5.1.6. Waterfront

5.1.6. Waterfront Aesthetics 1. General presentation Al-Qurna – Priority action #6 for SECAP Title: WATERFRONT AESTHETICS The project suggests: Summary of the Action - An Awareness Campaign to shed light on the importance of preserving the aesthetics of the Waterfront for the environmental quality and visual quality important for the tourism industry. - A National meeting to coordinate among Mehleb committee and other officials in charge to safeguard the waterfront. General Objectives of the project Focusing on safeguarding the aesthetics of the West Bank waterfront. Specific Objectives of the project a) Minimise massive illumination, thus mass electricity consumption lighting the mountain. b) Safeguard green belt and minimise the urbanised lands in order to minimise electricity housing consumption. # 6 Location: Al-Qurna Village Start date: Dec. 2017 Project lifetime: 3 months End date: March 2018 Estimated cost € 13,000 Status of the Action: • New • Planned • Under implementation • Following previous action. Principal partners and stakeholders Luxor Governorate, Ministry of Agriculture, Ministry of Tourism, Tourism chamber (representing hotels investors and hotel chains), farmers syndicate, and Mehleb committee (Nile encroachment committee led by the ex-prime minister). Contact person in the local authority Dr. Ramadan Sedeek, Env. Dept., Luxor Governorate 2. Technical description Financial Analysis Advertising and campaign: 10,000 € The Meeting necessitate: - Airplane Ticket: Business class Cairo-Luxor-Cairo, return flight booking for 8-10 persons. 4,000 EGP per Person = 36,000 EGP = 1,718.6 € - Accommodation: 2 nights in a 5-star hotel in Luxor; preferably where the meeting & workshop shall be held. 1,000 per 2 nights/person = 9,000 EGP = 430 € - Meeting room for up to 30 persons for a whole day, 2 coffee breaks and lunch for 20-30 persons 500EGP/person, for 25 persons = 12,500 EGP = 600 € - 2 microbuses or 1 coaster for a whole day 1500 EGP = 72 € - printed materials and logistics 400 EGP = 24 € Total Cost of Conference: 2,844.6 € ≈ 3,000 € 39

Total cost of Project: 13,000 € Decreasing Emissions PS. Redesign the lighting of the mountain in coordination with the electricity department, Luxor Governorate and the SCA, would certainly save much electricity. PS. Removing encroachments on the waterfront would minimise the residential and building, limiting thus the consumed electricity in housing. Both saved electricity would minimise emissions. Nevertheless, investigations are needed and lighting redesign should be applied in order to define the spared KW/hr. saved. Link to municipal development plan Coping with Luxor the city of green heritage slogan where the green waterfront is safeguarded with a rationalised the mountain (waterfront background) illumination reflecting rather more sustainable meaning in energy consumption. Implementation plan Component 1: Investing on what is called Mehleb committee, named after the ex-prime-minister commissioned by H.E. President to clear all violations along the River Nile, coordination among concerned stakeholders. The committee is an essential need to confront the current rapid pace of uncontrolled development consuming the green belt and casting a grey ugly shadow in what used to a spectacular heritage panoramic view characterising Luxor. Component 2: An awareness campaign is also needed to raise the awareness of the importance of preserving the aesthetics and environmental balance of the West Bank waterfront among all stakeholders: SCA, Localities & Luxor Governorate, Local Community & private investors in tourism sector, mainly hotels and hotel chains. The art symposium under the title ‘together for a clean environment’, part of action fiche 6 could contribute to the awareness campaign proposed above. 3. Organization and procedures Formal approval Governor of Luxor Staff training needs The governor office establish communication with Mehleb committee calling for the national meeting. Dr. Sadeek, coordinating with Dr. Waziri (SCA) and the farmer syndicate and Tourism chamber with the rep. of the ministry of tourism for the Awareness Campaign, as well as liaising for the parallel activity: organising for the national meeting. Staff allocated to prepare, implement, monitor action The office of HE. The governor of Luxor, SCA rep. Dr. Moustafa Al-Waziri, Dr. Ramadan Sadeek (CES-MED rep. in Luxor Governorate). Role of Partners Dr. Sadeek and CES-MED team introduce the project to H.E. The governor providing necessary training and support for his Excellency’s office staff for logistics and support for the Awareness campaign and the national meeting. 4. Summary of related Awareness Raising (AR) actions Some of the actions include: • Spreading information and training material (posters, brochures, stickers, etc.) on how to save energy. To include training given by municipal staff. • Creating an annual “Energy festival/day” to demonstrate best practices and celebrate innovative projects. Would be promoted through traditional media and online social networks. • Mobilising families by training women/mothers • Implement events such as an Art Symposium promoting the “Towards a clean environment”. Developing a network of “Positive energy schools” that produce not only more energy than they consume, but where teachers integrate the project into their curricula to train students, develop projects, etc. 40

  • Page 1 and 2:

    This project is funded by the Europ

  • Page 3 and 4:

    EuropeAid/132630/C/SER/Multi CLEANE

  • Page 5 and 6:

    Table of contents Executive Summary

  • Page 7 and 8:

