280218_Luxor-Egypt SECAP Final_revised

5. Assumptions and risks

5. Assumptions and risks Resistance from farmers and owners with an access to the waterfront land. 6. Key success factors 1) The presidential decree against encroachments on the Nile is a strong legislative mean facilitating law enforcement 2) The area designation decided by the governor would slow the pace of the violations/ uncontrolled urban expansion. 7. Cost estimates Initial and start-up expenses: basic equipment for the unit – advertising material Approximate operational Costs (including maintenance) 13,000 N/A Approximate annual income for energy producing projects Return of Investment (draft calculation) 8. Available and foreseen sources of funding Local authority's own resources: International Financial Institutions: - N/A International hotel chains on the East Bank. JICA (specially for the scientific lighting design of the mountain on the West Bank). Public-Private-Partnerships (available or to raise) Loans and potential borrower - 9. Projected Energy Estimates in 2030 (or other set target year) Energy savings MWh/y Renewable energy production MWh/y Not available CO2 reduction t CO 2/a - Reference Year - Target Year - Percentage of net reduction on the territory - Reduction as related to BAU scenario - Per capita calculated reduction 2017 2030 Not available Not available Not available 41

5.2 Project fiches mid-term actions. 5.2.1. Integrated Master Plan 1. General presentation Al-Qurna – Priority action #7 for SECAP Title: INTEGRATED MASTER PLAN Summary of the Action Aiming at a balanced environment, it is essential to address uncontrolled urban and rural developments, unsuitable and inappropriate crops close to the archaeological sites, ineffective management of the archaeological sites etc. There must be a master plan that combines the inputs of different authorities. Many problems could be resolved only if there is coordination among different stakeholders. Thus, an integrated master plan must be developed: urban development plan, rural development plan, archaeological site management plan, and integrated plan/ strategy must be developed, to be achieved: - Form the committee in charge of managing the master plan development, - Develop the TOR, - Send the RFP and receive the technical & financial props. - Analyse props. and select the winning consultant/ consultancy, - Select a scientific committee to be in charge to follow up, monitor the progress, hold regular meeting and get progress monthly report; it could be all or some of the members of the managing committee. Around 2 workshops shall be held, - Hold the pre-final workshop where reps. of all stakeholder shall attend: Local community reps., SCA& MoA, farmers syndicate, Luxor Governorate and Localities, MoL, MoI, NUCA & MoH, MoD. - Final submission and exhibition of the final master plan through a national meeting where top ranked officials of the above stakeholders, especially of governmental entities, shall attend and decree the necessary consents and decisions needed to implement the integrated master plan. General Objectives of the project Focusing on developing a balanced environment enhancing urban, rural environment as well as safeguarding heritage. Specific Objectives of the project # 7 Location: Al-Qurna Village Start date: Dec. 2017 Project lifetime: 12 months End date: Dec. 2018 Estimated cost € 162,000 Status of the Action: a) New b)Planned c) Under implementation d)Following previous action. a) Control UD so the housing emissions are controlled and balanced, b) Control agricultural development and expansions for less emissions and minimise water table hazards against heritage areas, and c) Provide effective heritage site management for heritage safeguarding and more effective lighting thus less electricity and emissions elicited due to unplanned lighting of the mountain and the archaeological sites. Principal partners and stakeholders Luxor Governorate & localities; SCA (MoA); Farmer syndicate; Local community; New Urban Communities Authority (NUCA) (MoH), and Armed Forces (MoD). Contact person in the local authority Dr. Ramadan Sedeek, Env. Dept., Luxor Governorate & CES-MED rep. & Dr. Moustafa Waziri, SCA, Luxor Governorate. 2. Technical description 42

  • Page 1 and 2:

    This project is funded by the Europ

  • Page 3 and 4:

    EuropeAid/132630/C/SER/Multi CLEANE

  • Page 5 and 6:

    Table of contents Executive Summary

  • Page 7 and 8:

    4.3. Renewable energy development .

  • Page 9 and 10:

    2.2.1 Template 2.2.1 Proposed Commu

  • Page 11 and 12:

    List of tables Table 1: Emission fa

  • Page 13 and 14:

    Industry; d) Transport; e) Waste an

  • Page 15 and 16:

    Section I: Governorate climate and

  • Page 17 and 18:

    (MCEI) is responsible for drawing u

  • Page 19 and 20:

    implementing the NEEAP and using sm

  • Page 21 and 22:

    previously set by H.E. General Fara

  • Page 23 and 24:

    8. Construct 4500 housing units in

  • Page 25 and 26:

    2. Promote the integration of energ

  • Page 27 and 28:

    The SEAU will be in charge of all G

  • Page 29 and 30:

    To ensure the success of project im

  • Page 31 and 32:

    Financing the SECAP The Governorate

  • Page 33 and 34:

    consumption and GHG emissions. 1.2.

