
Ch. 85<br />
Ch. 82<br />
Ch. 82<br />
Ch. 60<br />
Ch. 23 Ch. 60<br />
Ch. 113<br />
Ch. 23 Ch. 113<br />
Ch. 6<br />
Ch. 6<br />
Ch. 5<br />
Ch. 5<br />
Ch. 41<br />
Ch. 41<br />
Ch. 0<br />
Ch. 0<br />
Integration<br />
Integration<br />
Int. 0.72<br />
Int. 0.79<br />
Int. 0.72<br />
Int. 0.79<br />
Int. 0.71<br />
Int. 0.71<br />
Int. 1.00<br />
Int. 1.00<br />
Int. 1.20<br />
Int. 0.87<br />
Int. 1.20<br />
Int. 0.87<br />
Int. 1.06<br />
Int. 1.06<br />
Int. 1.12<br />
Int. 0.63<br />
Int. 1.12<br />
Int. 0.63<br />
Ìnt. 0.96<br />
Ìnt. 0.96<br />
Int. 0.71<br />
Int. 0.70 Int. 0.71<br />
Int. 0.86<br />
Int. 0.70 Int. 0.86<br />
Int. 0.81<br />
Int. 0.81<br />
Int. 0.63<br />
Int. 0.63<br />
Int. 0.82<br />
Int. 0.82<br />
Int. 0.67<br />
Int. 0.67<br />
Int. 0.93<br />
Int. 0.93<br />
Int. 0.92<br />
Int. 0.92<br />
Int. 0.60<br />
Int. 0.60<br />
Int. 0.95<br />
Int. 0.95<br />
Int. 1.12<br />
Int. 1.12<br />
Int. 0.98<br />
Int. 0.98<br />
Int. 0.73<br />
Int. 0.73<br />
Convex<br />
Convex a<br />
Through<br />
Through<br />
almost<br />
almost a<br />
galleries,<br />
galleries,<br />
ment<br />
ment<br />
in<br />
in t<br />
is<br />
is<br />
able<br />
able<br />
to<br />
to<br />
one<br />
one<br />
in<br />
in<br />
th<br />
th<br />
The<br />
The<br />
only<br />
only<br />
into<br />
into<br />
sma<br />
sma<br />
ing.<br />
ing.<br />
Neve<br />
Neve<br />
tor<br />
tor<br />
is<br />
is<br />
loc<br />
loc<br />
The<br />
The<br />
solut<br />
solut<br />
lift.<br />
lift.<br />
Int. 0.55<br />
Int. 0.55<br />
New<br />
New<br />
Methods<br />
Methods<br />
in<br />
in<br />
<strong>Urban</strong><br />
<strong>Urban</strong><br />
Analysis<br />
Analysis<br />
and<br />
and<br />
<strong>Simulation</strong><br />
<strong>Simulation</strong> |<br />
Impressionist<br />
Impressionist<br />
museum<br />
museum<br />
at<br />
at<br />
My<strong>the</strong>nquai<br />
My<strong>the</strong>nquai<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
19
Ground Floor<br />
First Floor<br />
G r o u n d F l o o r<br />
Mst.: 1 : 100<br />
F i r s t F l o o r<br />
Mst.: 1 : 100<br />
Convex Convex Analysis analysis<br />
Through this analysis we find out that <strong>the</strong> modifications made in <strong>the</strong> building are working<br />
almost as desired for <strong>the</strong> project. The integration is almost evenly distributed between <strong>the</strong><br />
Through galleries, this analysis being <strong>the</strong>se we find spaces out <strong>the</strong> that areas <strong>the</strong> modifications with <strong>the</strong> most made privacy in <strong>the</strong> and building concentrating are working <strong>the</strong> movement<br />
for in <strong>the</strong> project. displacement The integration spaces. The is almost intention evenly <strong>of</strong> this distributed to generate between <strong>the</strong> <strong>the</strong> feeling galleries, that <strong>the</strong> being user <strong>the</strong>se<br />
almost as<br />
desired<br />
spaces is able <strong>the</strong> to areas look with at <strong>the</strong> <strong>the</strong> art most in peace, privacy but and that concentrating while moving <strong>the</strong> through movement <strong>the</strong> building, in <strong>the</strong> displacement he not <strong>the</strong> only spaces.<br />
The one intention <strong>the</strong> <strong>of</strong> museum. this is to generate <strong>the</strong> feeling that <strong>the</strong> user is able to look at <strong>the</strong> art in peace, but that<br />
while moving through <strong>the</strong> building, he is not <strong>the</strong> only one in <strong>the</strong> museum.<br />
The only undesired result is <strong>the</strong> highest choice point. The subdivision <strong>of</strong> <strong>the</strong> right middle space<br />
The only into smaller undesired spaces result helps is <strong>the</strong> generate highest choice a better point. balance The subdivision in regards with <strong>of</strong> <strong>the</strong> <strong>the</strong> right movement middle space <strong>of</strong> <strong>the</strong> into building.<br />
helps Never<strong>the</strong>less, generate <strong>the</strong> a better analysis balance shows in that regards <strong>the</strong> best with area <strong>the</strong> to movement through <strong>of</strong> <strong>the</strong> it is building. where Never<strong>the</strong>less, eleva-<br />
smaller<br />
spaces<br />
<strong>the</strong> analysis tor located shows right that now. <strong>the</strong> best This area suggests to move that through <strong>the</strong> stairs it is are where up <strong>the</strong> to an elevator extent is a located useless right element. now. This<br />
suggests The solution, that <strong>the</strong> though, stairs are is quite up to simple: an extent switching a useless <strong>the</strong> location element. <strong>of</strong> The <strong>the</strong> secondary solution, though, staircase is quite with <strong>the</strong> simple:<br />
switching lift. <strong>the</strong> location <strong>of</strong> <strong>the</strong> secondary staircase with <strong>the</strong> lift.<br />
20<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture<br />
7/8
cording<br />
rooms<br />
ated as<br />
ing <strong>the</strong><br />
is s<strong>of</strong>t<br />
anging.<br />
f addist<br />
<strong>from</strong><br />
n issue<br />
<strong>of</strong> light<br />
affectroom.<br />
is also<br />
artificial<br />
set on<br />
that is<br />
at while<br />
locate<br />
ly light<br />
rroundnatural<br />
olution<br />
South elevation<br />
West elevation<br />
North elevation<br />
is ideal<br />
t is still<br />
ng into<br />
Ground floor<br />
Ground Floor<br />
First floor<br />
First Floor<br />
ssionist museum at My<strong>the</strong>nquai 8/8<br />
Interior radiation analysis<br />
Whilst it has already been established that <strong>the</strong> site is ideal for <strong>the</strong> placement <strong>of</strong> a building in a ‘villa style’,<br />
it is still important to consider <strong>the</strong> amount <strong>of</strong> light coming into <strong>the</strong> spaces due to <strong>the</strong> proposed program.<br />
In <strong>the</strong> ground floor all rooms are ideally lighted according to <strong>the</strong> function thought for each one <strong>of</strong><br />
<strong>the</strong>m. The rooms at <strong>the</strong> sou<strong>the</strong>ast and northwestern tips are designated as living rooms. Although <strong>the</strong><br />
exhibition space facing <strong>the</strong> sou<strong>the</strong>rn facade is highly illuminated, <strong>the</strong> radiation is s<strong>of</strong>t on <strong>the</strong> side walls,<br />
where <strong>the</strong> art is meant to be hanging. The largest exhibition space however will require <strong>of</strong> additional<br />
artificial lighting in order to s<strong>of</strong>ten <strong>the</strong> contrast <strong>from</strong> <strong>the</strong> light coming <strong>from</strong> <strong>the</strong> windows.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
21
East elevation South elevation West e<br />
Interior radiation analysis<br />
Whilst it it has already been established that <strong>the</strong> site is ideal<br />
for <strong>the</strong> placement <strong>of</strong> a building in a ‘villa style’, it it is still<br />
importante to consider <strong>the</strong> amount <strong>of</strong> light coming into<br />
<strong>the</strong> spaces due to <strong>the</strong> proposed program.<br />
In <strong>the</strong> ground floor all rooms are ideally lighted according<br />
West West elevation elevation<br />
to <strong>the</strong> function thought for each one <strong>of</strong> <strong>the</strong>m. The rooms<br />
at <strong>the</strong> sou<strong>the</strong>ast and northwestern tips are designated as<br />
living rooms. Although <strong>the</strong> exhibition space facing <strong>the</strong><br />
sou<strong>the</strong>rn facade is highly iluminated, <strong>the</strong> radiation is s<strong>of</strong>t<br />
on <strong>the</strong> side walls, where <strong>the</strong> art is meant to be hanging.<br />
The largest exhibition space however will require <strong>of</strong> addi-<br />
Interior tional radiation artificial lighting analysis in order to s<strong>of</strong>ten <strong>the</strong> constrast <strong>from</strong><br />
<strong>the</strong> light coming <strong>from</strong> <strong>the</strong> windows.<br />
North North elevation elevation<br />
The first floor is quite adecuate as well. The main issue<br />
raises in <strong>the</strong> large gallery, where <strong>the</strong> amount <strong>of</strong> light<br />
The first floor is quite adequate as well. The main issue raises in <strong>the</strong> large gallery, where <strong>the</strong> amount<br />
coming <strong>from</strong> both sides is too high and is basically affect-<br />
<strong>of</strong> light coming <strong>from</strong> both sides is too high and is basically affecting <strong>the</strong> largest exhibition wall that is<br />
ing <strong>the</strong> largest exhibition wall that is available in <strong>the</strong> room.<br />
available Not only in <strong>the</strong> <strong>the</strong> room. light is Not not only evenly <strong>the</strong> distributed, light is not but evenly it it is also<br />
distributed, but it is also forcing <strong>the</strong> room to require<br />
a high forcing amount <strong>the</strong> room <strong>of</strong> artificial to requiere lighting a high and amount that this <strong>of</strong> artificial<br />
one at <strong>the</strong> same time can be set on different levels<br />
according lighting and to <strong>the</strong> that space this one <strong>of</strong> at <strong>the</strong> <strong>the</strong> room same that time is can supposed be set on<br />
to be light.<br />
diferent levels according to <strong>the</strong> space <strong>of</strong> <strong>the</strong> room that is<br />
From supposed <strong>the</strong> rest to <strong>of</strong> be <strong>the</strong> light.<br />
spaces it can be concluded that while doing opening for exhibition spaces it is<br />
better to locate <strong>the</strong>m in <strong>the</strong> centre <strong>of</strong> <strong>the</strong> room, as this will uniformly light <strong>the</strong> space while hitting with a<br />
lower<br />
From intensity<br />
<strong>the</strong> rest <strong>the</strong><br />
<strong>of</strong> <strong>the</strong> surrounding<br />
spaces it it can walls.<br />
be concluded For <strong>the</strong> large<br />
that while<br />
gallery in <strong>the</strong> first floor, top natural light with and a<br />
doing openning for exhibition spaces it it is better to locate<br />
single window might be <strong>the</strong> best solution to light <strong>the</strong> space.<br />
<strong>the</strong>m in <strong>the</strong> center <strong>of</strong> <strong>the</strong> room, as this will uniformly light<br />
<strong>the</strong> space while hitting with a lower intensity <strong>the</strong> surrounding<br />
walls. For <strong>the</strong> large gallery in <strong>the</strong> first floor, top natural<br />
light with and a single window might be <strong>the</strong> best solution<br />
to light <strong>the</strong> space.<br />
22<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Ground floor<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
23
Limmat Loop<br />
Student: Alexandra Meuche
connect <strong>the</strong>se to <strong>the</strong> pedestrian network. This is achieved by restricting car traffic o<br />
it to pass between Hauptbahnh<strong>of</strong> and Central and leading all o<strong>the</strong>r traffic through th<br />
it to pass between Hauptbahnh<strong>of</strong> and Central and leading all o<strong>the</strong>r traffic through th<br />
which is extended all <strong>the</strong> way to <strong>the</strong> police department. Fur<strong>the</strong>rmore <strong>the</strong> newly crea<br />
which is extended all <strong>the</strong> way to <strong>the</strong> police department. Fur<strong>the</strong>rmore <strong>the</strong> newly crea<br />
pedestrian network should be connected to <strong>the</strong> Limmat, which is great quality <strong>of</strong><br />
pedestrian network should be connected to <strong>the</strong> Limmat, which is a great quality <strong>of</strong><br />
are designed to lead <strong>the</strong> people down to <strong>the</strong> river onto decks, where <strong>the</strong>y can expe<br />
are designed to lead <strong>the</strong> people down to <strong>the</strong> river onto decks, where <strong>the</strong>y can expe<br />
Current Situation: Globus Provisorium<br />
Current Situation: Globus Pro<br />
Current Situation: Globus Pro<br />
Current Situation: Hauptbahn<br />
Current Situation: Hauptbahn<br />
Current Situation: Hauptbahnh<strong>of</strong><br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> Limmat Loop<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Limmat Loop<br />
Summary:<br />
For this semester’s design studio, we’ve been working on a master plan to improve <strong>the</strong> situation by <strong>the</strong><br />
Bahnh<strong>of</strong>quai and integrate a new building, which shall replace <strong>the</strong> Globus Provisorium.<br />
The area around <strong>the</strong> Hauptbahnh<strong>of</strong> has a few connected pedestrian areas. The idea <strong>of</strong> <strong>the</strong> design is to<br />
create more pedestrian friendly areas in front <strong>of</strong> <strong>the</strong> Hauptbahnh<strong>of</strong> and by <strong>the</strong> Globus Provisorium and<br />
to connect <strong>the</strong>se to <strong>the</strong> pedestrian network. This is achieved by restricting car traffic over ground, only<br />
allowing it to pass between Hauptbahnh<strong>of</strong> and Central and leading all o<strong>the</strong>r traffic through <strong>the</strong> existing<br />
underpass, which is extended all <strong>the</strong> way to <strong>the</strong> police department. Fur<strong>the</strong>rmore <strong>the</strong> newly created<br />
spaces and <strong>the</strong> pedestrian network should be connected to <strong>the</strong> Limmat, which is a great quality <strong>of</strong> <strong>the</strong><br />
city. The open spaces are designed to lead <strong>the</strong> people down to <strong>the</strong> river onto decks, where <strong>the</strong>y can<br />
experience <strong>the</strong> river.<br />
26<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
ium for <strong>the</strong> public brings additional value to <strong>the</strong> situation. The underpass and streets influence how<br />
move and how much <strong>the</strong>y really see. With help <strong>of</strong> convex, axial and isovist maps I want to show that<br />
an situation can be improved significantly.<br />
analyses I opened up <strong>the</strong> hall <strong>of</strong> <strong>the</strong> mainstation, as it is an area used frequently by pedestrians.<br />
building proposal <strong>of</strong>fers a similar public passage through <strong>the</strong> building, which is why that part<br />
eft open too for <strong>the</strong> analysis.<br />
at Loop:<br />
edestrian network<br />
Limmat Loop:<br />
New pedestrian network<br />
1/9<br />
Motivation:<br />
<br />
With <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> current situation and <strong>the</strong> newly designed Limmat Loop I aim to figure out if <strong>the</strong><br />
new design improves <strong>the</strong> urban situation. The proposal aims to bring more life into <strong>the</strong> area by creating<br />
more attractive pedestrian areas. Less car traffic and more direct access to <strong>the</strong> Limmat are <strong>the</strong> main<br />
factors.<br />
The analysis methods I used help show how opening up <strong>the</strong> Bahnh<strong>of</strong>quai and <strong>the</strong> around <strong>the</strong> Globus<br />
Provisorium for <strong>the</strong> public brings additional value to <strong>the</strong> situation. The underpass and streets influence<br />
how people move and how much <strong>the</strong>y really see. With help <strong>of</strong> convex, axial and isovist maps I want to<br />
show that <strong>the</strong> urban situation can be improved significantly.<br />
For <strong>the</strong> analyses I opened up <strong>the</strong> hall <strong>of</strong> <strong>the</strong> main station, as it is an area used frequently by pedestrians.<br />
The new building proposal <strong>of</strong>fers a similar public passage through <strong>the</strong> building, which is why that part<br />
will be left open too for <strong>the</strong> analysis.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
27
Current Situation: Convex Map - Integration<br />
Current Situation:<br />
Convex Map - Integration<br />
Both maps show <strong>the</strong> Bahnh<strong>of</strong>brücke and <strong>the</strong> Bahnh<strong>of</strong>platz as most integrated convex<br />
spaces. No matter where one wants to go, it all passes through <strong>the</strong>se two areas. This<br />
is<br />
Both<br />
also<br />
maps<br />
<strong>the</strong> case<br />
show<br />
in<br />
<strong>the</strong><br />
reality.<br />
Bahnh<strong>of</strong>brücke<br />
The River and<br />
and<br />
<strong>the</strong><br />
<strong>the</strong><br />
underpass<br />
Bahnh<strong>of</strong>platz<br />
are excluded<br />
as most integrated<br />
<strong>from</strong> <strong>the</strong> analysis,<br />
convex spaces. No ma<br />
as<br />
The<br />
<strong>the</strong>se<br />
River<br />
areas<br />
and <strong>the</strong><br />
cannot<br />
underpass<br />
be reached<br />
are excluded<br />
as pedestrian.<br />
<strong>from</strong> <strong>the</strong> analysis, as <strong>the</strong>se areas cannot be reached as pe<br />
Looking at <strong>the</strong> map <strong>of</strong> <strong>the</strong> current situation, <strong>the</strong> underpass has a high impact on <strong>the</strong> integration <strong>of</strong> <strong>the</strong><br />
Looking<br />
integrated,<br />
at <strong>the</strong><br />
but<br />
map<br />
<strong>the</strong> fur<strong>the</strong>r<br />
<strong>of</strong> <strong>the</strong><br />
away<br />
current<br />
<strong>the</strong><br />
situation,<br />
areas get,<br />
<strong>the</strong><br />
<strong>the</strong><br />
underpass<br />
less integrated<br />
has a<br />
<strong>the</strong>y<br />
high<br />
are.<br />
impact on <strong>the</strong><br />
integration<br />
The new proposal<br />
<strong>of</strong> <strong>the</strong> areas<br />
shows<br />
by<br />
improvements<br />
<strong>the</strong> Globus Provisorium<br />
in this area.<br />
and<br />
Bigger<br />
<strong>the</strong><br />
areas<br />
Hauptbahnh<strong>of</strong>.<br />
are better<br />
The<br />
connected<br />
areas<br />
than before, a<br />
close<br />
The areas<br />
to <strong>the</strong><br />
to<br />
red<br />
<strong>the</strong><br />
spaces<br />
north and<br />
are<br />
<strong>the</strong><br />
well<br />
south<br />
integrated,<br />
<strong>of</strong> where<br />
but<br />
<strong>the</strong><br />
<strong>the</strong><br />
underpass<br />
fur<strong>the</strong>r away<br />
was<br />
<strong>the</strong><br />
are<br />
areas<br />
more<br />
get,<br />
connected<br />
<strong>the</strong> less<br />
than when <strong>the</strong><br />
integrated<br />
<strong>the</strong> underpass<br />
<strong>the</strong>y<br />
and<br />
are.<br />
<strong>the</strong> traffic bring additional value and helps connect <strong>the</strong>se areas to <strong>the</strong> Limmat.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Limmat Loop<br />
28<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
New Proposal: Convex Map - Integration<br />
New Proposal:<br />
Convex Map - Integration<br />
The new proposal shows improvements in this area. Bigger areas are better connected<br />
than before, and <strong>the</strong> integration is better over <strong>the</strong> distance as well. This can be seen well<br />
matter where one<br />
along<br />
wants<br />
<strong>the</strong> Bahnh<strong>of</strong>quai:<br />
to go, it all passes<br />
The areas<br />
through<br />
to <strong>the</strong><br />
<strong>the</strong>se<br />
north<br />
two<br />
and<br />
areas.<br />
<strong>the</strong><br />
This<br />
south<br />
is also<br />
<strong>of</strong> where<br />
<strong>the</strong> case<br />
<strong>the</strong> underpass<br />
in reality.<br />
pedestrian.<br />
was are more connected than when <strong>the</strong> underpass is still <strong>the</strong>re.<br />
he areas by <strong>the</strong> Globus Provisorium and <strong>the</strong> Hauptbahnh<strong>of</strong>. The areas close to <strong>the</strong> red spaces are well<br />
This suggests, that creating pedestrian areas in <strong>the</strong>se two areas by removing <strong>the</strong><br />
, and <strong>the</strong> integration<br />
underpass<br />
is better<br />
and<br />
over<br />
<strong>the</strong> traffic<br />
<strong>the</strong> distance<br />
bring additional<br />
as well. This<br />
value<br />
can<br />
and<br />
be<br />
helps<br />
seen<br />
connect<br />
well along<br />
<strong>the</strong>se<br />
<strong>the</strong> Bahnh<strong>of</strong>quai:<br />
areas to <strong>the</strong><br />
he underpass<br />
Limmat.<br />
is still <strong>the</strong>re. This suggests, that creating pedestrian areas in <strong>the</strong>se two areas by removing<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
2/9<br />
29
Current Situation: Convex Map - Choice<br />
Current Situation:<br />
Convex Map - Choice<br />
Just like in <strong>the</strong> Integration map, <strong>the</strong> Bahnh<strong>of</strong>brücke and <strong>the</strong> Bahnh<strong>of</strong>platz are <strong>the</strong> most<br />
chosen areas. This is <strong>the</strong> case, as <strong>the</strong>se spaces are most integrated. It is true that <strong>the</strong>se<br />
are<br />
Just<br />
<strong>the</strong><br />
like<br />
most<br />
in <strong>the</strong><br />
chosen<br />
Integration<br />
spaces,<br />
map,<br />
as<br />
<strong>the</strong><br />
all commuters<br />
Bahnh<strong>of</strong>brücke<br />
pass<br />
and<br />
<strong>the</strong>se<br />
<strong>the</strong><br />
areas.<br />
Bahnh<strong>of</strong>platz are <strong>the</strong> most chosen areas.<br />
spaces, as all commuters pass <strong>the</strong>se areas.<br />
According<br />
According to<br />
to<br />
<strong>the</strong><br />
<strong>the</strong><br />
analysis<br />
analysis<br />
<strong>of</strong> <strong>the</strong><br />
<strong>of</strong> <strong>the</strong><br />
current<br />
current<br />
situation,<br />
situation,<br />
<strong>the</strong> Bahnh<strong>of</strong>strasse<br />
<strong>the</strong> Bahnh<strong>of</strong>strasse<br />
and <strong>the</strong><br />
and<br />
Waisenhausstrasse<br />
<strong>the</strong><br />
are<br />
Waisenhausstrasse<br />
Waisenhausstrasse<br />
are<br />
does<br />
more<br />
not<br />
chosen<br />
get chosen<br />
than<br />
nearly<br />
o<strong>the</strong>r<br />
as<br />
streets<br />
much<br />
in<br />
as<br />
<strong>the</strong><br />
<strong>the</strong><br />
area.<br />
Bahnh<strong>of</strong>strasse.<br />
This is true for<br />
In<br />
<strong>the</strong><br />
reality, <strong>the</strong> traffic p<br />
Bahnh<strong>of</strong>strasse,<br />
Removing <strong>the</strong> underpass<br />
however<br />
seems<br />
<strong>the</strong> Waisenhausstrasse<br />
to connect <strong>the</strong> Hauptbahnh<strong>of</strong><br />
does not get chosen<br />
more to<br />
nearly<br />
<strong>the</strong> outdoor<br />
as much<br />
space, but decrea<br />
as<br />
choice<br />
<strong>the</strong> Bahnh<strong>of</strong>strasse.<br />
potential will not<br />
In<br />
decrease<br />
reality, <strong>the</strong><br />
in<br />
traffic<br />
<strong>the</strong>se<br />
potential<br />
areas, but<br />
in <strong>the</strong><br />
ra<strong>the</strong>r<br />
hall<br />
stay<br />
<strong>of</strong> <strong>the</strong><br />
<strong>the</strong><br />
main<br />
same<br />
station<br />
or increase.<br />
should<br />
In general howe<br />
be<br />
intervention.<br />
much higher.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Limmat Loop<br />
30<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Current Situation: Convex Map - Choice<br />
New Proposal:<br />
Convex Map - Choice<br />
Removing <strong>the</strong> underpass seems to connect <strong>the</strong> Hauptbahnh<strong>of</strong> more to <strong>the</strong> outdoor<br />
space, but decreases <strong>the</strong> traffic potential by <strong>the</strong> Beatenplatz and <strong>the</strong> Bahnh<strong>of</strong>strasse. I<br />
s. This is <strong>the</strong> case,<br />
believe<br />
as<br />
<strong>the</strong><br />
<strong>the</strong>se<br />
decrease<br />
spaces<br />
<strong>of</strong><br />
are<br />
<strong>the</strong><br />
most<br />
choice<br />
integrated.<br />
potential<br />
It<br />
will<br />
is true<br />
not decrease<br />
that <strong>the</strong>se<br />
in<br />
are<br />
<strong>the</strong>se<br />
<strong>the</strong><br />
areas,<br />
most chosen<br />
but ra<strong>the</strong>r<br />
stay <strong>the</strong> same or increase. In general however, <strong>the</strong> areas <strong>of</strong> <strong>the</strong> new pedestrian zones<br />
re more chosen<br />
get<br />
than<br />
a higher<br />
o<strong>the</strong>r<br />
traffic<br />
streets<br />
potential,<br />
in <strong>the</strong> area.<br />
which<br />
This<br />
is <strong>the</strong><br />
is true<br />
goal<br />
for<br />
<strong>of</strong><br />
<strong>the</strong><br />
<strong>the</strong><br />
Bahnh<strong>of</strong>strasse,<br />
intervention.<br />
however <strong>the</strong><br />
potential in <strong>the</strong> hall <strong>of</strong> <strong>the</strong> main station should be much higher.<br />
reases <strong>the</strong> traffic potential by <strong>the</strong> Beatenplatz and <strong>the</strong> Bahnh<strong>of</strong>strasse. I believe <strong>the</strong> decrease <strong>of</strong> <strong>the</strong><br />
wever, <strong>the</strong> areas <strong>of</strong> <strong>the</strong> new pedestrian zones get a higher traffic potential, which is <strong>the</strong> goal <strong>of</strong> <strong>the</strong><br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
3/9<br />
31
Current Situation: Axial Map - Integration<br />
Current Situation:<br />
Axial Map - Integration<br />
The map <strong>of</strong> <strong>the</strong> current situation shows that <strong>the</strong> most integrated axes are between <strong>the</strong><br />
Central and <strong>the</strong> Bahnh<strong>of</strong>platz and run along <strong>the</strong> Bahnh<strong>of</strong>quai. However, none <strong>of</strong> <strong>the</strong>se<br />
paths<br />
The map<br />
allow<br />
<strong>of</strong><br />
<strong>the</strong><br />
<strong>the</strong><br />
people<br />
current<br />
to<br />
situation<br />
get to<br />
shows<br />
<strong>the</strong> Limmat.<br />
that <strong>the</strong><br />
The<br />
most<br />
paths<br />
integrated<br />
are purely<br />
axes<br />
functional,<br />
are between<br />
evading<br />
<strong>the</strong> Central and <strong>the</strong><br />
obstacles,<br />
to <strong>the</strong> Limmat.<br />
in this<br />
The<br />
case<br />
paths<br />
<strong>the</strong> underpass.<br />
are purely functional,<br />
Standing in<br />
evading<br />
this area,<br />
obstacles,<br />
this is also<br />
in this<br />
<strong>the</strong> case.<br />
case <strong>the</strong><br />
People<br />
underpass. Standin<br />
walk<br />
integrated<br />
between<br />
axes,<br />
Central<br />
never<br />
and<br />
really<br />
<strong>the</strong><br />
approaching<br />
Hauptbahnh<strong>of</strong><br />
<strong>the</strong> River.<br />
along <strong>the</strong> most integrated axes, never<br />
really<br />
The new<br />
approaching<br />
proposal<br />
<strong>the</strong><br />
shows<br />
River.<br />
a much closer relationship to <strong>the</strong> Limmat. People will be able to move along<br />
axis between Central and <strong>the</strong> Bahnh<strong>of</strong>splatz. Presumably people will continue using <strong>the</strong> old paths whe<br />
<strong>the</strong> Limmat back to <strong>the</strong> city and are well integrated into <strong>the</strong> pedestrian network.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Limmat Loop<br />
32<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Current Situation: Axial Map - Integration<br />
New Proposal:<br />
Axial Map - Integration<br />
The new proposal shows a much closer relationship to <strong>the</strong> Limmat. People will be able<br />
to move along <strong>the</strong> river. Additionally, <strong>the</strong> axis along <strong>the</strong> Bahnh<strong>of</strong>quai gets much stronger<br />
<strong>the</strong> Bahnh<strong>of</strong>platz<br />
integrated,<br />
and run<br />
compared<br />
along <strong>the</strong> Bahnh<strong>of</strong>quai.<br />
to <strong>the</strong> axis between<br />
However,<br />
Central<br />
none<br />
and<br />
<strong>of</strong> <strong>the</strong>se<br />
<strong>the</strong> Bahnh<strong>of</strong>platz.<br />
paths allow <strong>the</strong><br />
Presumably<br />
people to get<br />
ding in this area,<br />
people<br />
this is<br />
will<br />
also<br />
continue<br />
<strong>the</strong> case.<br />
using<br />
People<br />
<strong>the</strong> old<br />
walk<br />
paths<br />
between<br />
when<br />
Central<br />
commuting,<br />
and <strong>the</strong><br />
but<br />
Hauptbahnh<strong>of</strong><br />
more people in<br />
along<br />
general<br />
<strong>the</strong> most<br />
might use <strong>the</strong> two new spaces, as <strong>the</strong>y bring <strong>the</strong> quality <strong>of</strong> <strong>the</strong> Limmat back to <strong>the</strong> city<br />
ng <strong>the</strong> river. Additionally,<br />
and are well<br />
<strong>the</strong><br />
integrated<br />
axis along<br />
into<br />
<strong>the</strong><br />
<strong>the</strong><br />
Bahnh<strong>of</strong>quai<br />
pedestrian<br />
gets<br />
network.<br />
much stronger integrated, compared to <strong>the</strong><br />
hen commuting, but more people in general might use <strong>the</strong> two new spaces, as <strong>the</strong>y bring <strong>the</strong> quality <strong>of</strong><br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
4/9<br />
33
Current Situation: Axial Map - Choice<br />
Current Situation:<br />
Axial Map - Choice<br />
The choice map for <strong>the</strong> current situation illustrates, that <strong>the</strong> axes with highest traffic<br />
potential are between Central and Bahnh<strong>of</strong>platz, along <strong>the</strong> Bahnh<strong>of</strong>quai and between<br />
Werdmühleplatz<br />
The choice map<br />
and<br />
for <strong>the</strong><br />
Beatenplatz.<br />
current situation<br />
Examining<br />
illustrates,<br />
<strong>the</strong> situation<br />
that <strong>the</strong><br />
in reality,<br />
axes with<br />
<strong>the</strong> axes<br />
highest<br />
with<br />
traffic<br />
highest<br />
potential are betw<br />
traffic<br />
platz.<br />
potential<br />
Examining<br />
are<br />
<strong>the</strong><br />
between<br />
situation<br />
Central<br />
in reality,<br />
and<br />
<strong>the</strong><br />
Bahnh<strong>of</strong>platz<br />
axes with highest<br />
and along<br />
traffic<br />
Bahnh<strong>of</strong>strasse.<br />
potential are between<br />
The<br />
Central and<br />
axes<br />
if one<br />
by<br />
visits<br />
<strong>the</strong><br />
<strong>the</strong><br />
Beatenplatz<br />
cinema. This<br />
are<br />
result<br />
actually<br />
probably<br />
barely<br />
appeared,<br />
used, only<br />
because<br />
if one visits<br />
most<br />
<strong>the</strong><br />
lines<br />
cinema.<br />
intersections<br />
This<br />
appear in tha<br />
result<br />
The new<br />
probably<br />
proposal<br />
appeared,<br />
suggests,<br />
because<br />
that <strong>the</strong><br />
most<br />
Bahnh<strong>of</strong>quai<br />
lines intersections<br />
will get used<br />
appear<br />
much<br />
in that<br />
more<br />
area.<br />
than <strong>the</strong> axis between Ce<br />
value <strong>of</strong> <strong>the</strong> axis between Central and Bahnh<strong>of</strong>platz will really reduce. If opening up <strong>the</strong> spaces by <strong>the</strong><br />
recommends creating attractive pedestrian areas. This is <strong>the</strong> idea <strong>of</strong> <strong>the</strong> urban proposal. Looking at th<br />
potential, as <strong>the</strong>re are many axes in this area. However, if <strong>the</strong> pedestrian area by <strong>the</strong> Globus Provisoriu<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Limmat Loop<br />
34<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Current Situation: Axial Map - Choice<br />
New Proposal:<br />
Axial Map - Choice<br />
The new proposal suggests, that <strong>the</strong> Bahnh<strong>of</strong>quai will get used much more than<br />
<strong>the</strong> axis between Central and <strong>the</strong> Bahnh<strong>of</strong>platz. Considering <strong>the</strong> walkways <strong>of</strong> <strong>the</strong><br />
tween Central<br />
commuters,<br />
and Bahnh<strong>of</strong>platz,<br />
I’m not<br />
along<br />
sure<br />
<strong>the</strong><br />
that<br />
Bahnh<strong>of</strong>quai<br />
<strong>the</strong> choice<br />
and<br />
value<br />
between<br />
<strong>of</strong> <strong>the</strong><br />
Werdmühleplatz<br />
axis between<br />
and<br />
Central<br />
Beatend<br />
Bahnh<strong>of</strong>platz<br />
and<br />
Bahnh<strong>of</strong>platz<br />
and along Bahnh<strong>of</strong>strasse.<br />
will really reduce.<br />
The<br />
If<br />
axes<br />
opening<br />
by <strong>the</strong><br />
up<br />
Beatenplatz<br />
<strong>the</strong> spaces<br />
are<br />
by<br />
actually<br />
<strong>the</strong> Hauptbahnh<strong>of</strong><br />
barely used,<br />
and<br />
only<br />
hat area.<br />
<strong>the</strong> Globusprovisorium leads to a higher choice value, <strong>the</strong> map actually recommends<br />
entral and <strong>the</strong><br />
creating<br />
Bahnh<strong>of</strong>platz.<br />
attractive<br />
Considering<br />
pedestrian<br />
<strong>the</strong><br />
areas.<br />
walkways<br />
This is<br />
<strong>of</strong><br />
<strong>the</strong><br />
<strong>the</strong><br />
idea<br />
commuters,<br />
<strong>of</strong> <strong>the</strong> urban<br />
I’m<br />
proposal.<br />
not sure that<br />
Looking<br />
<strong>the</strong> choice<br />
at<br />
he Hauptbahnh<strong>of</strong><br />
<strong>the</strong><br />
and<br />
axis<br />
<strong>the</strong><br />
between<br />
Globusprovisorium<br />
Werdmühleplatz<br />
leads<br />
and<br />
to<br />
Beatenplatz,<br />
a higher choice<br />
I believe<br />
value,<br />
it<br />
<strong>the</strong><br />
again<br />
map<br />
shows<br />
actually<br />
itself with<br />
<strong>the</strong> axis between<br />
a high<br />
Werdmühleplatz<br />
traffic potential,<br />
and<br />
as<br />
Beatenplatz,<br />
<strong>the</strong>re are many<br />
I believe<br />
axes in<br />
it again<br />
this area.<br />
shows<br />
However,<br />
itself with<br />
if <strong>the</strong><br />
a high<br />
pedestrian<br />
traffic<br />
rium is attractive,<br />
area<br />
people<br />
by <strong>the</strong> Globus<br />
might start<br />
Provisorium<br />
using <strong>the</strong><br />
is<br />
path<br />
attractive,<br />
towards<br />
people<br />
<strong>the</strong> Werdmühleplatz<br />
might start using<br />
more<br />
<strong>the</strong> path<br />
than<br />
towards<br />
today.<br />
<strong>the</strong> Werdmühleplatz more than today.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
5/9<br />
35
Current Situation: Isovist Map - Isovist Area<br />
Current Situation:<br />
Isovist Map - Isovist Area<br />
The isovist area map <strong>of</strong> <strong>the</strong> current situation shows that <strong>the</strong> areas with <strong>the</strong> largest<br />
isovists are located to <strong>the</strong> south <strong>of</strong> <strong>the</strong> Hauptbahnh<strong>of</strong>, by <strong>the</strong> Bahnh<strong>of</strong>platz and just<br />
below<br />
The isovist<br />
<strong>the</strong> exit<br />
area<br />
<strong>of</strong><br />
map<br />
<strong>the</strong> main<br />
<strong>of</strong> <strong>the</strong><br />
station<br />
current<br />
towards<br />
situation<br />
<strong>the</strong><br />
shows<br />
Bahnh<strong>of</strong>quai.<br />
that <strong>the</strong><br />
This<br />
areas<br />
makes<br />
with<br />
sense,<br />
<strong>the</strong> largest<br />
as <strong>the</strong>se<br />
isovists are located<br />
two<br />
towards<br />
areas<br />
<strong>the</strong><br />
are<br />
Bahnh<strong>of</strong>quai.<br />
located by <strong>the</strong><br />
This<br />
intersections<br />
makes sense,<br />
<strong>of</strong> larger<br />
as <strong>the</strong>se<br />
roads<br />
two<br />
and<br />
areas<br />
squares.<br />
are located by <strong>the</strong> intersections <strong>of</strong> la<br />
over <strong>the</strong> overall situation in <strong>the</strong>se areas. It is also advantage for traffic and pedestrians, as a lot <strong>of</strong> diffe<br />
Comparing<br />
roads.<br />
this with experience it is <strong>the</strong> case that one has <strong>the</strong> best overview over <strong>the</strong><br />
overall<br />
Removing<br />
situation<br />
<strong>the</strong> underpasses<br />
in <strong>the</strong>se areas.<br />
<strong>from</strong><br />
It is<br />
<strong>the</strong><br />
also<br />
area<br />
advantage<br />
creates a<br />
for<br />
totally<br />
traffic<br />
new<br />
and<br />
situation<br />
pedestrians,<br />
concerning<br />
as a lot<br />
isovists. The who<br />
<strong>of</strong><br />
area<br />
different<br />
with large<br />
means<br />
isovists.<br />
<strong>of</strong> transport<br />
Considering<br />
cross<br />
<strong>the</strong><br />
<strong>the</strong>se<br />
new<br />
areas,<br />
open<br />
and<br />
areas<br />
<strong>the</strong><br />
should<br />
overview<br />
help<br />
over<br />
connect<br />
<strong>the</strong><br />
<strong>the</strong><br />
traffic<br />
city<br />
is<br />
to <strong>the</strong> Limmat a<br />
needed<br />
new spaces<br />
to cross<br />
and<br />
<strong>the</strong><br />
on to<br />
roads.<br />
<strong>the</strong> river.<br />
The results are somewhat biased, as <strong>the</strong> river and underpass are not included in <strong>the</strong> analysis, and one<br />
at <strong>from</strong> a walking or openness perspective, not a view perspective.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Limmat Loop<br />
36<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Current Situation: Isovist Map - Isovist Area<br />
New Proposal:<br />
Isovist Map - Isovist Area<br />
Removing <strong>the</strong> underpasses <strong>from</strong> <strong>the</strong> area creates a totally new situation concerning<br />
isovists. The whole area <strong>from</strong> <strong>the</strong> Landesmuseum along <strong>the</strong> Bahnh<strong>of</strong>quai to <strong>the</strong> Globus<br />
d to <strong>the</strong> south<br />
Provisorium<br />
<strong>of</strong> <strong>the</strong> Hauptbahnh<strong>of</strong>,<br />
becomes one<br />
by <strong>the</strong><br />
big<br />
Bahnh<strong>of</strong>platz<br />
area with large<br />
and<br />
isovists.<br />
just below<br />
Considering<br />
<strong>the</strong> exit<br />
<strong>the</strong><br />
<strong>of</strong> <strong>the</strong><br />
new<br />
main<br />
open<br />
station<br />
areas<br />
larger roads and<br />
should<br />
squares.<br />
help connect<br />
Comparing<br />
<strong>the</strong><br />
this<br />
city<br />
with<br />
to <strong>the</strong><br />
experience<br />
Limmat<br />
it<br />
and<br />
is <strong>the</strong><br />
