Views
5 months ago

VOL2 EMPLOYED

VOL2 EMPLOYED

light funnel

light funnel 캐노피의 형태상의 특징으로 인해서 캐노피 하부의 court yard는 주변에 비해 어두워질수 밖에 없습니다. 이영역에 최소한의 조도를 확보하기 위해 light funnel 을 이용해서 확산광을 유입하도록 하였습니다. Light Funnel AMBIENT LIGHT As a way to achieve appropriate ambient light level in the courtyard, the light funnel, as an extension of the PV panels, holds light reflectors/refractors in order to scatter or redirect sunlight down below to both the courtyard and reservoir. SUMMER WINTER LIGHT REFLECTORS 18 EXPO 2020 DUBAI | SUSTAINABILITY PAVILION

1 NTS 1 3 NTS 1 : 50 2 . . . . . . 2 4 NTS 1 : 50 2 3 1 : 100 1 : 100 32 31 30 29 28 27 26 25 24 33 23 34 36 15° 15° 1 22 21 20 16 4 15 6 7 8 9 10 11 12 13 14 Q Q DM Stamp 35 2 3 5 REFLECTOR GLAZING VERTICAL SUPPORTS ALIGNED TO MAIN CANOPY TRUSS PLA-201 SILICONE ACCORDION EXPANSION JOINT Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This document may not, in whole or in part, be reproduced, stored, transmitted or distributed in any form or by any means, whether electronic, mechanical, by photocopy, recording or otherwise, without the prior written permission of EX20. Except where otherwise expressly agreed in writing by EX20, EX20 shall have no responsibility or liability for any loss (direct, consequential or otherwise) which may arise from reliance on or use of this document or the information contained therein. DO NOT SCALE THIS DRAWING. GLS-120 TEMPERED GLASS, DOUBLE LAYERED, FRIT PATTERN MTL-411 ALUMINUM PV FRAMING N REFLECTOR STRUCTURE MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH 19 18 17 No Description SAFETY, HEALTH AND ENVIRONMENT INFORMATION Brief details on the identified hazard symbol referencing the unusual residual hazards / risks are listed above. MTL-413 ALUMINUM GRATING 3 600502 MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH CANOPY REFLECTOR RING BEAM SETOUT PLAN 2 600502 1 50% DD MR WS 06/29/17 0 03 CANOPY TENDER ISSUE MR WS 06/12/17 Rev Description Apvr Chk'd Date Client LINEAR SPANS BTW. CIRCULAR RING BEAMS OFFSET FROM RING BEAMS SEE TYP. DETAIL EXPO 2020 Lehbab Road, DWC South Dubai - United Arab Emirates T: +971 4 555 2020 CANOPY STRUCUTURE PLA-202 CURVED NON-SLIP WALKING SURFACE MTL-320 METAL FLOOR PANEL PV-2 GLASS LAMINATED PHOTOVOLTAIC PANEL CIRCULAR RING BEAMS 16,286 Development Manager Project Manager Emaar Properties PJSC P.O. Box 9440, Dubai, UAE T: +971 4 3673333 F: +971 4 3673000 enquiry@emaar.ae Turner International Middle East, Ltd. Turner Construction - International LLC P.O. Box 13036 - Dubai, UAE P: +971 4 337 0990 F: +971 4 334 8216 tci.dxb@tcco.com PV-1 STANDARD PHOTOVOLTAIC PANEL MTL-321 METAL WALL PANEL MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH MTL-317 STAINLESS STEEL WIRE MESH MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH X 72,000 Y 92,950 Z 9,040 X 72,000 Y 93,770 Z 7,310 X 72,000 Y 94,350 Z 5,490 X 72,000 Y 94,680 Z 3,630 X 72,000 Y 94,750 Z 1,740 X 72,000 Y 94,530 Z -130 11° 12° 13° 14° 14,719 13,498 12,507 12,159 12,079 X 72,000 Y 108,950 Z 12,100 X 72,000 Y 108,170 Z 10,340 X 72,000 Y 107,500 Z 8,540 X 72,000 Y 106,940 Z 6,690 X 72,000 Y 106,510 Z 4,810 X 72,000 Y 106,220 Z 2,920 Local Consultant Floor 2, Hassanicor Building, Al Barsha First P.O. Box 454801, Dubai, UAE T: +971 4 399 4788 F: +971 4 399 4780 rpedubai@emirates.net.ae Design Architect 637 West 27th Street New York, New York 10001 T: +01 212.693.3600 Parcel IDE / Community 5219784 / Madinat Al Mataar Project Title EXPO2020 SUSTAINABILITY PAVILION Project Adress Drawing Title STRUCTURE BELOW THIS DATUM TO BE FIRE PROOFED MTL-211 AESS CATEGORY 4, APPLIED HIGH PERFORMANCE FINISH MTL-213 CAST STEEL, APPLIED HIGH PERFORMANCE FINISH EVENT C144200 00 6 CANOPY LIGHT REFLECTOR DETAIL FFL 6,100 TOS Approved Seal Date 06/12/17 Designed Drawn Checked GA KD WS CANOPY LIGHT