o Detailed Master Landscaped Plan (scale of 1:100)<br />

o Plan Title, Scale, North Arrow, Project Name, Address of Site, Applicant Name, Date<br />

o<br />

o<br />

o<br />

o<br />

Calculations of required landscaping and fencing<br />

Schedule of plants and materials to be incorporated into the project including name, quantity and reference to the<br />

Landscape Master Plan<br />

Site plan and section detail of location of landscape treatments, including trees, shrubs, ground cover and lawns<br />

Location and section detail of hard surface materials, water features and fencing to be located on the project site<br />

a p p l i c at i o n c h e c k l i s t s<br />

o<br />

Irrigation Calculations<br />

o Irrigation water demand calculations relating to the proposed plantings shown and described in the Landscape Master<br />

Plan, including the peak daily plant water consumption as indicated in liters and calculated at the peak season of July<br />

o<br />

o<br />

o<br />

Monthly projected irrigation water consumption figures covering the effect of leaching and other off-season practices<br />

Irrigation site plan (scale of 1:200) indicating the location and capacity of the irrigation water storage tanks, tank<br />

connections, and details of the distribution system.<br />

A timetable for timing in relationship to irrigation of landscaping at maturity<br />

o Utility Plan (scale of 1:200)<br />

Schedule and plan indicating coordinates, depths, levels, and sizes of all pipes, conduits and connections regarding<br />

water (potable and for irrigation), wastewater, electricity, telephone, and other utilities from points of entering the site to<br />

distribution including, if required, transformers, switch boxes, meters and emergency generator.<br />

o<br />

o<br />

o<br />

Electricity Calculations and Diagrams<br />

o Final electricity load calculations for the development expressed in kVA<br />

o<br />

Detailed electrical diagrams indicating details of distribution and circuit breakers<br />

Refuse Plan<br />

Calculation of anticipated refuse to be accumulated as well as provisions made for storage and disposal<br />

Construction Schedule<br />

o Proposed time schedule for completion of the project as initiated upon receiving an approved Building Permit<br />

o<br />

Management plan describing the organization of work to be completed on the project in coordination with the provided<br />

time schedule, including plans for onsite supervisory personnel