create<br />
case<br />
a<br />
that<br />
new<br />
one<br />
attractive<br />
has <strong>the</strong> best<br />
pedestrian<br />
overview<br />
fferent means<br />
areas,<br />
<strong>of</strong> transport<br />
this is<br />
cross<br />
a welcome<br />
<strong>the</strong>se<br />
characteristic.<br />
areas, and <strong>the</strong><br />
It<br />
overview<br />
allows a<br />
over<br />
view<br />
<strong>the</strong><br />
over<br />
traffic<br />
<strong>the</strong> new<br />
is needed<br />
spaces<br />
to<br />
and<br />
cross<br />
on<br />
<strong>the</strong><br />
to<br />
<strong>the</strong> river.<br />
hole area <strong>from</strong> <strong>the</strong> Landesmuseum along <strong>the</strong> Bahnh<strong>of</strong>quai to <strong>the</strong> Globus Provisorium becomes one big<br />
t and create a<br />
The<br />
new<br />
results<br />
attractive<br />
are<br />
pedestrian<br />
somewhat<br />
areas,<br />
biased,<br />
this<br />
as<br />
is<br />
<strong>the</strong><br />
a welcome<br />
river and<br />
characteristic.<br />
underpass are<br />
It<br />
not<br />
allows<br />
included<br />
a view<br />
in<br />
over<br />
<strong>the</strong><br />
<strong>the</strong><br />
analysis, and one is actually able to see over <strong>the</strong> river and over <strong>the</strong> underpass. The<br />
ne is actually able<br />
Isovist<br />
to<br />
analysis<br />
see over<br />
should<br />
<strong>the</strong> river<br />
be<br />
and<br />
looked<br />
over<br />
at<br />
<strong>the</strong><br />
<strong>from</strong><br />
underpass.<br />
a walking<br />
The<br />
or openness<br />
Isovist analysis<br />
perspective,<br />
should<br />
not<br />
be<br />
a<br />
looked<br />
view<br />
perspective.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
6/9<br />
37
Current Situation: Isovist Map - Min Radial<br />
Current Situation:<br />
Isovist Map - Min Radial<br />
The Isovist Min Radial map shows <strong>the</strong> areas with most movement potential. This is <strong>the</strong><br />
case for <strong>the</strong> largest areas.<br />
The Isovist Min Radial map shows <strong>the</strong> areas with most movement potential. This is <strong>the</strong> case for <strong>the</strong> lar<br />
From<br />
From experience<br />
experience<br />
I<br />
I<br />
would<br />
would<br />
agree<br />
agree<br />
that<br />
that<br />
<strong>the</strong><br />
<strong>the</strong><br />
area<br />
area<br />
by <strong>the</strong><br />
by <strong>the</strong><br />
Bahnh<strong>of</strong>quai<br />
Bahnh<strong>of</strong>quai<br />
and around<br />
and around<br />
<strong>the</strong> Hauptbahnh<strong>of</strong><br />
<strong>the</strong><br />
has h<br />
Hauptbahnh<strong>of</strong><br />
isn’t as active as<br />
has<br />
<strong>the</strong><br />
high<br />
analysis<br />
movement<br />
shows.<br />
potential<br />
It is a busy<br />
for<br />
traffic<br />
commuter<br />
area and<br />
transit.<br />
is barely<br />
However<br />
used<br />
I<br />
by<br />
believe<br />
pedestrians.<br />
space<br />
For my<br />
by<br />
design,<br />
<strong>the</strong> Globus<br />
<strong>the</strong> area<br />
Provisorium<br />
to <strong>the</strong> south<br />
isn’t<br />
<strong>the</strong><br />
as active<br />
Globus<br />
as<br />
Provisorium<br />
<strong>the</strong> analysis<br />
seems<br />
shows.<br />
to<br />
It<br />
act<br />
is a<br />
as<br />
busy<br />
movement<br />
traffic<br />
area. With th<br />
area<br />
opened<br />
and<br />
up<br />
is barely<br />
area in<br />
used<br />
front<br />
by<br />
<strong>of</strong><br />
pedestrians.<br />
<strong>the</strong> Hauptbahnh<strong>of</strong> also shows a very high movement potential. Not only co<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Limmat Loop<br />
38<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Current Situation: Isovist Map - Min Radial<br />
New Proposal:<br />
Isovist Map - Min Radial<br />
For my design, <strong>the</strong> area to <strong>the</strong> south <strong>the</strong> Globus Provisorium seems to act as movement<br />
area. With <strong>the</strong> right programming for <strong>the</strong> area, this space has potential to become a<br />
largest areas.<br />
vivid pedestrian area. The opened up area in front <strong>of</strong> <strong>the</strong> Hauptbahnh<strong>of</strong> also shows a<br />
high movement<br />
very<br />
potential<br />
high movement<br />
for commuter<br />
potential.<br />
transit.<br />
Not<br />
However<br />
only commuters,<br />
I believe space<br />
but also<br />
by <strong>the</strong><br />
people<br />
Globus<br />
passing<br />
Provisorium<br />
by for<br />
leisure can use this space.<br />
<strong>the</strong> right programming for <strong>the</strong> area, this space has potential to become a vivid pedestrian area. The<br />
commuters, but also people passing by for leisure can use this space.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
7/9<br />
39
Current<br />
New Pr<br />
New Pr<br />
Summer 0900 Summer 1800 Winter 1100 Winter 1500 Radiati<br />
Summer 0900 Summer 1800 Winter 1100 Winter 1500<br />
New Pr<br />
For <strong>the</strong> shadow and radiation analysis <strong>of</strong> <strong>the</strong> site I worked with <strong>the</strong> buildings just next to <strong>the</strong><br />
Globus Provisorium and around <strong>the</strong> two new pedestrian zones. I looked at <strong>the</strong> situation for <strong>the</strong><br />
current building as well as three variations <strong>of</strong> <strong>the</strong> new Globus Provisorium. I did measurements for<br />
New summer Methods and in for <strong>Urban</strong> winter Analysis solstice and in <strong>Simulation</strong> <strong>the</strong> morning | Limmat and evening. Loop<br />
40<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
General For Comments:<br />
<strong>the</strong> shadow and radiation analysis <strong>of</strong> <strong>the</strong> site i worked with th<br />
just next to <strong>the</strong> Globusprovisorium and around <strong>the</strong> two new pede<br />
During summer I looked at solstice <strong>the</strong> situation all open for <strong>the</strong> spaces current get building sun pretty as well much<br />
as three va<br />
throughout <strong>of</strong> <strong>the</strong> <strong>the</strong> new whole Globus day. More Provisorium. dense building I did measurements structures, like for <strong>the</strong><br />
summer<br />
Niederdorf, winter have solstice more shadow in <strong>the</strong> morning than <strong>the</strong> and open evening. spaces, as less light<br />
reaches <strong>the</strong> ground due to <strong>the</strong> narrow streets.<br />
Current Situation<br />
Situation<br />
New Proposal - Building - Building 1<br />
1<br />
New Proposal - Building - Building 2<br />
2<br />
New Proposal - Building 3<br />
New Proposal - Building 3<br />
Radiation<br />
RADIATION<br />
During lunch General time Comments: every part <strong>of</strong> <strong>the</strong> city gets sun at some point.<br />
One might have to think about adding some outside structures<br />
that provide During shade summer in <strong>the</strong> solstice open all areas, open especially spaces get considering sun pretty <strong>the</strong><br />
much thro<br />
hot summer <strong>the</strong> whole we had day. this More year. dense This might building be structures, some ro<strong>of</strong> structures<br />
like <strong>the</strong> Niederdor<br />
or groups more <strong>of</strong> trees, shadow so pedestrians than <strong>the</strong> open can spaces, sit or walk as less in <strong>the</strong> light shade.<br />
reaches <strong>the</strong> gro<br />
to <strong>the</strong> narrow streets.<br />
Zurich is During located lunch so far time north every that part we have <strong>of</strong> <strong>the</strong> shade city gets <strong>from</strong> sun <strong>the</strong> at buildings<br />
some point. O<br />
even during have lunch to think time about at <strong>the</strong> adding winter some solstice. outside If structures <strong>the</strong> sun shows<br />
that provide<br />
during that <strong>the</strong> time, open one areas, might especially only find considering a bit <strong>of</strong> sun in <strong>the</strong> <strong>the</strong> hot open summer spaces<br />
we had th<br />
during <strong>the</strong> This midday might be hours. some For ro<strong>of</strong> this structures one would or groups have to <strong>of</strong> search trees, <strong>the</strong><br />
so pedest<br />
areas around sit or walk <strong>the</strong> Limmat, in <strong>the</strong> shade. as <strong>the</strong>se are <strong>the</strong> most open spaces and<br />
<strong>the</strong> chance <strong>of</strong> catching a glimpse <strong>of</strong> sun and not shade is highest<br />
here. Densely Zurich built is located areas however, so far north like that <strong>the</strong> we Niederdorf, have shade have <strong>from</strong> shade<br />
<strong>the</strong> buildin<br />
<strong>the</strong> whole during day through.<br />
lunch time at <strong>the</strong> winter solstice. If <strong>the</strong> sun shows during th<br />
one might only find a bit <strong>of</strong> sun in <strong>the</strong> open spaces during <strong>the</strong> mid<br />
Comments For on this <strong>the</strong> one open would spaces have and to search building <strong>the</strong> designs:<br />
areas around <strong>the</strong> Limmat,<br />
<strong>the</strong> most open spaces and <strong>the</strong> chance <strong>of</strong> catching a glimpse <strong>of</strong> s<br />
Looking shade at my design, is highest it is here. nice Densely to see that built <strong>the</strong> areas open however, space located<br />
like <strong>the</strong> Niede<br />
to <strong>the</strong> south shade <strong>of</strong> <strong>the</strong> <strong>the</strong> whole Globus day Provisorium through. has sun all day long during<br />
summer solstice.<br />
I might have Comments to consider <strong>the</strong> planning open spaces a group and <strong>of</strong> building trees or designs: some o<strong>the</strong>r<br />
shade-giving structure in that area, to make sure <strong>the</strong> pedestrians<br />
are comfortable Looking even at my during design, long it is summer nice to see days.<br />
that <strong>the</strong> open space locate<br />
south <strong>of</strong> <strong>the</strong> Globus Provisorium has sun all day long during sum<br />
Additionally I might <strong>the</strong> have space to to consider <strong>the</strong> south planning <strong>of</strong> my a design group project <strong>of</strong> trees also or some has<br />
o<strong>the</strong>r<br />
sun during structure <strong>the</strong> lunch in that hours area, to during make winter sure <strong>the</strong> solstice. pedestrians Depending<br />
are comforta<br />
on wea<strong>the</strong>r during and long temperature summer days. <strong>the</strong> space could <strong>the</strong>refore be used<br />
during <strong>the</strong> Additionally winter time. <strong>the</strong> Light space can to get <strong>the</strong> south into <strong>the</strong> <strong>of</strong> building, my design as project <strong>the</strong> area<br />
also has<br />
to <strong>the</strong> south <strong>the</strong> lunch <strong>of</strong> <strong>the</strong> hours building during is winter free, which solstice. helps Depending make sure on wea<strong>the</strong>r an<br />
building <strong>the</strong> doesn’t space stay could dark <strong>the</strong>refore inside <strong>the</strong> be whole used during day through.<br />
<strong>the</strong> winter time. Light c<br />
<strong>the</strong> building, as <strong>the</strong> area to <strong>the</strong> south <strong>of</strong> <strong>the</strong> building is free, which<br />
Building sure 1 is <strong>the</strong> very building similar doesn’t to <strong>the</strong> stay original dark building, inside <strong>the</strong> showing whole day only<br />
through.<br />
little shadow on <strong>the</strong> neighbouring building and casting only<br />
small shadow Building during 1 is very <strong>the</strong> similar day. Building to <strong>the</strong> original 2 and building, 3 move showing closer to<br />
only little<br />
<strong>the</strong> neighbouring on <strong>the</strong> neighboring building, casting building a and greater casting shadow only small on <strong>the</strong> shadow o<strong>the</strong>r<br />
during<br />
building Building and <strong>the</strong> 2 walkway. and 3 move Therefore closer staying to <strong>the</strong> neighboring close to <strong>the</strong> building, original<br />
casting<br />
design will shadow help bring on <strong>the</strong> more o<strong>the</strong>r light building into <strong>the</strong> and area.<br />
<strong>the</strong> walkway. Therefore staying<br />
<strong>the</strong> original design will help bring more light into <strong>the</strong> area.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
41
Analysis <strong>of</strong> a park’s design<br />
Student: Alice Chevrier
Introduction:<br />
Parks are very important social and environmental elements <strong>of</strong> a city. They provide inhabitants with,<br />
among o<strong>the</strong>rs, places to relax, do sport and get social contact. With <strong>the</strong>ir vegetation, parks improve <strong>the</strong><br />
microclimate and constitute a living space for <strong>the</strong> fauna and flora.<br />
This is <strong>the</strong> reason why a park should be designed carefully, to enhance its benefic aspects. Its design<br />
needs to be attractive for <strong>the</strong> inhabitants, as <strong>the</strong>re is no way to force <strong>the</strong> population to use <strong>the</strong>se areas.<br />
This analysis aims to see how <strong>the</strong> tools we got presented in class can positively impact <strong>the</strong> design <strong>of</strong> a<br />
park. The environmental aspects will not be fur<strong>the</strong>rmore considered.<br />
As a basis <strong>the</strong> newly created “Pfingsweid Park” in Zürich is used. First <strong>the</strong> site position will be qualitatively<br />
analysed, in order to raise <strong>the</strong> qualities and/or default <strong>of</strong> <strong>the</strong> emplacement. Then, different version <strong>of</strong> <strong>the</strong><br />
park will be compared with <strong>the</strong> application <strong>of</strong> analysis methods learned in class – a shadow analysis as<br />
well as an integration analysis.<br />
Sources<br />
The 3D maps are created with OSM2World <strong>from</strong> an OSM file <strong>of</strong> open street map. The line plan used<br />
with Depthmap comes <strong>from</strong> <strong>the</strong> same OSM file (open street map), and is <strong>the</strong>n modified with <strong>the</strong> plug-in<br />
Elk on grasshopper in order to get <strong>the</strong> streets or <strong>the</strong> buildings only, depending on <strong>the</strong> analysis.<br />
The followings analyses are part <strong>of</strong> this report:<br />
1. Integration / Connectivity / Choice analysis site<br />
2. Isovists Analysis<br />
3. Shadow Analysis<br />
4. Connectivity and Choice Analysis in Park<br />
5. Conclusion<br />
Most <strong>of</strong> <strong>the</strong> times parks can only be place where <strong>the</strong>re is already an empty space, <strong>the</strong>y have to<br />
accommodate to <strong>the</strong>ir location. The integration analysis with Depthmap aims to give useful information<br />
about <strong>the</strong> site situation to planers.<br />
Before doing <strong>the</strong> analysis with Depthmap I had to correct <strong>the</strong> map <strong>of</strong> <strong>the</strong> area. Indeed this map was done<br />
with open street map data, which happened sometimes to have more than one line for representing a<br />
street.<br />
The area taken into consideration is approximately within 20-30 min walking distance <strong>from</strong> <strong>the</strong> park.<br />
From my point <strong>of</strong> view, <strong>the</strong> people living within this diameter represent <strong>the</strong> target audience. The south<br />
side is bordered by railways, which limit <strong>the</strong> access to <strong>the</strong> park.<br />
44<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
2 <br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
The park is well integrated in <strong>the</strong> area as we can see on figure 1.1. This is expected as <strong>the</strong> area was<br />
The park is well integrated in <strong>the</strong> area as we can see on figure 1.1. This is expected as <strong>the</strong> area <br />
taken to have <strong>the</strong> park as middle point (20-30 min to foot).<br />
taken to have <strong>the</strong> park as middle point (20-‐30 min to foot). <br />
From <strong>the</strong> connectivity analysis From <strong>the</strong> it connectivity can be seen analysis that <strong>the</strong> it can streets be seen surrounding that <strong>the</strong> streets <strong>the</strong> park surrounding are between <strong>the</strong> park dark are betwee<br />
blue and The light park green. is well blue integrated and light in <strong>the</strong> green. area as we can see on figure 1.1. This is expected as <strong>the</strong> area was <br />
taken to have <strong>the</strong> These park low as middle values point have (20-‐30 to be carefully min to foot). interpreted. The figure 1.2 shows that most <strong>of</strong> <strong>the</strong> street<br />
These low values have to area be have carefully low value interpreted. for connectivity, The figure except 1.2 <strong>the</strong> shows Hardbrücke that most and <strong>of</strong> some <strong>the</strong> crossroads. streets in this The averag<br />
area have From low <strong>the</strong> value connectivity for connectivity, <strong>of</strong> 2.4 compared analysis except it to can <strong>the</strong> be <strong>the</strong> high seen Hardbrücke value that <strong>the</strong> <strong>of</strong> 8 streets corresponding and surrounding some crossroads. to <strong>the</strong> <strong>the</strong> red park color The are shows average between <strong>the</strong> values dark color range is <br />
<strong>of</strong> 2.4 compared blue and light to <strong>the</strong> green. twisted<br />
high value<br />
through<br />
<strong>of</strong><br />
<strong>the</strong><br />
8 corresponding<br />
high connectivity<br />
to<br />
<strong>of</strong><br />
<strong>the</strong><br />
<strong>the</strong> <br />
red<br />
<strong>the</strong> Hardbrücke<br />
colour shows<br />
(figure<br />
<strong>the</strong><br />
1.4).<br />
colour<br />
In <strong>the</strong><br />
range<br />
area’s<br />
is<br />
totality t<br />
somehow These twisted low values are<br />
through have not<br />
<strong>the</strong> to too<br />
high be bad. carefully <br />
connectivity interpreted. <strong>of</strong> <strong>the</strong> The Hardbrücke figure 1.2 (figure shows 1.4). that most In <strong>the</strong> <strong>of</strong> area’s <strong>the</strong> streets totality in this <strong>the</strong> <br />
The same reflection on <strong>the</strong> color range applies to <strong>the</strong> choice analysis. Aside <strong>from</strong> <strong>the</strong> Hardbrüc<br />
values are<br />
area<br />
not<br />
have<br />
too<br />
low<br />
bad.<br />
value for connectivity, except <strong>the</strong> Hardbrücke and some crossroads. The average values <br />
<strong>of</strong> 2.4 compared vertical to <strong>the</strong> high component) value <strong>of</strong> 8 and corresponding some horizontal to <strong>the</strong> streets red color with shows lighter <strong>the</strong> blue color color, range all is <strong>of</strong> somehow <strong>the</strong> streets are s<br />
twisted through very <strong>the</strong> high low connectivity values. The proximity <strong>of</strong> <strong>the</strong> <strong>the</strong> <strong>of</strong> Hardbrücke <strong>the</strong> railways (figure also should 1.4). In not <strong>the</strong> be area’s forgotten totality and <strong>the</strong> plays values a negativ <br />
The same<br />
are<br />
reflection<br />
not too bad.<br />
on<br />
<br />
<strong>the</strong>se colour analyses, range as it applies blocks to any <strong>the</strong> pedestrian choice analysis. connection Aside on this <strong>from</strong> one <strong>the</strong> side. Hardbrücke (<strong>the</strong><br />
vertical component) The same reflection and some on <strong>the</strong> horizontal color range streets applies with to <strong>the</strong> lighter choice blue analysis. colour, Aside all <strong>of</strong> <strong>from</strong> <strong>the</strong> <strong>the</strong> streets Hardbrücke are showing (<strong>the</strong> <br />
very low vertical values. component) The proximity Living and in <strong>of</strong> some <strong>the</strong> <strong>the</strong> area horizontal railways I think also those streets should low with values not lighter be do blue match forgotten color, <strong>the</strong> reality. and all <strong>of</strong> plays <strong>the</strong> The streets a park negative are is situated showing role behind an <br />
<strong>the</strong>se analyses, very low as values. it blocks apartment The proximity any pedestrian building <strong>of</strong> <strong>the</strong> in railways connection an industrial also should on area, this and not one even be side. forgotten if it is close and to plays <strong>the</strong> Hardbrücke a negative role train-‐station <br />
<strong>the</strong>se analyses, as on it <strong>the</strong> blocks way, any which pedestrian probably connection is <strong>the</strong> reason this why one lots side. <strong>of</strong> people pass by. <br />
Living in <strong>the</strong> area I think those low values do match <strong>the</strong> reality. The park is situated behind an apartment<br />
building in Living an industrial <strong>the</strong> area area, I think and those even low if values it is close do match to <strong>the</strong> <strong>the</strong> Hardbrücke reality. The train-station park is situated is behind not on an <strong>the</strong> way,<br />
apartment building in an industrial area, and even if it is close to <strong>the</strong> Hardbrücke train-‐station it is not <br />
which probably is <strong>the</strong> reason why lots <strong>of</strong> people pass by<br />
on <strong>the</strong> way, which probably is <strong>the</strong> reason why lots <strong>of</strong> people pass by. <br />
1000m<br />
Figure 1.1: Integration <br />
Figure 1.1: Integration <br />
1000m<br />
figure 1.1: Integration<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
45
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
1000m<br />
Figure 1.2: Connectivity <br />
figure 1.2: Connectivity<br />
1000m<br />
Figure 1.2: Connectivity <br />
1000m<br />
1000m<br />
Figure 1.3: Choice <br />
figure 1.3: Choice 1000m<br />
Minimum Average Maximum <br />
Integration 0.0863966 0.189797 0.303238 <br />
1000m<br />
Figure Connectivity 1.3: Choice <br />
Choice 1 0 2.43063 50354.6 8 <br />
816741 <br />
Figure 1.4: Analysis’ values <br />
1000m Minimum Average Maximum <br />
Integration 0.0863966 0.189797 0.303238 <br />
Connectivity 1 2.43063 8 <br />
Choice 2. Isovists Analysis 0 <br />
50354.6 816741 <br />
Figure 1.4: Analysis’ values <br />
figure 1.4: Analysis’ Values<br />
In this part <strong>the</strong> 1000m<br />
site’s isovists will be analyzed with Depthmap. The color range was set equals <br />
throughout <strong>the</strong> different variants in order to allow a true comparison. <br />
Besides <strong>the</strong> park, a school at <strong>the</strong> upper end <strong>of</strong> <strong>the</strong> park is being planned. This is why <strong>the</strong> influence <strong>of</strong> <br />
2. Isovists 2. different Isovists Analysis<br />
shapes Analysis <strong>of</strong> <strong>the</strong> <br />
school building on <strong>the</strong> park will also be commented (fig. 2.0). <br />
The first school building version has one building. The second is made out <strong>of</strong> two buildings. Finally <strong>the</strong> <br />
In this In this part third part <strong>the</strong> site’s <strong>the</strong> version site’s is<br />
isovists isovists made out<br />
will will <strong>of</strong><br />
be analysed be three analyzed buildings.<br />
with with Depthmap. It is interesting<br />
The The colour color to note, that<br />
range was <strong>the</strong> <br />
was first set set equals variant’s<br />
equals <br />
building is <br />
throughout<br />
throughout lower <strong>the</strong> than different <strong>the</strong> o<strong>the</strong>r variants ones. <br />
in order to allow a true comparison. <br />
<strong>the</strong> different variants in order to allow a true comparison. Besides <strong>the</strong> park, a school at <strong>the</strong> upper end<br />
Besides <strong>the</strong> park, a school at <strong>the</strong> upper end <strong>of</strong> <strong>the</strong> park is being planned. This is why <strong>the</strong> influence <strong>of</strong> <br />
<strong>of</strong> <strong>the</strong> park is being planned. This is why <strong>the</strong> influence <strong>of</strong> different shapes <strong>of</strong> <strong>the</strong> school building on <strong>the</strong><br />
different shapes <strong>of</strong> <strong>the</strong> school building on <strong>the</strong> park will also be commented (fig. 2.0). <br />
park The will first also school be commented building version (fig. has 2.0). one building. The second is made out <strong>of</strong> two buildings. Finally <strong>the</strong> <br />
third version is made out <strong>of</strong> three buildings. It is interesting to note, that <strong>the</strong> first variant’s building is <br />
The lower first school than <strong>the</strong> building o<strong>the</strong>r ones. version has one building. The second is made out <strong>of</strong> two buildings. Finally <strong>the</strong><br />
third version is made out <strong>of</strong> three buildings. It is interesting to note, that <strong>the</strong> first variant’s building is<br />
lower than <strong>the</strong> o<strong>the</strong>r ones.<br />
46<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture<br />
3
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
figure Figure 2.0: 2.0: school school variants variants <br />
Good values for <strong>the</strong> isovists area and perimeter are benefic. The occlusivity should stay reasonable.<br />
This means Good that values <strong>the</strong> for park <strong>the</strong> isovists constructed area and in perimeter a pleasant are environment benefic. The occlusivity where people should can stay locate reasonable. <strong>the</strong>mselves This <br />
and do means feel safe. that Figure <strong>the</strong> park 2.0: is school constructed variants in a pleasant environment where people can locate <strong>the</strong>mselves and <br />
do feel safe. <br />
As we can see on <strong>the</strong> figures 2.1 (isovists area) <strong>the</strong> variant 3 has a larger red area. This is due to <strong>the</strong><br />
fact that<br />
As<br />
<strong>the</strong><br />
we <br />
school<br />
can Good see on<br />
building<br />
values <strong>the</strong> figures for<br />
is<br />
<strong>the</strong><br />
placed<br />
2.1 (isovists<br />
a bit<br />
area <br />
lower<br />
area) and <strong>the</strong> perimeter<br />
than<br />
variant<br />
for<br />
<br />
<strong>the</strong><br />
are 3 has benefic.<br />
o<strong>the</strong>r<br />
a larger<br />
variants.<br />
The red occlusivity area.<br />
On<br />
This<br />
<strong>the</strong><br />
should is<br />
upper<br />
due stay to<br />
part<br />
<strong>the</strong> reasonable. fact<br />
<strong>of</strong><br />
<br />
<strong>the</strong><br />
This <br />
that <strong>the</strong> school means building that <strong>the</strong> is park placed is constructed a bit lower than in a pleasant for <strong>the</strong> o<strong>the</strong>r environment variants. where people can locate <strong>the</strong>mselves and <br />
park <strong>the</strong> values are very good. The streets in <strong>the</strong> area are very large and <strong>of</strong>fer a good overview <strong>of</strong> <strong>the</strong><br />
On <strong>the</strong> upper do feel part safe. <strong>of</strong> <strong>the</strong> park <strong>the</strong> values are very good. The streets in <strong>the</strong> area are very large and <strong>of</strong>fer a <br />
surroundings. good overview <strong>of</strong> <strong>the</strong> surroundings. <br />
On <strong>the</strong> right As side we can <strong>of</strong> <strong>the</strong> see park, on <strong>the</strong> <strong>the</strong> figures colors 2.1 tend (isovists to get colder, area) <strong>the</strong> meaning variant that 3 has smaller a larger surfaces red area. can This be seen is due to <strong>the</strong> fact <br />
On <strong>the</strong> <strong>from</strong> right those side that points. <strong>of</strong> <strong>the</strong> school The park, streets building <strong>the</strong> are colours not is placed as tend wide a bit anymore to lower get colder, than as <strong>the</strong> for edifices meaning <strong>the</strong> o<strong>the</strong>r on variants. <strong>the</strong> that right smaller <br />
are a group surfaces <strong>of</strong> can be<br />
seen <strong>from</strong> residential those On points. buildings. <strong>the</strong> upper The part streets <strong>of</strong> <strong>the</strong> are park not <strong>the</strong> as values wide anymore are very good. as <strong>the</strong> The edifices streets in on <strong>the</strong> <strong>the</strong> area right are are very a large group and <strong>of</strong> <strong>of</strong>fer a <br />
residential At <strong>the</strong> buildings. lower good peak overview <strong>of</strong> <strong>the</strong> park <strong>of</strong> <strong>the</strong> high surroundings. value are to be found. This is due to <strong>the</strong> railways and doesn’t really <br />
match with On a feeling <strong>the</strong> right <strong>of</strong> side safety, <strong>of</strong> <strong>the</strong> but park, gives <strong>the</strong> a view colors on tend <strong>the</strong> horizon, to get colder, which meaning is not so that common smaller in a surfaces city and can be seen <br />
give a feeling <strong>from</strong> <strong>of</strong> those freedom. points. The streets are not as wide anymore as <strong>the</strong> edifices on <strong>the</strong> right are a group <strong>of</strong> <br />
At <strong>the</strong> lower peak<br />
residential<br />
<strong>of</strong> <strong>the</strong> park<br />
buildings.<br />
high value<br />
<br />
are to be found. This is due to <strong>the</strong> railways and doesn’t really<br />
match with a feeling At <strong>the</strong> <strong>of</strong> lower safety, peak but <strong>of</strong> <strong>the</strong> gives park a high view value on <strong>the</strong> are horizon, to be found. which This is is due not to so <strong>the</strong> common railways in and a doesn’t city and really <br />
can give a feeling match <strong>of</strong> freedom with a feeling <strong>of</strong> safety, but gives a view on <strong>the</strong> horizon, which is not so common in a city and can <br />
give a feeling <strong>of</strong> freedom. <br />
Figure 2.1: isovists area – variants 1, 2 and 3 <br />
The occlusivity (figure 2.2) measures <strong>the</strong> length <strong>of</strong> hidden edges and is an important factor for <strong>the</strong> <br />
safety feeling. <br />
The side <strong>of</strong> Figure <strong>the</strong> school 2.1: isovists looking area at <strong>the</strong> – variants park has 1, low 2 and value 3 <strong>of</strong> occlusivity. The schoolyard will probably be <br />
placed <strong>the</strong>re figure as 2.1: a isovists low occlusivity area - variants is 1,2 a and sign 3<br />
for a feeling <strong>of</strong> safety since not much hidden edges can be <br />
seen. For a The school, occlusivity having (figure a high feeling 2.2) measures <strong>of</strong> safety <strong>the</strong> is very length important. <strong>of</strong> hidden edges and is an important factor for <strong>the</strong> <br />
The occlusivity (figure safety 2.2) feeling. measures <strong>the</strong> length <strong>of</strong> hidden edges and is an important factor for <strong>the</strong> safety<br />
feeling. The side <strong>of</strong> <strong>the</strong> school looking at <strong>the</strong> park has low value <strong>of</strong> occlusivity. The schoolyard will probably be <br />
placed <strong>the</strong>re as a low occlusivity is a sign for a feeling <strong>of</strong> safety since not much hidden edges can be <br />
The side <strong>of</strong> <strong>the</strong> school seen. For looking a school, at having <strong>the</strong> park a high has feeling low value <strong>of</strong> safety <strong>of</strong> occlusivity. is very important. The schoolyard will probably be<br />
placed <strong>the</strong>re as a low occlusivity is a sign for a feeling <strong>of</strong> safety since not much hidden edges can be<br />
seen. For a school, having a high feeling <strong>of</strong> safety is very important.<br />
4 <br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
47
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
figure Figure 2.2: 2.2: isovists isovists occlusivity occlusivity - variants 1, – 2 variants and 3 1, 2 and 3 <br />
The isovists perimeter analysis is very similar to <strong>the</strong> area analysis, with however lower values<br />
The isovists perimeter analysis is very similar to <strong>the</strong> area analysis, with however lower values. <br />
Figure 2.2: isovists occlusivity – variants 1, 2 and 3 <br />
The isovists perimeter analysis is very similar to <strong>the</strong> area analysis, with however lower values. <br />
Figure 2.3: isovists perimeter – variants 1, 2 and 3 <br />
It can be outlined that <strong>the</strong> value for area and perimeter are in reality better. The park is here modeled <br />
figure Figure 2.3: 2.3: isovists isovists perimeter perimeter - variants 1,2 – variants and 3 1, 2 and 3 <br />
as a building, in reality however it is reasonably possible to see through. For <strong>the</strong> occlusivity <strong>the</strong> value <br />
will also rise. However as <strong>the</strong> trees are creating more hidden edges than a wall, this can lead to a less <br />
It can be outlined that <strong>the</strong> value for area and perimeter are in reality better. The park is here modeled <br />
strong feeling <strong>of</strong> safety. <br />
as a building, in reality however it is reasonably possible to see through. For <strong>the</strong> occlusivity <strong>the</strong> value <br />
It can be outlined will also that rise. <strong>the</strong> However value as for <strong>the</strong> area trees and are perimeter creating more are in hidden reality edges better. than The a wall, park this here can lead modelled to a less <br />
as a building, strong in reality feeling however <strong>of</strong> safety. it is reasonably possible to see through. For <strong>the</strong> occlusivity <strong>the</strong> value<br />
will also rise.<br />
3.<br />
However<br />
Shadow<br />
as <strong>the</strong><br />
Analysis<br />
trees are<br />
<br />
creating more hidden edges than a wall, this can lead to a less<br />
strong feeling <strong>of</strong> safety.<br />
Shadow analysis is done for <strong>the</strong> winter (22. December) as well as for <strong>the</strong> summer solstice (20. June). <br />
3. Shadow 3.<br />
First Analysis Shadow Analysis <br />
this will be done on an empty park. Some statement will be made and <strong>the</strong>n verify on three variants <br />
<strong>of</strong> <strong>the</strong> park. Fur<strong>the</strong>rmore <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> variants will allow discussing on <strong>the</strong> tree placement. <br />
Shadow analysis is done for <strong>the</strong> winter (22. December) as well as for <strong>the</strong> summer solstice (20. June). <br />
Shadow analysis is done for <strong>the</strong> winter (22. December) as well as for <strong>the</strong> summer solstice (20. June).<br />
First this will be done on an empty park. Some statement will be made and <strong>the</strong>n verify on three variants <br />
First this will Winter solstice shadow analysis: <br />
<strong>of</strong><br />
be<br />
<strong>the</strong><br />
done<br />
park.<br />
on<br />
Fur<strong>the</strong>rmore<br />
an empty<br />
<br />
park.<br />
<strong>the</strong> analysis<br />
Some<br />
<strong>of</strong><br />
statement<br />
<strong>the</strong> variants<br />
will<br />
will<br />
be<br />
allow<br />
made<br />
discussing<br />
and <strong>the</strong>n<br />
on<br />
verify<br />
<strong>the</strong> tree<br />
on three<br />
placement.<br />
variants<br />
<br />
<strong>of</strong> <strong>the</strong> park. Fur<strong>the</strong>rmore <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> variants will allow discussing on <strong>the</strong> tree placement.<br />
The analysis is performed between 12 am and 16 pm. <br />
Winter solstice shadow analysis: <br />
This time slot is <strong>the</strong> time in winter where people are most likely to go out in a park. Classic lunchtime is <br />
Winter solstice shadow analysis:<br />
between 12 am and 2 pm. A good park design has to take it into account in order to provide sunny <br />
The analysis is performed between 12 am and 16 pm. <br />
places for people coming to enjoy <strong>the</strong> sun. The analysis This performed time slot is between <strong>the</strong> time in 12 winter am and where 16 people pm. are most likely to go out in a park. Classic lunchtime is <br />
This time slot between is <strong>the</strong> 12 time am in and winter 2 pm. where A good people park design are most has to likely take it to into go account out in a in park. order Classic to provide lunchtime sunny <br />
is between<br />
places<br />
12 am<br />
for<br />
and<br />
people<br />
2 pm.<br />
coming<br />
A good<br />
to enjoy<br />
park<br />
<strong>the</strong><br />
design<br />
sun. <br />
has to take it into account in order to provide sunny<br />
places for people coming to enjoy <strong>the</strong> sun.<br />
5 <br />
48<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture<br />
5
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
Figure 3.1 – Winter analysis <br />
figure 3.1 - Winter analysis<br />
Figure 3.2 -‐ Summer analysis <br />
figure 3.2 - Summer analysis<br />
The area encircled with red (figure 3.1) should have some seating possibilities. If no equipped area can <br />
The area encircled Figure be found 3.1 with – Winter inside red (figure analysis this red 3.1) figure, should this could have lead some to seating lower Figure frequentation 3.2 possibilities. -‐ Summer <strong>of</strong> analysis If <strong>the</strong> no park equipped <br />
in winter. area can<br />
be found inside this red figure, this could lead to lower frequentation <strong>of</strong> <strong>the</strong> park in winter.<br />
The The area emplacement encircled with <strong>of</strong> red <strong>the</strong> (figure park, with 3.1) its should proximity have some to railways seating is possibilities. in this case a If huge no equipped advantage area as <strong>the</strong>re can <br />
are <br />
be found no buildings inside this in <strong>the</strong> red lower figure, corner, this could which lead would to lower project frequentation shadows in <strong>of</strong> <strong>the</strong> <strong>the</strong> afternoon. park in winter. This is <br />
<strong>the</strong> reason why <br />
The emplacement <strong>the</strong> red<br />
<strong>of</strong> area<br />
<strong>the</strong> stays<br />
park, shadow-‐free<br />
with its proximity <strong>from</strong> 12h<br />
to on.<br />
railways <br />
is in this case a huge advantage as <strong>the</strong>re<br />
