Views
6 months ago

VOL2 EMPLOYED

VOL2 EMPLOYED

green roof systems

green roof systems 35psf의 sound mass를 만족시키는 green roofing system은 크게 두가지의 가능성으로 좁혀졌습니다. 첫번째는 conventional 한 sedume carpet rollout roofing system이며 다른 하나의 방법은 extensive system + modular approach였습니다. GREEN ROOF SYSTEM // TRAY SYSTEM - OPTION 1 GREEN ROOF SYSTEM EXISTING ROOF / TRUSS // METAL DECK - OPTION 2 NEW TRUSS (TRANSVERSE) EXISTING ROOF / TRUSS NEW TRUSS (TRANSVERSE) PLACE TRAYS FINISH PURLINS + METAL DECK FINISH SYSTEM TYPE ‘A’ Truss system installed and purlins set in place. Metal Deck applied and waterproofing. Green Roof system installed by way of conventional methods, using a hybrid of sedum carpet and mat system depending on the slope. SHoP ARCHITECTS, P.C. 11 PARK PLACE, PENTHOUSE NEW YORK, NY P. 212.889.9005 F. 212.889.3686 THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS SUCH MAY NOT BE USED FOR OTHER PROJECTS, FOR ADDITIONS TO THIS PROJECT OR COMPLETION OF THIS PROJECT BY OTHERS. BARCLAYS CENTER ATLANTIC YARDS BROOKLYN, NEW YORK TITLE | GREEN ROOF INITIAL SUMMARY JOB # |090705 DATE | 05.24.2013 SCALE | AS NOTED DRAWN BY | WJS CHECKED BY | BDS FILE/STO# DSK 001

GREEN ROOF SYSTEM // METAL DECK - OPTION 2 GREEN ROOF SYSTEM EXISTING ROOF / TRUSS // TRAY SYSTEM - OPTION 1 NEW TRUSS (TRANSVERSE) EXISTING ROOF / TRUSS NEW TRUSS (TRANSVERSE) PURLINS + METAL DECK FINISH PLACE TRAYS FINISH SYSTEM TYPE ‘B’ Steel Pan: Designed & Engineered by SHoP/TT. Fabricated and delivered to site or staging area. Pan to be waterproofed and contain drainage outlet. Design to be used as part of overall roof structural system. Green System: Material grown offsite. Delivered to site or staging area and installed into steel pan prior to hoist or set in place on roof once pan installed. SHoP ARCHITECTS, P.C. 11 PARK PLACE, PENTHOUSE NEW YORK, NY P. 212.889.9005 F. 212.889.3686 THESE DRAWINGS ARE INSTRUMENTS OF SERVICE AND AS SUCH MAY NOT BE USED FOR OTHER PROJECTS, FOR ADDITIONS TO THIS PROJECT OR COMPLETION OF THIS PROJECT BY OTHERS. BARCLAYS CENTER ATLANTIC YARDS BROOKLYN, NEW YORK TITLE | GREEN ROOF INITIAL SUMMARY JOB # |090705 DATE | 05.24.2013 SCALE | AS NOTED DRAWN BY | WJS CHECKED BY | BDS FILE/STO# DSK 001

Reference Projects Old Town - AEC Online
What is DFIRM Map Production Pro? - Mapping Information Platform