Views
8 months ago

Selwyn Times: October 03, 2017

4 Tuesday

4 Tuesday October 3 2017 Latest Christchurch news at www.star.kiwi News SELWYN TIMES One third of the journey over for • By Georgia O’Connor-Harding A THIRD of the $195 million Southern Motorway upgrade has been finished. The Christchurch Southern Motorway Stage 2 is on target to be ready by early 2020, which will see a section of Main South Rd widened to four lanes and the project linked up to the Halswell Junction Rd end of the motorway. Work on the major project has been under way since November and is set to ramp up as summer approaches. The motorway aims to halve the travel time between Rolleston and Christchurch from 30 to about 15min. Over winter, more than 300,000 cu m of earth was moved, two new roads built and the first of eight bridges has almost been completed. New roads Tiptree Lane and Manion Rd are open, along with construction at Justine Drive having just begun. PROGRESS: A new bridge (above) on Main South Rd, north of Rolleston, is 80 per cent complete. Work continues on the new motorway extension looking south from Waterholes Rd to Robinsons Rd with two lanes in each direction and a central median barrier. PHOTOS: MARTIN HUNTER ​ BIG CHANGES: An artist’s impression of the Christchurch Southern Motorway Stage 2 project. Been paid out from EQC or needing a facelift? Buy all your DIY painting & decorating trade products at affordable prices delivered to your doorstep. Decorative Supplies Ltd ″The Painters Warehouse″ ORDER ONLINE TODAY decorativesupplies.co.nz Trusted by tradies for over 14 years! 114 Sawyers Arms Road, Papanui 6 Huxley Street, Sydenham Phone 03 352 8575 6th, 7th & 8th Oct www.theswapmeet.org.nz FLOORING SHOWROOM 3/954 FeRRy ROad | CHRISTCHURCH | Tel. 03 943 2001 | WWW .gReenFlOORIng.CO .nz QUICKSTEP – LOC – ELKA – PERGO – TORLYS LET US HELP YOU SAVE $$$ ON FLOORING • TIMBER • TILE • CORK • LAMINATE • LEATHER laRge SeleCTIOn FRee MeaSURe & QUOTe TRAdInG hOURS: Tuesday to Thursday 8:30am to 5:30pm, Friday 8:30am to 5:00pm, Saturday 9:30am to 1:00pm, Sunday & Monday closed.

SELWYN TIMES Latest Christchurch news at www.star.kiwi Tuesday October 3 2017 5 motorway Local News Now Fire rages, homes at risk New Zealand Transport Agency principal project manager Geoff Griffiths said the new roads give access to homes and businesses. He said Manion Rd allows the CSM2 team to carry on with work on the four-lane motorway from Weedons Rd to Curraghs Rd. The Main South Bridge, north of Rolleston, is 80 per cent complete and is planned to take traffic up and over the motorway. Work on the Weedons interchange and Main South Rd is also progressing. Motorists are able to travel up to 110km/h on some of the country’s expressways, including Tauranga’s eastern link. The southern section of the Christchurch motorway would be considered for this in the future. Mr Griffiths said the 110km/h limit can only be applied to roads that have been built to a standard where an increase in the speed limit is both safe and appropriate. A number of factors need CONSTRUCTION: A full interchange is being built at Weedons Rd as part of the Christchurch Southern Motorway Stage 2 project. to be considered including whether it is a mediandivided road with at least two lanes in each direction, if it has any direct access to properties and has a low crash risk. Mr Griffiths said once the project is completed and deemed suitable, NZTA will go out for consultation on the speed limit change. •HAVE YOUR SAY: What do you think of the progress made on stage two of the Christchurch Southern Motorway? Email your views to georgia.oconnor@ starmedia.kiwi Key features of Christchurch Southern Motorway Stage 2 project: •Main South Rd (SH1) will be widened to two lanes in each direction from the passing lanes north of Rolleston to Robinsons Rd. •A new section of motorway will be built from Robinsons Rd to join the Christchurch Southern Motorway stage one (CSM1) at Halswell Junction Rd. •A full grade-separated interchange at the Weedons Rd/Main South Rd intersection will allow full access to and from Weedons Rd and Weedons Ross Rd. This will include a new local road between Berketts Rd and Robinsons Rd. •Larcombs Rd will be closed at Main South Rd. •Berketts Rd will be restricted to left turns in from Main South Rd and left turns out to Main South Rd. •Robinsons Rd will pass under Main South Rd to remain connected with Curraghs Rd. •A new shared cycle path will be provided between Curraghs Rd and Dawsons Rd. •A new grade separated ‘Y-junction’ north of Robinsons Rd will be included. •A new roundabout will be built at the Dawsons Rd/Waterholes Rd/ Main South Rd intersection. •Waterholes Rd will pass over the new motorway. •Trents Rd will pass over the new motorway. •Blakes Rd will be cut by the new motorway, becoming two cul-desacs. •A full grade-separated ‘diamond’ interchange at Shands Rd will allow the new motorway to be free-flowing and provide access to Shands Rd. •A new walking and cycling path will connect the shared use path with the Little River Rail Trail. •Ramps at Halswell Junction Rd will provide motorway access to the city. •Halswell Junction Rd and Springs Road will pass over the motorway. •John Paterson Drive will be realigned to join Halswell Junction Rd. •A 1.5m wide shoulder will be provided on all local road bridges and underpasses. •A shared pedestrian and cycle path will be provided on the Trents Rd and Marshs Rd bridges. LIPSTICK Spring stock instore now! DREAMS BY HELEN O’CONNOR & SIMON HOPKINSON 5-14 OCTOBER A must-see play full of laughter, tears and fun, with toe-tapping songs from the Swinging 60s that will have you dancing in the aisles! HAGLEY THEATRE, HAGLEY COLLEGE, 510 HAGLEY AVE TICKETS: $23 WAGED / $19 UNWAGED. FOR SHOW TIMES AND BOOKINGS PHONE 03 338 4699 OR VISIT WWW.RICCARTONPLAYERS.CO.NZ Welding & Engineering Services available: • Welding, metal fabrication • Engineering repair • Farm, factory and site work undertaken Well equipped workshop Widely experienced, many years Wilson Engineering Workshop, 486 Two Chain Road, Burnham. Phone 347 6760 or 021 329 605 SMITH & BOSTON Prebbleton Village | Christchurch Ph: 03 349 5646 www.smithandboston.co.nz Round 2 Events Fund applications open now! Applications to round 2 of the Selwyn District Events Fund are open during October to fund events happening between 1 January and 30 June 2018. The Council’s Events Fund can support a wide variety of events and help cover costs such as equipment, venue hire, promotions, consent and traffic management to ensure your event is a success. Applications for funding close 5pm, Tuesday 31 October 2017. To find out more and make an application visit www.selwyn.govt.nz/eventsfund or phone 347 2719 or 318 8338. growing strong communities together