    4.3. Renewable energy development .

  • Page 9 and 10:

    2.2.1 Template 2.2.1 Proposed Commu

  • Page 11 and 12:

    List of tables Table 1: Emission fa

  • Page 13 and 14:

    Industry; d) Transport; e) Waste an

  • Page 15 and 16:

    Section I: Governorate climate and

  • Page 17 and 18:

    (MCEI) is responsible for drawing u

  • Page 19 and 20:

    implementing the NEEAP and using sm

  • Page 21 and 22:

    previously set by H.E. General Fara

  • Page 23 and 24:

    8. Construct 4500 housing units in

  • Page 25 and 26:

    2. Promote the integration of energ

  • Page 27 and 28:

    The SEAU will be in charge of all G

  • Page 29 and 30:

    To ensure the success of project im

  • Page 31 and 32:

    Financing the SECAP The Governorate

  • Page 33 and 34:

    consumption and GHG emissions. 1.2.

  • Page 35 and 36:

    1.3.1.2 Employment statistics The e

  • Page 37 and 38:

    Value provided Method Final value E

  • Page 39 and 40:

    * Emissions from livestock and anim

  • Page 41 and 42:

    average emissions per capita in Egy

  • Page 43 and 44:

    10% 10% Governorate (Municipal) Bui

  • Page 45 and 46:

    Agriculture 1 692 0 2 622 0 0 0 0 4

  • Page 47 and 48:

    Figure 11: Impression of the City o

  • Page 49 and 50:

    4. Planned actions for the city of

  • Page 51 and 52:

    This commitment to act on its own p

  • Page 53 and 54:

    EGP 340,910 (€ 16,148), offering

  • Page 55 and 56:

    places and avenues where the new li

  • Page 57 and 58:

    - Get a good understanding of the b

  • Page 59 and 60:

    energy conservation, energy efficie

  • Page 61 and 62:

    only possible when real alternative

  • Page 63 and 64:

    155 boats with an average fuel cons

  • Page 65 and 66:

    Luxor and, by the way, a very effic

  • Page 67 and 68:

    4.2.3.3 Medium-term actions (3 to 1

  • Page 69 and 70:

    electricity used in tertiary buildi

  • Page 71 and 72:

    4.2.5.2 Possible actions As agricul

  • Page 73 and 74:

    a feed in tariff policy. If this po

  • Page 75 and 76:

    producing solar heater in small wor

  • Page 77 and 78:

    TRANSPORT Common charter for servic

  • Page 79 and 80:

    Figure 14: Seasonal (winter: Decemb

  • Page 81 and 82:

    2.2. Climate Change Impacts in Egyp

  • Page 83 and 84:

    cause mortalities 18 . In line with

  • Page 85 and 86:

    36 million from 1950 to 2010, popul

  • Page 87 and 88:

    harbour) in Alexandria 45 . Moreove

  • Page 89 and 90:

    The national strategy, its goals an

  • Page 91 and 92:

    The key players of this strategy st

  • Page 93 and 94:

    a. Ambient temperature (2000-2012)

  • Page 95 and 96:

    Figure 20: Change in cool nights (a

  • Page 97 and 98:

    a. Dry-bulb temperature (°C) scena

  • Page 99 and 100:

    • “C”, corresponds to complet

  • Page 101 and 102:

    Future Cities Adaptation Compass To

  • Page 104:

    Receptors Extreme weather event Pot

  • Page 108:

    Receptors Extreme weather event Riv

  • Page 112:

    Receptors Extreme weather event Pot

  • Page 115 and 116:

    Storms - Higher maintenance cost -

  • Page 117 and 118:

    Storms Floods - Damages/ loss of ha

  • Page 119 and 120:

    esult of a partnership between Egyp

  • Page 121 and 122:

    necessary adaptation policies. Prov

  • Page 123 and 124:

    2. Build institutional and technica

  • Page 125 and 126:

    Alert / Communication / Education D

  • Page 127 and 128:

    Table 17: Suggested adaptation acti

  • Page 129 and 130:

    Adoption of methods to reduce water

  • Page 131 and 132:

    Section V: Project Fiches City of L

  • Page 133 and 134:

    Strategy - Transport Strategy and A

  • Page 135 and 136:

    in the Nile river is absolutely cen

  • Page 137 and 138:

    • Structuring the urban transport

  • Page 139 and 140:

    5. Assumptions and risks • Mobili

  • Page 141 and 142:

    Loans and potential borrower Expect

  • Page 143 and 144:

    water quality of the surrounding en

  • Page 145 and 146:

    - Reduce energy consumption in all

  • Page 147 and 148:

    • Environmental permit: EEAA appr

  • Page 149 and 150:

    - Minimum NG required per Cruise bo

  • Page 151 and 152:

    • MoTr through River Transport Au

  • Page 153 and 154:

    8. Cost estimates Technical support

  • Page 155 and 156:

    City of Luxor - Governorate of Luxo

  • Page 157 and 158:

    - Second National Communication on

  • Page 159 and 160:

    - Reduce fossil fuel consumption in

  • Page 161 and 162:

    - Directive 2001/42/EC (SEA Directi

  • Page 163 and 164:

    - Train small local companies that

  • Page 165 and 166:

    Staff training Governorate (Municip

  • Page 167 and 168:

    - Lamp replacement by LED 10% 783 k

  • Page 169 and 170:

    City of Luxor (Governorate of Luxor

  • Page 171 and 172:

    Laws, Regulations and Decrees Laws

  • Page 173 and 174:

    lower GHG emissions. This action is

  • Page 175 and 176:

    Component 2: Develop Solar Water He

  • Page 177 and 178:

    - Municipality and Governorate - Go

  • Page 179 and 180:

    • The development of Green hotels

  • Page 181 and 182:

    - Reduction as related to BAU scena

  • Page 183 and 184:

    is a need to make use of green labe

  • Page 185 and 186:

    - Incentives for Generating Electri

  • Page 187 and 188:

    • Install PV Solar panels and SHW

  • Page 189 and 190:

    This includes: - Switch from AC/ He

  • Page 191 and 192:

    The development would require the f

  • Page 193 and 194:

    • Municipality determination to a

  • Page 195 and 196:

    Energy savings GWh/y - Lamp replace

  • Page 197 and 198:

    the workshop participants towards t

  • Page 199 and 200:

    I. Identification of the target aud

  • Page 201 and 202:

    From this study concerning the targ

  • Page 203 and 204:

    - Link to other opportunities and/o

  • Page 205 and 206:

    2.1.2. Template Proposed Communicat

  • Page 207 and 208:

    the installation of ordinary lamps

  • Page 209 and 210:

    - Staff training needs: Coordinatio

  • Page 211 and 212:

    - Coordinate with the road manageme

  • Page 213 and 214: 2.2.2. Template Proposed Communicat
  • Page 215 and 216: 3.1. Template Identification of CAP
  • Page 217 and 218: expected in %. 2- Reduce carbon emi
  • Page 219 and 220: staff and household owners and mana
  • Page 221 and 222: Key Message: - Luxor is turning gre
  • Page 223 and 224: References Elkhayt, M. 2016. The Eg
  • Page 225 and 226: Climate Change Legislation in Egypt
  • Page 227 and 228: Table of Contents LIST OF TABLES ..
  • Page 229 and 230: 1. Introduction Al-Qurna is one of
  • Page 231 and 232: 2 3 (1) Heritage Sites (2) Agricult
  • Page 233 and 234: Consequently, the following will be
  • Page 235 and 236: - Tourism and Heritage problem Lack
  • Page 237 and 238: The introduction of the by road, Lu
  • Page 239 and 240: the constant stream of tourists has
  • Page 241 and 242: Uncoordinated designation for herit
  • Page 243 and 244: d) To mitigate visiting risks throu
  • Page 245 and 246: from the SCA tourist info. Center s
  • Page 247 and 248: - Awareness campaign for SCA staff
  • Page 249 and 250: Provide comfortable environment fri
  • Page 251 and 252: After minimising trips by 40 per ce
  • Page 253 and 254: Public-Private-Partnerships (availa
  • Page 255 and 256: to PV system. Conclusion: - A clean
  • Page 257 and 258: 5.1.4 Management of Agriculture was
  • Page 259 and 260: Phase 2: Continue with the rest of
  • Page 261 and 262: 5.1.5. Environmental public awarene
  • Page 263: • Spreading information and train
  • Page 267 and 268: 5.2 Project fiches mid-term actions
  • Page 269 and 270: Component 1: Select and formulate t
  • Page 271 and 272: 6. Appendix: Luxor Governorate Stra
  • Page 273: Declared by H.E. the governor, Luxo
Energy future of the Stockholm region 2010-2050
how to develop a sustainable energy action plan (seap)
PUTTING THE EU ON TRACK FOR 100% RENEWABLE ENERGY
Race to the front
1IfAQ3O
GineersNow Renewable Green Leaders Magazine Issue 001
Ju8uG
The Role of Nuclear Power in a Low Carbon Economy - Sustainable ...
Ae8F7
Greensense-Out-of-Hours-eBook
one million climate jobs 2014
RENEWABLE CITY STRATEGY
Climate Action 2010-2011
Sustainable Energy in the G20
Connecting the Future - Greenpeace UK
the ecological sustainability of europe's 2020 renewables ... - spea.pt
Guide for local and regional governments - Council of European ...
Capital consumption - London Sustainable Development Commission
Sustainable Energy Options - Arab Forum for Environment and ...
“Putting the EU on Track for 100% Renewable Energy,” report - WWF
Development a matter of energy.pdf - Train4dev.Net
ZERO ENERGY SPACE Experience the Future of Buildings
Make IT Green: Cloud computing and its contribution - Greenpeace
Highlights
Make IT Green: Cloud computing and its contribution - Greenpeace
Climate Change Mitigation.pdf - IESR
Wisconsin's Clean Energy Future - US Climate Action Network
Future low carbon energy systems - Copenhagen Cleantech Cluster
Download summary report - Civic Exchange
Sustainable Community Energy Planning (for non-engineers)