are no buildings The emplacement in <strong>the</strong> lower <strong>of</strong> corner, <strong>the</strong> park, which with its would proximity project to railways shadows is in in <strong>the</strong> this afternoon. case a huge This advantage is <strong>the</strong> as reason <strong>the</strong>re are <br />
why <strong>the</strong> red no area buildings Summer stays solstice in shadow-free <strong>the</strong> lower corner, <strong>from</strong> analysis: which 12h on. would project shadows in <strong>the</strong> afternoon. This is <strong>the</strong> reason why <br />
<strong>the</strong> red area stays shadow-‐free <strong>from</strong> 12h on. <br />
Summer solstice Here shadow <strong>the</strong> same analysis:<br />
reflection can be applied as in winter. However as <strong>the</strong> sun is high in <strong>the</strong> sky, it produces <br />
Summer very little solstice shaded shadow areas. analysis: This can <br />
be seen on figure 3.2. This lack <strong>of</strong> shaded area can lead to lower <br />
Here <strong>the</strong> same comfort reflection for <strong>the</strong> can users be applied in summer. as in This winter. is why However shadings as have <strong>the</strong> to sun be is installed. high in The <strong>the</strong> blue sky, encircled it produces<br />
area <br />
Here represents <strong>the</strong> same reflection <strong>the</strong> area that can receives be applied sun as in in winter. <strong>from</strong> However 12h on. as It <strong>the</strong> is preferable sun is high to in install <strong>the</strong> sky, shadings it produces out <strong>of</strong> <br />
<br />
very little shaded areas. This can be seen on figure 3.2. This lack <strong>of</strong> shaded area can lead to lower<br />
very this little blue shaded zone, areas. in order This no can to affect be seen <strong>the</strong> on shading figure 3.2. on this This area lack in <strong>of</strong> winter. shaded area can lead to lower <br />
comfort for <strong>the</strong> users in summer. This is why shadings have to be installed. The blue encircled area<br />
comfort for <strong>the</strong> users in summer. This is why shadings have to be installed. The blue encircled area <br />
represents represents <strong>the</strong> area that <strong>the</strong> area receives that receives sun in winter sun in <strong>from</strong> winter 12h <strong>from</strong> on. 12h It is on. preferable It is preferable to install to install shadings shadings out <strong>of</strong> out this <strong>of</strong> <br />
blue zone, this in order Now blue we zone, no will to in affect analyze order <strong>the</strong> no three to shading affect variants, <strong>the</strong> on shading and this see area on if it in this matches winter. area in our winter. expectations. <br />
Those three variants were <br />
part <strong>of</strong> <strong>the</strong> competition for <strong>the</strong> park’s design. Variant 1 won <strong>the</strong> competition and was built. The variants <br />
Now we will analyse can be seen three on variants, <strong>the</strong> next figures. and see The if it trees matches in <strong>the</strong> first our variant expectations. are quite Those dispersed three over variants <strong>the</strong> whole were<br />
park. <br />
part <strong>of</strong> <strong>the</strong> Now competition The we second will analyze for variant <strong>the</strong> three park’s has variants, a more design. structured and Variant see if distribution, 1 it matches won <strong>the</strong> our competition as expectations. <strong>the</strong> green and area Those was is divided built. three in The variants quadratic variants were parts. <br />
<br />
can be seen part on Finally <strong>of</strong> <strong>the</strong> competition next <strong>the</strong> last figures. version for The has <strong>the</strong> trees park’s most in <strong>of</strong> design. <strong>the</strong> its trees first Variant on variant <strong>the</strong> 1 lower won are <strong>the</strong> quite peak. competition dispersed and over was <strong>the</strong> built. whole The park. variants <br />
The second can variant The be seen analyses<br />
has on <strong>the</strong> a were<br />
more next done figures. structured for The 12h <br />
distribution, trees as well in as <strong>the</strong> for first <br />
as 16h. variant <strong>the</strong> <br />
green are area quite is dispersed divided over in quadratic <strong>the</strong> whole parts. park. <br />
The second variant has a more structured distribution, as <strong>the</strong> green area is divided in quadratic parts. <br />
Finally <strong>the</strong> last version has most <strong>of</strong> its trees on <strong>the</strong> lower peak.<br />
Finally Winter <strong>the</strong> last analysis: version has most <strong>of</strong> its trees on <strong>the</strong> lower peak. <br />
The analyses<br />
The <br />
were<br />
analyses<br />
done<br />
were<br />
for<br />
done<br />
12h<br />
for<br />
as<br />
<br />
well<br />
12h as<br />
as<br />
well<br />
for<br />
<br />
16h.<br />
as for 16h. <br />
Winter analysis: Winter analysis: <br />
Fig 3.3 – Variant 1: 12h Fig 3.4 – Variant 2: 12h Fig 3.5 – Variant 3: 12h <br />
Fig 3.3 – Variant 1: 12h Fig 3.4 – Variant 2: 12h Fig 3.5 – Variant 3: 12h <br />
figure 3.3 - Variant 1: 12h figure 3.4 - Variant 2: 12h figure 3.5 - Variant 3: 12h<br />
6 <br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
49<br />
6
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – – Alice Chevrier <br />
<strong>Digital</strong> <strong>Digital</strong> <strong>Urban</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> HS<strong>2015</strong> – Alice – Alice Chevrier Chevrier <br />
Fig 3.6 – Variant 1: 16h Fig 3.7 – Variant 2: 16h Fig 3.8 – Variant 3: 16h <br />
figure 3.6 - Variant 1: 16h<br />
figure 3.7 - Variant 2: 16h<br />
figure 3.8 - Variant 3: 16h<br />
The Fig<br />
lower<br />
Fig 3.6 3.6<br />
corner – – Variant that 1: <br />
1:<br />
was 16h marked <br />
in red in Fig Fig<br />
<strong>the</strong> 3.7 3.7<br />
previous – – Variant figures 2: 2: 16h is not left empty Fig<br />
<br />
Fig<br />
and 3.8 3.8<br />
even – – Variant though 3: 3:<br />
<br />
some 16h <br />
<br />
The lower corner that was marked in red in <strong>the</strong> previous figures is not left empty and even though some<br />
sun can Fig Fig 3.6 get – 3.6 through, Variant – Variant this 1: 16h 1: doesn’t 16h match <strong>the</strong> Fig expectations. Fig 3.7 – 3.7 Variant – Variant The 2: 16h version 2: 16h 2 is <strong>the</strong> one Fig where Fig 3.8 – 3.8 we Variant – can Variant see 3: 16h <strong>the</strong> 3: 16h <br />
sun can get through, this doesn’t match <strong>the</strong> expectations. The version 2 is <strong>the</strong> one where we can see <br />
most The<br />
sun lower<br />
on this corner lower that<br />
corner. was Even marked though in in red <strong>the</strong> in in<br />
<br />
o<strong>the</strong>r <strong>the</strong> <strong>the</strong> previous <br />
designs figures<br />
have<br />
less is is not<br />
sun<br />
left<br />
<br />
<br />
on<br />
left empty<br />
<strong>the</strong><br />
lower and corner, even though both <strong>of</strong> some <br />
<strong>the</strong> most <br />
<strong>the</strong>m sun The sun<br />
manage on this<br />
The can lower lower get <br />
<br />
get<br />
a corner sun lower through, corner window corner. that this that was in doesn’t was <strong>the</strong> Even marked marked upper though match in part red in <strong>the</strong> <strong>the</strong> red in <strong>of</strong> <strong>the</strong> expectations. <strong>the</strong> o<strong>the</strong>r<br />
in <strong>the</strong> previous park. designs The figures The<br />
<br />
<br />
squared have figures version is trees less not is 2 not left 2 is<br />
<br />
<br />
distribution sun on <strong>the</strong><br />
is <strong>the</strong> left empty <strong>the</strong> one empty and where <strong>of</strong> lower<br />
and even variant corner,<br />
we even we though can though 2 see<br />
<br />
see some <strong>the</strong> <strong>the</strong> some <br />
<br />
both <strong>of</strong> doesn’t <strong>the</strong>m sun most sun let can<br />
manage sun<br />
sun can get on<br />
on get through,<br />
a<br />
through,<br />
sun this lower on this<br />
window <strong>the</strong> corner. this doesn’t upper doesn’t<br />
in Even <br />
part, match<br />
<strong>the</strong> match though upper which <strong>the</strong> <strong>the</strong> expectations. <strong>the</strong><br />
makes part<br />
<strong>the</strong> <strong>of</strong> o<strong>the</strong>r it <strong>the</strong> designs The design park.<br />
The version have The where version <br />
squared less 2 <strong>the</strong>re is sun 2 is on <strong>the</strong> is one <strong>the</strong><br />
trees <strong>the</strong><br />
<strong>the</strong> one where lower<br />
less<br />
where<br />
distribution sun we corner, at can we 12h can see both <strong>of</strong><br />
see <strong>the</strong> <strong>of</strong> <strong>of</strong> <strong>the</strong> <br />
variant 2 doesn’t <strong>the</strong>m most most sun manage let sun on sun this on a a sun this through lower window lower corner. on corner. in<br />
<strong>the</strong><br />
in Even <strong>the</strong> <strong>the</strong><br />
upper Even upper though though part, part <strong>the</strong> <strong>of</strong><br />
which <strong>of</strong> o<strong>the</strong>r o<strong>the</strong>r park. makes designs designs The it have squared <strong>the</strong> have less design less trees sun sun on where distribution <strong>the</strong> <strong>the</strong> lower <strong>the</strong>re lower corner, <strong>of</strong><br />
is<br />
<strong>of</strong> variant <strong>the</strong><br />
corner, less<br />
both 2 both 2 <strong>of</strong> <br />
<strong>of</strong> <br />
sun at On 12h. <strong>the</strong> <strong>the</strong>m doesn’t figure <strong>the</strong>m manage let <br />
let manage for sun 4 a <br />
pm, through sun a one sun window <strong>of</strong> window on on<br />
<strong>the</strong> <strong>the</strong> <strong>the</strong> last upper <strong>the</strong> in shadow <strong>the</strong> upper part, upper part <br />
projection which part <strong>of</strong> <strong>the</strong> makes <strong>of</strong> <strong>the</strong> park. before park. it it <strong>the</strong> The <br />
<br />
<strong>the</strong><br />
<strong>the</strong> The design squared <br />
night squared <br />
where<br />
can<br />
trees be trees <br />
<strong>the</strong>re seen. distribution The<br />
<strong>the</strong> <strong>the</strong><br />
position less <strong>of</strong> variant sun <strong>of</strong> <strong>of</strong> variant at <br />
at 12h 2 <br />
<br />
2 <br />
<strong>the</strong> sun doesn’t doesn’t is now let such sun let sun through that through <strong>the</strong> on high <strong>the</strong> on building’s <strong>the</strong> upper upper part, shadow part, which which doesn’t makes makes reach it <strong>the</strong> it design <strong>the</strong> design park where anymore. where <strong>the</strong>re <strong>the</strong>re At is this <strong>the</strong> <strong>the</strong> less time less sun <strong>the</strong> sun at <br />
12h at 12h <br />
On <strong>the</strong> trees figure On<br />
<br />
On<br />
are <strong>the</strong> for <br />
<br />
<strong>the</strong><br />
<strong>the</strong> figure 4 <br />
main pm, for<br />
<br />
<br />
reason one for 4 4 pm, <strong>of</strong> for <strong>the</strong> one shadows last <strong>of</strong> <strong>of</strong> <strong>the</strong> shadow <strong>the</strong> last<br />
in <strong>the</strong> shadow projection park. projection<br />
As<br />
<strong>the</strong>y before stretch before <strong>the</strong> up, night <strong>the</strong> <br />
<br />
<strong>the</strong><br />
it is night can easy can be to be seen. be that<br />
seen. The <strong>the</strong> The<br />
position variant 2 <br />
<strong>of</strong><br />
<strong>of</strong> <br />
<strong>the</strong> sun<br />
is not<br />
is On <strong>the</strong> now<br />
<br />
<strong>the</strong><br />
ideal, <strong>the</strong> On sun such <strong>the</strong> figure whereas is is now figure that for such <br />
<strong>the</strong> 4 <strong>the</strong> for pm, that 4 two<br />
high pm, one <strong>the</strong><br />
o<strong>the</strong>r<br />
<strong>the</strong> one building’s <strong>of</strong> high <strong>the</strong> <strong>of</strong> variants <strong>the</strong> building’s last last shadow<br />
managed shadow projection doesn’t<br />
to keep doesn’t reach before a sun reach before enlighten<br />
<strong>the</strong> <strong>the</strong> park <strong>the</strong> night park night area<br />
anymore. can can be on seen. be <strong>the</strong> seen. At<br />
top The At this <br />
<br />
<strong>of</strong> this The position <strong>the</strong> time position <br />
<strong>the</strong> <strong>of</strong> <br />
<strong>of</strong> <br />
park. trees Letting <strong>the</strong> sun are are sun is a <strong>the</strong> now <br />
<strong>the</strong><br />
large is main now such area such reason that without that <strong>the</strong> for for <strong>the</strong> high shadows<br />
trees<br />
high building’s in <strong>the</strong> in in <strong>the</strong><br />
middle<br />
<strong>the</strong> shadow park. shadow is <br />
As<br />
indeed doesn’t As <strong>the</strong>y doesn’t a stretch reach good reach <br />
design <strong>the</strong> up, up, <strong>the</strong> park it it is<br />
in<br />
is park easy anymore. order to to<br />
to see see<br />
let At <br />
light this At this <strong>the</strong> time access time <strong>the</strong> <br />
trees are <strong>the</strong> main reason for shadows in <strong>the</strong> park. As <strong>the</strong>y stretch up, it is easy to see that <strong>the</strong> variant<br />
<strong>the</strong> 2 2 <br />
<strong>the</strong> area. is trees is not trees Though are ideal, are <strong>the</strong> whereas main <strong>the</strong> main building reason <strong>the</strong> reason <strong>the</strong> two<br />
<br />
environment for o<strong>the</strong>r shadows for variants in has <strong>the</strong> in to managed <strong>the</strong> park. be park. considered. As to <strong>the</strong>y As to keep <strong>the</strong>y stretch It a stretch a<br />
leads sun up, in up, it this it easy is case easy to to see to shadows<br />
on see that that top <strong>the</strong> <br />
2 is not <strong>of</strong> <strong>the</strong> variant <strong>the</strong> variant <br />
2 2 <br />
especially ideal, whereas is park. not is Letting not ideal, on<br />
<strong>the</strong> ideal, whereas upper <strong>the</strong> two a a large whereas area o<strong>the</strong>r area <strong>the</strong> <strong>the</strong> in two without <strong>the</strong> variants<br />
two o<strong>the</strong>r afternoon. managed<br />
o<strong>the</strong>r trees variants variants in in<br />
to keep a sun enlighten area on <strong>the</strong> top <strong>of</strong> <strong>the</strong><br />
<strong>the</strong> <strong>the</strong> managed middle is to is indeed keep to keep a a sun good a sun enlighten design in area in order area on <strong>the</strong> on to to let <strong>the</strong> top let light top <strong>of</strong> <strong>the</strong> <strong>of</strong> access <strong>the</strong> <br />
park. Letting a large area without trees in <strong>the</strong> middle is indeed a good design in order to let light access<br />
<br />
<strong>the</strong> park. <strong>the</strong> park. area. Letting Though Letting a large a <strong>the</strong> large <strong>the</strong> area building area without without environment trees trees in <strong>the</strong> in has <strong>the</strong> middle to to middle be be considered. is indeed is indeed a good It a It leads good design in design in this in order case in order to to shadows let to light let light <br />
access access <br />
<strong>the</strong> area. Summer <strong>the</strong> Though especially <strong>the</strong> area. analysis: area. Though <strong>the</strong> on on Though <strong>the</strong><br />
building<br />
<strong>the</strong> upper <strong>the</strong> <strong>the</strong> building environment area building in environment in <strong>the</strong> <strong>the</strong> has afternoon. to has be has to be considered. to considered. be It It leads leads It leads in in this this in this case case case to shadows to to shadows<br />
<br />
especially especially on <strong>the</strong> upper on <strong>the</strong> on area <strong>the</strong> upper in upper <strong>the</strong> area area afternoon.<br />
in <strong>the</strong> in <strong>the</strong> afternoon. <br />
Summer analysis: <br />
Summer analysis:<br />
Summer Summer analysis: analysis: <br />
Fig 3.9 – Variant 1: 16h Fig 3.10 – Variant 2: 16h Fig 3.11 – Variant 3: 16h <br />
Fig Fig 3.9 3.9 – – Variant 1: 1: 16h Fig Fig 3.10 – – Variant 2: 2: 16h Fig Fig 3.11 – – Variant 3: 3: 16h <br />
Fig<br />
figure Fig 3.9 – 3.9 -<br />
–<br />
Variant<br />
<br />
1: 16h<br />
1: 16h Fig <br />
figure<br />
Fig 3.10 3.10 – -<br />
–<br />
Variant<br />
<br />
2: 16h<br />
2: 16h Fig Fig<br />
figure 3.11 <br />
3.11 – <br />
-– Variant<br />
3: <br />
16h<br />
3: 16h <br />
Fig 3.12 – Variant 1: 19h Fig 3.13 – Variant 2: 19h Fig 3.14 – Variant 3: 19h <br />
figure 3.12 - Variant 1: 19h<br />
figure 3.13 - Variant 2: 19h<br />
figure 3.14 - Variant 3: 19h<br />
Fig Fig 3.12 – – Variant 1: 1: 19h Fig Fig 3.13 – – Variant 2: 2: 19h Fig Fig 3.14 – – Variant 3: 3: 19h <br />
Fig Fig 3.12 3.12 – Variant – Variant 1: 19h 1: 19h Fig Fig 3.13 3.13 – Variant – Variant 2: 19h 2: 19h Fig Fig 3.14 3.14 – Variant – Variant 3: 19h 3: 19h <br />
7 <br />
50<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture<br />
77 <br />
7 7
The analysis for 12h is not shown, as it is <strong>of</strong> limited interest due to <strong>the</strong> very high position <strong>of</strong> <strong>the</strong> sun, <br />
which leads to shadow only under <strong>the</strong> trees. Instead <strong>the</strong> shadow situation at 7pm was analyzed. This is <br />
The analysis<br />
last<br />
for<br />
hour<br />
12h<br />
<strong>of</strong> <br />
is<br />
sun<br />
not<br />
in summer,<br />
shown,<br />
<br />
as<br />
and<br />
it<br />
a<br />
is<br />
generally<br />
<strong>of</strong> limited<br />
very<br />
interest<br />
appreciated<br />
due to<br />
time<br />
<strong>the</strong><br />
to<br />
very<br />
be outside.<br />
high position<br />
<br />
<strong>of</strong> <strong>the</strong> sun,<br />
which leads At to 4 pm shadow <strong>the</strong> trees only disposition under <strong>the</strong> as trees. well as Instead <strong>the</strong> building <strong>the</strong> shadow environment situation doesn’t at 7pm affect was <strong>the</strong> sunlight analysed. reaching This <br />
is last hour <strong>the</strong> <strong>of</strong> park. sun in In summer, this case <strong>the</strong> and variant a generally 2 could very be <strong>the</strong> appreciated most enjoyable time as to sun be and outside. shadow At spaces 4 pm are <strong>the</strong> well trees <br />
disposition distributed. as well as The <strong>the</strong> variant building 3 on environment <strong>the</strong> o<strong>the</strong>r hand doesn’t has clear affect marked <strong>the</strong> zones sunlight for sun reaching (upper <strong>the</strong> part) park. and shadow In this <br />
case <strong>the</strong> variant (lower 2 part). could be <strong>the</strong> most enjoyable as sun and shadow spaces are well distributed. The<br />
variant 3 on At <strong>the</strong> 7 pm o<strong>the</strong>r variants hand 1 and has 2 clear are also marked to be zones preferred, for as sun <strong>the</strong>y (upper allow part) larger and space shadow <strong>of</strong> sunlight (lower than part). <strong>the</strong> At variant 7 <br />
pm variants 3. 1 and 2 are also to be preferred, as <strong>the</strong>y allow larger space <strong>of</strong> sunlight than <strong>the</strong> variant 3.<br />
4. Connectivity and Choice Analysis in Park<br />
The analysis 4. <strong>of</strong> <strong>the</strong> Connectivity connectivity and <strong>of</strong> Choice <strong>the</strong> choice Analysis in <strong>the</strong> in park Park will be made on two new variants. This<br />
comes <strong>from</strong> <strong>the</strong> fact that <strong>the</strong> variants used in <strong>the</strong> above analyses didn’t have clearly defined ways. I<br />
chose to analyse The analysis two intuitive <strong>of</strong> <strong>the</strong> connectivity pathway and distributions: <strong>of</strong> <strong>the</strong> choice one in pathway <strong>the</strong> park will is surrounding be made on two <strong>the</strong> new park variants. and o<strong>the</strong>rs This <br />
crossing it. The first variants has vertically and horizontally pathways whereas <strong>the</strong> second one diagonals.<br />
comes <strong>from</strong> <strong>the</strong> fact that <strong>the</strong> variants used in <strong>the</strong> above analyses didn’t have clearly defined ways. <br />
I chose to analyze two intuitive pathway distributions: one pathway is surrounding <strong>the</strong> park and o<strong>the</strong>rs <br />
In Depthmap crossing I set it. up The <strong>the</strong> first colour variants scale has so vertically that both and <strong>of</strong> horizontally <strong>the</strong> variants pathways have <strong>the</strong> whereas same. <strong>the</strong> This second allows one a true<br />
comparison. diagonals. However some caution in <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> results is needed as <strong>the</strong> analysis is done on<br />
segments,<br />
In<br />
which<br />
Depthmap<br />
can lead<br />
I set up<br />
to<br />
<br />
a<br />
<strong>the</strong><br />
lack<br />
color<br />
<strong>of</strong><br />
scale<br />
exactness.<br />
so that both<br />
Finally<br />
<strong>of</strong> <strong>the</strong><br />
it should<br />
variants<br />
not<br />
have<br />
be<br />
<strong>the</strong><br />
forgotten<br />
same. This<br />
that<br />
allows<br />
this<br />
<br />
is<br />
a true<br />
a park<br />
<br />
comparison. However some caution in <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> results is needed as <strong>the</strong> analysis is done on <br />
and <strong>the</strong>refore <strong>the</strong> ways are not as definite as a real street can be. There is always a possibility to cross<br />
segments, which can lead to a lack <strong>of</strong> exactness. Finally it should not be forgotten that this is a park and <br />
through.<br />
<strong>the</strong>refore <strong>the</strong> ways are not as definite as a real street can be. There is always a possibility to cross <br />
through. <br />
The two figures appear to have a very different choice distribution. The vertical pathway on variant 1 is<br />
<strong>the</strong> most used. The two On figures <strong>the</strong> o<strong>the</strong>r appear hand, to have <strong>the</strong> variant a very different 2 has a choice very equal distribution. distribution The vertical <strong>of</strong> <strong>the</strong> pathway people’s on flow. variant This 1 is <br />
type <strong>of</strong> analysis <strong>the</strong> most is very used. helpful On <strong>the</strong> o<strong>the</strong>r in order hand, to <strong>the</strong> dimension variant 2 <strong>the</strong> has ways. a very equal In this distribution example <strong>the</strong> <strong>of</strong> <strong>the</strong> red people’s coloured flow. path This <br />
would have type to be <strong>of</strong> analysis large enough is very helpful and to in be order made to dimension out <strong>of</strong> a strong <strong>the</strong> ways. and In easy this to example maintain <strong>the</strong> red material. colored Maybe path <br />
<strong>the</strong> landscape would architects have to be would large enough ra<strong>the</strong>r have and to a be park made without <strong>of</strong> a big strong artery. and In easy this to case maintain <strong>the</strong> material. variant 2 Maybe would <strong>the</strong> <br />
fit much better.<br />
landscape architects would ra<strong>the</strong>r have a park without a big artery. In this case <strong>the</strong> variant 2 would fit <br />
much better. <br />
100m<br />
Fig. 4.1: Choice <br />
figure 4.1 Choice<br />
100m<br />
The figures The above figures are below for connectivity. are for connectivity. They give They information give information on how on many how many segments segments one one segment is is <br />
connected connected to. The figures to. The have figures here have more here similarities more similarities than with than <strong>the</strong>y with had <strong>the</strong>y for had <strong>the</strong> for choice. <strong>the</strong> choice. The The pathways pathways <br />
crossing <strong>the</strong> park show a high connection with neighboring paths. <br />
crossing <strong>the</strong> park show a high connection with neighbouring paths.<br />
Here <strong>the</strong> segment analysis is not totally correct. For example on variant 1, <strong>the</strong> two indicated paths <br />
should have <strong>the</strong> same color. However <strong>the</strong> left one has a lighter blue color due to <strong>the</strong> fact that <strong>the</strong> line at <br />
Here <strong>the</strong> segment <strong>the</strong> intersection analysis not is not a straight totally line, correct. and is For considered example by on <strong>the</strong> variant program 1, as <strong>the</strong> two two distinct indicated segments. paths <br />
should have <strong>the</strong> same color. However <strong>the</strong> left one has a lighter blue color due to <strong>the</strong> fact that <strong>the</strong> line<br />
at <strong>the</strong> intersection is not a straight line, and is considered by <strong>the</strong> program as two distinct segments. 8 <br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
51
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> HS<strong>2015</strong> – Alice Chevrier <br />
100m<br />
Fig 4.2: Connectivity <br />
figure 4.2 Connectivity<br />
100m<br />
Conclusion<br />
Conclusion <br />
Through <strong>the</strong>se analyses I wanted to see how we could apply <strong>the</strong> tools we learned in class for real<br />
design purposes. Such tools can bring a lot <strong>of</strong> information for a better design. They are a big help into<br />
trying to get a social approach as we always have to think what impact this or that property will have<br />
on <strong>the</strong> users and on its behaviour. They are also a way to measure and quantify <strong>the</strong>se properties and<br />
allow quantitative and not only qualitative comparisons.<br />
Through <strong>the</strong>se analyses I wanted to see how we could apply <strong>the</strong> tools we learned in class for real design <br />
purposes. Such tools can bring a lot <strong>of</strong> information for a better design. They are a big help into trying to <br />
get a social approach as we always have to think what impact this or that property will have on <strong>the</strong> <br />
The analysis users done and on on this its behavior. park was They very are interesting. also a way to However measure making and quantify a choice <strong>the</strong>se for properties <strong>the</strong> best and variant allow is<br />
very difficult quantitative for different and reasons. not only First, qualitative I analyzed comparisons. two sets <strong>of</strong> variants. For <strong>the</strong> shadow range analysis<br />
I used three The variants analysis that done were on this actually park was competing very interesting. and, for However <strong>the</strong> connectivity making a analysis, choice for two <strong>the</strong> best variants that is <br />
I drew myself. very Making difficult a for choice different on reasons. <strong>the</strong> three First, variants I analyzed only two over sets a shadow <strong>of</strong> variants. range For analysis <strong>the</strong> shadow is very range difficult analysis I <br />
and should used in practice three variants not be that done. were O<strong>the</strong>r actually very competing important and, parameters for <strong>the</strong> connectivity have to analysis, be taken two into variants account. that I <br />
drew myself. Making a choice on <strong>the</strong> three variants only over a shadow range analysis is very difficult <br />
However, if I had to give an opinion, relying only on this shadow range analysis, I would take <strong>the</strong> variant 1,<br />
and should in practice not be done. O<strong>the</strong>r very important parameters have to be taken into account. <br />
which was built. I make this choice by considering <strong>the</strong> sunshine distribution on <strong>the</strong> park over winter and<br />
However, if I had to give an opinion, relying only on this shadow range analysis, I would take <strong>the</strong> variant <br />
summer. Regarding 1, which was <strong>the</strong> built. variants I make used this in choice <strong>the</strong> choice by considering and connectivity <strong>the</strong> sunshine analysis distribution I can on not <strong>the</strong> make park over a choice winter <br />
only base on and those summer. results. Regarding The context <strong>the</strong> variants in which used <strong>the</strong> in <strong>the</strong> park choice is integrated and connectivity is here analysis much too I can important not make a not <br />
to be taken choice into account. only base This on those is a choice results. The that context <strong>the</strong> planers in which have <strong>the</strong> to park make, is integrated without overlooking is here much <strong>the</strong> too many<br />
o<strong>the</strong>r important important factors. not to be taken into account. This is a choice that <strong>the</strong> planers have to make, without <br />
overlooking <strong>the</strong> many o<strong>the</strong>r important factors. <br />
Theses powerful Theses tools powerful should tools definitively should definitively be used be when used possible. when possible. However However <strong>the</strong> computer <strong>the</strong> computer analysis analysis isn’t isn’t <br />
enough and enough a questioning and a questioning <strong>of</strong> <strong>the</strong> results <strong>of</strong> <strong>the</strong> is results fundamental is fundamental to properly to properly use <strong>the</strong> use provided <strong>the</strong> provided information. information. These These <br />
tools have a very wide range <strong>of</strong> application. Using <strong>the</strong>m for a park design analysis is an example on how <br />
tools have a very wide range <strong>of</strong> application. Using <strong>the</strong>m for a park design analysis is an example on how<br />
much can be done with <strong>the</strong>m. <br />
much can be done with <strong>the</strong>m.<br />
52<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture<br />
9
Hochschulgebiet Zentrum<br />
Student: Jonas Landholt & Stefan Caranovic
Hochschulgebiet Zentrum - Strategy As<br />
Final Examination<br />
Name: Stefan Caranovic, Jonas Landolt<br />
Date: 30.11.<strong>2015</strong><br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
56<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
sessment<br />
1/13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
57
In<br />
wa<br />
an<br />
an<br />
de<br />
wa<br />
Summary<br />
The ETH, University and <strong>the</strong> University Hospital <strong>of</strong> Zurich are planning to transform <strong>the</strong> Hochschulquartier<br />
in Zurich City within <strong>the</strong> next 15 years. During this huge project, lots <strong>of</strong> older buildings are planned to<br />
be Summary: demolished and new space will be created. The intention <strong>of</strong> this gigantic retr<strong>of</strong>it project is to extend<br />
and centralize <strong>the</strong> space for <strong>the</strong> high schools and <strong>the</strong> hospital to form a Campus.<br />
The ETH, University and <strong>the</strong> University Hospital <strong>of</strong> Zurich are planning to transform <strong>the</strong> Hochschulquartier in<br />
In Zurich this City digital within urban <strong>the</strong> simulation next 15 years. project, During <strong>the</strong> this huge status project, quo as lots well <strong>of</strong> older as <strong>the</strong> buildings “Masterplan are planned Hochschulgebiet<br />
to be demolished<br />
and are new analyzed space will according be created. to The traffic, intention accessibility, <strong>of</strong> this gigantic open retr<strong>of</strong>it spaces project and photovoltaics is extend and potential. centralize The <strong>the</strong><br />
Zentrum”<br />
“Masterplan” space for <strong>the</strong> high is an schools existing and conceptual <strong>the</strong> hospital study - to form <strong>of</strong> future a Campus. transformation potentials for this city quarter.<br />
Beside In this digital <strong>the</strong> analysis urban simulation <strong>of</strong> existing project, variations, <strong>the</strong> status some quo as fur<strong>the</strong>r well as improvement <strong>the</strong> “Masterplan suggestions Hochschulgebiet and Zentrum” optimization are<br />
strategies analyzed according are analyzed. to traffic, accessability, open spaces and photovoltaics potential. The “Masterplan” is an<br />
existing conceptual study <strong>of</strong> future transformation potentials for this city quarter.<br />
Figure 1 and 2 show <strong>the</strong> existing situation as well as <strong>the</strong> building composition planned in <strong>the</strong> “Masterplan”.<br />
As<br />
Beside<br />
shown<br />
<strong>the</strong><br />
in<br />
analysis<br />
<strong>the</strong> figures<br />
<strong>of</strong> existing<br />
<strong>the</strong> “Masterplan”<br />
variations, some<br />
gives<br />
fur<strong>the</strong>r<br />
a drastic<br />
improvement<br />
change<br />
suggestions<br />
to <strong>the</strong> whole<br />
and<br />
campus<br />
optimization<br />
area.<br />
strategies<br />
For such<br />
are<br />
analyzed.<br />
a big transformation project it is important to analyse impacts on traffic and pedestrian movement.<br />
Figure 1 and 2 show <strong>the</strong> existing situation as well as <strong>the</strong> building composition planned in <strong>the</strong> “Masterplan”. As<br />
shown in <strong>the</strong> figures <strong>the</strong> “Materplan” gives a drastic change to <strong>the</strong> whole campus area. For such a big transformation<br />
project it is importent to analyze impacts on traffic and pedestrian movements.<br />
Si<br />
co<br />
qu<br />
po<br />
ity<br />
Si<br />
re<br />
So<br />
bu<br />
An<br />
Th<br />
es<br />
to<br />
to<br />
cit<br />
fro<br />
ex<br />
pa<br />
Figure1:StatusQuo,Buildingsthatareintendedtobedemolished(yellow)<br />
that are intended to demolished (yellow) Figure2:Masterplan,plannednewbuildings(red)<br />
planned new (red)<br />
Motivation:<br />
Motivation<br />
In <strong>the</strong> current situation <strong>the</strong>re is quite some traffic through <strong>the</strong> “Hochschulgebiet Zentrum” coming <strong>from</strong> <strong>the</strong><br />
In Bellevue <strong>the</strong> current and leading situation towards <strong>the</strong>re Bucheggplatz. is quite some This traffic is through producing <strong>the</strong> quite “Hochschulgebiet some noise and is Zentrum” separating coming <strong>the</strong><br />
<strong>from</strong> Hochschulgebiet <strong>the</strong> Bellevue in and two leading parts. In towards early morning Bucheggplatz. and evening This hours traffic where is producing also people quite flow is some massive noise (~15’000 and is<br />
separating Students studying <strong>the</strong> Hochschulgebiet int his area), <strong>the</strong> roads in two get parts. <strong>of</strong>ten In stucked early morning by cars and and <strong>the</strong> evening noise & pollutants hours where load also on <strong>the</strong> people<br />
flow<br />
pedestrians<br />
is massive<br />
in quite<br />
(~15’000<br />
high and<br />
Students<br />
<strong>the</strong> people<br />
studying<br />
flow is also<br />
in<br />
distracted<br />
his area),<br />
by<br />
<strong>the</strong><br />
<strong>the</strong><br />
roads<br />
cars blocking<br />
get <strong>of</strong>ten<br />
<strong>the</strong><br />
jammed<br />
roads.To visualize<br />
by cars<br />
this<br />
and<br />
unsatisfying situation, <strong>the</strong> first part <strong>of</strong> <strong>the</strong> analysis will focus on improvement strategies <strong>of</strong> <strong>the</strong> traffic situation,<br />
<strong>the</strong> noise & pollutants load on <strong>the</strong> pedestrians in quite high and <strong>the</strong> people flow is also distracted by<br />
means reduce <strong>the</strong> private traffic through <strong>the</strong> “Hochschulgebiet Zentrum”. This analysis will be performed by an<br />
<strong>the</strong> cars blocking <strong>the</strong> roads. To visualize this unsatisfying situation, <strong>the</strong> first part <strong>of</strong> <strong>the</strong> analysis will<br />
integration and choice analysis on a bigger scale.<br />
focus on improvement strategies <strong>of</strong> <strong>the</strong> traffic situation, means reduce <strong>the</strong> private traffic through <strong>the</strong><br />
“Hochschulgebiet Zentrum”. This analysis will be performed by an integration and choice analysis on<br />
a bigger scale<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
58<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
e<br />
000<br />
in<br />
ole<br />
<strong>the</strong><br />
” are<br />
ies are<br />
As<br />
orma-<br />
Since <strong>the</strong> pedestrian density in <strong>the</strong> “Hochschulgebiet Zentrum” is quite high due to <strong>the</strong> high amount<br />
<strong>of</strong> students coming to ETH or University Zurich, <strong>the</strong> pedestrian pathways need to be improved. The<br />
“Masterplan Hochschulquartier” includes also a guideline where new pedestrian paths should be created<br />
and where new public transportation stations should be built. To analyse <strong>the</strong> proposed pedestrian paths<br />
and fur<strong>the</strong>r improve <strong>the</strong> accessibility <strong>of</strong> <strong>the</strong> area for pedestrians, an integration and choice analysis is<br />
performed<br />
Since <strong>the</strong><br />
on<br />
pedestrian<br />
district level.<br />
density in <strong>the</strong> “Hochschulgebiet Zentrum” is quite high due to <strong>the</strong> high amount <strong>of</strong> students<br />
coming to ETH or University Zurich, <strong>the</strong> pedestrian pathways need to be improved. The “Masterplan Hochschulquartier”<br />
includes also a guideline where new pedestrian paths should be created and where new public transportation<br />
Since such a<br />
stations<br />
high urban<br />
should<br />
transformation<br />
be built. To analyse<br />
is planned,<br />
<strong>the</strong> proposed<br />
<strong>the</strong> designers<br />
pedestrian<br />
should<br />
paths and<br />
also<br />
fur<strong>the</strong>r<br />
think<br />
improve<br />
about an<br />
<strong>the</strong><br />
integration<br />
accessability<br />
<strong>of</strong> <strong>the</strong> area energy for pedestrians, technologies an integration and how and <strong>the</strong> newly choice built analysis buildings is performed could on be district optimised level. for renewables.<br />
<strong>of</strong> renewable<br />
With a Solar Radiation analysis, <strong>the</strong> PV potential is assessed and with optimization strategies, <strong>the</strong><br />
heights Since <strong>of</strong> such <strong>the</strong> a new high urban buildings stransformation get adjusted is planned, in a way <strong>the</strong> to designers optimise should <strong>the</strong> amount also think <strong>of</strong> electricity about an integration out <strong>of</strong> PV. <strong>of</strong><br />
renewable energy technologies and how <strong>the</strong> newly built buildings could be optimized for renewables. With a<br />
