Views
5 months ago

280218_Luxor-Egypt SECAP Final_revised

280218_Luxor-Egypt SECAP

This project is funded by the European Union Contract No. ENPI 2012/309-311/EuropAid/132630/C/SER/MULTI Egypt Governorate of Luxor Sustainable Energy & Climate Adaptation Plan (SECAP)

  • Page 2 and 3: The document was produced as part o
  • Page 4 and 5: Transitions Team Bruno REBELLE - Ma
  • Page 6 and 7: SECTION II: BASELINE EMISSION INVEN
  • Page 8 and 9: 6.2.1. Adaptation Challenges ......
  • Page 10 and 11: List of Figures Figure 1: SWOT Anal
  • Page 12 and 13: Executive Summary The Sustainable E
  • Page 14 and 15: the Future Cities Adaptation Compas
  • Page 16 and 17: solar energy projects for a long pe
  • Page 18 and 19: 2.2. Sectorial Policies Energy Effi
  • Page 20 and 21: • Pursing nationwide transport/ t
  • Page 22 and 23: December 2015. Accordingly, Governo
  • Page 24 and 25: - Ensure energy consumption reducti
  • Page 26 and 27: • Funding sources for energy effi
  • Page 28 and 29: • Demonstrate the political will
  • Page 30 and 31: implementation of its activities. F
  • Page 32 and 33: Section II: Baseline Emission Inven
  • Page 34 and 35: Figure 3: Considered themes in BEI
  • Page 36 and 37: Gasoline Transports excepted 250 kg
  • Page 38 and 39: Electricity consumption in Waste Tr
  • Page 40 and 41: If we look more precisely and analy
  • Page 42 and 43: Table 7: GHG emissions per sector a
  • Page 44 and 45: until 2030 (-4 per cent). The table
  • Page 46 and 47: Section III: SECAP - Actions Planne
  • Page 48 and 49: agriculture, transport, constructio
  • Page 50 and 51: Figure 13: Sustainable energy and c
  • Page 52 and 53:

    consumption in such buildings could

  • Page 54 and 55:

    Almost 80% of the urban territory i

  • Page 56 and 57:

    Considering the annual budget consu

  • Page 58 and 59:

    City of Luxor / Governorate fleet T

  • Page 60 and 61:

    issues, engage in energy conservati

  • Page 62 and 63:

    • Public transport system and RTB

  • Page 64 and 65:

    choice, providing loans at an attra

  • Page 66 and 67:

    Awareness raising on the three targ

  • Page 68 and 69:

    4.2.3.5 Expected results Assumption

  • Page 70 and 71:

    Energy in MWh/year Situation in 201

  • Page 72 and 73:

    The GIU will support companies in d

  • Page 74 and 75:

    power plant project will be generat

  • Page 76 and 77:

    5. Conclusions The current action p

  • Page 78 and 79:

    Section IV: Climate Adaptation Plan

  • Page 80 and 81:

    densely populated cities and suburb

  • Page 82 and 83:

    negative impacts of climate change.

  • Page 84 and 85:

    Kilometre Square by 2025 17 . A stu

  • Page 86 and 87:

    to climate change impacts on the ha

  • Page 88 and 89:

    3. National and Regional Strategy o

  • Page 90 and 91:

    • Contribute to better corporate

  • Page 92 and 93:

    − Installed capacity of about 300

  • Page 94 and 95:

    Source: http://www.weatheronline.co

  • Page 96 and 97:

    Main climate trends Temperature In

  • Page 98 and 99:

    Table 12: Climate Change Risks by S

  • Page 100 and 101:

    The Governorate of Luxor has develo

  • Page 102:

    Table 15: Vulnerability analysis (b

  • Page 106:

    Receptors Extreme weather event Pot

  • Page 110:

    Receptors Extreme weather event - H

  • Page 114 and 115:

    Table 16: Suggested template for th

  • Page 116 and 117:

    Built Environment Buildings’ stoc

  • Page 118 and 119:

    3.5 3 R7 2.5 Probability 2 1.5 1 R4

  • Page 120 and 121:

    impacts on low-level lands in Delta

  • Page 122 and 123:

    Agricultural Sector: 1. Build an ef

  • Page 124 and 125:

    This should be established as early

  • Page 126 and 127:

    to preserve agricultural lands. The

  • Page 128 and 129:

    Communication Educational Developin

  • Page 130 and 131:

    Technical management Planning, cons

  • Page 132 and 133:

    mobility solution -- “Sustainable

  • Page 134 and 135:

    - National Environmental, Economic

  • Page 136 and 137:

    need of a strategic and comprehensi

  • Page 138 and 139:

    This would include the following en

  • Page 140 and 141:

    8. Available and foreseen sources o

  • Page 142 and 143:

    City of Luxor - Governorate of Luxo

  • Page 144 and 145:

    - Integrated Coastal Zone Managemen

  • Page 146 and 147:

    The estimated cost of transferring

  • Page 148 and 149:

    • Energy efficiency is the corner

  • Page 150 and 151:

    lamps plus 50 for corridors and sta

  • Page 152 and 153:

    move. Awareness should also focus o

  • Page 154 and 155:

    - Abu Dhabi Fund for Development (A

  • Page 156 and 157:

    • Involve and train companies tha

  • Page 158 and 159:

    - National Action Plan for Adaptati

  • Page 160 and 161:

    improvement, - Assess the number of

  • Page 162 and 163:

    Component 1: Phase 1: Set up the EA

  • Page 164 and 165:

    This priority action includes a 2 n

  • Page 166 and 167:

    Successful projects in national and

  • Page 168 and 169:

    - Kuwait Fund for Arab Economic Dev

  • Page 170 and 171:

    The Sustainable and Green Tourism P

  • Page 172 and 173:

    - Reduce energy consumption in all

  • Page 174 and 175:

    - (Copenhagen) Amendment to the Mon

  • Page 176 and 177:

    will save 8,157 MWh/year of electri

  • Page 178 and 179:

    move. Awareness should also focus o

  • Page 180 and 181:

    - French Development Agency (AFD),

  • Page 182 and 183:

    City of Luxor - Governorate of Luxo

  • Page 184 and 185:

    • Contribute to build a sustainab

  • Page 186 and 187:

    - Reduce energy consumption in all

  • Page 188 and 189:

    - Secure energy resources, - Increa

  • Page 190 and 191:

    Developing Solar PV power generatio

  • Page 192 and 193:

    An adequate awareness raising actio

  • Page 194 and 195:

    International Financial Institution

  • Page 196 and 197:

    Section VI: Citizen Awareness Promo

  • Page 198 and 199:

    Preparation of a COMMUNITY AWARENES

  • Page 200 and 201:

    IV. Previous awareness actions cond

  • Page 202 and 203:

    2.1.1. Template Proposed Communicat

  • Page 204 and 205:

    - Annexes or references to annexes

  • Page 206 and 207:

    198 Coordinate with the Ministry of

  • Page 208 and 209:

    2.1.3. Template Proposed Communicat

  • Page 210 and 211:

    2.2.1 Template Proposed Communicati

  • Page 212 and 213:

    the engines to limit and reduce har

  • Page 214 and 215:

    206 Training from GASCO on the econ

  • Page 216 and 217:

    3.2. Template CAPP activities as re

  • Page 218 and 219:

    appropriate for constructing bike l

  • Page 220 and 221:

    citizens that could encompass sever

  • Page 222 and 223:

    In the case of Luxor specifically,

  • Page 224 and 225:

    Omran E. Frihy, Khalid M. DewidarMo

  • Page 226 and 227:

    Annex l Al-Qurna Governorate of Lux

  • Page 228 and 229:

    LIST OF TABLES Table 1 - Hazard & R

  • Page 230 and 231:

    Image 1: Location of Al-Qurna in th

  • Page 232 and 233:

    a. Building activities close to mon

  • Page 234 and 235:

    monuments. Also, the west bank is r

  • Page 236 and 237:

    4.2 Sustainable Urban Design analys

  • Page 238 and 239:

    Image 14: Part of the encroachment

  • Page 240 and 241:

    Table 1 - Hazard & risks, Heritage

  • Page 242 and 243:

    5. Proposed Interventions Based on

  • Page 244 and 245:

    Construction material= 15,000 EGP F

  • Page 246 and 247:

    Minibuses - 1.13 x 7 x 9 = 71.19 li

  • Page 248 and 249:

    5.1.2 Clear transportation on the w

  • Page 250 and 251:

    introduced with an incentive to the

  • Page 252 and 253:

    Staff training needs N/A Role of Pa

  • Page 254 and 255:

    5.1.3. Solar PV for Heritage Sites

  • Page 256 and 257:

    4. Summary of related Awareness Rai

  • Page 258 and 259:

    10 x 340,000 = 3,400,000 EGP 1 Trai

  • Page 260 and 261:

    Energy savings MWh/y Renewable ener

  • Page 262 and 263:

    The Awareness unit will be a key co

  • Page 264 and 265:

    5.1.6. Waterfront Aesthetics 1. Gen

  • Page 266 and 267:

    5. Assumptions and risks Resistance

  • Page 268 and 269:

    Financial analysis Conference A nat

  • Page 270 and 271:

    Local authority's own resources: In

  • Page 272 and 273:

    Strength - Distinctive geographical

  • Page 275:

    The European Union is made up of 28

Energy future of the Stockholm region 2010-2050
how to develop a sustainable energy action plan (seap)
focus
The_Political_Economy_of_Sustainable_Energy
07.14-Sustainable-Clean-Energy-dbl-pg-10mb1
Race to the front
Green buildings - Grundfos E-Newsletter
The Role of Nuclear Power in a Low Carbon Economy - Sustainable ...
CIB W116—Smart and Sustainable Built Environments - Test Input
Buildings and Climate Solutions (Nov. 2008) - Pacific Institute for ...
Fuel Cells for Buildings - Fuel Cells 2000
Energy for the City of the Future - Ljubljana
Download our energy strategy - London Stansted Airport
Leaflet Eusew (carte) - 081103.indd - First
Connecting the Future - Greenpeace UK
PUTTING THE EU ON TRACK FOR 100% RENEWABLE ENERGY
Smart Energy - Hnutí DUHA