24.01.2018 Views

2017-1

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

Worldwide News<br />

Japan’s Yaskawa expanding strategically<br />

in Europe<br />

Japanese technology group Yaskawa is focusing to intensify<br />

its presence in Europe, with the aim of becoming one of the<br />

leading manufacturers of industrial robots in strategic target<br />

markets. The company plans to expand its production<br />

capacities and open a new robot manufacturing plant and a<br />

new European robotics development centre in Slovenia.<br />

Creating 200 additional jobs in the process. The first Yaskawa<br />

Austrian company NKE completes 20<br />

successful years in the bearings industry<br />

NKE, the bearing manufacturer based in the Austrian city of Steyr<br />

is celebrating its 20 th anniversary. The company, by Heimo Ebner<br />

and Harald Zerobin, produces bearings for all industrial applications,<br />

with engineering, product development, production,<br />

logistics, sales and marketing being centralised at its Steyr<br />

headquarters. The company operates its sales through 12 international<br />

offices and 240 distribution outlets in 60 countries. In its first<br />

10 years, NKE saw rapid growth, with its turnover increasing on<br />

average by more than 20 % a year. To keep up with the growth, the<br />

company invested more than 15 million Euros to build its new<br />

premises in Stadtgut Steyr business park in 2009. This investment<br />

helped NKE double its production capacity. In 2016, the Spanish<br />

company ‘Fersa Bearings’ acquired 49 % interest in NKE. The<br />

resulting group of companies now boasts 3 production sites, 5<br />

distribution centres, and 3 R&D locations. After guiding the<br />

company for 20 years, both its two founders Heimo Ebner and<br />

Harald Zerobin passed the company’s management on to Thomas<br />

Witzler in July 2016. With their expertise and experience they<br />

continue to actively deal with NKE’s vision and strategic planning<br />

for the coming decades.<br />

robots from all-European production are expected to roll in<br />

2018. The factory should satisfy about 80 % of the European<br />

demand for robots. Total investments are estimated to be in<br />

the order of 25 million euros. As one of the top global players<br />

in the industrial robot sector with more than 350,000 units<br />

sold, Yaskawa is pursuing an ambitious expansion strategy in<br />

Europe. The new production and development capacities will<br />

permit faster customized robotic solutions in Europe. This<br />

will also strengthen the cooperation with OEMs in these<br />

markets. Yaskawa is expanding its European activities<br />

through investments in the existing robot business as well as<br />

electric drive technology, industrial control technology and<br />

‘Green Energy’.<br />

www.yaskawa.eu.com<br />

Caption: NKE founders Heimo Ebner (left) and Harald Zerobin<br />

(right) with General Manager Thomas Witzler (centre)<br />

www.nke.at/en/home<br />

NEWS AND MARKETS<br />

Mayr power transmission expands its existing facility<br />

Since the ground-breaking ceremony in mid 2016, much has<br />

happened on the construction site of the new facility at Mayr<br />

power transmission in Mauerstetten. Currently, trapezoidal<br />

sheets are being installed on the roof. Therefore, the roofing<br />

ceremony for the new facility took place back in November in<br />

the presence of numerous representatives from the companies<br />

involved in the construction. Owing to smooth construction<br />

process, it has been possible to cover the site according to plan<br />

before the winter. Over the winter months, the interior<br />

construction will take place, so that it will be possible to move<br />

into the new hall by approximately mid-<strong>2017</strong>. The new<br />

production and assembly hall has a length of 105 m and a<br />

width of 45 m, occupying a total floor area of 4 500 m 2 . The<br />

assembly, dispatch and a warehouse close to the assembly will<br />

be located in the new facility. Around 600 m² office area,<br />

appropriate meeting and engineering rooms have been<br />

planned in the building. Mayr Power transmission is investing<br />

heavily in its Mauerstetten location with this new site along<br />

with the new communications centre simultaneously being<br />

built on the premises.<br />

www.mayr.com<br />

WORLD OF INDUSTRIES – MOTION, DRIVE & AUTOMATION 1/<strong>2017</strong>

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!