Analysis Solar Radiation 1: Private analysis, Traffic <strong>the</strong> Reduction PV potential Strategies is assessed - Lake and with Tunnel optimization strategies, <strong>the</strong> heights <strong>of</strong> <strong>the</strong> new<br />
buildings get adjusted in a way to optimize <strong>the</strong> amount <strong>of</strong> electricity out <strong>of</strong> PV.<br />
The traffic situation in Zurich is quite complex. There is a very dense city centre whose border on one<br />
side Analysis touch- 1: es Private <strong>the</strong> lake. Traffic Zurich Reduction is widely Strategies known - Lake as Tunnel a traffic hot spot in Switzerland. If you want to travel<br />
<strong>from</strong> St. Gallen towards Bern / Basel you need to drive by Zurich. And if you want to go <strong>from</strong> Chur to<br />
Bern The / traffic Basel situation you also in need Zurich to is quite drive complex. by Zurich. There Therefor is a very Zurich dense city started centre to whose build border a Highway on one ring side around touches<br />
<strong>the</strong> to lake. limit Zurich <strong>the</strong> traffic is widely through known as <strong>the</strong> a traffic city centre. hot spot But in Switzerland. this Highway If you ring want has to travel never <strong>from</strong> been St. Gallen closed (see<br />
Zurich<br />
figure towards on title Bern page). / Basel An you example: need to drive people by Zurich. driving And <strong>from</strong> if you Zollikon want to with go destination <strong>from</strong> Chur to Wallisellen Bern / Basel will you likely also need drive<br />
through to drive <strong>the</strong> by City Zurich. - through Therefor <strong>the</strong> Zurich Hochschulquartier. started to build a Highway The existing ring around road system Zurich to with limit highways <strong>the</strong> traffic through (red), major <strong>the</strong><br />
roads city center. (green) But and this minor Highway roads ring (blue) has never is shown been closed in on <strong>the</strong> (see title figure page. on title page). An example: people driving<br />
<strong>from</strong> Zollikon with destination Wallisellen will likely drive through <strong>the</strong> City - through <strong>the</strong> Hochschulquartier. The<br />
In <strong>the</strong><br />
existing<br />
year<br />
road<br />
2000,<br />
system<br />
<strong>the</strong><br />
with<br />
cantonal<br />
highways<br />
government<br />
(red), major<br />
<strong>of</strong><br />
roads<br />
Zurich<br />
(green)<br />
planned<br />
and minor<br />
to build<br />
roads<br />
a tunnel<br />
(blue) is<br />
under<br />
shown<br />
<strong>the</strong><br />
in on<br />
lake<br />
<strong>the</strong><br />
to<br />
title<br />
close<br />
page.<br />
<strong>the</strong> high- way ring, but <strong>the</strong> governing council banned this project and as we all know it has never been<br />
realized. In this analysis <strong>the</strong> Status Quo traffic situation is compared with a situation where a tunnel<br />
In <strong>the</strong> year 2000, <strong>the</strong> cantonal government <strong>of</strong> Zurich planned to build a tunnel under <strong>the</strong> lake to close <strong>the</strong> highway<br />
ring, <strong>the</strong> lake but <strong>the</strong> would governing exist and council <strong>the</strong> banned highway this ring project would and be as we closed. all know To it see has <strong>the</strong> never impact been realized. on <strong>the</strong> traffic, In this an<br />
below<br />
integration analysis <strong>the</strong> and Status choice Quo traffic analysis situation with depthmap is compared was with a performed. situation where For a visualization tunnel below <strong>of</strong> <strong>the</strong> urban lake would scale exist hot<br />
spots and and <strong>the</strong> highway choice decisions, ring would be <strong>the</strong> closed. analysis To see radius <strong>the</strong> impact was set on to <strong>the</strong> infinite. traffic, an integration and choice analysis with<br />
depthmap was performed. For visualization <strong>of</strong> urban scale hot spots and choice decisions, <strong>the</strong> analysis radius<br />
was set to infinite.<br />
his<br />
on,<br />
an<br />
Lake Tunnel Highways Major Roads Minor Roads<br />
Figure 3: Closed Highway Figure ring 3: with Closed lake tunnel Highway ring with lake tunnel<br />
2/13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
59
Integration - Status Quo (Figure 4)<br />
Integration - Status Quo (Figure 4)<br />
Int<br />
In<br />
Integration - Status Quo (Figure 4)<br />
Integration - Lake Tunnel (Figure 5)<br />
Integration - Lake Tunnel (Figure 5)<br />
Inte<br />
Inte<br />
The<br />
tion The<br />
to tion in<br />
com to i<br />
com<br />
Sinc<br />
io Sinw<br />
ing io w<br />
ing<br />
Inte<br />
<strong>the</strong> Inte<br />
tion <strong>the</strong><br />
aro tion<br />
way aro<br />
io. wa<br />
io.<br />
City<br />
are City<br />
are<br />
Integration - Lake Tunnel (Figure 5)<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
60<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Integration - Difference between Status Quo & Lake Tunnel (Figure 6)<br />
Integration - Difference between Status Quo & Lake Tunnel (Figure 6)<br />
Integration <strong>Simulation</strong> - Status Quo vs. Lake Tunnel<br />
Integration <strong>Simulation</strong> - Status Quo vs. Lake Tunnel<br />
The two scenarios, Status Quo and Lake Tunnel, were analyzed with depthmap to see <strong>the</strong> difference in integration<br />
and to visualize <strong>the</strong> effect <strong>of</strong> closing <strong>the</strong> highway ring. The analysis radius <strong>of</strong> <strong>the</strong> integration analysis was set<br />
The<br />
to infinity<br />
two scenarios,<br />
to get a picture<br />
Status<br />
about<br />
Quo<br />
<strong>the</strong><br />
and<br />
city<br />
Lake<br />
wide<br />
Tunnel,<br />
hot spots.<br />
were<br />
The<br />
analyzed<br />
scales <strong>of</strong> <strong>the</strong><br />
with<br />
two<br />
depthmap<br />
analysis results<br />
to see<br />
were<br />
<strong>the</strong><br />
aligned<br />
difference<br />
to get<br />
in<br />
integra- comparabe tion results. and to visualize <strong>the</strong> effect <strong>of</strong> closing <strong>the</strong> highway ring. The analysis radius <strong>of</strong> <strong>the</strong> integration<br />
analysis was set to infinity to get a picture about <strong>the</strong> city wide hot spots. The scales <strong>of</strong> <strong>the</strong> two analysis<br />
results Since it is were not easy aligned to see to <strong>the</strong> get difference comparabe between results. figure 4 and 5, <strong>the</strong> integration results <strong>of</strong> <strong>the</strong> Status Quo scenario<br />
were substracted <strong>from</strong> <strong>the</strong> results <strong>of</strong> <strong>the</strong> Lake Tunnel values. Figure 6 was drawn with processing and is showing<br />
<strong>the</strong>se it is differences. not easy In to figure see <strong>the</strong> 6, <strong>the</strong> difference roads whose between integration figure value 4 and changed 5, <strong>the</strong> is integration clearly visible. results <strong>of</strong> <strong>the</strong> Status<br />
Since<br />
Quo scenar- io were substracted <strong>from</strong> <strong>the</strong> results <strong>of</strong> <strong>the</strong> Lake Tunnel values. Figure 6 was drawn with<br />
processing Integration is and a value is show- for <strong>the</strong> ing centrality <strong>the</strong>se <strong>of</strong> differences. each segment In figure and is 6, calculated <strong>the</strong> roads by how whose far a integration segment is value in relation changed to all<br />
is <strong>the</strong> clearly o<strong>the</strong>r segments. visible. Since in <strong>the</strong> Lake Tunnel scenario roads were just added and none were deleted, <strong>the</strong> integration<br />
<strong>of</strong> all <strong>the</strong> segments gets ei<strong>the</strong>r higher or stays more or less <strong>the</strong> same. As seen in figure 6, <strong>the</strong> integration<br />
Integration<br />
around <strong>the</strong> highway<br />
is a value<br />
ring<br />
for<br />
is increased<br />
<strong>the</strong> centrality<br />
much<br />
<strong>of</strong><br />
more<br />
each<br />
<strong>the</strong>n<br />
segment<br />
in <strong>the</strong> centre<br />
and is<br />
<strong>of</strong><br />
calculated<br />
<strong>the</strong> city. Especially<br />
by how<br />
around<br />
far a<br />
<strong>the</strong><br />
segment<br />
new highway<br />
junctions <strong>the</strong> integration in <strong>the</strong> Lake Tunnel scenario is much higher than it’s value in <strong>the</strong> Status Quo scenar-<br />
is in<br />
relation to all <strong>the</strong> o<strong>the</strong>r segments. Since in <strong>the</strong> Lake Tunnel scenario roads were just added and none<br />
io.<br />
were deleted, <strong>the</strong> integra- tion <strong>of</strong> all <strong>the</strong> segments gets ei<strong>the</strong>r higher or stays more or less <strong>the</strong> same.<br />
As seen in figure 6, <strong>the</strong> integration around <strong>the</strong> highway ring is increased much more <strong>the</strong>n in <strong>the</strong> centre<br />
City-Wide, as seen in figure 4 & 5, <strong>the</strong> integration pattern stays more or less <strong>the</strong> same since <strong>the</strong> overall hot spots<br />
<strong>of</strong> are <strong>the</strong> still city. almost Especially at <strong>the</strong> same around place. <strong>the</strong> new high- way junctions <strong>the</strong> integration in <strong>the</strong> Lake Tunnel scenario is<br />
much higher than it’s value in <strong>the</strong> Status Quo scenario.<br />
City-Wide, as seen in figure 4 & 5, <strong>the</strong> integration pattern stays more or less <strong>the</strong> same since <strong>the</strong> overall<br />
hot spots are still almost at <strong>the</strong> same place.<br />
3/13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
61
Choice - Status Quo (Figure 7)<br />
Choice - Status Quo (Figure 7)<br />
Cho<br />
Cho<br />
Choice - Status Quo (Figure 7)<br />
Choice - Lake Tunnel (Figure 8)<br />
Choice - Lake Tunnel (Figure 8)<br />
Cho<br />
Cho<br />
Clo<br />
for Clo<br />
tion for<br />
den tion<br />
den<br />
The<br />
not The<br />
<strong>the</strong> not<br />
visi <strong>the</strong><br />
ind visi<br />
pos ind<br />
me pos<br />
me<br />
Som<br />
new Som<br />
opt new<br />
opt<br />
Choice - Lake Tunnel (Figure 8)<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
62<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Choice - Difference between Status Quo & Lake Tunnel (Figure 9)<br />
Choice - Difference between Status Quo & Lake Tunnel (Figure 9)<br />
Choice <strong>Simulation</strong> - Status Quo vs. Lake Tunnel<br />
Choice <strong>Simulation</strong> - Status Quo vs. Lake Tunnel<br />
Closing <strong>the</strong> highway ring has quite some impact on <strong>the</strong> Choice vlaues in <strong>the</strong> city <strong>of</strong> Zurich. Choice is an indicator<br />
for Closing how <strong>of</strong>ten <strong>the</strong> highway a segment ring is passed has quite if all <strong>the</strong> some shortest impact paths on between <strong>the</strong> Choice each values segment in are <strong>the</strong> evaluated. city <strong>of</strong> Zurich. In this Choice simulation<br />
an indicator case <strong>the</strong> choice for how is <strong>the</strong>refor <strong>of</strong>ten a an segment indicator is for passed traffic density if all <strong>the</strong> and shortest visualizes paths on which between road segments each segment high trafic are<br />
is<br />
density is expected.<br />
evaluated. In this simulation case <strong>the</strong> choice is <strong>the</strong>refor an indicator for traffic density and visualizes on<br />
which road segments high traffic density is expected.<br />
The Lake Tunnel reduces <strong>the</strong> choice values in a high part <strong>of</strong> <strong>the</strong> <strong>the</strong> city center. Because <strong>the</strong> change in choice is<br />
not obvious visible in figures 7 and 8, also here <strong>the</strong> choice result <strong>of</strong> <strong>the</strong> status quo scenario was substracted <strong>from</strong><br />
<strong>the</strong><br />
The<br />
choice<br />
Lake<br />
result<br />
Tunnel<br />
<strong>of</strong> <strong>the</strong><br />
reduces<br />
Lake Tunnel<br />
<strong>the</strong> choice<br />
scenario.<br />
values<br />
Figure<br />
in<br />
9<br />
a<br />
represents<br />
high part<br />
this<br />
<strong>of</strong><br />
difference<br />
<strong>the</strong> city centre.<br />
in choice<br />
Because<br />
values and<br />
<strong>the</strong><br />
it<br />
change<br />
is clearly<br />
in<br />
visible choice that is not most obvious <strong>of</strong> <strong>the</strong> main visible road in segments figures 7 in and <strong>the</strong> 8, city also center here show <strong>the</strong> a choice negative result choice-difference <strong>of</strong> <strong>the</strong> status value quo which scenario<br />
indicates was subtracted that <strong>the</strong> Lake <strong>from</strong> Tunnel <strong>the</strong> choice functions result as expected <strong>of</strong> <strong>the</strong> Lake and Tunnel will likely scenario. reduce <strong>the</strong> Figure traffic 9 through represents <strong>the</strong> city. this In difference figure 9,<br />
positive in choice values values mean and higher it is choice clearly in visible <strong>the</strong> Lake that Tunnel most scenario <strong>of</strong> <strong>the</strong> than main in road <strong>the</strong> status segments quo scenario, in <strong>the</strong> city negative centre values show<br />
mean a negative lower choice-difference in <strong>the</strong> Lake Tunnel value scenario which than indicates <strong>the</strong> that status <strong>the</strong> quo. Lake Tunnel functions as expected and<br />
will likely reduce <strong>the</strong> traffic through <strong>the</strong> city. In figure 9, positive values mean higher choice in <strong>the</strong> Lake<br />
Some Tunnel <strong>of</strong> scenario <strong>the</strong> streets than around in <strong>the</strong> status new highway quo scenario, will be chosen negative more values <strong>of</strong>ten. mean Therefor lower <strong>the</strong> choice main streets in <strong>the</strong> leading Lake Tunnel to <strong>the</strong><br />
new scenario highway than would in <strong>the</strong> probably status quo. need to be expanded and <strong>the</strong> highway junctions would need to be designed in an<br />
optimal way to prevent traffic jams.<br />
Some <strong>of</strong> <strong>the</strong> streets around <strong>the</strong> new highway will be chosen more <strong>of</strong>ten. Therefor <strong>the</strong> main streets<br />
leading to <strong>the</strong> new highway would probably need to be expanded and <strong>the</strong> highway junctions would<br />
need to be designed in an optimal way to prevent traffic jams.<br />
4/13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
63
Choice Hochschulgebiet Zentrum - Status Quo (left) & Lake Tunnel (right) (Figure 10 & 11)<br />
Choice Hochschulgebiet Zentrum - Status Quo (left) & Lake Tunnel (right) (Figure 10 & 11)<br />
An<br />
An<br />
Th<br />
bu Th<br />
stu bu<br />
int stu<br />
int<br />
A s<br />
run A s<br />
stu run<br />
stu<br />
All<br />
<strong>the</strong> All<br />
ab <strong>the</strong><br />
ab<br />
Choice Hochschulgebiet Zentrum - Status Quo (left) & Lake Tunnel (right) (Figure 10 & 11)<br />
The main focus <strong>of</strong> this project lies on an<br />
optimization The main focus <strong>of</strong> <strong>of</strong> <strong>the</strong> this area project <strong>of</strong> <strong>the</strong> lies “Hochschulgebiet<br />
optimization main Zentrum”. <strong>of</strong> focus <strong>the</strong> area In <strong>of</strong> <strong>of</strong> this this <strong>the</strong> section “Hoch-<br />
project <strong>the</strong> lies<br />
on an<br />
The<br />
on impact schulgebiet an <strong>of</strong> optimization <strong>the</strong> Zentrum”. a Lake Tunnel In <strong>of</strong> this <strong>the</strong> (closing section area <strong>of</strong> <strong>the</strong> <strong>the</strong> <strong>of</strong> <strong>the</strong><br />
“Hochschulgebiet highway impact <strong>of</strong> ring) <strong>the</strong> a on Lake <strong>the</strong> Zentrum”. Tunnel choice (closing <strong>of</strong> <strong>the</strong> In this roads <strong>of</strong> section <strong>the</strong><br />
<strong>the</strong> within highway impact <strong>the</strong> ring) area <strong>of</strong> on <strong>the</strong> <strong>of</strong> <strong>the</strong> interest a choice Lake is Tunnel evaluated. <strong>of</strong> <strong>the</strong> roads (closing <strong>of</strong><br />
<strong>the</strong> within highway <strong>the</strong> area ring) <strong>of</strong> interest on <strong>the</strong> choice is evaluated. <strong>of</strong> <strong>the</strong> roads<br />
within Figure 10 <strong>the</strong> & area 11 show <strong>of</strong> interest <strong>the</strong> absolute is evaluated. choice<br />
value. Figure It 10 can & 11 be show seen <strong>the</strong> that absolute <strong>the</strong> main choice roads<br />
Figure<br />
(Rämistrasse, value. It 10 can & be Universitätsstrasse<br />
11 seen show that <strong>the</strong> absolute main & Seilergraben)<br />
show a lower value in <strong>the</strong> scenario<br />
roads choice<br />
value. (Rämistrasse, It can Universitätsstrasse be seen that <strong>the</strong> & main Seiler-roadgraben)<br />
<strong>the</strong> show Lake Tunnel a lower than value in in <strong>the</strong> <strong>the</strong> status<br />
with<br />
(Rämistrasse, Universitätsstrasse scenario &<br />
quo with scenario. <strong>the</strong> Lake Figure Tunnel 12 than shows in <strong>the</strong> again status <strong>the</strong><br />
Seilergraben) show a lower value in <strong>the</strong><br />
difference quo scenario. <strong>of</strong> <strong>the</strong> Figure choice 12 shows value <strong>of</strong> again <strong>the</strong> Lake<br />
scenario<br />
<strong>the</strong><br />
Tunnel difference Scenario<br />
with <strong>the</strong><br />
<strong>of</strong> <strong>the</strong> and<br />
Lake<br />
choice <strong>the</strong> value status<br />
Tunnel<br />
<strong>of</strong> quo<br />
than in <strong>the</strong><br />
<strong>the</strong> Lake<br />
status scenario quo<br />
Tunnel Scenario (lake scenario. tunel and minus Figure<br />
<strong>the</strong> status status 12<br />
quo quo). shows A again<br />
<strong>the</strong> positive difference<br />
scenario value (lake tunel means <strong>of</strong> <strong>the</strong><br />
minus that choice <strong>the</strong> status choice value<br />
quo). in A <strong>the</strong> <strong>of</strong> <strong>the</strong><br />
Lake lake positive tunel Tunnel<br />
value scenario Scenario<br />
means is higher and<br />
that <strong>the</strong> than <strong>the</strong><br />
choice in status <strong>the</strong> quo<br />
in <strong>the</strong><br />
scenario status lake tunel quo (lake<br />
scenario tunnel<br />
is and higher<br />
minus vice than versa. status<br />
in <strong>the</strong><br />
quo). A<br />
positive status quo value scenario means and that vice <strong>the</strong> versa. choice in <strong>the</strong><br />
lake tunnel scenario is higher than in <strong>the</strong><br />
status quo scenario and vice versa.<br />
Choice Difference - Hochschulgebiet Zentrum (Figure 12)<br />
Choice Difference - Hochschulgebiet Zentrum (Figure 12)<br />
Out<br />
Out<br />
<strong>of</strong><br />
<strong>of</strong><br />
<strong>the</strong><br />
<strong>the</strong><br />
segment<br />
segment<br />
analysis<br />
analysis<br />
it is<br />
it<br />
visible<br />
is visible<br />
that<br />
that<br />
a lake tunnel which closes <strong>the</strong> highway ring could be a good strategy<br />
Out to <strong>of</strong> reduce <strong>the</strong> segment traffic in analysis <strong>the</strong> city it center is visible <strong>of</strong> Zurich that a lake and tunnel especially which in <strong>the</strong> closes “Hochschulgebiet <strong>the</strong> highway ring Zentrum”.<br />
a lake tunnel which closes <strong>the</strong> highway ring<br />
could be a good strategy<br />
could to reduce be a traffic good in strategy <strong>the</strong> city to center reduce <strong>of</strong> Zurich traffic and especially in <strong>the</strong> “Hochschulgebiet Zentrum”.<br />
in <strong>the</strong> city centre <strong>of</strong> Zurich and especially in<br />
<strong>the</strong> <strong>Digital</strong> “Hochschulgebiet <strong>Urban</strong> <strong>Simulation</strong> | Zentrum”.<br />
Name <strong>of</strong> <strong>the</strong> project<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
Choice Difference - Hochschulgebiet Zentrum (Figure 12)<br />
Fig<br />
Fig<br />
Fo<br />
1 FoP<br />
1 P<br />
64<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Analysis 2: Pedestrian Flow in <strong>the</strong> “Hochschulgebiet Zentrum”<br />
The transformation <strong>of</strong> <strong>the</strong> “Hochschulgebiet Zentrum” and <strong>the</strong> demolishing and rebuilding <strong>of</strong> a high<br />
amount <strong>of</strong> buildings is a chance to optimise <strong>the</strong> pedestrian flow within this city quarter. Since most <strong>of</strong><br />
<strong>the</strong> thousands <strong>of</strong> students studying at ETH and University Zurich are coming by public transportation to<br />
this city quarter, a good integration and accessibility <strong>of</strong> all <strong>the</strong> high school buildings by foot is desired.<br />
Analysis 2: Pedestrian Flow in <strong>the</strong> “Hochschulgebiet Zentrum”<br />
A segment analysis <strong>of</strong> integration and choice <strong>of</strong> <strong>the</strong> various footpaths within <strong>the</strong> “Hochschulgebiet<br />
The Zentrum” transformation was run <strong>of</strong> <strong>the</strong> in Depthmap “Hochschulgebiet to visualize Zentrum” <strong>the</strong> pedestrian and <strong>the</strong> demolishing flow and to simulate and rebuilding improvement <strong>of</strong> a high strategies amount <strong>of</strong><br />
buildings and <strong>the</strong> is footpath a chance studies to optimize <strong>of</strong> <strong>the</strong> <strong>the</strong> “Masterplan pedestrian flow Hochschulgebiet within this city Zentrum”. quarter. Since most <strong>of</strong> <strong>the</strong> thousands <strong>of</strong><br />
students styding at ETH and University Zurich are coming by public transportation to this city quarter, a good<br />
integration All <strong>the</strong> footpaths and accessibility within <strong>of</strong> this all city <strong>the</strong> highschool quarter are buildings taken into by foot account. is desired. Since most <strong>of</strong> <strong>the</strong> students arrive<br />
by tram or via <strong>the</strong> Polybahn and leave <strong>the</strong> quarter <strong>the</strong> same way, reducing <strong>the</strong> analysis area to <strong>the</strong><br />
A segment Hochschulquartier analysis <strong>of</strong> integration is reason- able and choice to analyse <strong>of</strong> <strong>the</strong> pedestrian various footpaths flow within within this <strong>the</strong> quarter. “Hochschulgebiet Zentrum” was<br />
run in Depthmap to visualize <strong>the</strong> pedestrian flow and to simulate improvement strategies and <strong>the</strong> footpath<br />
studies For <strong>of</strong> <strong>the</strong> <strong>the</strong> integration “Masterplan and Hochschulgebiet choice analysis, Zentrum”. <strong>the</strong> following public transportation stations were taken into<br />
account: 1 Polybahn, 2 ETH / Universitätsspital, 3 Haldenbach, 4 Neumarkt, 5 Kantonsschule, 6 Platte,<br />
All <strong>the</strong> 7 Voltastrasse<br />
footpaths within this city quarter are taken into account. Since most <strong>of</strong> <strong>the</strong> students arrive by tram or via<br />
<strong>the</strong> Polybahn and levae <strong>the</strong> quarter <strong>the</strong> same way, reducing <strong>the</strong> anaylsis area to <strong>the</strong> Hochschulquartier is reasonable<br />
to analyze pedestrian flow within this quarter.<br />
7<br />
6<br />
5<br />
3<br />
2<br />
4<br />
Figure 13: Analysis Area with public transportation stations<br />
Figure 13: Analysis Area with public transportation stations<br />
1<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation 65<br />
For <strong>the</strong> integration and choice analysis, <strong>the</strong> following public transportation stations were taken into account:
Integration - Without Tram Stations<br />
Integration - With Tram Stations<br />
Inte<br />
Base<br />
Integration - Without Tram Stations<br />
Integration - With Tram Stations<br />
Integ<br />
Base<br />
Integration - Without Tram Stations Integration - With Tram Stations<br />
Choice - Without Tram Stations<br />
Integration - Secenario 1 Base Scenario, Status Quo<br />
Choice - With Tram Stations<br />
Inte<br />
new<br />
Choice - Without Tram Stations<br />
Choice - With Tram Stations<br />
Integ<br />
new t<br />
Choice - Without Tram Stations<br />
Choice - With Tram Stations<br />
The pictures above show clearly <strong>the</strong> impact <strong>of</strong> <strong>the</strong> tram stations on <strong>the</strong> integration<br />
and choice values. If you analyse footpaths, it’s important to take crowded places<br />
into account and to represent <strong>the</strong>m in an adequate way. In <strong>the</strong> simulations, tram<br />
stations and <strong>the</strong> station <strong>of</strong> <strong>the</strong> Polybahn are represented as shown in <strong>the</strong> sketch on<br />
The <strong>the</strong> The right pictures side.<br />
above above show show clearly clearly <strong>the</strong> impact <strong>the</strong> <strong>of</strong> impact <strong>the</strong> tram <strong>of</strong> stations <strong>the</strong> tram on stations <strong>the</strong> integration<br />
<strong>the</strong><br />
and integration choice values. and If choice you analyse values. footpaths, If you it’s analyse important footpaths, to take crowded it’s important places to<br />
into It take can<br />
account be crowded seen,<br />
and that<br />
to places represent in <strong>the</strong> into status<br />
<strong>the</strong>m account quo<br />
in <strong>the</strong><br />
an and adequate upper to parts represent way. around<br />
In <strong>the</strong>m simulations, university in an adequate tram<br />
hospital are much less integrated and<br />
stations <strong>the</strong> way. paths In and <strong>the</strong>re<br />
<strong>the</strong> simulations, station show a<br />
<strong>of</strong> much<br />
<strong>the</strong> tram Polybahn lower stations choice<br />
are and value<br />
represented <strong>the</strong> than station in<br />
as <strong>the</strong><br />
shown <strong>of</strong> lower <strong>the</strong> in path Polybahn <strong>the</strong> segments<br />
sketch are on<br />
around <strong>the</strong> ETH and University<br />
<strong>the</strong> Zurich represented right main<br />
side.<br />
buildings. as shown in <strong>the</strong> sketch on <strong>the</strong> right side<br />
It In It can a can next<br />
be seen, be step seen, that <strong>the</strong> new<br />
in that <strong>the</strong> footpath in status <strong>the</strong> quo status setup<br />
<strong>the</strong> <strong>of</strong> quo upper <strong>the</strong> <strong>the</strong> Masterplan<br />
parts upper around parts “Hochschulgebiet<br />
<strong>the</strong> around university <strong>the</strong> hospital Zentrum” university are with<br />
much hospital <strong>the</strong><br />
less new<br />
integrated are location much <strong>of</strong><br />
and less<br />
<strong>the</strong> tram integrated paths station<br />
<strong>the</strong>re “Kantonsschule” and show <strong>the</strong> a much paths lower is <strong>the</strong>re analyzed<br />
choice show and<br />
value a fur<strong>the</strong>r much than improvements<br />
in lower <strong>the</strong> lower choice path are value segments compared than around in against <strong>the</strong> <strong>the</strong> lower each<br />
ETH o<strong>the</strong>r. path and University segments<br />
Zurich around main <strong>the</strong> buildings. ETH and University Zurich main buildings.<br />
Scenario 1: Base Scenario - Status Quo<br />
In Scenario In<br />
a next<br />
a next<br />
step 2: Masterplan step<br />
<strong>the</strong> new<br />
<strong>the</strong><br />
footpath<br />
new “Hoschulgebiet footpath<br />
setup <strong>of</strong><br />
setup Zürich”<br />
<strong>the</strong> Masterplan<br />
<strong>of</strong> <strong>the</strong> Masterplan<br />
“Hochschulgebiet<br />
“Hochschulgebiet<br />
Zentrum” with<br />
Zentrum”<br />
<strong>the</strong> new location<br />
with <strong>the</strong><br />
<strong>of</strong><br />
new<br />
tram Scenario<br />
station 3:<br />
“Kantonsschule” Masterplan as a base<br />
is analyzed with and additional<br />
fur<strong>the</strong>r improvements tram station at<br />
are compared new Sternwartstrasse<br />
against each o<strong>the</strong>r.<br />
location <strong>of</strong> tram station “Kantonsschule” is analyzed and fur<strong>the</strong>r improvements are compared against<br />
Scenario each o<strong>the</strong>r.<br />
4: Masterplan as a base with additional tram station and additional footpaths<br />
Scenario 1: Base Scenario - Status Quo<br />
Scenario <strong>Digital</strong> <strong>Urban</strong> 2: Masterplan <strong>Simulation</strong> “Hoschulgebiet | Name <strong>of</strong> <strong>the</strong> project Zürich”<br />
Scenario<br />
Scenario<br />
3: Masterplan<br />
1: Base Scenario<br />
as a base<br />
-<br />
with<br />
Status<br />
an additional<br />
Quo<br />
tram station at <strong>the</strong> new Sternwartstrasse<br />
Scenario Scenario 4: Masterplan 2: Masterplan a base “Hoschulgebiet with additional Zürich” tram station and additional footpaths<br />
Scenario 3: Masterplan as a base with an additional tram station at <strong>the</strong> new Sternwartstrasse<br />
<strong>Digital</strong> Scenario <strong>Urban</strong> 4: <strong>Simulation</strong> Masterplan | Name as a <strong>of</strong> base <strong>the</strong> project with additional tram station and additional footpaths<br />
Wit<br />
chu<br />
<strong>the</strong><br />
gat<br />
With<br />
chul<br />
If a<br />
<strong>the</strong> are<br />
u<br />
gate<br />
acc<br />
If If<br />
an<br />
so<br />
area<br />
add<br />
acce<br />
If som<br />
addi<br />
66<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Integration - Secenario 1 Integration - Scenario 2<br />
Base Scenario, Status Quo<br />
Masterplan “Hochschulgebiet Zürich” with paths and tram stations<br />
Integration - Scenario 2<br />
Masterplan “Hochschulgebiet Zürich” with paths and tram stations<br />
Integration - Secenario 3 Integration - Scenario 4<br />
new tram station marked with a red circle<br />
new tram station as in scenario 3 with additional footpaths<br />
and<br />
rsity<br />
f<br />
Integration - Scenario 3<br />
new tram station marked with a red circle<br />
Integration - Scenario 4<br />
new tram station as in scenario 3 with additional footpaths<br />
With <strong>the</strong> Masterplan “Hochschulgebiet Zürich” (Scenario 2) and its new and relocated tram station “Kantonsschule”,<br />
most <strong>of</strong> <strong>the</strong> footpaths within <strong>the</strong> area <strong>of</strong> interest are more integrated <strong>the</strong>n nowadays (Scenario 1). 1). But still<br />
<strong>the</strong> upper parts around <strong>the</strong> University Hospital show a much lower value <strong>of</strong> integration and are still quite segregated<br />
<strong>from</strong> <strong>the</strong> rest <strong>of</strong> <strong>the</strong> universtity buildings.<br />
With <strong>the</strong> Masterplan “Hochschulgebiet Zürich” (Scenario 2) and its new and relocated tram station<br />
“Kantonsschule”,<br />
If If an additional tram<br />
most station<br />
<strong>of</strong> <strong>the</strong> around<br />
footpaths<br />
<strong>the</strong> upper<br />
within University<br />
<strong>the</strong> area Hospital<br />
<strong>of</strong> interest buildings<br />
are more was added<br />
integrated (Scenario<br />
<strong>the</strong>n 3)<br />
nowadays<br />
3) <strong>the</strong> upper<br />
(Scenario area <strong>of</strong> <strong>the</strong> 1). “Hochschulgebiet But still <strong>the</strong> upper Zentrum” parts gets around slightly <strong>the</strong> more University integrated. Hospital Such an show additional a much station lower could value be <strong>of</strong><br />
be<br />
integration accessed by and <strong>the</strong> are new still Sternwartstrasse quite segregated and <strong>from</strong> served <strong>the</strong> by rest tram <strong>of</strong> Nr. <strong>the</strong> 9. university buildings.<br />
If an<br />
If If some additional additional tram paths station are around added (Scenario <strong>the</strong> upper 4), University <strong>the</strong> upper part Hospital <strong>of</strong> <strong>the</strong> buildings area gets even was added more integrated (Scenario and and<br />
3) <strong>the</strong>se<br />
upper additional area <strong>of</strong> paths <strong>the</strong> could “Hochschulgebiet help to connect Zentrum” <strong>the</strong> different gets university slightly more buildings integrated. and increase Such <strong>the</strong> <strong>the</strong> an integration additional quite station a bit. bit.<br />
could be accessed by <strong>the</strong> new Sternwartstrasse and served by tram Nr. 9.<br />
If some additional paths are added (Scenario 4), <strong>the</strong> upper part <strong>of</strong> <strong>the</strong> area gets even more integrated<br />
and <strong>the</strong>se additional paths could help to connect <strong>the</strong> different university buildings and increase <strong>the</strong><br />
integration quite a bit.<br />
6/13 6/13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
67
Choice Secenario Choice Scenario Base Choice Scenario, - Secenario Status Quo 1 Masterplan Choice - Scenario “Hochschulgebiet 2 Zürich” with paths and tram stations<br />
Base Scenario, Status Quo<br />
Masterplan “Hochschulgebiet Zürich” with paths and tram stations<br />
Choice - Secenario 1 Base Scenario, Status Quo Choice - Scenario 2<br />
Masterplan “Hochschulgebiet Zürich” with paths and tram stations<br />
Choice Secenario Choice Scenario new Choice tram - station Secenario marked 3 with a red circle<br />
Choice new tram - Scenario station as 4in scenario 3 with additional footpaths<br />
new tram station marked with a red circle<br />
new tram station as in scenario 3 with additional footpaths<br />
So<br />
So<br />
As bui<br />
As t<br />
pre<br />
bui<br />
mo<br />
pre<br />
opt<br />
mo<br />
But<br />
opt<br />
allo<br />
But<br />
allo<br />
In (“Sy<br />
In t<br />
pot<br />
(“Sy<br />
pot<br />
se<br />
inte<br />
a se<br />
and<br />
inte<br />
and<br />
The Choice change - Secenario in choice 3 is less obvious since <strong>the</strong> differences Choice in - choice Scenario are 4 so small that <strong>the</strong>y are hard to see. But<br />
also<br />
The new tram change station<br />
here, <strong>the</strong><br />
in marked<br />
Masterplan<br />
choice with is a less red circle<br />
(Scenario<br />
obvious<br />
2)<br />
since<br />
increases<br />
<strong>the</strong> differences new tram<br />
<strong>the</strong> choice<br />
in<br />
<strong>of</strong><br />
choice station as<br />
<strong>the</strong> paths<br />
are in scenario so<br />
in<br />
small 3 with<br />
<strong>the</strong> middle<br />
that additional <strong>the</strong>y<br />
and<br />
are footpath<br />
in <strong>the</strong><br />
hard<br />
upper<br />
to see.<br />
part<br />
But<br />
<strong>of</strong><br />
<strong>the</strong><br />
also<br />
area<br />
here,<br />
<strong>of</strong><br />
<strong>the</strong><br />
interest<br />
Masterplan<br />
compared<br />
(Scenario<br />
to <strong>the</strong><br />
2)<br />
base<br />
increases<br />
scenario<br />
<strong>the</strong><br />
(Scenario<br />
choice <strong>of</strong><br />
1).<br />
<strong>the</strong> paths in <strong>the</strong> middle and in <strong>the</strong> upper part <strong>of</strong><br />
<strong>the</strong> area <strong>of</strong> interest compared to <strong>the</strong> base scenario (Scenario 1).<br />
An additional tram station (Scenario 3) would increase <strong>the</strong> choice <strong>of</strong> some segments at <strong>the</strong> Rämistrasse, Universitätsstrasse<br />
An additional<br />
and<br />
tram<br />
<strong>the</strong><br />
station<br />
new Sternwartstrasse<br />
(Scenario 3) would<br />
leading<br />
increase<br />
to <strong>the</strong><br />
<strong>the</strong><br />
tram<br />
choice<br />
station.<br />
<strong>of</strong> some segments at <strong>the</strong> Rämistrasse, Universitätsstrasse<br />
The change<br />
and<br />
in choice<br />
<strong>the</strong> new<br />
is<br />
Sternwartstrasse<br />
less obvious since<br />
leading<br />
<strong>the</strong><br />
to<br />
differences<br />
<strong>the</strong> tram station.<br />
in choice are so small that <strong>the</strong>y are hard to<br />
see. But also here, <strong>the</strong> Masterplan (Scenario 2) increases <strong>the</strong> choice <strong>of</strong> <strong>the</strong> paths in <strong>the</strong> middle and in<br />
Adding new paths (Scenario 4) is fur<strong>the</strong>r on slightly increasing <strong>the</strong> choice around Rämistrasse and <strong>the</strong> new<br />
Sternwartstrasse<br />
Adding <strong>the</strong> upper new part paths <strong>of</strong><br />
(axis<br />
(Scenario <strong>the</strong> area<br />
through<br />
4) <strong>of</strong><br />
<strong>the</strong><br />
is interest fur<strong>the</strong>r<br />
planned<br />
on compared<br />
new<br />
slightly<br />
buildings).<br />
increasing to <strong>the</strong> base <strong>the</strong> scenario choice around (Scenario Rämistrasse 1). and <strong>the</strong> new<br />
Sternwartstrasse (axis through <strong>the</strong> planned new buildings).<br />
Syn<strong>the</strong>seplan<br />
Overall in can be stated, that adding tram stations, rearranging or adding paths can have quite high impact on<br />
<strong>the</strong><br />
Overall<br />
integration<br />
in can be<br />
and<br />
stated,<br />
choice<br />
that<br />
<strong>of</strong><br />
adding<br />
<strong>the</strong> various<br />
tram<br />
path<br />
stations,<br />
segments.<br />
rearranging<br />
For <strong>the</strong><br />
or<br />
“Hochschulgebiet<br />
adding paths can<br />
Zentrum”<br />
have a quite<br />
we would<br />
high impact<br />
suggest<br />
on<br />
to<br />
<strong>the</strong> An set additional integration<br />
up an additional tram and choice station tram<br />
<strong>of</strong><br />
station (Scenario <strong>the</strong> various<br />
around 3) path would <strong>the</strong><br />
segments.<br />
area increase shown<br />
For <strong>the</strong> in<br />
<strong>the</strong><br />
Scenario choice “Hochschulgebiet <strong>of</strong> 3, to some give segments <strong>the</strong><br />
Zentrum”<br />
pedestrians at we <strong>the</strong> would<br />
<strong>the</strong> Rämistrasse,<br />
possibility<br />
suggest<br />
to<br />
to Universitätsstrasse access<br />
set up an<br />
<strong>the</strong><br />
additional<br />
upper part and tram<br />
<strong>of</strong> <strong>the</strong> <strong>the</strong><br />
station new University<br />
around Sternwartstrasse Area<br />
<strong>the</strong><br />
on<br />
area direct<br />
shown leading way. Scenario<br />
This to <strong>the</strong> would<br />
3, tram to<br />
clearly<br />
give station. <strong>the</strong><br />
lead<br />
pedestrians<br />
