22.01.2018 Views

Success Story Brochure - Dairy Meadow Primary

Transform your PDFs into Flipbooks and boost your revenue!

Leverage SEO-optimized Flipbooks, powerful backlinks, and multimedia content to professionally showcase your products and significantly increase your reach.

SUCCESS<br />

STORY<br />

In August 2016 SchoolCare undertook a complete refit of the ICT<br />

Suite @ <strong>Dairy</strong> <strong>Meadow</strong> <strong>Primary</strong> School, Southall, transforming<br />

their previous ICT Suite into a functional multi-purpose<br />

space with an additional PPA area and reprographics room.<br />

<strong>Dairy</strong> <strong>Meadow</strong><br />

<strong>Primary</strong><br />

School<br />

The comprehensive project saw a complete overhaul of the<br />

learning space, including furniture, internal partitioning,<br />

electrical installation, data and High Spec All-in-One Desktop PC’s.


THE CUSTOMER<br />

THE COMPANY<br />

Location<br />

Ringwood, Hampshire<br />

Specialism<br />

One Stop ICT Solutions Provider<br />

Web Site<br />

www.schoolcare.co.uk<br />

Employees<br />

19 Dedicated Individuals<br />

“SchoolCare<br />

have<br />

transformed<br />

our ICT Suite<br />

into a true<br />

multipurpose<br />

learning<br />

environment”<br />

Karl Murray - School<br />

Business Manager<br />

<strong>Dairy</strong> <strong>Meadow</strong> <strong>Primary</strong> School, is a school with a strong ethos to Enjoy,<br />

Educate, Embrace and Empower. The school achieves this by offering a<br />

happy stimulating environment in which children can acquire the skills,<br />

knowledge and concepts which are relevant to their future.<br />

THE CHALLENGE<br />

SchoolCare were invited to tender for the overhaul of the ICT Suite<br />

at <strong>Dairy</strong> <strong>Meadow</strong> <strong>Primary</strong> School. The previous ICT suite was in good<br />

order, however the school did not feel it was a good use of the available<br />

space and with space in the school at a premium, it was felt that<br />

the investment in a multipurpose space would benefit the school.<br />

The previous ICT suite was set out in forward facing rows and was<br />

used by teachers as both a teaching and PPA space. The rows were<br />

very wide and offered little in terms of flexibility should the space<br />

need to be used for any other purpose.<br />

The existing “flip” desk solution also posed challenges for the<br />

maintenance of hardware as well as cable management and<br />

aesthetics. At the time of the initial meeting, the school expressed<br />

a desire for the PC provision in the ICT suite to be overhauled to set<br />

off the new furniture.<br />

Discussions with the school during the design process highlighted a<br />

need for a separate PPA space (ideally within the ICT suite), which<br />

provided a place for teachers to work as well as offering some<br />

privacy away from the suite itself. This requirement was factored<br />

into the final design.<br />

The school’s requirement for a multi-purpose space was satisfied<br />

by the proposed design, however the school also required a flexible<br />

furniture solution to take advantage of this additional space.<br />

THE SOLUTION<br />

SchoolCare’s in-house design team were able to generate multiple<br />

3D designs immediately after the initial visit, to allow the school<br />

to visualise what their new learning space would look like. The<br />

visualisation process allowed the school to see everything from<br />

flooring and furniture colour, to ICT equipment placement and<br />

layout.<br />

Over a 30 year history SchoolCare has forged close working<br />

relationships with a number of well known and respected furniture


designers and manufacturers.<br />

This allows access to a wealth<br />

of options to turn the 3D Visuals<br />

into reality.<br />

SchoolCare leveraged inhouse<br />

resources to manage and<br />

implement the entire project,<br />

which included; internal<br />

partitioning works, new custom<br />

furniture, electrical modification<br />

and data modification works.<br />

SchoolCare managed the<br />

entire project internally, which<br />

included the internal building<br />

works, installation of ICT suite<br />

furniture and any electrical and<br />

data modification works.<br />

SchoolCare supplied flexible<br />

“sector” tables for the multipurpose<br />

space in the ICT Suite.<br />

This furniture can be arranged in<br />

multiple ways to suit the activity<br />

and paired with the seating from<br />

the edges of the room ensures<br />

the room is truly multi-purpose.<br />

As an ICT provider, SchoolCare<br />

supplied and installed 30<br />

new Dell 3020 All in One<br />

Workstations as part of the<br />

ICT Suite Installation works.<br />

THE RESULTS<br />

The ICT suite project completed<br />

on time ready for the new term.<br />

The pictures speak for<br />

themselves! See more online @<br />

www.schoolcare.co.uk<br />

The school now have a<br />

comfortable, light and functional<br />

Multi-Purpose ICT Learning<br />

space, equipped with the latest<br />

desktop technology.<br />

“SchoolCare have proven<br />

to be proactive and<br />

Flexible in their approach<br />

to everything they do.”


Contact us at<br />

sales@schoolcare.co.uk or visit<br />

www.schoolcare.co.uk for more<br />

information<br />

/SchoolCareTweet<br />

/SchoolCare

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!