FUNNEL EXPLODED AXON CANOPY REFLECTOR RING BEAM SETOUT SECTION Model File Ref: Scale A1 (594x841) Revision No 92001-MDL-C144200-AR-000002 As indicated 1 Drawing No 92001-DWG-C144200-AR-600502 92001-MDL-C144200-AR-000002 3,000 TYP. MTL-403 ALUMINUM FASCIA WATERTIGHT SEAL BTW. CATWALK AND REFLECTOR PANEL LOWEST CATWALK / GUTTER TOP PANEL BRIDGES REFLECTOR SUPPORT STRUCTURE AND ROOF PV SUPPORT STRUCTURE 1 600509 GLS-120 TEMPERED GLASS, DOUBLE LAYERED, FRIT PATTERN PLA-201 SILICONE ACCORDION EXPANSION JOINT MTL-411 ALUMINUM PV FRAMING MTL-413 ALUMINUM GRATING MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH MTL-317 STAINLESS STEEL WIRE MESH DM Stamp Copyright by Bureau Expo Dubai 2020 (EX20). All rights reserved. This document may not, in whole or in part, be reproduced, stored, transmitted or distributed in any form or by any means, whether electronic, mechanical, by photocopy, recording or otherwise, without the prior written permission of EX20. Except where otherwise expressly agreed in writing by EX20, EX20 shall have no responsibility or liability for any loss (direct, consequential or otherwise) which may arise from reliance on or use of this document or the information contained therein. 2,400 TYP. 600506 DO NOT SCALE THIS DRAWING. 1,400 TYP 2,077 CLEAR 2,059 CLEAR 1,961 CLEAR 2,212 2,310 2,328 VARIES VARIES VARIES 1,000 TYP. 1,000 TYP. 1,000 TYP. 1,000 TYP. 1,000 TYP. 1,000 TYP. 2 600509 1,000 TYP. 1,000 TYP. 1,000 TYP. 1,000 TYP. 1,000 TYP. No Description SAFETY, HEALTH AND ENVIRONMENT INFORMATION Brief details on the identified hazard symbol referencing the unusual residual hazards / risks are listed above. N LENGTH OF PANEL EDGE ACCESS LADDER ZONE SEE TAW REPORT FOR DETAILS REFLECTOR GLASS PLAN REFLECTOR GLASS SECTION DETAIL PV-1 STANDARD PHOTOVOLTAIC PANEL MTL-320 METAL FLOOR PANEL MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH 1 50% DD MR WS 06/29/17 0 03 CANOPY TENDER ISSUE MR WS 06/12/17 Rev Description Apvr Chk'd Date Client EXPO 2020 Lehbab Road, DWC South Dubai - United Arab Emirates T: +971 4 555 2020 MTL-413 ALUMINUM GRATING CATWALK MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH VERTICLES FOR REFLECTOR SUPPORT MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH CONNECTOR PLATE MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH CONNECTOR PLATE MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH CURVED TUBE MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH SHOP WELDED LATERAL SUPPORT Development Manager Project Manager Local Consultant Design Architect Emaar Properties PJSC P.O. Box 9440, Dubai, UAE T: +971 4 3673333 F: +971 4 3673000 enquiry@emaar.ae Turner International Middle East, Ltd. Turner Construction - International LLC P.O. Box 13036 - Dubai, UAE P: +971 4 337 0990 F: +971 4 334 8216 tci.dxb@tcco.com Floor 2, Hassanicor Building, Al Barsha First P.O. Box 454801, Dubai, UAE T: +971 4 399 4788 F: +971 4 399 4780 rpedubai@emirates.net.ae 637 West 27th Street New York, New York 10001 T: +01 212.693.3600 MTL-212 AESS CATEGORY 1, APPLIED HIGH PERFORMANCE FINISH SHOP WELDED LAB Parcel IDE / Community 5219784 / Madinat Al Mataar Project Title GLS-120 TEMPERED GLASS, DOUBLE LAYERED FRIT PATTERN EXPO2020 SUSTAINABILITY PAVILION Project Adress PLA-201 SILICONE ACCORDION EXPANSION JOINT Drawing Title EVENT C144200 00 6 CANOPY REFLECTOR GLASS DETAIL CANOPY STRUCTURE Approved Seal Date SERVICE CATWALK 06/12/17 REFLECTOR STRUCTURE Designed Drawn Checked GA KD WS REFLECTOR GLASS AXON DETAIL REFLECTOR GLAZING REFLECTOR GLASS EXPLODED AXON DETAIL Model File Ref: Scale A1 (594x841) Revision No 92001-MDL-C144200-AR-000002 1 : 50 1 Drawing No 92001-DWG-C144200-AR-600506 92001-MDL-C144200-AR-000002

Reference Projects Old Town - AEC Online
What is DFIRM Map Production Pro? - Mapping Information Platform