to higher<br />
<strong>the</strong><br />
integration<br />
possibility<br />
<strong>of</strong><br />
this<br />
to access<br />
area as<br />
<strong>the</strong><br />
shown<br />
upper<br />
in<br />
part<br />
<strong>the</strong><br />
<strong>of</strong><br />
integration<br />
<strong>the</strong> University<br />
map<br />
Area<br />
<strong>of</strong> Scenario<br />
on a direct<br />
3.<br />
way. This would clearly lead to a higher integration <strong>of</strong><br />
this Adding area new as shown paths in (Scenario <strong>the</strong> integration 4) is map fur<strong>the</strong>r <strong>of</strong> Scenario on slightly 3. increasing <strong>the</strong> choice around Rämistrasse and <strong>the</strong><br />
new Sternwartstrasse (axis through <strong>the</strong> planned new buildings).<br />
Overall <strong>Digital</strong> <strong>Urban</strong> in can <strong>Simulation</strong> be stated, | Name that <strong>of</strong> adding <strong>the</strong> project tram stations, rearranging or adding paths can have a quite high<br />
impact <strong>Digital</strong> <strong>Urban</strong> on <strong>the</strong> <strong>Simulation</strong> integration | Name and <strong>of</strong> choice <strong>the</strong> project <strong>of</strong> <strong>the</strong> various path segments. For <strong>the</strong> “Hochschulgebiet Zentrum”<br />
we would suggest to set up an additional tram station around <strong>the</strong> area shown in Scenario 3, to give <strong>the</strong><br />
pedestrians <strong>the</strong> possibility to access <strong>the</strong> upper part <strong>of</strong> <strong>the</strong> University Area on a direct way. This would<br />
clearly lead to a higher integration <strong>of</strong> this area as shown in <strong>the</strong> integration map <strong>of</strong> Scenario 3.<br />
68<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Solar Radiation Studies - Abstract<br />
Solar<br />
Solar<br />
Radiation<br />
Radiation<br />
Studies<br />
Studies -<br />
Abstract<br />
Abstract<br />
stations<br />
stations As <strong>the</strong> climatic change progresses (despite all our technological developments), <strong>the</strong> pressure on <strong>the</strong><br />
design <strong>of</strong> buildings, As <strong>the</strong> climatic quarters change and progresses cities increases (despite in all <strong>the</strong> our direction technological <strong>of</strong> energy developments), efficiency. Besides <strong>the</strong> pressure <strong>the</strong> on <strong>the</strong><br />
“defensive” As <strong>the</strong> climatic change progresses (despite all our technological developments), <strong>the</strong> pressure on <strong>the</strong><br />
buildings, measures quarters to prevent and energy cities increases loss through in <strong>the</strong> better direction insulation <strong>of</strong> energy and efficiency. optimising Besides heating/cooling <strong>the</strong> “defensive” m<br />
schedules, buildings, quarters and cities increases in <strong>the</strong> direction <strong>of</strong> energy efficiency. Besides <strong>the</strong> “defensive” prevent energy can be loss made through more better energy insulation efficient and also optimizing through heating/cooling intelligent use <strong>of</strong> schedules, solar energy. buildings ca<br />
Designing a prevent energy loss through better insulation and optimizing heating/cooling schedules, buildings ca<br />
more single energy house efficient on a green also field through for optimal intelligent solar use harvesting <strong>of</strong> solar energy. is a relatively Designing easy task a single that house can be on a gre<br />
achieved with more <strong>the</strong> energy help <strong>of</strong> efficient tables and also rules through <strong>of</strong> thumb. intelligent But when use <strong>of</strong> it solar comes energy. to designing Designing complex single buildings house on gre<br />
optimal solar harvesting is a relatively easy task that can be achieved with <strong>the</strong> help <strong>of</strong> tables and rules<br />
in an urban optimal context, solar designers harvesting need is relatively more powerful easy task tools that that can allows be achieved <strong>the</strong>m with to handle <strong>the</strong> help <strong>the</strong> <strong>of</strong> complex tables and rules<br />
But when it comes to designing complex buildings in an urban context, designers need more powerfu<br />
relationships But <strong>of</strong> when <strong>the</strong> big it comes scale to project. designing complex buildings in an urban context, designers need more powerfu<br />
allows <strong>the</strong>m to handle <strong>the</strong> complex relationships <strong>of</strong> <strong>the</strong> big scale project.<br />
allows <strong>the</strong>m to handle <strong>the</strong> complex relationships <strong>of</strong> <strong>the</strong> big scale project.<br />
In <strong>the</strong> following In <strong>the</strong> analysis following examples analysis examples we show, we based show, on based <strong>the</strong> “Hochschulquartier” on <strong>the</strong> “Hochschulquartier” and <strong>the</strong> and new <strong>the</strong> master new master<br />
plan for it In following analysis examples we show, based on <strong>the</strong> “Hochschulquartier” and <strong>the</strong> new master<br />
(“Syn<strong>the</strong>seplan”), how Rhino in in conjunction with with Grasshopper and and Ladybug can can be be used used to to asses<br />
assess <strong>the</strong> (“Syn<strong>the</strong>seplan”), how Rhino in conjunction with Grasshopper and Ladybug can be used to asses<br />
potential solar potential <strong>of</strong> a city <strong>of</strong> a quarter city quarter and how and parametric how parametric analysis analysis can help can to help benchmark to benchmark different different design or eve<br />
design or even potential <strong>of</strong> city quarter and how parametric analysis can help to benchmark different design or eve<br />
a series generate <strong>of</strong> design a series and optimize <strong>of</strong> design <strong>the</strong>m and optimise towards <strong>the</strong>m specific towards goals. specific As this kind goals. <strong>of</strong> As analysis this kind are <strong>of</strong> very com<br />
analysis are very series computational <strong>of</strong> design and intensive optimize and <strong>the</strong>m generate towards large specific amounts goals. <strong>of</strong> data, As this we kind will also <strong>of</strong> analysis analyse are how very com<br />
intensive and generate large amounts <strong>of</strong> data, we will also analyse how <strong>the</strong>se digital processes can be<br />
<strong>the</strong>se digital intensive processes and can generate be optimised large amounts and how <strong>of</strong> <strong>the</strong> data, conditions we will also can analyse be set how in order <strong>the</strong>se to digital get comparable processes can be<br />
and how <strong>the</strong> conditions can be set in order to get comparable results.<br />
results. and how <strong>the</strong> conditions can be set in order to get comparable results.<br />
hs<br />
hs<br />
Existing situat<br />
Existing situat<br />
see. But<br />
see. But<br />
er part <strong>of</strong><br />
er part <strong>of</strong><br />
Existing Situation<br />
Syn<strong>the</strong>seplan<br />
Syn<strong>the</strong>seplan<br />
sse, Univer-<br />
sse, Univer-<br />
e new<br />
new<br />
h impact on<br />
impact on<br />
uld suggest<br />
uld suggest<br />
possibility<br />
possibility<br />
tegration <strong>of</strong><br />
tegration <strong>of</strong><br />
Syn<strong>the</strong>seplan<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
69
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
Radiation analysis and PV potential<br />
In order to estimate <strong>the</strong> solar potential <strong>of</strong> <strong>the</strong> buildings in <strong>the</strong> HQ , we use <strong>the</strong> radiation analysis tool<br />
<strong>of</strong> Ladybug to generate a solar irradiation map. We develop fur<strong>the</strong>r a tool that takes <strong>the</strong> results <strong>from</strong><br />
Ladybug and estimates if certain areas are eligible for <strong>the</strong> installation <strong>of</strong> PV or not and generates a visual<br />
output <strong>of</strong> <strong>the</strong> suited areas. The decision is made based on an economic calculation and <strong>the</strong> efficiency<br />
<strong>of</strong> <strong>the</strong> PV modules. Taking into account <strong>the</strong> price per m2 <strong>of</strong> PV systems (1000 CHF/m2), <strong>the</strong> average<br />
lifetime (30 years), <strong>the</strong> efficiency (16%) and <strong>the</strong> market price <strong>of</strong> electricity in Switzerland (0.2 CHF/kWh),<br />
Radiation we come to <strong>the</strong> analysis conclusion and that PV a threshold potential <strong>of</strong> 1040 kWh/m2 <strong>of</strong> solar irradiation is needed in order to<br />
make PV pr<strong>of</strong>itable.<br />
In order to estimate <strong>the</strong> solar potential <strong>of</strong> <strong>the</strong> buildings in <strong>the</strong> HQ , we use <strong>the</strong> radiation analysis tool <strong>of</strong> Ladybug<br />
to After generate running a solar <strong>the</strong> irradiation script for map. both We existing develop situation fur<strong>the</strong>r a tool and that planned takes <strong>the</strong> intervention, results <strong>from</strong> we Ladybug noticed and an estimates increase if<br />
certain <strong>of</strong> 5’780 areas MWh are PV eligible potential for <strong>the</strong> in installation <strong>the</strong> “Syn<strong>the</strong>seplan”. <strong>of</strong> PV or not This and represents generates a an visual increase output <strong>of</strong> <strong>of</strong> 32% <strong>the</strong> suited <strong>from</strong> areas. <strong>the</strong> initial The<br />
decision is made based on an economic calculation and <strong>the</strong> efficiency <strong>of</strong> <strong>the</strong> PV modules. Taking into account <strong>the</strong><br />
potential <strong>of</strong> 18’050 MWh. Moreover, <strong>the</strong> new image <strong>of</strong> <strong>the</strong> areas suited for PV generation shows a<br />
price per m2 <strong>of</strong> PV systems (1000 CHF/m2), <strong>the</strong> average lifetime (30 years), <strong>the</strong> efficiency cy (16%) and <strong>the</strong> market<br />
much better distribution with bigger areas on flat ro<strong>of</strong>s. Even with <strong>the</strong> significant improvement, <strong>the</strong> PV<br />
price <strong>of</strong> electricity in Switzerland (0.2 CHF/kWh), we come to <strong>the</strong> conclusion that a threshold hold <strong>of</strong> 1040 kWh/m2 <strong>of</strong><br />
electricity production would cover only ca. 26% <strong>of</strong> <strong>the</strong> total electricity demand <strong>of</strong> <strong>the</strong> present quarter<br />
solar irradiation is needed in order to make PV pr<strong>of</strong>itable.<br />
(90’000MWh).<br />
After running <strong>the</strong> script for both existing situation and planned intervention, we noticed an increase <strong>of</strong> 5’780<br />
MWh Besides PV potential <strong>the</strong> distribution in <strong>the</strong> “Syn<strong>the</strong>seplan”. <strong>of</strong>f solar radiation This represents on <strong>the</strong> building an increase stock, <strong>of</strong> we 32% produce <strong>from</strong> <strong>the</strong> also initial maps potential that show <strong>of</strong> 18’050<br />
<strong>the</strong><br />
MWh. solar radiation Moreover, on <strong>the</strong> <strong>the</strong> new ground image plane. <strong>of</strong> <strong>the</strong> First, areas this suited shows for PV which generation areas are shows highly a much sheltered better <strong>from</strong> distribution <strong>the</strong> sun with<br />
and<br />
bigger if <strong>the</strong>re areas on buildings flat ro<strong>of</strong>s. that Even suffer with <strong>from</strong> <strong>the</strong> significant <strong>the</strong> lack improvement, <strong>of</strong> solar radiation. <strong>the</strong> PV Secondly, electricity this production type <strong>of</strong> would representation<br />
cover only<br />
ca. could 26% be <strong>of</strong> <strong>the</strong> a new total kind electricity <strong>of</strong> “ground demand floor <strong>of</strong> <strong>the</strong> plan”, present one quarter inspired (90’000MWh). by our era where energy seems to be <strong>the</strong><br />
driving factor <strong>of</strong> urban design. Although a direct expression <strong>of</strong> energy flows, <strong>the</strong>se maps have also a<br />
Besides human <strong>the</strong> scale. distribution They show <strong>of</strong>f how solar “narrow” radiation on or “closed” <strong>the</strong> building a space stock, feels we produce or how also close maps its perception that show <strong>the</strong> is to solar<br />
<strong>the</strong><br />
radiation one <strong>of</strong> an on interior <strong>the</strong> ground space. plane. The First, bluer this a spot, shows <strong>the</strong> which more areas it is are enclosed highly sheltered and perceived <strong>from</strong> <strong>the</strong> as sun belonging and if <strong>the</strong>re to <strong>the</strong> are<br />
buildings’ that private suffer space <strong>from</strong> <strong>the</strong> ra<strong>the</strong>r lack than <strong>of</strong> solar to radiation. <strong>the</strong> public Secondly, space <strong>of</strong> this <strong>the</strong> type city. <strong>of</strong> representation n could be a new kind <strong>of</strong><br />
“ground floor plan”, one inspired by our era where energy seems to be <strong>the</strong> driving factor <strong>of</strong> urban design. Although<br />
a direct expression <strong>of</strong> energy flows, <strong>the</strong>se maps have also a human scale. They show how “narrow” or “closed” a<br />
space feels or how close its perception is to <strong>the</strong> one <strong>of</strong> an interior space. The bluer a spot, <strong>the</strong> more it is enclosed<br />
and perceived as belonging to <strong>the</strong> buildings’ private space ra<strong>the</strong>r than to <strong>the</strong> public space <strong>of</strong> <strong>the</strong> city.<br />
Init<br />
Sitaon PVenergy PVarea letriitydemand CoveredbyPV<br />
# MWh m2 MWh %<br />
Original 18,050 102756 90,0000 20.06<br />
Syn<strong>the</strong>seplan 23,900 123513 90,0000 26.56<br />
elavehange 32.41 20.20 0.000 32.41<br />
70<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
ug<br />
es if<br />
The<br />
<strong>the</strong><br />
rket<br />
2 <strong>of</strong><br />
’780<br />
’050<br />
ith<br />
only<br />
olar<br />
are<br />
d <strong>of</strong><br />
ugh<br />
d” a<br />
sed<br />
Initial Situation - Solar irradiation analysis + PV potential areas Syn<strong>the</strong>seplan - Solar irradiation analysis + PV potential areas<br />
Initial Situation -<br />
Solar irradiation analysis<br />
Syn<strong>the</strong>seplan -<br />
Solar irradiation analysis<br />
+ PV potential areas<br />
+ PV potential areas<br />
.06<br />
.56<br />
.41<br />
8/13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
71
PV<br />
Afte<br />
and<br />
floo<br />
<strong>the</strong><br />
con<br />
To b<br />
by t<br />
clus<br />
initi<br />
algo<br />
requ<br />
para<br />
Orig<br />
Changes in <strong>the</strong> “Ground floor radiation<br />
plan” (Original, left - Syn<strong>the</strong>seplan - right)<br />
The<br />
ana<br />
and<br />
gras<br />
nec<br />
<strong>from</strong><br />
<br />
#<br />
More blue in <strong>the</strong> Syn<strong>the</strong>seplan means that more public<br />
space is privatised and <strong>the</strong> higher buildings generating<br />
more darker in-between spaces take up even more <strong>of</strong><br />
<strong>the</strong> “orange” public space.<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
72<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
PV Production Optimization<br />
ion<br />
ht)<br />
ion<br />
ht)<br />
After <strong>the</strong> analysis <strong>of</strong> both scenarios, we also looked at how parametric analysis and design can help<br />
benchmark and / or improve <strong>the</strong> planned intervention. With <strong>the</strong> help <strong>of</strong> <strong>the</strong> Galapagos optimization<br />
PV Production Optimization<br />
PV Production Optimization<br />
tool we took <strong>the</strong> ground floor plan <strong>of</strong> <strong>the</strong> “Syn<strong>the</strong>seplan” proposal, divided each building into several<br />
blocks and optimised <strong>the</strong> height <strong>of</strong> <strong>the</strong> blocks for optimal PV gain. In order to still fulfil <strong>the</strong> space<br />
requirement After <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> <strong>of</strong> both programme, scenarios, we set also as looked base at condition how parametric that <strong>the</strong> analysis generated and design volume can has help to benchmark<br />
equal to<br />
<strong>the</strong> and “Syn<strong>the</strong>seplan” / or improve planned proposal intervention. +- a certain With threshold. <strong>the</strong> help <strong>of</strong> <strong>the</strong> Galapagos optimization tool we took <strong>the</strong> ground<br />
After <strong>the</strong> analysis <strong>of</strong> both scenarios, we also looked at how parametric analysis and design can help benchmark<br />
floor plan <strong>of</strong> <strong>the</strong> “Syn<strong>the</strong>seplan” proposal, divided each building into several blocks and optimized <strong>the</strong> height <strong>of</strong><br />
and / or improve <strong>the</strong> planned intervention. With <strong>the</strong> help <strong>of</strong> <strong>the</strong> Galapagos optimization tool we took <strong>the</strong> ground<br />
To <strong>the</strong><br />
floor<br />
be blocks<br />
plan<br />
even for<br />
<strong>of</strong> <strong>the</strong><br />
more optimal<br />
“Syn<strong>the</strong>seplan”<br />
precise PV gain. in In<br />
proposal,<br />
<strong>the</strong> order generation to still fulfil<br />
divided each<br />
<strong>of</strong> <strong>the</strong> output space<br />
building<br />
data, requirement<br />
into several<br />
we decided <strong>of</strong> <strong>the</strong> programme,<br />
blocks and<br />
to<br />
optimized<br />
normalize we<br />
<strong>the</strong><br />
<strong>the</strong> set as<br />
height<br />
resulted base<br />
<strong>of</strong><br />
PV condition<br />
<strong>the</strong> production that <strong>the</strong><br />
blocks for optimal by generated <strong>the</strong> PV built volume<br />
gain. has<br />
In order in to<br />
to order be equal<br />
still fulfil to <strong>the</strong> avoid to <strong>the</strong> “Syn<strong>the</strong>seplan”<br />
space bigger requirement effects proposal <strong>of</strong> <strong>of</strong> <strong>the</strong> bigger +- a<br />
programme, volumes. certain threshold.<br />
we After set as running base<br />
simulations condition that on <strong>the</strong> several generated clusters volume we has managed to be equal to to get <strong>the</strong> for “Syn<strong>the</strong>seplan” all <strong>of</strong> <strong>the</strong>m proposal noticeable +- a certain improvements threshold. <strong>of</strong> our<br />
benchmark<br />
To even more<br />
criteria,<br />
precise<br />
compared<br />
in <strong>the</strong> generation<br />
to <strong>the</strong> initial<br />
<strong>of</strong> output<br />
“Syn<strong>the</strong>seplan”<br />
data, we decided<br />
designs.<br />
to normalize<br />
Especially<br />
<strong>the</strong> resulted<br />
in clusters<br />
PV production<br />
01 and 02<br />
by <strong>the</strong> built volume in order to avoid bigger effects <strong>of</strong> bigger volumes. After running simulations on several<br />
<strong>the</strong>re To be is even a clear more tendency precise in <strong>of</strong> <strong>the</strong> <strong>the</strong> generation optimization <strong>of</strong> output algorithm data, we to decided increase to <strong>the</strong> normalize height <strong>the</strong> in <strong>the</strong> resulted north PV and production decrease<br />
clusters we managed to get for all <strong>of</strong> <strong>the</strong>m noticeable improvements <strong>of</strong> our benchmark criteria, compared to <strong>the</strong><br />
it by in <strong>the</strong> built south volume while keeping order to <strong>the</strong> avoid volume bigger in effects <strong>the</strong> required <strong>of</strong> bigger range. volumes. Cluster After 03 running shows simulations a more unpredictable<br />
on several<br />
initial “Syn<strong>the</strong>seplan” designs. Especially in clusters 01 and 02 <strong>the</strong>re is a clear tendency <strong>of</strong> <strong>the</strong> optimization<br />
behaviour clusters we managed to get for all <strong>of</strong> <strong>the</strong>m noticeable improvements <strong>of</strong> our benchmark criteria, compared to <strong>the</strong><br />
algorithm to probably increase because <strong>the</strong> height <strong>of</strong> in <strong>the</strong> <strong>the</strong> high north amount and decrease <strong>of</strong> parameters it in <strong>the</strong> it south had to while adjust. keeping <strong>the</strong> volume in <strong>the</strong><br />
initial “Syn<strong>the</strong>seplan” designs. Especially in clusters 01 and 02 <strong>the</strong>re is a clear tendency <strong>of</strong> <strong>the</strong> optimization<br />
required range. Cluster 03 shows a more unpredictable behaviour probably because <strong>of</strong> <strong>the</strong> high amount <strong>of</strong><br />
The algorithm optimization to increase study <strong>the</strong> shows height some in <strong>the</strong> main north methods and decrease how it solar in <strong>the</strong> gain south can while be optimised. keeping <strong>the</strong> However, volume in <strong>the</strong>se<br />
parameters it had to adjust.<br />
kind required <strong>of</strong> analysis range. Cluster have to 03 be shows viewed a more with unpredictable caution, for <strong>the</strong>y behaviour can distort probably <strong>the</strong> view because on <strong>the</strong> <strong>of</strong> <strong>the</strong> quality high <strong>of</strong> amount a building. <strong>of</strong><br />
parameters<br />
very clear<br />
it had<br />
and<br />
to adjust.<br />
The optimization study quantifiable shows some results main can methods shadow how o<strong>the</strong>r solar gain aspects can be that optimized. have to However, be taken <strong>the</strong>se into kind account <strong>of</strong><br />
but analysis are have not easily to be viewed to be with grasped. caution, Even for <strong>the</strong>y more, can <strong>the</strong> distort numbers <strong>the</strong> view generated on <strong>the</strong> quality can <strong>of</strong> have a building. a strong The very impact clear on<br />
The optimization study shows some main methods how solar gain can be optimized. However, <strong>the</strong>se kind <strong>of</strong><br />
decision and quantifiable makers results that are can not shadow necessarily o<strong>the</strong>r aspects architecturally that have gifted to be and taken lead into to account planning but decisions are not easily that to hinder be<br />
analysis have to be viewed with caution, for <strong>the</strong>y can distort <strong>the</strong> view on <strong>the</strong> quality <strong>of</strong> a building. The very clear<br />
architecturally grasped. Even<br />
and quantifiable valuable more, <strong>the</strong><br />
results can projects numbers<br />
shadow <strong>from</strong> generated<br />
o<strong>the</strong>r being aspects built. can have a strong impact on decision makers that are not<br />
that have to be taken into account but are not easily to be<br />
necessarily architecturally gifted and lead to planning decisions that hinder architecturally valuable projects<br />
grasped. Even more, <strong>the</strong> numbers generated can have a strong impact on decision makers that are not<br />
<strong>from</strong> being built.<br />
necessarily architecturally gifted and lead to planning decisions that hinder architecturally valuable projects<br />
<strong>from</strong> being built.<br />
PV energy PV / V<br />
ter ni PV enerrgy ni PV / V ri PV energy ri PV / V improvement improvement<br />
PV energy PV / V<br />
# MWh kWh / m3 MWh kWh / m3 % %<br />
ter ni PV enerrgy ni PV / V ri PV energy ri PV / V improvement improvement<br />
# MWh kWh / m3 MWh kWh / m3 % %<br />
1 2,120 5.486 2,260 5.88 6.603773585 7.18<br />
2 1,850 6.547 2,080 7.55 12.43243243 15.32<br />
1 2,120 5.486 2,260 5.88 6.603773585 7.18<br />
3 1,210 5.236 1,690 8.044 39.66942149 53.63<br />
2 1,850 6.547 2,080 7.55 12.43243243 15.32<br />
3 1,210 5.236 1,690 8.044 39.66942149 53.63<br />
Original Design, Cluster 01<br />
Original Design, Cluster 01<br />
Original Design, Cluster 01<br />
9/13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation 73<br />
9/13
Optimization Cluster 01 - pv / V = 5.079<br />
Initial Cluster 01 - pv / V = 5.486<br />
Optimization Cluster 01 -<br />
Optimization Cluster 02 - pv / V = 6.586 Optimization Cluster 02 -<br />
Initial Cluster 02 - pv / V = 6.547<br />
Optimization Cluster 03 -Initial Situation Optimization Cluster 03 -<br />
Initial Cluster 03 - pv / V = 5.236<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
74<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Optimization Cluster 01 - pv / V = 5.580 Optimization Cluster 01 -<br />
Optimization Cluster 02 - pv / V = 6.941 Optimization Cluster 02 -<br />
Optimization Cluster 03 - pv / V = 7.310 Optimization Cluster 03 -<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
75
Optimization Cluster 01 - pv / V = 5.881<br />
Optimization Cluster 02 - pv / V = 7.554<br />
Optimization Cluster 03 - pv / V = 8.044<br />
10/13<br />
76<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Shadow analysis <strong>of</strong> Sternwarte Plaza<br />
Shadow analysis <strong>of</strong> Sternwarte Plaza<br />
Shadow analysis <strong>of</strong> Sternwarte Plaza<br />
We identified <strong>the</strong> place around <strong>the</strong> Sternwarte to be suitable as a central plaza especially because its<br />
connection to <strong>the</strong> new quarter boulevard and its position between <strong>the</strong> 3 main actors <strong>of</strong> <strong>the</strong> HQ. As <strong>the</strong><br />
quarter is already We identified quite dense <strong>the</strong> place and <strong>the</strong> around buildings <strong>the</strong> Sternwarte are usually to very be suitable high, <strong>the</strong>re as a central are not plaza many especially sunny places because its co<br />
for pedestrians We to <strong>the</strong> to identified sit, new except quarter <strong>the</strong> Polyterasse. place boulevard around and Because <strong>the</strong> its Sternwarte position <strong>of</strong> <strong>the</strong> between to normal suitable <strong>the</strong> configuration 3 main as a central actors <strong>of</strong> streets <strong>of</strong> plaza <strong>the</strong> HQ. especially and As buildings, <strong>the</strong> because quarter is its alre co<br />
it happens that to dense <strong>the</strong> new and sunniest quarter <strong>the</strong> buildings places boulevard are usually and its position in very <strong>the</strong> high, middle between <strong>the</strong>re <strong>of</strong> are <strong>the</strong> a street, not 3 main many which actors sunny is <strong>of</strong> unfortunate. <strong>the</strong> places HQ. As <strong>the</strong> pedestrians Plazas quarter is to alres<br />
however are dense Polyterasse. places and where <strong>the</strong> Because <strong>the</strong> buildings normal <strong>of</strong> <strong>the</strong> are normal relation usually configuration between very high, street <strong>the</strong>re <strong>of</strong> streets (as are <strong>the</strong> not and space many buildings, for sunny moving) it happens places and for that buildings pedestrians <strong>the</strong> sunniest to s<br />
turns around. Polyterasse. usually The spaces in <strong>the</strong> Because <strong>of</strong> middle movement <strong>of</strong> <strong>of</strong> <strong>the</strong> a normal street, come which configuration very close is unfortunate. to <strong>of</strong> <strong>the</strong> streets buildings Plazas and buildings, and however <strong>the</strong> sunny it are happens places centre that where remains <strong>the</strong> <strong>the</strong> sunniest norma<br />
open for pedestrians. usually between in street <strong>the</strong> middle (as <strong>the</strong> space <strong>of</strong> a street, for moving) which and is unfortunate. buildings turns Plazas around. however The spaces are places <strong>of</strong> movement where <strong>the</strong> come norma ve<br />
between <strong>the</strong> buildings street and (as <strong>the</strong> sunny space centre for moving) remains and open buildings for pedestrians. turns around. The spaces <strong>of</strong> movement come ve<br />
In our analysis <strong>the</strong> we buildings use again and <strong>the</strong> <strong>the</strong> optimization sunny centre tool remains Galapagos open for to find pedestrians. <strong>the</strong> best geometries for <strong>the</strong> buildings<br />
surrounding <strong>the</strong> In our “Sternwarte analysis we Plaza” use again order <strong>the</strong> to optimization minimize <strong>the</strong> tool shadowing. Galapagos We to measure find <strong>the</strong> <strong>the</strong> best shadow geometries effect for <strong>the</strong><br />
on <strong>the</strong> day <strong>of</strong><br />
In surrounding summer<br />
our analysis<br />
solstice <strong>the</strong> we “Sternwarte use<br />
(21<br />
again<br />
June) Plaza” <strong>the</strong><br />
and in optimization<br />
try order to to minimize minimize tool<br />
<strong>the</strong><br />
Galapagos <strong>the</strong> area shadowing. <strong>of</strong><br />
to<br />
<strong>the</strong><br />
find<br />
plaza We <strong>the</strong> measure perimeter<br />
best geometries <strong>the</strong> shadow that is<br />
for effect <strong>the</strong> o<br />
affected during<br />
surrounding <strong>of</strong> summer an entire solstice day.<br />
<strong>the</strong> “Sternwarte<br />
From (21 June) <strong>the</strong> results<br />
Plaza” and try we<br />
in to order<br />
can minimize see<br />
to minimize<br />
a result <strong>the</strong> area that<br />
<strong>the</strong> <strong>of</strong> shadowing.<br />
does <strong>the</strong> plaza not necessarily perimeter We measure that surprise:<br />
<strong>the</strong> affected shadow<br />
<strong>the</strong><br />
effect duringo<br />
<strong>of</strong> day. summer From <strong>the</strong> solstice results (21 we June) can and see try a result to minimize that does <strong>the</strong> not area necessarily <strong>of</strong> <strong>the</strong> plaza surprise: perimeter <strong>the</strong> that buildings is affected adjacent during<br />
buildings adjacent to <strong>the</strong> plaza become lower as <strong>the</strong> shaded area becomes smaller. Although this could to<br />
day. become From lower <strong>the</strong> results as <strong>the</strong> we shaded can see area a result becomes that smaller. does not Although necessarily this surprise: could have <strong>the</strong> buildings easily been adjacent evaluate to<br />
have easily been evaluated by any designer without digital aids, <strong>the</strong> benefit <strong>of</strong> using parametric methods<br />
become designer lower without as digital <strong>the</strong> shaded aids, <strong>the</strong> area benefit becomes <strong>of</strong> using smaller. parametric Although methods this could is that have multiple easily solutions been evaluate<br />
is that multiple solutions can be generated very fast while taking into account multiple restrictions (in our<br />
can be g<br />
designer very fast while without taking digital into aids, account <strong>the</strong> benefit multiple <strong>of</strong> using restrictions parametric (in our methods case shadow is that area multiple and solutions volume). can In a be cong<br />
case shadow area and volume). In a conventional design process, every volume decrease in one part<br />
very design fast process, while taking every volume into account decrease multiple in one restrictions part <strong>of</strong> a building (in our case has to shadow be manually area and compensated volume). In a by con ad<br />
<strong>of</strong> a building has to be manually compensated by adding that volume in ano<strong>the</strong>r part, which for more<br />
design volume process, in ano<strong>the</strong>r every part, volume which decrease for more in one complex part <strong>of</strong> geometries a building and has to multiple be manually conditions compensated can become by ad<br />
complex geometries<br />
volume intensive. in<br />
and<br />
ano<strong>the</strong>r<br />
multiple<br />
part,<br />
conditions<br />
which for<br />
can<br />
more<br />
become<br />
complex<br />
very<br />
geometries<br />
time intensive.<br />
and multiple conditions can become<br />
intensive.<br />
Initial design, perspe<br />
Initial design, perspe<br />
Initial design, perspective<br />
Improved design, pe<br />
Improved design, pe<br />
Improved design, perspective<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
77
ion<br />
ite<br />
ept<br />
are<br />
ion<br />
to<br />
gs<br />
ay<br />
tire<br />
aza<br />
ny<br />
ted<br />
nal<br />
hat<br />
me<br />
Sternwarte Plaza, shadow optimization - A=3685 m2<br />
A=3412 m2<br />
A=3885 m2<br />
A=3679 m2<br />
ve<br />
Initial design, ground floor plan, A = 5600 m2<br />
Improved design, ground floor plan, A = 2679 m2<br />
11/13<br />
78<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Radiation analysis<br />
The radiation analysis tool provided by <strong>the</strong> Ladybug plug-in is a good base for a small scale project,<br />
Radiation<br />
but for a study Analysis<br />
on quarter level, <strong>the</strong> script has shown his limits. The main problem we identified is that<br />
<strong>the</strong> use <strong>of</strong> Breps as input geometries uses an internal mesh generator <strong>of</strong> <strong>the</strong> script which adds to <strong>the</strong><br />
The radiation analysis tool provided by <strong>the</strong> Ladybug plugin is a good base for a small scale project, but for a study<br />
RAM consumption and reduces <strong>the</strong> power <strong>of</strong> <strong>the</strong> solar radiation calculator. Moreover, <strong>the</strong> script seems<br />
on quarter level, <strong>the</strong> script has shown his limits. The main problem we identified is that <strong>the</strong> use <strong>of</strong> Breps as input<br />
to have trouble with surfaces that are not connected to closed volumes and created blank faces where<br />
geometries uses an internal mesh generator <strong>of</strong> <strong>the</strong> script which adds to <strong>the</strong> RAM consumption and reduces <strong>the</strong><br />
power<br />
normal <strong>of</strong><br />
vectors <strong>the</strong> solar<br />
show radiation<br />
in <strong>the</strong> calculator.<br />
wrong Moreover,<br />
direction. <strong>the</strong><br />
To script<br />
avoid seems<br />
<strong>the</strong>se to<br />
problems, have trouble<br />
we with<br />
created surfaces<br />
our that<br />
own are<br />
mesh<br />
not<br />
connected generator to where closed we volumes take Breps and created as input blank and faces generate where a normal predominantly vectors show rectangular in <strong>the</strong> wrong mesh direction. <strong>of</strong> a specified<br />
To avoid<br />
<strong>the</strong>se resolution. problems, If needed, we created <strong>the</strong> our mesh own is mesh unified generator and flipped where we in take order Breps to perfectly as input and function generate with a predominantly<br />
<strong>the</strong> ladybug<br />
rectangular script. Very mesh large <strong>of</strong> areas a specified had resolution. to be split If needed, into multiple <strong>the</strong> mesh clusters is unified that and where flipped simulated in order to with perfectly surrounding<br />
function<br />
with context.<br />
<strong>the</strong> ladybug script. Very large areas had to be split into multiple clusters that where simulated with<br />
surrounding context.<br />
Op<br />
The<br />
“gen<br />
sha<br />
The<br />
to k<br />
floo<br />
(up<br />
volu<br />
If it<br />
rad<br />
sen<br />
Ladybug component enhanced by separate mesh generator<br />
Ladybug component enhanced by separate mesh generator<br />
Smaller clusters for better performance<br />
Smaller clusters for better performance<br />
PV Potential Analysis<br />
PV Potential Analysis<br />
The PV potential analysis part takes as input <strong>the</strong> analysis mesh and <strong>the</strong> radiation results <strong>from</strong> ladybug and generates<br />
The <strong>from</strong> PV potential <strong>the</strong>se two analysis lists, toge<strong>the</strong>r part takes with as <strong>the</strong> input indicated <strong>the</strong> analysis threshold mesh and and PV efficiency, <strong>the</strong> radiation <strong>the</strong> results achievable <strong>from</strong> PV ladybug production and<br />
and generates <strong>the</strong> geometry <strong>from</strong> <strong>the</strong>se <strong>of</strong> two PV eligible lists, toge<strong>the</strong>r area. with <strong>the</strong> indicated threshold and PV efficiency, <strong>the</strong> achievable<br />
PV production and <strong>the</strong> geometry <strong>of</strong> <strong>the</strong> PV eligible area.<br />
ge<br />
PotentialEvaluator<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Name <strong>of</strong> <strong>the</strong> project<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
79
Optimization Components<br />
Optimization Components<br />
The optimization is done with <strong>the</strong> help <strong>of</strong> Galapagos which takes as input a “fitness function” and<br />
adjusts a list <strong>of</strong> “genomes” in order to minimize or maximize <strong>the</strong> “fitness function”. As fitness function<br />
project, we Optimization but defined for a study ei<strong>the</strong>r PV The Components<br />
/ V optimization or shaded area. is done with <strong>the</strong> help <strong>of</strong> Galapagos which takes as input a “fitness function” a<br />
e use <strong>of</strong> Breps as input “genomes” in order to minimize or maximize <strong>the</strong> “fitness function”. As fitness function we defin<br />
dy ption and The reduces optimization main part <strong>the</strong> <strong>of</strong> is done <strong>the</strong>se shaded with feature area. <strong>the</strong> help is <strong>the</strong> <strong>of</strong> Galapagos geometryGenerator, which takes which as input takes a “fitness as input function” a fixed and geometry adjusts a list <strong>of</strong><br />
ut surfaces (parts “genomes” that we are want in not order to to keep minimize constant), or maximize a variable <strong>the</strong> “fitness geometry function”. (geometry As fitness to optimize), function we <strong>the</strong> defined list <strong>of</strong> genomes ei<strong>the</strong>r PV / V or<br />
he ong direction. (representing shaded To area. avoid <strong>the</strong> number The main <strong>of</strong> floors), part <strong>of</strong> <strong>the</strong>se height feature <strong>of</strong> is a <strong>the</strong> floor, geometryGenerator, <strong>the</strong> original geometry which (for takes benchmarking as input a fixed <strong>the</strong> geome<br />
ot erate a generated predominantly volume) and to keep two constant), thresholds a (upper variable and geometry lower bounds (geometry <strong>of</strong> acceptable to optimize), volume <strong>the</strong> list deviation). <strong>of</strong> genomes In <strong>the</strong> (represent<br />
er id to perfectly geometryGenerator The main function part <strong>of</strong> <strong>the</strong>se floors), component, feature <strong>the</strong> is height <strong>the</strong> a set geometryGenerator, <strong>of</strong> <strong>of</strong> a floor, volumes <strong>the</strong> original are generated which geometry takes according as (for input benchmarking to a fixed <strong>the</strong> genome geometry <strong>the</strong> generated list (parts and <strong>the</strong> we volume) want a<br />
tly where resulted to simulated keep constant), volume with is a compared variable (upper and geometry to lower <strong>the</strong> original (geometry bounds design. <strong>of</strong> to acceptable optimize), If it has volume an <strong>the</strong> acceptable list <strong>of</strong> deviation). genomes deviation In (representing <strong>the</strong> <strong>from</strong> geometryGenerator <strong>the</strong> <strong>the</strong> original number <strong>of</strong> com<br />
on volume, floors), <strong>the</strong> <strong>the</strong> height geometry <strong>of</strong> volumes a floor, is sent <strong>the</strong> are original fur<strong>the</strong>r generated to geometry <strong>the</strong> according Ladybug (for benchmarking to solar <strong>the</strong> genome radiation <strong>the</strong> list tool, generated and else, <strong>the</strong> resulted no volume) data volume is and transferred. two is compared thresholds to t<br />
ith This (upper first and condition lower bounds for If it <strong>the</strong> has <strong>of</strong> geometry an acceptable is very volume deviation important deviation). <strong>from</strong> in order <strong>the</strong> In original <strong>the</strong> not geometryGenerator to volume, send all <strong>the</strong> geometries geometry component, to is <strong>the</strong> sent solar fur<strong>the</strong>r a set <strong>of</strong> to<br />
radiation volumes are component generated radiation which according usually tool, to else, <strong>the</strong> needs genome data lots <strong>of</strong> is list transferred. resources and <strong>the</strong> resulted and This time. first volume condition is compared for <strong>the</strong> geometry to <strong>the</strong> original is very design. importa<br />
If it has an acceptable send deviation all geometries <strong>from</strong> <strong>the</strong> to <strong>the</strong> original solar volume, radiation <strong>the</strong> component geometry which is sent usually fur<strong>the</strong>r needs to <strong>the</strong> lots Ladybug <strong>of</strong> resources solar an<br />
radiation tool, else, no data is transferred. This first condition for <strong>the</strong> geometry is very important in order not to<br />
send all geometries to <strong>the</strong> solar radiation component which usually needs lots <strong>of</strong> resources and time.<br />
ter performance<br />
geometryGenerator<br />
m ladybug and generievable<br />
PV geometryGenerator<br />
production<br />
eron<br />
80<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture<br />
12/13
Conclusions and future perspectives<br />
The architectural design becomes more and more difficult as <strong>the</strong> design tasks evolve <strong>from</strong> <strong>the</strong> building<br />
scale to <strong>the</strong> urban scale. The situation is made even more difficult by <strong>the</strong> ever increasing number <strong>of</strong><br />
norms, regulations and energetic, environments, political and economic factors that need to be taken<br />
into account. The analogic design <strong>of</strong> <strong>the</strong> past generations is a method that became too slow for <strong>the</strong><br />
current speed <strong>of</strong> design and construction. Manpower becomes also gradually more expensive and<br />
scarce. The digital and parametric design tools <strong>of</strong>fer <strong>the</strong> architects and planners <strong>the</strong> possibility to<br />
analyse and handle large numbers <strong>of</strong> design factors with minimal time investment. The rapid generation<br />
<strong>of</strong> design variants with <strong>the</strong> help <strong>of</strong> optimization algorithms allows to quickly recognize <strong>the</strong> boundaries <strong>of</strong><br />
<strong>the</strong> design freedom and complex relationships between geometry and physical parameters.<br />
The problem <strong>of</strong> digital analysis remains <strong>the</strong> scale. These tools are usually very good for small scales,<br />
where data is processed fast and <strong>the</strong> accuracy <strong>of</strong> <strong>the</strong> results can be estimated by an experienced user.<br />
However, once you go on urban scale things get very complicated, data need long time periods for<br />
processing, <strong>the</strong> computational power required grows and <strong>the</strong> results are difficult to interpret.<br />
In order to handle <strong>the</strong> complexities <strong>of</strong> <strong>the</strong> digital analysis on urban scale, a good and stable workflow<br />
needs to be implemented in order to optimise resource requirements. Moreover, it is crucial to decide<br />
on few and precisely formulated outputs that can be compared and evaluated by <strong>the</strong> user. Generating<br />
large amounts <strong>of</strong> complex data only leads to more trouble than it actually could solve.<br />
In our specific case we see multiple future perspectives for improving our analysis and designing<br />
process. Besides optimising <strong>the</strong> input geometry and <strong>the</strong> resolution <strong>of</strong> analysis, we could think about<br />
improving <strong>the</strong> optimization criteria and debate about what it really says and how meaningful it is for<br />
design benchmarking. For example, setting as optimization criteria (PV / PV area), we could evaluate<br />
<strong>the</strong> economic efficiency <strong>of</strong> <strong>the</strong> solar cells. By comparing <strong>the</strong> (radiation / envelope area) we could get an<br />
indication about <strong>the</strong> <strong>the</strong>rmal performance <strong>of</strong> <strong>the</strong> buildings (total gains / total losses).<br />
Finally, <strong>the</strong> digital and parametric design tools open to <strong>the</strong> architects and planners numerous new design<br />
possibilities and methods, but <strong>the</strong>y still have <strong>the</strong> limitation <strong>of</strong> not being able to measure architectural<br />
quality and “beauty”. In <strong>the</strong> end, <strong>the</strong>re is still <strong>the</strong> need for experienced planners that know how to<br />
handle <strong>the</strong>se tools and apply <strong>the</strong>m in a conscious way, avoiding to use <strong>the</strong>m as tools <strong>of</strong> manipulating<br />
decision makers.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
81
Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
Student: Natalia Daukszewicz & Philippe Blarer
Summary:<br />
We analysed <strong>the</strong> train station Stadelh<strong>of</strong>en. It is situated in <strong>the</strong> north <strong>of</strong> <strong>the</strong> Stadelh<strong>of</strong>erplatz which is<br />
directly connected to Sechseläutenplatz, one <strong>of</strong> <strong>the</strong> largest squares in Zürich. This park complex is also<br />
one <strong>of</strong> <strong>the</strong> most representative in <strong>the</strong> city. Even <strong>the</strong> public train station building seems to be connected<br />
to this area - but its front appears to be plainly functional. Due to <strong>the</strong> location <strong>of</strong> parking spaces for cars<br />
and bicycles just in front <strong>of</strong> <strong>the</strong> building, it seems to be losing its ’’public face’’.<br />
There are plans to extend <strong>the</strong> existing station by <strong>the</strong> 4th track. While <strong>the</strong> location <strong>of</strong> <strong>the</strong> track is yet to<br />
be decided, we took <strong>the</strong> liberty to analyse <strong>the</strong> current urban and building situation and deal with its<br />
constraints within possible means.<br />
Motivation:<br />
On one hand, we have a paved Sechseläutenplatz that opens to <strong>the</strong> Zürich Lake. It is perfectly designed<br />
for people ga<strong>the</strong>rings. One should not forget though, that it used to be a green park before. It has been<br />
not so long ago, when <strong>the</strong> trees have been removed and <strong>the</strong> character <strong>of</strong> <strong>the</strong> whole place has been<br />
dramatically changed. Then <strong>the</strong>re is a Stadelh<strong>of</strong>erplatz, green, covered with large trees and water<br />
fountains. It gives shadow and relief in summer but it also completely blocks <strong>the</strong> view between Zürich<br />
Lake and <strong>the</strong> head building <strong>of</strong> <strong>the</strong> Stadelh<strong>of</strong>en Bahnh<strong>of</strong>. And <strong>the</strong>n <strong>the</strong>re is <strong>the</strong> train station itself. With<br />
all its side entrances, hidden between <strong>the</strong> o<strong>the</strong>r buildings, cars and bicycles, only “unwillingly” opening<br />
itself to <strong>the</strong> visitors.<br />
In <strong>the</strong> design project we argue that <strong>the</strong> area in front <strong>of</strong> <strong>the</strong> train station should become more open<br />
and connected to Stadelh<strong>of</strong>erplatz. Therefore we suggest <strong>the</strong> removal <strong>of</strong> <strong>the</strong> car and bicycles parking<br />
lots and its replacement with trees and ano<strong>the</strong>r pavement surface tin order to create an emotional<br />
connection with <strong>the</strong> park across <strong>the</strong> street. The building itself should also be able to activate <strong>the</strong> space<br />
in front <strong>of</strong>t it. It becomes necessary to rearrange <strong>the</strong> ground floor.<br />
The analyses should show <strong>the</strong> underlying phenomena that prevent <strong>the</strong> Stadtelh<strong>of</strong>erpark to become a<br />
functional public space. They should also be understood as a fur<strong>the</strong>r argumentation <strong>of</strong> a project. They<br />
also remain open to interpretations, hinting at decisions.<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
84<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
85
Project (building Project level): (building level):<br />
-2 now<br />
-2 now<br />
GF now<br />
GF now<br />
GF projectGF project<br />
-2 project-2<br />
project<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Digital</strong> <strong>Simulation</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en Stadelh<strong>of</strong>en<br />
86<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
-2 now<br />
-2 project<br />
3 / 13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
87
The map shows up <strong>the</strong> potential <strong>of</strong> urban development for <strong>the</strong> Stadelh<strong>of</strong>erplatz.<br />
The Theaterstrasse is <strong>the</strong> most connected street which correspond to <strong>the</strong><br />
predominant situation. The street is crossing <strong>the</strong> two public parks. The parks<br />
do also show high connectivity and integration. This indicates a little contradiction:<br />
The Stadelh<strong>of</strong>erplatz is well integrated but <strong>the</strong> analysis does not<br />
feature Analysis 1 (City this level as / a axial quality. map - integration): It suggest, that it is more a transition zone than a<br />
representative space with high quality potential.<br />
The map shows up <strong>the</strong> potential <strong>of</strong> urban development for <strong>the</strong> Stadelh<strong>of</strong>erplatz.<br />
The Theaterstrasse is <strong>the</strong> most connected street which correspond to <strong>the</strong> predominant situation. The street is<br />
crossing <strong>the</strong> two public parks. The parks do also show high connectivity and integretion. This indicates a little<br />
contradiciton: The Stadelh<strong>of</strong>erplatz is well integrated but <strong>the</strong> analysis does not feature this as a quality. It suggest,<br />
that it is more a transition zone than a representative space with high quality potential.<br />
Analysis 2 (City level / axia<br />
<strong>Digital</strong> Analysis <strong>Urban</strong> 1 (City level <strong>Simulation</strong> / axial map | - Bahnh<strong>of</strong> integration): Stadelh<strong>of</strong>en<br />
88<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Analysis 2 (City level / axial map - connectivity):<br />
nt situation. The street is<br />
tion. This indicates a little<br />
re this as a quality. It sugtential.<br />
Analysis 2 (City level / axial map - connectivity):<br />
4 / 13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
89
This map shows up <strong>the</strong> hi<br />
Stadelh<strong>of</strong>erplatz. Most vis<br />
that attract people and ac<br />
ity analysis, combining it w<br />
The visibility map that an<br />
nected.<br />
The disadvantage <strong>of</strong> <strong>the</strong> v<br />
train station that prevents<br />
Analysis 3 (City level / visibility map map - - connectivity):<br />
Analysis 3 (City level / visib<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
90<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Analysis 3 (City level / visibility map - connectivity):<br />
This map shows up <strong>the</strong> highest visibility at <strong>the</strong> Sechseläutenplatz. It also<br />
shows <strong>the</strong> visual connection with <strong>the</strong> Stadelh<strong>of</strong>erplatz. Most visible are <strong>the</strong><br />
facades on <strong>the</strong> east side <strong>of</strong>t <strong>the</strong> Stadtelh<strong>of</strong>erplatz. These may be places that<br />
This map shows up <strong>the</strong> highest visibility at <strong>the</strong> Sechseläutenplatz. It also shows <strong>the</strong> visual connection with <strong>the</strong><br />
Stadelh<strong>of</strong>erplatz.<br />
attract people<br />
Most<br />
and<br />
visible<br />
activate<br />
are <strong>the</strong> facades<br />
<strong>the</strong> Stadelh<strong>of</strong>erplatz,<br />
on <strong>the</strong> east side <strong>of</strong>t <strong>the</strong> Stadtelh<strong>of</strong>erplatz.<br />
like c<strong>of</strong>fee shops<br />
These may<br />
or restaurants.<br />
attract Pr<strong>of</strong>iting people and <strong>from</strong> activate this <strong>the</strong> Stadelh<strong>of</strong>erplatz, visibility analysis, like c<strong>of</strong>fee combining shops or restaurants. it with Pr<strong>of</strong>iting integration <strong>from</strong> this visibil-<br />
and<br />
be places<br />
that<br />
ity analysis, combining it with integration and choice, it hints a possibilty for intervention.<br />
choice, it hints a possibility for intervention.<br />
The visibility map that analised <strong>the</strong> Stadelh<strong>of</strong>erplatz shows that <strong>the</strong> one <strong>of</strong> its corners seems to be more connected.<br />
The disadvantage visibility <strong>of</strong> map <strong>the</strong> visibility that analysed map analysis <strong>the</strong> is that Stadelh<strong>of</strong>erplatz we have to neglect <strong>the</strong> shows tarrain. There’s that a <strong>the</strong> hill behind one <strong>the</strong> <strong>of</strong><br />
train station that prevents <strong>the</strong> analysis <strong>the</strong> coverage <strong>of</strong> <strong>the</strong> part behind <strong>the</strong> station .<br />
its corners seems to be more connected. The disadvantage <strong>of</strong> <strong>the</strong> visibility<br />
map analysis is that we have to neglect <strong>the</strong> terrain. There’s a hill behind <strong>the</strong><br />
train station that prevents <strong>the</strong> analysis <strong>the</strong> coverage <strong>of</strong> <strong>the</strong> part behind 5 <strong>the</strong> / 13<br />
station .<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
91
Analysis 4 (City level / convex / map - integration):<br />
- Analysis 4 (City level/ co<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
92<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Analysis 4 (City level/ convex map - - connectivity):<br />
6 / 13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
93
Analysis 5 (Building level GF now / convex map - connectivity):<br />
Analysis 5 (Building level G<br />
Analysis 6 (Building level GF now / convex map - integration):<br />
Analysis 6 (Building level G<br />
Analysis 7 (Building level GF now / convex map - choice):<br />
Analysis 7 (Building level G<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
94<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Analysis 5 (Building level GF project/ convex map - connectivity):<br />
Analysis 6 (Building level GF project/ convex map - integration):<br />
Analysis 7 (Building level GF project / convex map - choice):<br />
7 / 13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
95
Analysis 8 (Building level GF now / isovist map - connectivity):<br />
Analysis 8 (Building level G<br />
The existing building is symmetrical, so <strong>the</strong> entrance hall in <strong>the</strong> middle is <strong>the</strong> most integrated. The side volumes<br />
on <strong>the</strong> left and right include private rooms that serve <strong>the</strong> passerbys The integration is increasing to <strong>the</strong> sides.<br />
The central hall shows, as expected, <strong>the</strong> highest connectivity and choice.<br />
Analysis 8 (Building level GF project / isovist map - connectivity):<br />
The project aim is to activate <strong>the</strong> public space inside. That should open <strong>the</strong> space in front <strong>of</strong> <strong>the</strong> building. The<br />
staircase and serving rooms have been moved to <strong>the</strong> back and sides <strong>of</strong>t he building. The public space seems<br />
to be <strong>the</strong> most integrated and accessible while <strong>the</strong> serving rooms are less integrated and connected. The staff<br />
area is connected through <strong>the</strong> public space but <strong>the</strong>y are also connected with each o<strong>the</strong>r, while before <strong>the</strong>y were<br />
more seperated. So <strong>the</strong> connectivity increases after changes.<br />
The visibility map <strong>of</strong> <strong>the</strong> old groundfloor shows <strong>the</strong> highest visibility at <strong>the</strong> entrence hall. The staff area is separated<br />
and does not exhibit visual connections.<br />
The new groundfloor <strong>of</strong>fers a new visual axis running through <strong>the</strong> building. The main hall is open and all spaces<br />
are visbile <strong>from</strong> it. The public spaces ond <strong>the</strong> left and right are less visible. They include c<strong>of</strong>fe tables for visitors,<br />
so people walking through <strong>the</strong> main hall to <strong>the</strong> stairecases will not disturbe <strong>the</strong> visitors.<br />
grated. The side volumes<br />
increasing to <strong>the</strong> sides.<br />
front <strong>of</strong> <strong>the</strong> building. The<br />
. The public space seems<br />
and connected. The staff<br />
er, while before <strong>the</strong>y were<br />
all. The staff area is separhall<br />
is open and all spaces<br />
e c<strong>of</strong>fe tables for visitors,<br />
rs.<br />
The existing building is symmetrical, so <strong>the</strong> entrance hall in <strong>the</strong> middle is <strong>the</strong><br />
most integrated. The side volumes on <strong>the</strong> left and right include private rooms<br />
that serve <strong>the</strong> passersby The integration is increasing to <strong>the</strong> sides. The central<br />
hall shows, as expected, <strong>the</strong> highest connectivity and choice.<br />
The project aim is to activate <strong>the</strong> public space inside. That should open <strong>the</strong><br />
<strong>Digital</strong><br />
space<br />
<strong>Urban</strong><br />
in front<br />
<strong>Simulation</strong><br />
<strong>of</strong> <strong>the</strong><br />
|<br />
building.<br />
Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
The staircase and serving rooms have been<br />
moved to <strong>the</strong> back and sides <strong>of</strong>t he building. The public space seems to be<br />
<strong>the</strong> most integrated and accessible while <strong>the</strong> serving rooms are less integrated<br />
and connected. The staff area is connected through <strong>the</strong> public space<br />
but <strong>the</strong>y are also connected with each o<strong>the</strong>r, while before <strong>the</strong>y were more<br />
separated. So <strong>the</strong> connectivity increases after changes.<br />
The visibility map <strong>of</strong> <strong>the</strong> old ground floor shows <strong>the</strong> highest visibility at <strong>the</strong><br />
entrance hall. The staff area is separated and does not exhibit visual connections.<br />
The new ground floor <strong>of</strong>fers a new visual axis running through <strong>the</strong> building.<br />
The main hall is open and all spaces are visible <strong>from</strong> it. The public spaces<br />
and <strong>the</strong> left and right are less visible. They include c<strong>of</strong>fee tables for visitors,<br />
so people walking through <strong>the</strong> main hall to <strong>the</strong> staircases will not disturb <strong>the</strong><br />
8 / 13<br />
visitors.<br />
96<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
vel -2 now Analysis / convex 9 map (Building - connectivity):<br />
level -2 now / convex map - connectivity):<br />
ilding level Analysis -2 now / 9 convex (Building map level - connectivity):<br />
-2 now / convex map - connectivity):<br />
Analysis 9 (Building level -2 project Analysis / convex 9 (Building map - connectivity):<br />
level -2 project / convex m<br />
Analysis 9 (Building level Analysis -2 project 9 (Building / convex level map -2 - connectivity):<br />
project / convex map - connect<br />
uilding level Analysis -2 now 10 / convex (Building map level - integration):<br />
-2 now / convex map - integration):<br />
level -2 now Analysis / convex 10 map (Building - integration):<br />
level -2 now / convex map - integration):<br />
Analysis 10 (Building level Analysis -2 project 10 (Building / convex level map -2 - integration):<br />
project / convex map - integra<br />
Analysis 10 (Building level -2 project Analysis / convex 10 (Building map - integration):<br />
level -2 project / convex<br />
uilding level Analysis GF now 11 / convex (Building map level - choice): GF now / convex map - choice):<br />
level GF now Analysis / convex 11 (Building map - choice):<br />
level GF now / convex map - choice):<br />
Analysis 11 (Building level Analysis GF project 11 (Building / convex level map GF - choice): project / convex map - choice<br />
Analysis 11 (Building level GF project Analysis / convex 11 (Building map - choice):<br />
level GF project / conve<br />
n <strong>Simulation</strong> <strong>Digital</strong> | Bahnh<strong>of</strong> <strong>Urban</strong> <strong>Simulation</strong> Stadelh<strong>of</strong>en | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
lation | <strong>Digital</strong> Bahnh<strong>of</strong> <strong>Urban</strong> Stadelh<strong>of</strong>en<br />
<strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
97
Analysis 12 (Building level -2 now / isovist map - connectivity):<br />
Analysis 12 (Building level -2 pr<br />
Analysis 12 (Building level -2 project / isovist map - connectivity):<br />
The main floor is as expected <strong>the</strong> most integrated and also shows up <strong>the</strong> highest choice. All stores are directly<br />
accessible through <strong>the</strong> main passage. The stores are on both sides <strong>of</strong> <strong>the</strong> passage and are only connected to<br />
each o<strong>the</strong>r through this passage. The storages at <strong>the</strong> back <strong>of</strong> <strong>the</strong> stores are <strong>the</strong> areas that are least integrated.<br />
In <strong>the</strong> new situation <strong>the</strong>re are three new staircases leading downstairs to <strong>the</strong> new platform. They should be<br />
good connected, so <strong>the</strong>y are also placed next to main floor. They show <strong>the</strong> same integration and connectivity<br />
to <strong>the</strong> stores.<br />
The most visible and connected part <strong>of</strong> <strong>the</strong> underground floor is <strong>the</strong> intersection <strong>of</strong> <strong>the</strong> main floor and <strong>the</strong> axis<br />
where <strong>the</strong> staircase is leading down <strong>from</strong> ground level to <strong>the</strong> underground. The main floor shows some peaks at<br />
<strong>the</strong> store and staircase entrances. The difficulty was to deal with <strong>the</strong> stores, espcecially in Coop. There is a large<br />
space but it is not really visibly conected because <strong>of</strong> <strong>the</strong> shelfs etc.<br />
While designing <strong>the</strong> retail areas, it became clear that <strong>the</strong> investor wishes to locate some <strong>of</strong> <strong>the</strong> most important<br />
infrastructure (such as info points <strong>of</strong> cash registers) in <strong>the</strong> back <strong>of</strong> <strong>the</strong> complex. This would mean for <strong>the</strong> visitor,<br />
that <strong>the</strong>se areas are not well integrated but it would force <strong>the</strong>m to pass <strong>the</strong> shops on <strong>the</strong> way to it.<br />
st choice. All stores are directly<br />
age and are only connected to<br />
areas that are least integrated.<br />
The main floor is as expected <strong>the</strong> most integrated and also shows up <strong>the</strong> highest choice. All stores are<br />
directly accessible through <strong>the</strong> main passage. The stores are on both sides <strong>of</strong> <strong>the</strong> passage and are only<br />
connected to each o<strong>the</strong>r through this passage. The storages at <strong>the</strong> back <strong>of</strong> <strong>the</strong> stores are <strong>the</strong> areas<br />
that are least integrated.<br />
new platform. They should be<br />
e integration and connectivity<br />
n <strong>of</strong> <strong>the</strong> main floor and <strong>the</strong> axis<br />
ain floor shows some peaks at<br />
ecially in Coop. There is a large<br />
In <strong>the</strong> new situation <strong>the</strong>re are three new staircases leading downstairs to <strong>the</strong> new platform. They should<br />
be good connected, so <strong>the</strong>y are also placed next to main floor. They show <strong>the</strong> same integration and<br />
connectivity to <strong>the</strong> stores. The most visible and connected part <strong>of</strong> <strong>the</strong> underground floor is <strong>the</strong> intersection<br />
<strong>of</strong> <strong>the</strong> main floor and <strong>the</strong> axis where <strong>the</strong> staircase is leading down <strong>from</strong> ground level to <strong>the</strong> underground.<br />
The main floor shows some peaks at <strong>the</strong> store and staircase entrances. The difficulty was<br />
to deal with <strong>the</strong> stores, especially in Coop. There is a large space but it is not really visibly connected<br />
because <strong>of</strong> <strong>the</strong> shelves etc.<br />
te some <strong>of</strong> <strong>the</strong> most important<br />
This would mean for <strong>the</strong> visitor,<br />
s on <strong>the</strong> way to it.<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
While designing <strong>the</strong> retail areas, it became clear that <strong>the</strong> investor wishes to locate some <strong>of</strong> <strong>the</strong> most<br />
important infrastructure (such as info points <strong>of</strong> cash registers) in <strong>the</strong> back <strong>of</strong> <strong>the</strong> complex. This would<br />
10 / 13<br />
mean for <strong>the</strong> visitor, that <strong>the</strong>se areas are not well integrated but it would force <strong>the</strong>m to pass <strong>the</strong> shops<br />
on <strong>the</strong> way to it.<br />
98<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Analysis 13 (City level / shadow range summer solstice):<br />
Analysis 13 (City level / shad<br />
21. June<br />
range 08:00 - 18:00<br />
no trees<br />
21. June<br />
range 08:00 - 18:00<br />
additional trees<br />
21. June<br />
08:00<br />
no trees<br />
21. June<br />
08:00<br />
additional trees<br />
21. June<br />
12:00<br />
no trees<br />
21. June<br />
12:00<br />
additional trees<br />
21. June<br />
18:00<br />
no trees<br />
21. June<br />
18:00<br />
additional trees<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
99
Analysis 13 (City level / shadow range winter solstice):<br />
21. June<br />
range 08:00 - 18:00<br />
additional trees<br />
21. December<br />
range 08:00 - 18:00<br />
no trees<br />
21. December<br />
range 08:00 - 18:00<br />
additional trees<br />
21. June<br />
08:00<br />
additional trees<br />
21. December<br />
08:00<br />
no trees<br />
21. December<br />
08:00<br />
additional trees<br />
21. June<br />
12:00<br />
additional trees<br />
21. December<br />
12:00<br />
no trees<br />
21. December<br />
12:00<br />
additional trees<br />
21. June<br />
18:00<br />
additional trees<br />
21. December<br />
18:00<br />
no trees<br />
21. December<br />
18:00<br />
additional trees<br />
11 / 13<br />
100<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Analysis 14 (City level / solar radiation analysis - no trees):<br />
Analysis 14 (City level / solar radiation analysis - no trees):<br />
Analysis 14 (City level / solar radiation analysis - addition<br />
s):<br />
Since <strong>the</strong> discussion whe<strong>the</strong>r to keep or remove <strong>the</strong> trees at Stadelh<strong>of</strong>erplatz emerged, we decided to investigate<br />
Analysis both scenarios. 14 (City level / solar radiation analysis - additional trees):<br />
One<br />
Analysis<br />
can clearly<br />
14 (City<br />
see,<br />
level<br />
in both<br />
/ solar<br />
shadow<br />
radiation<br />
range<br />
analysis<br />
and solar<br />
- additional<br />
radiation<br />
trees):<br />
analysis, that after removing <strong>the</strong> trees, <strong>the</strong> square<br />
becomes exposed to <strong>the</strong> sun radiation for almost whole day, especially in wam periods <strong>of</strong> <strong>the</strong> year. This would<br />
definitely lead to <strong>the</strong> increase <strong>of</strong> <strong>the</strong> temeprature in this area and contribute to <strong>the</strong> phenomenon <strong>of</strong> heat islands<br />
in <strong>the</strong> city. However, <strong>the</strong>re is a possibility for <strong>the</strong> hot air to get cooled down due to <strong>the</strong> impact <strong>of</strong> <strong>the</strong> lake, which<br />
none <strong>of</strong> <strong>the</strong> above analysis were able to incorporate.<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Bahnh<strong>of</strong> Stadelh<strong>of</strong>en<br />
es at Stadelh<strong>of</strong>erplatz emerged, we decided to investigiation<br />
analysis, that after removing <strong>the</strong> trees, <strong>the</strong> square<br />
e day, especially in wam periods <strong>of</strong> <strong>the</strong> year. This would<br />
area and contribute to <strong>the</strong> phenomenon <strong>of</strong> heat islands<br />
o get cooled down due to <strong>the</strong> impact <strong>of</strong> <strong>the</strong> lake, which<br />
Since <strong>the</strong> discussion whe<strong>the</strong>r to keep or remove <strong>the</strong> trees at Stadelh<strong>of</strong>erplatz emerged, we decided<br />
to investigate both scenarios. One can clearly see, in both shadow range and solar radiation analysis,<br />
that after removing <strong>the</strong> trees, <strong>the</strong> square becomes exposed to <strong>the</strong> sun radiation for almost whole day,<br />
especially in warm periods <strong>of</strong> <strong>the</strong> year. This would definitely lead to <strong>the</strong> increase <strong>of</strong> <strong>the</strong> temperature in<br />
this area and contribute to <strong>the</strong> phenomenon <strong>of</strong> heat islands in <strong>the</strong> city. However, <strong>the</strong>re is a possibility<br />
for <strong>the</strong> hot air to get cooled down due to <strong>the</strong> impact <strong>of</strong> <strong>the</strong> lake, which none <strong>of</strong> <strong>the</strong> above analysis were<br />
able to incorporate.<br />
n 12 / 13<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
101
Conclusions:<br />
Improving <strong>the</strong> existing urban situation is always difficult. One should always<br />
ask him- or herself where to start and end with analysis and suggestions.<br />
In this case <strong>the</strong>re is a conflict between open Sechseläutenplatz and closed<br />
Stadelh<strong>of</strong>erplatz. To remove <strong>the</strong> trees <strong>from</strong> <strong>the</strong> latter would improve <strong>the</strong> visibility<br />
but it would also destroy <strong>the</strong> local feeling <strong>of</strong> Stadelh<strong>of</strong>erplatz, that we<br />
now have. In this case, <strong>the</strong> design process requires <strong>the</strong> rethinking <strong>of</strong> connectivity<br />
and visual links.<br />
Also <strong>the</strong> redesigning <strong>of</strong> <strong>the</strong> existing train station, given <strong>the</strong> investor’s needs,<br />
cannot entirely rely on common knowledge , even if it is backed-up by simulations.<br />
The above analyses are by far no guidelines to follow but <strong>the</strong>y manage to<br />
indicate zones for intervention and highlight <strong>the</strong> areas for improvement.<br />
102<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Zurich - Historic City & City Blocks<br />
Student: Ricardo Joss
Zurich - Historic City & City Blocks<br />
Final Examination<br />
Name: Ricardo Joss<br />
Date: 28. November <strong>2015</strong><br />
Zurich, Map <strong>of</strong> Roads, Connectivity Analysis, Radius @ 800m<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Zurich - Historic City & City Blocks<br />
106<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Zoom in: Zurich, Historic City<br />
Zoom in: Zurich, Historic City<br />
Zoom in: Zurich, City Blocks area<br />
Zoom in: Zurich, City Blocks area<br />
Summary<br />
Summary<br />
The focus in this examination is on analyzing this two different city typologies on different scales and<br />
The<br />
with<br />
focus<br />
different<br />
in this<br />
tools.<br />
examination<br />
How do <strong>the</strong><br />
is on<br />
geometrical<br />
analysing<br />
properties<br />
this two different<br />
<strong>of</strong> those<br />
city<br />
two<br />
typologies<br />
centers compere<br />
on different<br />
to each<br />
scales<br />
o<strong>the</strong>r?<br />
and<br />
with street<br />
different<br />
network<br />
tools.<br />
analysis<br />
How do<br />
rendered<br />
<strong>the</strong> geometrical<br />
two pedestrian<br />
properties<br />
centers<br />
<strong>of</strong> those<br />
in Zurich.<br />
two centres<br />
Both will<br />
compere<br />
be compared<br />
to each<br />
using<br />
o<strong>the</strong>r?<br />
<strong>the</strong><br />
A<br />
same<br />
street<br />
tools.<br />
network<br />
The<br />
analysis<br />
sites are<br />
rendered<br />
analyzed<br />
two<br />
on<br />
pedestrian<br />
connectivity,<br />
centres<br />
compactness,<br />
in Zurich.<br />
minimal<br />
Both will<br />
and<br />
be<br />
maximal<br />
compared<br />
radii.<br />
using<br />
Three<br />
<strong>the</strong><br />
same<br />
chosen<br />
tools.<br />
points<br />
The<br />
each<br />
sites<br />
are<br />
are<br />
analyzed<br />
analyzed<br />
with<br />
on<br />
2D<br />
connectivity,<br />
and 3D isovists.<br />
compactness, minimal and maximal radii. Three<br />
chosen points each are analyzed with 2D and 3D isovists.<br />
Motivation<br />
Motivation<br />
The map on <strong>the</strong> left shows a connectivity analysis <strong>of</strong> <strong>the</strong> streets <strong>of</strong> Zurich. The Radius is set at 800<br />
meters, because this is a crucial distance for pedestrians. It’s roughly <strong>the</strong> distance <strong>of</strong> a 10 minutes<br />
The<br />
walk<br />
map<br />
or a<br />
on<br />
distance<br />
<strong>the</strong> left<br />
<strong>of</strong><br />
shows<br />
two bus<br />
a connectivity<br />
stops. Distances<br />
analysis<br />
longer<br />
<strong>of</strong> <strong>the</strong><br />
than<br />
streets<br />
this are<br />
<strong>of</strong><br />
more<br />
Zurich.<br />
likely<br />
The<br />
to<br />
Radius<br />
be traveled<br />
is set<br />
by<br />
at<br />
bike<br />
800<br />
meters,<br />
or motorized<br />
because<br />
vehicles.<br />
this is a crucial distance for pedestrians. It’s roughly <strong>the</strong> distance <strong>of</strong> a 10 minutes walk<br />
or<br />
The<br />
a distance<br />
map renders<br />
<strong>of</strong> two<br />
two<br />
bus<br />
centers.<br />
stops.<br />
The<br />
Distances<br />
red one<br />
longer<br />
is at <strong>the</strong><br />
than<br />
historic<br />
this are<br />
city<br />
more<br />
<strong>of</strong> Zurich,<br />
likely to<br />
<strong>the</strong><br />
be<br />
orange<br />
travelled<br />
one<br />
by<br />
is<br />
bike<br />
at <strong>the</strong><br />
or<br />
motorized<br />
Kalkbreite<br />
vehicles.<br />
area which is typically built with city blocks.<br />
The structure, mainly <strong>the</strong> streets and squares <strong>of</strong> <strong>the</strong> historic city emerged <strong>from</strong> <strong>the</strong> year 800 on. The<br />
The<br />
city block<br />
map renders<br />
structure<br />
two<br />
came<br />
centres.<br />
roughly<br />
The<br />
1000<br />
red<br />
years<br />
one is<br />
later<br />
at <strong>the</strong><br />
and<br />
historic<br />
was planned<br />
city <strong>of</strong><br />
in<br />
Zurich,<br />
<strong>the</strong> time<br />
<strong>the</strong><br />
expansion<br />
orange one<br />
due<br />
is<br />
to<br />
at<br />
<strong>the</strong><br />
<strong>the</strong><br />
Kalkbreite<br />
industrial revolution.<br />
area which is typically built with city blocks. The structure, mainly <strong>the</strong> streets and squares <strong>of</strong><br />
<strong>the</strong> historic city emerged <strong>from</strong> <strong>the</strong> year 800 on. The city block structure came roughly 1000 years later<br />
and was planned in <strong>the</strong> time expansion due to <strong>the</strong> industrial revolution.<br />
1/5<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
107
5<br />
Blackmap <strong>of</strong> historic city (St. Peter area) and city blocks (around Idaplatz)<br />
Blackmap <strong>of</strong> historic city (St. Peter area) and city blocks (around Idaplatz)<br />
Isovist Compactness Analysis, Grid Analysis, 3 meters<br />
Grid 3 meters<br />
500m<br />
500m<br />
Analysis and and Interpretation - Blackmap - Blackmap and Compactness<br />
and Compactness<br />
The blackmap already shows that <strong>the</strong> density <strong>of</strong> <strong>the</strong> historic city is much higher. Also <strong>the</strong> regularity<br />
The and blackmap wideness <strong>of</strong> already <strong>the</strong> streets shows are that very <strong>the</strong> different. density <strong>of</strong> The <strong>the</strong> historic city city has is much two big higher. axis, one Also <strong>the</strong> right regularity <strong>the</strong> Limmat<br />
River <strong>of</strong> and <strong>the</strong> on streets <strong>the</strong> left are <strong>the</strong> very Bahnh<strong>of</strong>strasse. different. The The historic site around city has Idaplatz two big is axis, much one more <strong>the</strong> homogeneous.<br />
right <strong>the</strong> Limmat<br />
and<br />
wideness River The streets and on have <strong>the</strong> more left <strong>the</strong> or Bahnh<strong>of</strong>strasse. les <strong>the</strong> same size The and site <strong>the</strong>re around is mainly Idaplatz just one is much building more typology, homogeneous. <strong>the</strong> city The<br />
streets block with have it’s more courtyard. or less <strong>the</strong> same size and <strong>the</strong>re is mainly just one building typology, <strong>the</strong> city block<br />
with The most it’s courtyard.<br />
compact places are in both sites always <strong>the</strong> empty courtyards <strong>of</strong> <strong>the</strong> city blocks. The most<br />
interesting aspect is <strong>the</strong> compactness <strong>of</strong> <strong>the</strong> street spaces in <strong>the</strong> historic city. The narrow streets,<br />
The niches, most pockets compact and places squares form in both more sites compact always <strong>the</strong> spaces empty than courtyards <strong>the</strong> long axis <strong>of</strong> <strong>the</strong> <strong>of</strong> city <strong>the</strong> blocks. streets The in <strong>the</strong> most city interesting<br />
block area. aspect is <strong>the</strong> compactness <strong>of</strong> <strong>the</strong> street spaces in <strong>the</strong> historic city. The narrow streets, niches,<br />
pockets and squares form more compact spaces than <strong>the</strong> long axis <strong>of</strong> <strong>the</strong> streets in <strong>the</strong> city block area.<br />
5<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Zurich - Historic City & City Blocks<br />
108<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Isovist Maximal Radius Radius Analysis, Grid Analysis, 3 meters<br />
Grid 3 meters<br />
500m<br />
00m<br />
Isovist Minimal Radius Radius Analysis, Grid Analysis, 3 meters<br />
Grid 3 meters<br />
00m<br />
500m<br />
Analysis and Interpretation - Maximal Radius and Minimal Radius<br />
Analysis and Interpretation - Maximal Radius and Minimal Radius<br />
The maximal radius analysis emphasizes <strong>the</strong> long axis in both maps. The left map has, since <strong>the</strong> river<br />
is The not maximal analyzed, radius just analysis one dominant emphasizes axis which <strong>the</strong> long is <strong>the</strong> axis Bahnh<strong>of</strong>strasse in both maps. and The a left not map very has, dominant since <strong>the</strong> area river is<br />
right not analyzed, to <strong>the</strong> river.The just one historic dominant city has axis no which highlighted is <strong>the</strong> Bahnh<strong>of</strong>strasse areas at all. The and city a not block very area dominant has several area almost right to<br />
equally <strong>the</strong> river. dominant The historic axis city and has most no <strong>of</strong> highlighted <strong>the</strong> streets areas part at all. <strong>of</strong> The <strong>the</strong>m. city block area has several almost equally<br />
The dominant minimal axis radius and most analysis <strong>of</strong> <strong>the</strong> renders streets a good are part image <strong>of</strong> <strong>the</strong>m.<br />
<strong>of</strong> size <strong>of</strong> a place. The street widths in <strong>the</strong> historic<br />
city vary much more than in <strong>the</strong> city block area. The larges area is clearly at <strong>the</strong> Lindenh<strong>of</strong>. The<br />
city The block minimal area radius is more analysis homogenous, renders a very good <strong>of</strong>ten image <strong>the</strong> <strong>of</strong> streets <strong>the</strong> size have <strong>of</strong> a <strong>the</strong> place. same The width street as widths <strong>the</strong> inner <strong>the</strong> courtyards.<br />
city vary A much football more field than on <strong>the</strong> in top <strong>the</strong> left city is block <strong>the</strong> largest area. The place. largest area is clearly at <strong>the</strong> Lindenh<strong>of</strong>. The city<br />
historic<br />
block area is more homogenous, very <strong>of</strong>ten <strong>the</strong> streets have <strong>the</strong> same width as <strong>the</strong> inner courtyards. A<br />
football field on <strong>the</strong> top left is <strong>the</strong> largest place.<br />
2/5<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
109
IMAGE<br />
Zurich, Bahnh<strong>of</strong>strasse, St. Peter Platz, Visual Connectivity Analysis, Grid 2 meters<br />
Zurich, Bahnh<strong>of</strong>strasse, St. Peter Platz, Visual Connectivity Analysis, Grid 2 meters<br />
Historic City - Analysis and Interpretation<br />
Historic The most City connected - Analysis nodes and Interpretation<br />
are all situated on <strong>the</strong> Bahnh<strong>of</strong>strasse and marked in red and orange.<br />
Larger squares in green and cyan tones. Due to de small and narrow spaces, all <strong>the</strong> streets and<br />
The smaller most squers connected <strong>of</strong> <strong>the</strong> historic nodes are city all are situated rendered on in <strong>the</strong> light Bahnh<strong>of</strong>strasse and dark blue. and marked in red and orange.<br />
Larger It shows squares clearly in that green relatively and cyan to <strong>the</strong> tones. newer Due streets to de built small for and cars narrow and tramways, spaces, all <strong>the</strong> historic streets city and is smaller visually<br />
less <strong>of</strong> connected. <strong>the</strong> historic The city need are rendered <strong>of</strong> cars for in wider light and roads dark and blue. better It overview shows clearly is reflected that relatively in this analy-<br />
to <strong>the</strong><br />
squares<br />
500m<br />
newer sis. streets built for cars and tramways, <strong>the</strong> historic city is visually less connected. The need <strong>of</strong> cars<br />
for wider roads and better overview is reflected in this analysis.<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Zurich - Historic City & City Blocks<br />
110<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Zurich, Idaplatz, Visual Connectivity Analysis, Grid 2 meters<br />
Zurich, Idaplatz, Visual Connectivity Analysis, Grid 2 meters<br />
City Blocks - Analysis and Interpretation<br />
City The Blocks highest - visual Analysis connectivity and Interpretation is <strong>the</strong> intersection <strong>of</strong> larger roads. The wider <strong>the</strong> road, <strong>the</strong> higher<br />
it‘s connectivtiy at <strong>the</strong> intersection. Also smaller roads render a reletively higher connectivity at <strong>the</strong>ir<br />
The intersection. highest visual Also very connectivity clearly visible at <strong>the</strong> is one intersection <strong>of</strong> <strong>the</strong> driving <strong>of</strong> larger ideas roads. <strong>of</strong> <strong>the</strong> The city wider block. <strong>the</strong> It has road, a public <strong>the</strong> higher outer it‘s<br />
connectivity facade, defining at <strong>the</strong> <strong>the</strong> intersection. public space Also and smaller <strong>the</strong> streets. roads But render also a <strong>the</strong> relatively private higher inner facade, connectivity which at this <strong>the</strong>ir analysis<br />
renders Also always very clearly in blue visible colors, is even one <strong>of</strong> if <strong>the</strong> driving courtyard ideas is partially <strong>of</strong> <strong>the</strong> city open block. towards It has <strong>the</strong> a public street. outer facade,<br />
intersection.<br />
defining <strong>the</strong> public space and <strong>the</strong> streets. But also <strong>the</strong> private inner facade, which this analysis renders<br />
always in blue colours, even if <strong>the</strong> courtyard is partially open towards <strong>the</strong> street.<br />
3/5<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
111
Scale 1:3‘000 Scale 1:3‘000<br />
Scale 1:5‘000 Scale 1:5‘000<br />
Thermengasse Thermengasse<br />
Idastrasse Idastrasse<br />
Robert-Walser-Gasse Robert-Walser-Gasse<br />
Idaplatz Middle Idaplatz Middle<br />
St. Peter<br />
St. Peter<br />
St. Peter-Platz St. Peter-Platz<br />
Idaplatz Junction Idaplatz Junction<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Digital</strong> <strong>Simulation</strong> <strong>Urban</strong> <strong>Simulation</strong> | Zurich - | Historic Zurich City - Historic & City Blocks City & City Blocks<br />
112 New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Area [m²]<br />
Perimeter [m]<br />
40000<br />
34406<br />
30000<br />
20000<br />
10000<br />
0<br />
6918<br />
5128<br />
3658<br />
60 66 209 162<br />
2221<br />
282<br />
606<br />
737<br />
Thermengasse Robert-Walser-Gasse St. Peter Idastrasse Idaplatz-Mitte Idaplatz-Kreuzung<br />
Compactness<br />
Ratio: Min / Max Length<br />
60 %<br />
59 %<br />
"2<br />
45 %<br />
42 %<br />
42 %<br />
40 %<br />
30 %<br />
32 %<br />
15 %<br />
20 %<br />
18 %<br />
12 %<br />
0 %<br />
8 %<br />
6 %<br />
4 %<br />
3 %<br />
Thermengasse Robert-Walser-Gasse St. Peter Idastrasse Idaplatz-Mitte Idaplatz-Kreuzung<br />
Analysis Analysis and Interpretation and Interpretation - 2D Isovists, - 2D Isovists, <strong>from</strong> small <strong>from</strong> to small medium to medium to large to large<br />
"3<br />
I chose six points, three on each map, to analyze with 2D and 3D Isovists (see next page). In absolute<br />
I chose measures, six points, even three <strong>the</strong> largest on each site map, <strong>of</strong> <strong>the</strong> to historic analyse city with was 2D smaller and 3D than Isovists <strong>the</strong> smallest (see next <strong>of</strong> <strong>the</strong> page). city In block absolute area.<br />
measures, The largest even place <strong>the</strong> largest <strong>of</strong> <strong>the</strong> historic site <strong>of</strong> <strong>the</strong> city, historic <strong>the</strong> St. Peter-Platz city was smaller is much than more <strong>the</strong> compact smallest than <strong>of</strong> <strong>the</strong> <strong>the</strong> city largest block area area.<br />
The in largest <strong>the</strong> city place block. <strong>of</strong> The <strong>the</strong> historic smalles city, places <strong>the</strong> are St. by Peterplatz far found is in much <strong>the</strong> historic more city. compact Large sites than with <strong>the</strong> largest a long view area in<br />
<strong>the</strong> city<br />
and<br />
block.<br />
low compactness<br />
The smallest<br />
are<br />
places<br />
found<br />
are<br />
in <strong>the</strong><br />
by<br />
city<br />
far found<br />
block area.<br />
in <strong>the</strong> historic city. Large sites with a long view and<br />
low<br />
Compactness<br />
compactness<br />
is<br />
are<br />
calculated<br />
found in <strong>the</strong><br />
as ratio<br />
city<br />
between<br />
block area.<br />
<strong>the</strong><br />
Compactness<br />
acutal perimeter<br />
is calculated<br />
and <strong>the</strong> smallest<br />
as ratio<br />
possible<br />
between<br />
perimeter<br />
<strong>the</strong> actual<br />
perimeter and <strong>the</strong> smallest possible perimeter for an area <strong>of</strong> <strong>the</strong> same size. The Min / Max Length<br />
for an area <strong>of</strong> <strong>the</strong> same size. The Min / Max Lenght value compares <strong>the</strong> ratio form shortest to longest<br />
ray in <strong>the</strong> isovist.<br />
value compares <strong>the</strong> ratio form shortest to longest ray in <strong>the</strong> isovist<br />
4/5<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
113
Historic city: Analyzed points<br />
City Blocks: Analyzed points<br />
3D Isovist Rays: Cut-Offs at St. Peter-Platz<br />
3D Isovist Rays: Analyzed Rays at Idaplatz<br />
114<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Idastrasse Idaplatz-Mitte Idaplatz-Kreuzung Thermengasse Robert-Walser-Gasse St. Peter-Platz<br />
100.0<br />
Length [m]<br />
10.0<br />
1.0<br />
0.1<br />
1 401 801 1201 1601 2001<br />
Rays N° 1-2400 (Sorted <strong>from</strong> shortest to longest)<br />
Analysis and Interpretation - 3D Isovists, <strong>from</strong> small to medium to large<br />
Analysis and Interpretation - 3D Isovists, <strong>from</strong> small to medium to large<br />
To analyze <strong>the</strong> same six points with a 3D-Isovist, I placed 2400 rays with <strong>the</strong> length <strong>of</strong> 400 meters<br />
To analyse <strong>the</strong> same six points with a 3D-Isovist, I placed 2400 rays with <strong>the</strong> length <strong>of</strong> 400 meters on<br />
on each point. All <strong>the</strong> rays where cut when <strong>the</strong>y hit <strong>the</strong> ground or a building. The left image show <strong>the</strong><br />
each point. All <strong>the</strong> rays where cut when <strong>the</strong>y hit <strong>the</strong> ground or a building. The left image show <strong>the</strong> cut<br />
cutted <strong>of</strong> rays at St. Peter-Platz. The image on <strong>the</strong> right shows <strong>the</strong> rays used for <strong>the</strong> analysis at <strong>the</strong><br />
<strong>of</strong> rays at St. Peterplatz. The image on <strong>the</strong> right shows <strong>the</strong> rays used for <strong>the</strong> analysis at <strong>the</strong> junction<br />
junction <strong>of</strong> Idaplatz. The diagram shows <strong>the</strong> lengths <strong>of</strong> each ray for each <strong>of</strong> <strong>the</strong> six points. Using a<br />
<strong>of</strong> Idaplatz. The diagram shows <strong>the</strong> lengths <strong>of</strong> each ray for each <strong>of</strong> <strong>the</strong> six points. Using a logarithmic<br />
logarhitmic<br />
scale for <strong>the</strong><br />
scale<br />
lengths,<br />
for <strong>the</strong><br />
<strong>the</strong><br />
lengths,<br />
diagram<br />
<strong>the</strong><br />
shows<br />
diagram<br />
a nice<br />
shows<br />
progression<br />
a nice progression<br />
and <strong>the</strong> rays<br />
and<br />
become<br />
<strong>the</strong> rays<br />
comparable.<br />
become comparable.<br />
The top<br />
horizontal<br />
The<br />
line<br />
top<br />
shows<br />
horizontal<br />
all rays<br />
line<br />
with<br />
shows<br />
<strong>the</strong> lengths<br />
all rays with<br />
<strong>of</strong> 400<br />
<strong>the</strong><br />
meters.<br />
lengths<br />
This<br />
<strong>of</strong> 400<br />
is equal<br />
meters.<br />
to rays<br />
This<br />
which<br />
is equal<br />
would<br />
to rays<br />
reach<br />
which<br />
<strong>the</strong> sky.<br />
would<br />
The<br />
reach<br />
longer<br />
<strong>the</strong><br />
<strong>the</strong><br />
sky.<br />
top<br />
The<br />
horizontal<br />
longer<br />
line,<br />
<strong>the</strong><br />
<strong>the</strong><br />
top<br />
more<br />
horizontal<br />
sky view<br />
line,<br />
and<br />
<strong>the</strong> more<br />
natural<br />
sky<br />
light<br />
view<br />
is visible<br />
and natural<br />
at <strong>the</strong><br />
light<br />
site.<br />
ist<br />
visible at <strong>the</strong> site.<br />
Five out <strong>of</strong> <strong>the</strong> six sites have <strong>the</strong> same progression for <strong>the</strong> 800 shortest rays. After this mark <strong>the</strong> spatial<br />
Five<br />
characteristics<br />
out <strong>of</strong> <strong>the</strong> six<br />
for<br />
sites<br />
each<br />
have<br />
site become<br />
<strong>the</strong> same<br />
visible.<br />
progression<br />
Unlike <strong>the</strong><br />
for<br />
2D-Isovist<br />
<strong>the</strong> 800 shortest<br />
analysis,<br />
rays.<br />
<strong>the</strong><br />
afters<br />
St. Peterplatz<br />
this mark<br />
has<br />
<strong>the</strong><br />
bigger<br />
spatial<br />
isovist<br />
characteristics<br />
than <strong>the</strong> Idastrasse.<br />
for each site<br />
The<br />
become<br />
very small<br />
visible.<br />
place<br />
Unlike<br />
at Thermengasse<br />
<strong>the</strong> 2D-Isovist<br />
has<br />
analysis,<br />
almost<br />
<strong>the</strong><br />
no<br />
St.<br />
rays<br />
Peter-Platz<br />
longer than<br />
has<br />
5<br />
bigger<br />
meters<br />
isovist<br />
and just<br />
than<br />
about<br />
<strong>the</strong> Idastrasse.<br />
3% reach <strong>the</strong> sky. Unlike <strong>the</strong> Junction at Idaplatz where more than half <strong>of</strong> <strong>the</strong><br />
The rays very are small longer place than at 10 Thermengasse meters and almost has almost 40% reach no rays <strong>the</strong> sky. longer than 5 meters and just about 3%<br />
reach <strong>the</strong> sky. Unlike <strong>the</strong> Junction at Idaplatz where more than half <strong>of</strong> <strong>the</strong> rays are longer than 10 meters<br />
Conclusion and almost 40% reach <strong>the</strong> sky.<br />
Conclusion<br />
The used analysis tools help to measure and compare spatial properties. They also showed different<br />
The characteristics used analysis <strong>of</strong> tools <strong>the</strong> two help analyzed to measure areas. and Some compare where spatial more properties. obvious than They o<strong>the</strong>rs. also showed Sometimes different<br />
analysis characteristics help to discover <strong>of</strong> <strong>the</strong> two new analyzed things or areas. <strong>the</strong>y Some confirm where presumptions. more obvious The than 3D o<strong>the</strong>rs. Isovist Sometimes analysis is an<br />
<strong>the</strong><br />
<strong>the</strong> interesting analysis start. help to It cloud discover be new much things more or sophisticated <strong>the</strong>y confirm in presumptions. terms <strong>of</strong> modelling The 3D and Isovist also analysis for analysation. is interesting The ray could start. be It cloud analyzed be much regarding more <strong>the</strong>ir sophisticated angle, since in <strong>the</strong> terms horizontal <strong>of</strong> modeling rays are and <strong>the</strong> also most for analyzation. important for<br />
The orientation. ray could The be analyzed more vertical regarding <strong>the</strong> ray <strong>the</strong>ir is, angle, <strong>the</strong> less since important <strong>the</strong> horizontal it is since rays gravity are <strong>the</strong> forces most important us to navigate for<br />
orientation. mostly in 2D The coordinates. more vertical The <strong>the</strong> analysis ray is, could <strong>the</strong> less also important me direction it is since sensitive gravity and forces simulate us to <strong>the</strong> navigate visible cone<br />
mostly <strong>of</strong> humans. in 2D coordinates. The analysis could also me direction sensitive and simulate <strong>the</strong> visible cone<br />
<strong>of</strong> humans.<br />
106<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
5/5<br />
115
Optimisation <strong>of</strong> agriculture<br />
in an urban environment<br />
Student: Romain Masson
Optimization <strong>of</strong> agriculture in an urban enviro<br />
Final examination<br />
Name: Romain Masson<br />
Date: 30.11.<strong>2015</strong><br />
Summary:<br />
My project is situated in Pilastro near Bologna. I’m working on adding programm on big empty and undifi<br />
ned spaces created between <strong>the</strong> buildings by <strong>the</strong> architecture <strong>of</strong> <strong>the</strong> 1960-1970 . For this exerice i interested<br />
myself into agriculture and greenhouses. Where is <strong>the</strong> best place to make agricutlure and how could<br />
Summary:<br />
i build optimized greenhouses. For this i used grasshopper and tried galapagos for <strong>the</strong> optimization<br />
My project is situated in Pilastro near Bologna. I’m working on adding programme on big empty and<br />
undefined spaces created between <strong>the</strong> buildings by <strong>the</strong> architecture <strong>of</strong> <strong>the</strong> 1960-1970 . For this exercise<br />
I interested myself into agriculture and greenhouses. Where is <strong>the</strong> best place to make agriculture and<br />
how could I build optimised greenhouses. For this I used grasshopper and tried Galapagos for <strong>the</strong><br />
optimization<br />
One <strong>of</strong> <strong>the</strong> results <strong>of</strong> my ro<strong>of</strong> <strong>from</strong> simulations<br />
One <strong>of</strong> <strong>the</strong> results <strong>of</strong> my ro<strong>of</strong> <strong>from</strong> simulations<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Optimization <strong>of</strong> agriculture in an urban environment<br />
118<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
ironment<br />
1<br />
i-<br />
-<br />
ld<br />
I analysed <strong>the</strong> soloar radiations <strong>the</strong> ground so i could use <strong>the</strong>se data to put my agriculture / greenhouses.<br />
The<br />
1<br />
most surpising fact for me was <strong>the</strong> big infl uence <strong>of</strong> building situated west and east <strong>from</strong> a measurement<br />
point<br />
I analysed <strong>the</strong> solar radiations <strong>the</strong> ground so I could use <strong>the</strong>se data to put my agriculture / greenhouses.<br />
The most surprising fact for me was <strong>the</strong> big influence <strong>of</strong> building situated west and east <strong>from</strong> a<br />
measurement point.<br />
1 / x<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
119
2 Making a threshold at a certain level <strong>of</strong> radiation (this case 1100) 4 Sim<br />
3 I only worked on a part <strong>of</strong> <strong>the</strong> site 5 Ma<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Optimization <strong>of</strong> agriculture in an urban environment<br />
120<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
4 Simplification <strong>of</strong> <strong>the</strong> polyline<br />
5 Making <strong>the</strong> grid for <strong>the</strong> greenhouse<br />
1 / x<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
121
Gala<br />
and<br />
case<br />
6 Building <strong>the</strong> greenhouses <strong>from</strong> <strong>the</strong> grid 7 run<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Optimization <strong>of</strong> agriculture in an urban environment<br />
122<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
7 running <strong>the</strong> simulation<br />
7 running <strong>the</strong> simulation<br />
Galapagos optimised optimized <strong>the</strong> <strong>the</strong> total total radiation by by modifying 3 3 parameters <strong>of</strong> <strong>of</strong> <strong>the</strong> <strong>of</strong> <strong>the</strong> greenhouses, <strong>the</strong> <strong>the</strong> <strong>the</strong> orientation,<br />
and 2 different erents type <strong>of</strong> <strong>of</strong> points which are are changing <strong>the</strong> <strong>the</strong> ro<strong>of</strong>. ro<strong>of</strong>. The The diff difference between between <strong>the</strong> <strong>the</strong> <strong>the</strong> best best and and and worst<br />
worst<br />
case was<br />
was around 25<br />
25 %.<br />
%.<br />
1 /<br />
1<br />
x<br />
/ x<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation 123
Conclusions:<br />
Choosing where to put agriculture was straightforward so quite successful.<br />
Conclusions:<br />
The simulation <strong>of</strong> <strong>the</strong> greenhouse part was more complex and <strong>the</strong>refore had more flaws :<br />
Choosing where to put agriculture was kinda straightforward so kinda sucessful,<br />
- My design was so restrictive it couldn’t be very optimised.<br />
The simulation <strong>of</strong> <strong>the</strong> greenhouse part was more complex and had more flaw :<br />
- I My only design took into was account to restricitive, <strong>the</strong> total it couldn’t radiation be <strong>the</strong> so greenhouse much optimized. received, but <strong>the</strong> total size <strong>of</strong> <strong>the</strong> greenhouse<br />
was - I only changing took into with account <strong>the</strong> different <strong>the</strong> total parameters radiation <strong>the</strong> (mostly greenhouse with <strong>the</strong> received, orientation but <strong>the</strong> which total was size <strong>the</strong>n <strong>of</strong> <strong>the</strong> limiting greenhouse <strong>the</strong> grid<br />
differently was and changing so <strong>the</strong>re with is <strong>the</strong> not different always <strong>the</strong> parameters same number (mostly <strong>of</strong> with elements) <strong>the</strong> orientation which was <strong>the</strong>n limiting <strong>the</strong><br />
grid diff erently and so <strong>the</strong>re is not always <strong>the</strong> same number <strong>of</strong> elements)<br />
- There is is really more parameters which I i could take into account. (aeration, wind, need <strong>of</strong> light depending<br />
on <strong>the</strong> seasons, <strong>of</strong> <strong>the</strong> seasons, etc ) etc )<br />
- The precision <strong>of</strong> <strong>the</strong> measurement was only <strong>of</strong> 7m.<br />
- The precision <strong>of</strong> <strong>the</strong> measurement was only <strong>of</strong> 7m.<br />
There is 2 main interessant things in <strong>the</strong> final result :<br />
- The grid alligned itself on <strong>the</strong> south-north axe, which seems kinda logical, but still was a small pro<strong>of</strong> that<br />
There are 2 main interesting things in <strong>the</strong> final result :<br />
<strong>the</strong> results weren’t totaly random !<br />
- Instead <strong>of</strong> having a “normal ro<strong>of</strong>“, <strong>the</strong>re is an inverted ro<strong>of</strong>, perhpas it’s better so each element dont give<br />
- The grid<br />
shadows<br />
aligned<br />
to<br />
itself<br />
<strong>the</strong> elements<br />
on <strong>the</strong> south-north<br />
behind<br />
axe, which seems logical, but still was a small pro<strong>of</strong> that <strong>the</strong><br />
results weren’t totally random !<br />
Fin<br />
- If Instead i had time <strong>of</strong> it having would a be “normal really interesant ro<strong>of</strong>“, <strong>the</strong>re trying is an to inverted do ano<strong>the</strong>r ro<strong>of</strong>, simulation perhaps with it’s a better new more so each free element design <strong>of</strong> does<br />
not greenhouses give shadows to see to how <strong>the</strong> it elements could be behind. even more If I had optimized time it would be really interested trying to do ano<strong>the</strong>r<br />
simulation with a new more free design <strong>of</strong> greenhouses to see how it could be even more optimised.<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Optimization <strong>of</strong> agriculture in an urban environment<br />
124<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Final optimized greenhouses<br />
e<br />
e<br />
g<br />
t<br />
e<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
125<br />
11 / / xx
A school <strong>of</strong> Cambodia<br />
Student: Stéphane de Weck
Rainda<br />
School project in Cambodia<br />
Summary:<br />
Final Examination<br />
“We are planning a school in rural Cambodia within an existing village structure about two hours north<br />
<strong>of</strong> <strong>the</strong> capital Phnom Penh. The school consists <strong>of</strong> several classrooms, a cafeteria, an auditorium as<br />
well Name: as medical Stéphane and infrastructural de Weck buildings.<br />
Date: November 30 th <strong>2015</strong><br />
We plan within <strong>the</strong> specific context <strong>of</strong> a society which is dominated on one hand by <strong>the</strong> fascinating<br />
history<br />
Summary:<br />
<strong>of</strong> <strong>the</strong> Khmer culture and on <strong>the</strong> o<strong>the</strong>r hand a dramatic demographic development due to <strong>the</strong><br />
brutal civil war in <strong>the</strong> recent past. 52.1% <strong>of</strong> <strong>the</strong> population <strong>of</strong> Cambodia are under <strong>the</strong> age <strong>of</strong> 24 years,<br />
<strong>the</strong> “We average are planning <strong>of</strong> <strong>the</strong> a school total population in rural Cambodia is 23.5 within years. an The existing question village <strong>of</strong> structure education about and two care hours is thus north socially <strong>of</strong> <strong>the</strong><br />
relevant capital Phnom and urgent. Penh. The school consists <strong>of</strong> several classrooms, a cafeteria, an auditorium as well as medical<br />
and infrastructural buildings.<br />
In addition to <strong>the</strong>se specific social conditions, <strong>the</strong> availability <strong>of</strong> material resources, talent and technical<br />
skills We plan as well within as <strong>the</strong> <strong>the</strong> specific climatic, context ecological <strong>of</strong> a society and economic which is dominated conditions on have one hand to be by considered <strong>the</strong> fascinating <strong>the</strong> history design. <strong>of</strong><br />
The <strong>the</strong> Khmer question culture <strong>of</strong> contemporary and <strong>the</strong> o<strong>the</strong>r didactical hand a dramatic concepts demographic and <strong>the</strong>ir development spatial implementation due to <strong>the</strong> brutal is an civil important war in<br />
issue<br />
<strong>the</strong> recent<br />
in <strong>the</strong><br />
past.<br />
semester.<br />
52.1% <strong>of</strong><br />
Toge<strong>the</strong>r population<br />
with local<br />
<strong>of</strong> Cambodia<br />
pr<strong>of</strong>essionals<br />
are under<br />
we will<br />
<strong>the</strong><br />
develop<br />
age <strong>of</strong> 24<br />
a<br />
years,<br />
reasonable<br />
<strong>the</strong> average<br />
and customized<br />
<strong>of</strong> <strong>the</strong> total<br />
population is 23.5 years. The question <strong>of</strong> education and care is thus socially relevant and urgent.<br />
strategy how <strong>the</strong> school system and <strong>the</strong> necessary infrastructure can be implemented in several phases.<br />
It<br />
In<br />
is<br />
addition<br />
<strong>the</strong> declared<br />
to <strong>the</strong>se<br />
aim<br />
specific<br />
<strong>of</strong> <strong>the</strong><br />
social<br />
course<br />
conditions,<br />
to develop<br />
<strong>the</strong> availability<br />
designs<br />
<strong>of</strong><br />
that<br />
material<br />
are feasible<br />
resources,<br />
in<br />
talent<br />
terms<br />
and<br />
<strong>of</strong><br />
technical<br />
architecture<br />
skills<br />
and<br />
as<br />
construction, well as <strong>the</strong> climatic, <strong>from</strong> urban ecological and and neighbourhood economic conditions issues to have <strong>the</strong> to constructive be considered detailing in <strong>the</strong> design. <strong>of</strong> individual The question buildings. <strong>of</strong><br />
The contemporary results <strong>of</strong> <strong>the</strong> didactical studio concepts should be and a relevant <strong>the</strong>ir spatial contribution implementation to <strong>the</strong> is contemporary an important architectural issue in <strong>the</strong> semester. culture <strong>of</strong><br />
Cambodia, Toge<strong>the</strong>r with respecting local pr<strong>of</strong>essionals <strong>the</strong> specific we will social develop and a climatic reasonable conditions.” and customized strategy how <strong>the</strong> school system<br />
and <strong>the</strong> necessary infrastructure can be implemented in several phases. It is <strong>the</strong> declared aim <strong>of</strong> <strong>the</strong> course to<br />
http://www.hebel.arch.ethz.ch/fall-semester-<strong>2015</strong>-cambodia-village-school-project/<br />
develop designs that are feasible in terms <strong>of</strong> architecture and construction, <strong>from</strong> urban and neighborhood<br />
issues to <strong>the</strong> constructive detailing <strong>of</strong> individual buildings. The results <strong>of</strong> <strong>the</strong> studio should be a relevant contribution<br />
to <strong>the</strong> contemporary architectural culture <strong>of</strong> Cambodia, respecting <strong>the</strong> specific social and climatic conditions.”<br />
Motiv<br />
The i<br />
<strong>the</strong>se<br />
<strong>the</strong> te<br />
bodia<br />
shad<br />
Rega<br />
could<br />
if <strong>the</strong><br />
Anoth<br />
spac<br />
http://www.hebel.arch.ethz.ch/fall-semester-<strong>2015</strong>-cambodia-village-school-project/<br />
N<br />
School project in Cambodia<br />
Solar e<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | School project in Cambodia<br />
128<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Motivation:<br />
The important climatic factors which were influential in <strong>the</strong> project, are <strong>the</strong> solar exposition and <strong>the</strong><br />
rainfalls. In <strong>the</strong>se latitudes <strong>the</strong> problem is more <strong>the</strong> heat itself than <strong>the</strong> heat variation which is pretty<br />
constant. However, <strong>the</strong> temperatures are high <strong>the</strong> whole year: <strong>from</strong> minimum 25 °C to maximum 35 °C.<br />
This is why actually Cambodian people live mostly in <strong>the</strong> shadows. It is noticeable that <strong>the</strong>ir architecture<br />
is designed more with <strong>the</strong> shadows ra<strong>the</strong>r than with <strong>the</strong> light. Therefore <strong>the</strong> first goal will be to sunprotect<br />
<strong>the</strong> users <strong>of</strong> <strong>the</strong> building.<br />
Motivation:<br />
f <strong>the</strong><br />
dical<br />
ry <strong>of</strong><br />
ar in<br />
total<br />
ills as<br />
ion <strong>of</strong><br />
ester.<br />
stem<br />
se to<br />
hood<br />
ontri-<br />
con-<br />
Regarding The important <strong>the</strong> rainfalls, climatic factors <strong>the</strong>re which is in <strong>the</strong>se were influential latitudes in <strong>the</strong> <strong>the</strong> monsoon project, are phenomenon. <strong>the</strong> solar exposition In only and a <strong>the</strong> few rainfalls. minutes, In<br />
everything <strong>the</strong>se latitudes could <strong>the</strong> be problem potentially is more flooded. <strong>the</strong> heat How itself to than design <strong>the</strong> heat a project variation to which make is pretty sure constant. every spaces However, are<br />
effectively <strong>the</strong> temperatures reachable are even high <strong>the</strong> if <strong>the</strong> whole ground year: is <strong>from</strong> flooded minimum ? In 25 o<strong>the</strong>r °C to words, maximum how 35 to °C. optimise This is why <strong>the</strong> actually connections cambodian<br />
people <strong>the</strong> spaces live mostly ? in <strong>the</strong> shadows. It is noticeable that <strong>the</strong>ir architecture is designed more with <strong>the</strong><br />
between<br />
shadows ra<strong>the</strong>r than with <strong>the</strong> light. Therefore <strong>the</strong> first goal will be to sun-protect <strong>the</strong> users <strong>of</strong> <strong>the</strong> building.<br />
Ano<strong>the</strong>r goal <strong>of</strong> <strong>the</strong> project is to differentiate <strong>the</strong> spaces by its private and visually reachable aspects.<br />
Some Regarding spaces <strong>the</strong> have rainfalls, to <strong>the</strong>re be quiet is in <strong>the</strong>se and latitudes private, o<strong>the</strong>rs monsoon have phenomenon. to be quiet In but only watchable a few minutes, or public everything and<br />
ceremonial.<br />
could be potentially flooded. How to design a project to make sure every spaces are effectively reachable even<br />
if <strong>the</strong> ground is flooded ? In o<strong>the</strong>r words, how to optimize <strong>the</strong> connections between <strong>the</strong> spaces ?<br />
Ano<strong>the</strong>r goal <strong>of</strong> <strong>the</strong> project is to diffrentiate <strong>the</strong> spaces by its privativ and visually reachable aspects. Some<br />
spaces have to be quiet and privativ, o<strong>the</strong>rs have to be quiet but watchable or public and ceremonial.<br />
Raindays in Cambodia<br />
Rainfall in Cambodia<br />
bodia Solar exposition in Cambodia Tempartures in Cambodia<br />
1/6<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
129
Isovist area, before<br />
Isovist area, before<br />
This first isovist analysis already explains <strong>the</strong> project quiet well:<br />
This first isovist analysis already explains <strong>the</strong> project quiet well:<br />
1) big ceremonial courtyard in which <strong>the</strong> students could assemble for <strong>the</strong> morning ceremony (red part).<br />
1) A big ceremonial courtyard in which <strong>the</strong> students could assemble for <strong>the</strong> morning ceremony (red<br />
Indeed, in cambodian schools, students are used to raise <strong>the</strong> flag before <strong>the</strong> first lesson.<br />
part). Indeed, in Cambodian schools, students are used to raise <strong>the</strong> flag before <strong>the</strong> first lesson.<br />
2) Public courtyards organised in between <strong>the</strong> builings (yellow parts).<br />
2) Public courtyards organised in between <strong>the</strong> buildings (yellow parts).<br />
3) Privativ courtyards in <strong>the</strong> crossing points <strong>of</strong> two buildings (green parts). These are mainly thought to be playgrounds<br />
for small children. This is way we want <strong>the</strong>m to be privativ but watchable.<br />
3) Private courtyards in <strong>the</strong> crossing points <strong>of</strong> two buildings (green parts). These are mainly thought to<br />
be play- grounds for small children. This is way we want <strong>the</strong>m to be private but watchable.<br />
4) Closed classrooms (blue parts)<br />
4) Closed classrooms (blue parts)<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | School project in Cambodia<br />
130<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
t).<br />
Isovist area, after<br />
Isovist area, after<br />
We wanted to have more defined spaces and a more precise hierarchy. This is why we closed <strong>the</strong> two publics<br />
courtyards<br />
We wanted<br />
on<br />
to<br />
<strong>the</strong><br />
have<br />
left<br />
more<br />
side and<br />
defined<br />
extend<br />
spaces<br />
one building<br />
and a more<br />
in <strong>the</strong><br />
precise<br />
middle<br />
hierarchy.<br />
part. The<br />
This<br />
ceremonial<br />
is why<br />
courtyard<br />
we closed<br />
is<br />
<strong>the</strong><br />
now much<br />
two publics courtyards on <strong>the</strong> left side and extend one building in <strong>the</strong> middle part. The ceremonial<br />
more defined. The two publics courtyards (green-yelow parts) in <strong>the</strong> left side have now <strong>the</strong> same value as <strong>the</strong><br />
courtyard is now much more defined. The two publics courtyards (green-yellow parts) in <strong>the</strong> left side<br />
ones in <strong>the</strong> right side.<br />
have now <strong>the</strong> same value as <strong>the</strong> ones in <strong>the</strong> right side.<br />
y-<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
131<br />
2/6
Axial map – choice, before<br />
Axial For <strong>the</strong> map project – choice, and before regarding <strong>the</strong> flood issues, we want to deck <strong>the</strong> ways that connect <strong>the</strong> different parts <strong>of</strong> <strong>the</strong><br />
school. However, what are <strong>the</strong> main thoroughfares <strong>of</strong> <strong>the</strong> site ? The choice calculation which has been inter<br />
For preted <strong>the</strong> project as movement and regarding flow potential <strong>the</strong> flood is helpfull issues, here we and want answers to deck spontaneously <strong>the</strong> ways that to connect <strong>the</strong> question. <strong>the</strong> different<br />
parts <strong>of</strong> <strong>the</strong> school. However, what are <strong>the</strong> main thoroughfares <strong>of</strong> <strong>the</strong> site ? The choice calculation<br />
which Notice has that been <strong>the</strong> interpreted analysis also as bring movement to light flow <strong>the</strong> courtyards. potential is The helpful courtyard here and on answers <strong>the</strong> right side spontaneously is noticeable: to a public<br />
<strong>the</strong> but question. quiet space. The choice calculation shows <strong>the</strong> issue we already mentioned in <strong>the</strong> isovist analysis: <strong>the</strong> cere<br />
monial courtyard is split because not defined enough. To <strong>the</strong> same extent, <strong>the</strong> courtyard on <strong>the</strong> top left corne<br />
Notice looks that more <strong>the</strong> like analysis undefined also bring transit to light space <strong>the</strong> than courtyards. a public The but courtyard quiet courtyard. on <strong>the</strong> right side is noticeable:<br />
a public but quiet space. The choice calculation shows <strong>the</strong> issue we already mentioned in <strong>the</strong> isovist<br />
analysis: <strong>the</strong> ceremonial courtyard is split because not defined enough. To <strong>the</strong> same extent, <strong>the</strong><br />
courtyard on <strong>the</strong> top left corner looks more like an undefined transit space than a public but quiet<br />
courtyard.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | School project in Cambodia<br />
132 New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Axial map – choice, after<br />
<strong>the</strong><br />
erlic<br />
reer<br />
Axial The changes map – choice, that have afteralready been made on <strong>the</strong> plan solve <strong>the</strong> issues abovementionned. The ceremonial<br />
courtyard is not split anymore and <strong>the</strong> courtyard on <strong>the</strong> top left corner is now much more defined: <strong>the</strong> flows<br />
The stay changes outside and that we have can already enjoy its been stillness. made on <strong>the</strong> plan solve <strong>the</strong> issues above mentioned. The<br />
ceremonial courtyard is not split anymore and <strong>the</strong> courtyard on <strong>the</strong> top left corner is now much more<br />
defined: If <strong>the</strong> isovist <strong>the</strong> flows map is stay compared outside and with we <strong>the</strong> can axial enjoy map its we stillness. can notice that <strong>the</strong> playground in <strong>the</strong> crossing point on<br />
<strong>the</strong> left side is as visible as <strong>the</strong> public courtyard on <strong>the</strong> left side but <strong>the</strong> first one is in <strong>the</strong> middle <strong>of</strong> a very dense<br />
If movement <strong>the</strong> isovist flow map and is compared <strong>the</strong> second with one <strong>the</strong> is well axial isolated. map we The can playground notice that is <strong>the</strong> <strong>the</strong>refore playground more watchable. in <strong>the</strong> crossing<br />
point on <strong>the</strong> left side is as visible as <strong>the</strong> public courtyard on <strong>the</strong> left side but <strong>the</strong> first one is in <strong>the</strong> middle<br />
<strong>of</strong> a very dense movement flow and <strong>the</strong> second one is well isolated. The playground is <strong>the</strong>refore more<br />
watchable.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
133<br />
3/6
Shadow analysis, before<br />
<strong>from</strong> 9 am to 5 pm, December 22 sd<br />
Shadow analysis, before<br />
<strong>from</strong> 9 am to 5 pm, June 21 st<br />
134<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | School project in Cambodia<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
135<br />
4/6
Shadow analysis, after<br />
<strong>from</strong> 9 am to 5 pm, December 22 sd<br />
136<br />
Shadow analysis, after<br />
<strong>from</strong> 9 am to 5 pm, June 21 st<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | School project in Cambodia<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
137<br />
5/6
Radiation analysis, June<br />
The radiation analysis and <strong>the</strong> shadow analysis on <strong>the</strong> previous page, show both <strong>the</strong> importance <strong>of</strong> a big a ro<strong>of</strong><br />
and trees.<br />
As already mentionned, combodian people live in shadows; The heat in radiated spaces is unbearable. Since<br />
Radiation <strong>the</strong> project analysis, a school, June <strong>the</strong> control <strong>of</strong> <strong>the</strong> atmosphere is even more important: working conditions should be<br />
optimal. This is why it was made sure that <strong>the</strong>re is a continuous sun-protected path that connect every single<br />
The rooms radiation in <strong>the</strong> school. analysis The and second <strong>the</strong> change shadow is <strong>the</strong> analysis amount on <strong>of</strong> trees <strong>the</strong> previous in <strong>the</strong> courtyards page, show which both must be <strong>the</strong> sun-protected<br />
importance<br />
<strong>of</strong> as well a big to a be ro<strong>of</strong> in use: and The trees. courtyards As already requiered mentioned, much more Cambodian trees than people what was live designed in shadows; originally. The heat in<br />
radiated spaces is unbearable. Since <strong>the</strong> project is a school, <strong>the</strong> control <strong>of</strong> <strong>the</strong> atmosphere is even<br />
more important: working conditions should be optimal. This is why it was made sure that <strong>the</strong>re is a<br />
continuous sun-protected path that connect every single rooms in <strong>the</strong> school. The second change is<br />
<strong>the</strong> amount <strong>of</strong> trees in <strong>the</strong> courtyards which must be sun-protected as well to be in use: The courtyards<br />
required much more trees than what was designed originally.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | School project in Cambodia<br />
138<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Olympic Legacy<br />
Student: Thorben Westerhuys
Summary:<br />
As a final project I decided on a closer look into designs and experiments around <strong>the</strong> Olympic games<br />
candidacy <strong>of</strong> Hamburg for 2024. The city is actively pursuing a jump beyond <strong>the</strong> river that cuts <strong>the</strong> city<br />
in half both geographically as well as mentally.<br />
So I acquired <strong>the</strong> relevant OSM Data, tried to include all pedestrian relevant information that are not<br />
already included with ELKs road component and ran a segment analysis.<br />
The current situation shows <strong>the</strong> disconnect ra<strong>the</strong>r clearly but also reveals that Wilhelmsburg is sort <strong>of</strong><br />
an island between <strong>the</strong> city and Hamburg, making a connection possible again.<br />
So I took KCAP/gmp/vogts proposal for an Olympic area on “Kleiner Grassbrook” and compared its<br />
potential for a re-connection with one <strong>from</strong> Kees Christiaanses ongoing studio at ETH on <strong>the</strong> same<br />
topic. The second proposal places <strong>the</strong> Olympic Games fur<strong>the</strong>r west onto Steinwerder. That location<br />
is more centrally located and always visible <strong>from</strong> <strong>the</strong> city. This would also revise <strong>the</strong> old Elbtunnel, that<br />
is - toge<strong>the</strong>r with Elbbrücken and <strong>the</strong> new Elbtunnel/A7 - <strong>the</strong> only inner city bridges/tunnels across.<br />
Running those analysis I looked at choice and integration in particular since those two become relevant<br />
in deciding whe<strong>the</strong>r <strong>the</strong> re-connection can be made and what kind <strong>of</strong> effects this would produce onto<br />
o<strong>the</strong>r existing - neighbourhoods.<br />
The results are less clear than expected and reveal, that it is a big challenge to bridge <strong>the</strong> gap. Both<br />
proposals have ra<strong>the</strong>r limited effects on <strong>the</strong> overall system, locally however <strong>the</strong>y will have an effect on<br />
<strong>the</strong>ir surroundings. The first proposal will streng<strong>the</strong>n <strong>the</strong> HafenCity - <strong>the</strong>n fully built out, whereas <strong>the</strong><br />
second one will shift <strong>the</strong> focus away <strong>from</strong> HafenCity more towards Landungsbrücken and Altona.<br />
Going a step fur<strong>the</strong>r I <strong>the</strong>n ran an Isovist analysis on both proposals to look at <strong>the</strong>ir spatial configurations<br />
on site. Whereas <strong>the</strong> first proposal tries to balance open and closed spaces by closely interweaving<br />
sports and residential uses, <strong>the</strong> second one deliberately had a sharp contrast between <strong>the</strong> stadium and<br />
residential areas. Both work with alternations on city blocks and hence create compact semi private<br />
courtyards as opposed to open streets.<br />
142<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Motivation:<br />
alf<br />
dy<br />
Motivation: Hamburg is trying to advance urban strategies and developments through different projects. Recently<br />
a lot through big projects such as <strong>the</strong> HafenCity, IBA and now Olympic Games. Each <strong>of</strong> those had a<br />
Hamburg strong or is solely trying urban to advance planning urban and development strategies and approach developments and usually through aimed different at developing projects. Recently <strong>the</strong> north a lot<br />
through south axis big <strong>of</strong> projects <strong>the</strong> city. such as <strong>the</strong> HafenCity, IBA and now Olympic Games. Each <strong>of</strong> those had a strong or<br />
soley urban planning and development approach and usually aimed at develeoping <strong>the</strong> north south axis <strong>of</strong><br />
<strong>the</strong> So, city. being grown up in Hamburg I was intrigued to see, if and what Olympic games and <strong>the</strong> current<br />
plans could bring to this goal using space syntax analysis methods.<br />
So, being grown up in Hamburg I was intrigued to see, if and what Olympic games and <strong>the</strong> current plans<br />
could bring to this goal using space syntax analysis methods.<br />
ly<br />
lbne<br />
al<br />
1 / 10<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
143
Cu<br />
In<br />
be<br />
bu<br />
co<br />
pe<br />
Current situation – Integration, R50 steps<br />
ital <strong>Urban</strong> <strong>Simulation</strong> | Olympic Legacy<br />
144<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Current Situation<br />
In <strong>the</strong> Integration analysis <strong>of</strong> <strong>the</strong> current pedestrian<br />
network <strong>of</strong> <strong>the</strong> city a clear division between <strong>the</strong> “inner<br />
city” and <strong>the</strong> sou<strong>the</strong>rn parts becomes visible. Fur<strong>the</strong>r<br />
Wilhelmsburg has been established as a ra<strong>the</strong>r well<br />
connected islands in between only loosely connected<br />
to <strong>the</strong> south and north. Hamburg on <strong>the</strong> o<strong>the</strong>r side<br />
works almost independently on <strong>the</strong> city.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
145
A<br />
I<br />
F<br />
b<br />
A<br />
t<br />
p<br />
P<br />
P<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Olympic Legacy<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Olympic Legacy<br />
146<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Acquisition <strong>of</strong> Data<br />
I Acquisition chose a relevant <strong>of</strong> Data part <strong>of</strong> OpenStreetMap Data and imported that into ELK. From <strong>the</strong>re<br />
I extracted roads and pedestrian paths with different key combinations based on actual<br />
usage I chose in a Hamburg. relevant part <strong>of</strong> OpenStreetMap Data and imported that into ELK.<br />
From <strong>the</strong>re I extracted roads and pedestrian paths with different key combinations<br />
Afterwards based on actual I tried usage to clean in up Hamburg. <strong>the</strong> data for fur<strong>the</strong>r processing in Depthmap. For <strong>the</strong> two<br />
proposals I drew all relevant entities (roads, pathways, buildings) according to <strong>the</strong> plans<br />
you<br />
Afterwards<br />
see below.<br />
I tried to clean up <strong>the</strong> data for fur<strong>the</strong>r processing in DepthMap. For <strong>the</strong><br />
two proposals I drew all relevan entities (roads, pathways, buildings) according to <strong>the</strong><br />
plans you see below.<br />
Proposal 1 - KCAP, gmp, vogt<br />
Proposal 2 - Students <strong>from</strong> “Hamburg - Olympic Legacy”, Pr<strong>of</strong>. Kees Christiaanse<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
147<br />
3 / 10
Integr<br />
The p<br />
appe<br />
analy<br />
to ac<br />
load.<br />
Current situation – Integration, – Integration, R50 steps, R50 angular steps, segment angular segment<br />
Proposal 1 – 1 Integration, – R50 steps, R50 steps, angular segment angular segment<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Olympic Legacy<br />
148<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Integration Analysis<br />
The potential for developing a new distric on “Kleiner Grassbrook” seems ra<strong>the</strong>r<br />
appealing, since its <strong>the</strong> natural link between HafenCity and Wilkelmsburg. The<br />
analysis however shows, that much more and relevant connections will be neeed<br />
to achieve that. Only locally an axis forms but Ellbrücken still carries most <strong>of</strong> <strong>the</strong><br />
load.<br />
Integration Analysis<br />
The potential for developing a new district on “Kleiner Grassbrook” seems ra<strong>the</strong>r appealing,<br />
since its <strong>the</strong> natural link between HafenCity and Wilhelmsburg. The analysis however<br />
shows, that much more and relevant connections will be need to achieve that. Only locally<br />
an axis forms but Elbbrücken still carries most <strong>of</strong> <strong>the</strong> load.<br />
t<br />
4 / 10<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
149
Integr<br />
The p<br />
and t<br />
not b<br />
fur<strong>the</strong><br />
Local<br />
tralitie<br />
towar<br />
Current situation – Integration, – Integration, R50 steps, R50 angular steps, segment angular segment<br />
Proposal 2 – 2 Integration, – R50 steps, R50 steps, angular segment angular segment<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Olympic Legacy<br />
150<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Integration Analysis<br />
The proposal has <strong>the</strong> potential to increase <strong>the</strong> reachability <strong>of</strong> <strong>from</strong>er harbour area<br />
and <strong>the</strong>re are slight increases in centrality on Steinwerder. However this part does<br />
not become <strong>the</strong> <strong>the</strong> new axis/gate to <strong>the</strong> south. That still remains with Elbbrücken<br />
fur<strong>the</strong>r in <strong>the</strong> east.<br />
Locally <strong>the</strong> new residential areas are quite well organized and do form local centralities.<br />
The<br />
Integration Analysis<br />
focus seems to shift slightly <strong>from</strong> <strong>the</strong> eastern part and HafenCIty<br />
towards <strong>the</strong> west and Landungsbrücken/Altona.<br />
The proposal has <strong>the</strong> potential to increase <strong>the</strong> reachability <strong>of</strong> former harbour area and <strong>the</strong>re<br />
are slight increases in centrality on Steinwerder. However this part does not become <strong>the</strong><br />
new axis/gate to <strong>the</strong> south. That still remains with Elbbrücken fur<strong>the</strong>r in <strong>the</strong> east.<br />
Locally <strong>the</strong> new residential areas are quite well organized and do form local centralities.<br />
The focus seems to shift slightly <strong>from</strong> <strong>the</strong> eastern part and HafenCity towards <strong>the</strong> west and<br />
Landungsbrücken/Altona.<br />
t<br />
5 / 10<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
151
Choic<br />
The c<br />
grand<br />
more<br />
Current situation – Choice, – Choice, R2km R2km<br />
Proposal 1 – 1 Choice, – Choice, R2km R2km<br />
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Olympic Legacy<br />
152<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Choice Analysis<br />
The coice analysis reveals slight increases here and <strong>the</strong>re but no new axis or<br />
grand connection. This is concruent with integration but shows that fact even<br />
more clearly.<br />
Choice Analysis<br />
The choice analysis reveals slight increases here and <strong>the</strong>re but no new axis or grand<br />
connection. This is concurrent with integration but shows that fact even more clearly.<br />
Choice Analysis<br />
In this case <strong>the</strong> choice values for alter Elbtunnel are even decreased and Wilhelmsburg<br />
only sees minor choice improvements. This also supports <strong>the</strong> corresponding integration<br />
analysis.<br />
It becomes clear though that choice increases in <strong>the</strong> area <strong>of</strong> Landungsbrücken and towards<br />
Altona, fur<strong>the</strong>r support <strong>the</strong> shift to <strong>the</strong> west.<br />
6 / 10<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
153
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Olympic Legacy<br />
154<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Isovists Area – Olympic site<br />
Looking at Isovist areas <strong>the</strong> two proposals differ in<br />
<strong>the</strong>ir approach to how residential and public spaces<br />
are arranged.<br />
The first one tries to integrate both ends <strong>of</strong> <strong>the</strong><br />
spectrum as closely as possible while <strong>the</strong> second one<br />
plays with wide open fields as buffers and hence a<br />
contrast between <strong>the</strong> closeness <strong>of</strong> urban blocks and<br />
wide plazas.<br />
The first proposal does achieve a kind <strong>of</strong> spatial<br />
hierarchy through differences in street width, whereas<br />
<strong>the</strong> second proposal does not have that.<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
155
<strong>Digital</strong> <strong>Urban</strong> <strong>Simulation</strong> | Olympic Legacy<br />
156<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Isovists Compactness – Olympic site<br />
Both proposals use variations <strong>of</strong> blocks in <strong>the</strong><br />
residential areas. Hence creating ra<strong>the</strong>r closed or very<br />
open courtyards. From <strong>the</strong> analysis proposal 2 tends<br />
to have too big courtyards, whereas its more evenly<br />
distributed in proposal 1. Though <strong>the</strong>re are more<br />
variations in proposal 1 that seem more open on first<br />
sight.<br />
Very visibly <strong>the</strong> street network carries through into <strong>the</strong><br />
open areas and creates patterns even on <strong>the</strong> most<br />
open areas.<br />
The stadium is placed differently and hence dominates<br />
(proposal 1) <strong>the</strong> open area or merely frames it (proposal<br />
2).<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
157
Conclusions:<br />
Added linkages and a complex project such as Olympic games<br />
might not be enough to actually bridge <strong>the</strong> gaps. Wilhelmsburg<br />
currently is not viewed as <strong>the</strong> island in between that much. That<br />
part <strong>of</strong> <strong>the</strong> analysis might have <strong>the</strong> biggest impact on how one<br />
should start thinking about <strong>the</strong> north-south-axis within <strong>the</strong> city.<br />
The key to this part <strong>of</strong> <strong>the</strong> city lies within Wilhelmsburg. All analysis<br />
show that comparably small interventions in Steinwerder or Kleiner<br />
Grassbrook do not have a lot <strong>of</strong> influences and hence a different<br />
view should be taken on how to develop this part <strong>of</strong> <strong>the</strong> city.<br />
Since this area carries a long history <strong>of</strong> harbour related industries<br />
breaking with <strong>the</strong> rail and car-centric past in this area is both<br />
challenging and has high potentials. Learning <strong>from</strong> <strong>the</strong> analysis this<br />
could and should be <strong>the</strong> focus <strong>of</strong> new developments especially<br />
since Hamburg is facing a crisis in affordable houses and flats.<br />
On <strong>the</strong> more local scale <strong>the</strong> first proposal creates a heterogenous<br />
urban fabric that has private<br />
as well as very public areas. Whereas <strong>the</strong> second proposal has a<br />
very different approach for residential vs. public spaces. However<br />
<strong>the</strong>re is no spatial hierarchy in <strong>the</strong> street network, that is clearly<br />
visible in proposal one and should give visitors and citizens a much<br />
clearer sense <strong>of</strong> orientation.<br />
158<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
Uster 2035<br />
Student: Vincent Hischier
Wit<br />
cho<br />
Ch<br />
Ac<br />
<strong>the</strong><br />
it p<br />
nea<br />
The<br />
sho<br />
The<br />
ing<br />
new<br />
Inte<br />
Page example 1<br />
Summary:<br />
In <strong>the</strong> framework <strong>of</strong> a semester assignment a vision for <strong>the</strong> city <strong>of</strong> Uster (Zurich) in <strong>the</strong><br />
year 2035 has to be elaborated. Nowadays <strong>the</strong> city accommodates approximately<br />
35 000 inhabitants. If <strong>the</strong> growth continues like in <strong>the</strong> passed few years up to 10<br />
000 new inhabitants are expected until <strong>the</strong> year 2035.<br />
Lebendiges Uster 2035<br />
Where to host <strong>the</strong> newly arrived inhabitants? Building new houses outside <strong>the</strong> city<br />
border is not permitted anymore due to <strong>the</strong> Kulturlandinitiative in Zürich in 2012.<br />
Inside <strong>the</strong> city borders <strong>the</strong>re’s only few space, which is still undeveloped. So <strong>the</strong><br />
focus lies on <strong>the</strong> built environment.<br />
Final Examination<br />
Name: Vincent Ano<strong>the</strong>r Hischier problem <strong>the</strong> city <strong>of</strong> Uster has to face (like every o<strong>the</strong>r city on <strong>the</strong> western<br />
Date: 30. hemisphere) November <strong>2015</strong> is <strong>the</strong> aging <strong>of</strong> its population. New services are needed to satisfy <strong>the</strong><br />
special needs.<br />
Summary: Lastly <strong>the</strong> city consists <strong>of</strong> much more inhabitants than working forces. The danger<br />
<strong>of</strong> a bedroom community persists where people only come home to spend <strong>the</strong><br />
In <strong>the</strong> framework night. <strong>of</strong> a semester assignment a vision for <strong>the</strong> city <strong>of</strong> Uster (Zurich) in <strong>the</strong> year 2035 has to be<br />
elaborated. Nowadays <strong>the</strong> city accommodates approximately 35 000 inhabitants. If <strong>the</strong> growth continues like<br />
in <strong>the</strong> passed<br />
One<br />
few<br />
possible<br />
years up<br />
solution<br />
to 10 000<br />
to<br />
new<br />
face<br />
inhabitants<br />
<strong>the</strong>se challenges<br />
are expected<br />
would<br />
until<br />
be<br />
<strong>the</strong><br />
to<br />
year<br />
densify<br />
2035.<br />
<strong>the</strong> existing<br />
Where to host <strong>the</strong> newly arrived inhabitants? Building new houses outside <strong>the</strong> city border is not permitted<br />
centre and to build new dense mixed-used neighbourhood centres, which would<br />
anymore due to <strong>the</strong> Kulturlandinitiative in Zürich in 2012. Inside <strong>the</strong> city borders <strong>the</strong>re’s only few space, which<br />
consist <strong>of</strong> working places and residential buildings designed especially for elder<br />
is still undeveloped. So <strong>the</strong> focus lies on <strong>the</strong> built environment.<br />
people.<br />
Ano<strong>the</strong>r problem <strong>the</strong> city <strong>of</strong> Uster has to face (like every o<strong>the</strong>r city on <strong>the</strong> western hemisphere) is <strong>the</strong> aging <strong>of</strong><br />
its population. New services are needed to satisfy <strong>the</strong> special needs.<br />
Lastly <strong>the</strong> city consists <strong>of</strong> much more inhabitants than working forces. The danger <strong>of</strong> a bedroom community<br />
persists where people only come home to spend <strong>the</strong> night.<br />
One possible solution to face <strong>the</strong>se challenges would be to densify <strong>the</strong> existing center and to build new<br />
dense mixed-used neighborhood centers, which would consist <strong>of</strong> working places and residential buildings<br />
designed especially for elder people.<br />
Mo<br />
As<br />
Wh<br />
net<br />
loc<br />
Las<br />
An<br />
and<br />
<strong>the</strong><br />
cou<br />
An<br />
162<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture<br />
The<br />
bes<br />
cho
Motivation:<br />
As described in <strong>the</strong> summary new neighbourhood centres could be a solution to<br />
face future challenges. Where are possible locations for <strong>the</strong>se new centres? Among<br />
o<strong>the</strong>r criteria <strong>the</strong> analysis <strong>of</strong> <strong>the</strong> existing street network with a segment analysis<br />
could give first hints to know where central, well integrated streets are located. In<br />
a next step <strong>the</strong> impact <strong>of</strong> <strong>the</strong> new centre on <strong>the</strong> neighbourhood network should<br />
be analyzed. Lastly an isovist analysis <strong>of</strong> <strong>the</strong> new developed area would show its<br />
structure <strong>from</strong> a visual point <strong>of</strong> view.<br />
Ano<strong>the</strong>r measure to increase <strong>the</strong> livability in <strong>the</strong> city would be to create pedestrian<br />
zones in <strong>the</strong> centre. Shops and o<strong>the</strong>r services could be placed along <strong>the</strong>se streets.<br />
To do so it would be helpful to know which streets in <strong>the</strong> centre would suit <strong>the</strong><br />
requirements for a pedestrian zone. The choice value <strong>from</strong> <strong>the</strong> segment analysis<br />
could show where <strong>the</strong> most crowded streets are situated.<br />
Analysis 1 (Angular Segment Analysis):<br />
With this first analysis <strong>the</strong> whole street network is looked at. For <strong>the</strong> angular<br />
analysis a 500m radius was chosen as this is a normal walking distance. The result<br />
is displayed on <strong>the</strong> next page.<br />
Choice<br />
According to <strong>the</strong> choice map <strong>the</strong> streets that have <strong>the</strong> highest through movement<br />
are located in or around <strong>the</strong> existing city centre (light blue and green circles).<br />
Especially <strong>the</strong> Poststrasse (green circle) is interesting as it points directly to <strong>the</strong><br />
railway station. This situation would be very suitable for a pedestrian zone as <strong>the</strong> is<br />
near <strong>the</strong> existing city centre and its vicinity to <strong>the</strong> railway station would attract also<br />
people <strong>from</strong> o<strong>the</strong>r cities. Therefore this street should be released <strong>from</strong> car traffic.<br />
In a next steps new shops, cafés, hairdresser etc. should be placed in <strong>the</strong> ground<br />
floor to make this street more attractive.<br />
The red circles show possible locations for future developments like a new<br />
neighbourhood centre with working places and residential buildings. As <strong>the</strong>re are<br />
o<strong>the</strong>r factors that influence <strong>the</strong> decision where to build a new centre <strong>the</strong> circles<br />
show only first possibilities.<br />
Integration<br />
The Integration map shows that <strong>the</strong> integrated streets are well distributed. The<br />
streets which are integrated best are located around <strong>the</strong> centre, <strong>the</strong>y have <strong>the</strong><br />
highest to-movement potential. The streets with a high choice value do also have<br />
a high integration value<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
163
Choice, Radius 500m<br />
Choice, Radius 500m<br />
5000 m<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Lebendiges Uster 2035<br />
164<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
5000m<br />
Integration, Radius Radius 500m 500m<br />
2/6<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
165
Page example 3<br />
Gestaltungsplan Plan Plan<br />
Grundplan amtliche Vermessung<br />
Bereich Bereich Tiefgarage Tiefgarage<br />
Baufelder Baufelder<br />
Naturnah Naturnah gestalteter gestalteter Gewässerraum<br />
Mantelline Mantelline<br />
MIV-Achse MIV-Achse<br />
Befahrbare Befahrbare LV-Verbindung<br />
LV-Achse LV-Achse<br />
Bereich Bereich Gestaltungsplan<br />
© Stadt © Stadt Uster: öV-Achse Uster: Stadtvermessung öV-Achse<br />
Uster Uster und GIS-Kompetenzzentrum; und http://www.cadastre.ch/legende<br />
ÖV-Haltestelle<br />
Stadt Stadt Uster Uster<br />
1:1'000 1:1'000 GIS-Kompetenzzentrum<br />
Oberlandstrasse 78 78<br />
8610 8610 Uster Uster<br />
044-944 044-944 72 66, 72 66,<br />
gis@ uster.ch gis@ uster.ch<br />
Ausgabe: Ausgabe: 23.11.<strong>2015</strong> 23.11.<strong>2015</strong><br />
gis.uster.ch<br />
Bebauungsvorschlag<br />
Grundplan amtliche Vermessung<br />
Bereich Bereich Gestaltungsplan<br />
Grillstelle Grillstelle mit Sitzgelegenheit<br />
mit Baum Baum<br />
Befahrbare Befahrbare LV-Verbindung<br />
Gewässer Gewässer<br />
Café, Bäckerei, Café, Bäckerei, Restaurant... Restaurant...<br />
Publikumsintensive Einrichtungen<br />
Feuchtgebiet Feuchtgebiet<br />
Kinderspielplatz<br />
Privatgärten Privatgärten<br />
Veloparkplatz Veloparkplatz überdacht überdacht<br />
Einfahrt Einfahrt Tiefgarage Tiefgarage<br />
Bushaltestelle Bushaltestelle<br />
MIV-Parkplatz MIV-Parkplatz<br />
© Stadt © Stadt Uster: Uster: Stadtvermessung Uster Uster und GIS-Kompetenzzentrum; und http://www.cadastre.ch/legende<br />
Stadt Stadt Uster Uster<br />
1:1'000 1:1'000 GIS-Kompetenzzentrum<br />
Oberlandstrasse 78 78<br />
8610 8610 Uster Uster<br />
044-944 044-944 72 66, 72 66,<br />
gis@ uster.ch gis@ uster.ch<br />
Ausgabe: Ausgabe: 23.11.<strong>2015</strong> 23.11.<strong>2015</strong><br />
gis.uster.ch<br />
244900 244950 245000 245050 245100<br />
244900 244950 245000 245050 245100<br />
695600 695600<br />
Baufeld C<br />
Baufeld C<br />
min. 1000m^2<br />
min. 1000m^2<br />
695650 695650<br />
695700 695700<br />
Baufeld B<br />
Baufeld B<br />
min. min. 1500m^2 1500m^2<br />
min. min. 1000m^2 1000m^2<br />
Baufeld Baufeld A A<br />
695750 695750<br />
244900 244950 245000 245050 245100<br />
244900 244950 245000 245050 245100<br />
695600 695600<br />
4 OG<br />
4 OG<br />
4 OG<br />
4 OG<br />
695650 695650<br />
695700 695700<br />
7 OG<br />
7 OG<br />
3 OG 3 OG<br />
2 OG 2 OG 2 OG 2 OG<br />
695750 695750<br />
695600 695600<br />
695650 695650<br />
695700 695700<br />
695750 695750<br />
695600 695600<br />
695650 695650<br />
695700 695700<br />
695750 695750<br />
Development <strong>of</strong> a new neighbourhood centre<br />
To develop a new neighbourhood centre first a location had to be found. The<br />
decision was based on <strong>the</strong> fact that <strong>the</strong> municipality still owns undeveloped<br />
land in <strong>the</strong> southwest <strong>of</strong> Uster. The analysis <strong>of</strong> <strong>the</strong> street network played a<br />
minor role.<br />
Development <strong>of</strong> <strong>of</strong> a a new neighborhood center<br />
To To develop a a new neighborhood center first a a location had to to be be found. The decision was based on on <strong>the</strong> <strong>the</strong> fact that <strong>the</strong> <strong>the</strong> municipality still still owns<br />
played a a minor role.<br />
To To obtain a a high quality development <strong>of</strong> <strong>of</strong> <strong>the</strong> <strong>the</strong> site first layout plan with regulations for for <strong>the</strong> <strong>the</strong> future development was established. From <strong>the</strong> <strong>the</strong> layou<br />
spaces was derived. In In <strong>the</strong> <strong>the</strong> last step <strong>the</strong> <strong>the</strong> proposal was visualized.<br />
On On <strong>the</strong> <strong>the</strong> next pages this newly devoped area is is analyzed.<br />
New Methods in in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | | Lebendiges Uster 2035<br />
166<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
is.uster.ch<br />
695750<br />
695750<br />
To obtain a high quality development <strong>of</strong> <strong>the</strong> site first layout plan with regulations<br />
for <strong>the</strong> future development was established. From <strong>the</strong> layout plan a design<br />
proposal which shows <strong>the</strong> building volumes, public and private spaces was<br />
derived. In <strong>the</strong> last step <strong>the</strong> proposal was visualized.<br />
On <strong>the</strong> next pages this newly developed area is analyzed.<br />
unicipality still owns undeveloped land in <strong>the</strong> southwest <strong>of</strong> Uster. The analysis <strong>of</strong> <strong>the</strong> street nework<br />
hed. From <strong>the</strong> layout plan a design proposal which shows <strong>the</strong> building volumes, public and private<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
167
Choice 500m, existing s<br />
network<br />
Choice 500m, existing<br />
network<br />
500m<br />
Choice 500m, existing street network<br />
500m<br />
IMAGE<br />
IMAGE<br />
Choice 500m, with stree<br />
neighborhood center<br />
Choice 500m, with stre<br />
neighborhood center<br />
500m<br />
Analysis 2 (Angular 500m Segment Analysis, Choice, radius: 500m):<br />
Choice 500m, with streets <strong>of</strong> new neighborhood center<br />
Analysis The aim 2 <strong>of</strong> (Angular <strong>the</strong> analysis Segment was to Analysis, find out Choice, wheter <strong>the</strong> radius: new 500m): streets <strong>of</strong> <strong>the</strong> <strong>the</strong> neighborhood center wo<br />
an impact on <strong>the</strong> sorrounding streets within walking distance. To do so <strong>the</strong> situation with and with<br />
The<br />
Analysis streets aim was <strong>of</strong><br />
2 (Angular<br />
<strong>the</strong> compared analysis<br />
Segment using was to <strong>the</strong> Analysis,<br />
find same out color wheter<br />
Choice, range. <strong>the</strong><br />
radius:<br />
new streets<br />
500m):<br />
<strong>of</strong> <strong>the</strong> <strong>the</strong> neighborhood center wo<br />
an impact on <strong>the</strong> sorrounding streets within walking distance. To do so <strong>the</strong> situation with and with<br />
streets The analysis aim was <strong>of</strong> compared <strong>the</strong> <strong>of</strong> <strong>the</strong> analysis choice using was parameter <strong>the</strong> to same find shows color out whe<strong>the</strong>r two range. streets <strong>the</strong> (orange new streets circles) <strong>of</strong> with significant higher valu<br />
<strong>the</strong> fore neighbourhood <strong>the</strong>se streets would centre have would a higher have trough an impact movement. on <strong>the</strong> surrounding<br />
The streets analysis within <strong>of</strong> walking <strong>the</strong> choice distance. parameter To do shows so <strong>the</strong> two situation streets with (orange and circles) without with significant higher va<br />
fore new Looking <strong>the</strong>se streets at streets <strong>the</strong> was street compared would network have using a inside higher <strong>the</strong> <strong>of</strong> same trough <strong>the</strong> new color movement. center range. reveals The that analysis <strong>the</strong>re <strong>of</strong> is one main street with a<br />
<strong>the</strong> higher choice trough parameter movement shows potential two streets for pedestrians (orange than circles) on with <strong>the</strong> o<strong>the</strong>rs significant (white circle),<br />
Looking higher values. at <strong>the</strong> street There- network fore <strong>the</strong>se inside streets <strong>of</strong> <strong>the</strong> new would center have reveals a higher that trough <strong>the</strong>re is one main street with a<br />
higher movement. trough movement potential for pedestrians than on <strong>the</strong> o<strong>the</strong>rs (white circle),<br />
Looking at <strong>the</strong> street network inside <strong>of</strong> <strong>the</strong> new centre reveals that <strong>the</strong>re<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Lebendiges Uster 2035<br />
is one main street with a significant higher trough movement potential<br />
for pedestrians than on <strong>the</strong> o<strong>the</strong>rs (white circle).<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Lebendiges Uster 2035<br />
168<br />
New Methods in <strong>Urban</strong> Analysis and <strong>Simulation</strong> | Final project documentation<br />
Chair <strong>of</strong><br />
Information<br />
iA Architecture
isting street<br />
isting street<br />
Integration 500m, e<br />
network Integration 500m, e<br />
network<br />
th streets <strong>of</strong> new<br />
enter th streets <strong>of</strong> new<br />
enter<br />
500m<br />
Integration 500m, existing street network<br />
500m<br />
Integration 500m, e<br />
network Integration 500m, e<br />
network<br />
500m<br />
ter would have<br />
ter d without would have new<br />
d without new<br />
her values. Therewith<br />
a significant<br />
her values. Therewith<br />
a significant<br />
500m<br />
Integration 500m, existing street network<br />
Analysis 2 (Angular Segment Analysis, Integration):<br />
Analysis 2 (Angular Segment Analysis, Integration):<br />
The analysis <strong>of</strong> <strong>the</strong> integration values show that many sorrounding streets get higher values. T<br />
Analysis 2 (Angular Segment Analysis, Integration):<br />
be The interpreted analysis <strong>of</strong> in <strong>the</strong> that integration way that values <strong>the</strong> added show streets that many lead to sorrounding a denser streets network get higher for pedestrian values. T<br />
neighborhood be interpreted and in that is <strong>the</strong>refore way that <strong>the</strong> more added attractive streets for lead <strong>the</strong>m. to a denser street network for pedestrian<br />
The analysis <strong>of</strong> <strong>the</strong> integration values show that many surrounding<br />
neighborhood and is <strong>the</strong>refore more attractive for <strong>the</strong>m.<br />
streets get higher values. The result can be interpreted in that way that<br />
<strong>the</strong> added streets lea