  • Page 35 and 36:

    1.3.1.2 Employment statistics The e

  • Page 37 and 38:

    Value provided Method Final value E

  • Page 39 and 40:

    * Emissions from livestock and anim

  • Page 41 and 42:

    average emissions per capita in Egy

  • Page 43 and 44:

    10% 10% Governorate (Municipal) Bui

  • Page 45 and 46:

    Agriculture 1 692 0 2 622 0 0 0 0 4

  • Page 47 and 48:

    Figure 11: Impression of the City o

  • Page 49 and 50:

    4. Planned actions for the city of

  • Page 51 and 52:

    This commitment to act on its own p

  • Page 53 and 54:

    EGP 340,910 (€ 16,148), offering

  • Page 55 and 56:

    places and avenues where the new li

  • Page 57 and 58:

    - Get a good understanding of the b

  • Page 59 and 60:

    energy conservation, energy efficie

  • Page 61 and 62:

    only possible when real alternative

  • Page 63 and 64:

    155 boats with an average fuel cons

  • Page 65 and 66:

    Luxor and, by the way, a very effic

  • Page 67 and 68:

    4.2.3.3 Medium-term actions (3 to 1

  • Page 69 and 70:

    electricity used in tertiary buildi

  • Page 71 and 72:

    4.2.5.2 Possible actions As agricul

  • Page 73 and 74:

    a feed in tariff policy. If this po

  • Page 75 and 76:

    producing solar heater in small wor

  • Page 77 and 78:

    TRANSPORT Common charter for servic

  • Page 79 and 80:

    Figure 14: Seasonal (winter: Decemb

  • Page 81 and 82:

    2.2. Climate Change Impacts in Egyp

  • Page 83 and 84:

    cause mortalities 18 . In line with

  • Page 85 and 86:

    36 million from 1950 to 2010, popul

  • Page 87 and 88:

    harbour) in Alexandria 45 . Moreove

  • Page 89 and 90:

    The national strategy, its goals an

  • Page 91 and 92:

    The key players of this strategy st

  • Page 93 and 94:

    a. Ambient temperature (2000-2012)

  • Page 95 and 96:

    Figure 20: Change in cool nights (a

  • Page 97 and 98:

    a. Dry-bulb temperature (°C) scena

  • Page 99 and 100:

    • “C”, corresponds to complet

  • Page 101 and 102:

    Future Cities Adaptation Compass To

  • Page 104:

    Receptors Extreme weather event Pot

  • Page 108:

    Receptors Extreme weather event Riv

  • Page 112:

    Receptors Extreme weather event Pot

  • Page 115 and 116:

    Storms - Higher maintenance cost -

  • Page 117 and 118:

    Storms Floods - Damages/ loss of ha

  • Page 119 and 120:

    esult of a partnership between Egyp

  • Page 121 and 122:

    necessary adaptation policies. Prov

  • Page 123 and 124:

    2. Build institutional and technica

  • Page 125 and 126:

    Alert / Communication / Education D

  • Page 127 and 128:

    Table 17: Suggested adaptation acti

  • Page 129 and 130:

    Adoption of methods to reduce water

  • Page 131 and 132:

    Section V: Project Fiches City of L

  • Page 133 and 134:

    Strategy - Transport Strategy and A

  • Page 135 and 136:

    in the Nile river is absolutely cen

  • Page 137 and 138:

    • Structuring the urban transport

  • Page 139 and 140:

    5. Assumptions and risks • Mobili

  • Page 141 and 142:

    Loans and potential borrower Expect

  • Page 143 and 144:

    water quality of the surrounding en

  • Page 145 and 146:

    - Reduce energy consumption in all

  • Page 147 and 148:

    • Environmental permit: EEAA appr

  • Page 149 and 150:

    - Minimum NG required per Cruise bo

  • Page 151 and 152:

    • MoTr through River Transport Au

  • Page 153 and 154:

    8. Cost estimates Technical support

  • Page 155 and 156:

    City of Luxor - Governorate of Luxo

  • Page 157 and 158:

    - Second National Communication on

  • Page 159 and 160:

    - Reduce fossil fuel consumption in

  • Page 161 and 162:

    - Directive 2001/42/EC (SEA Directi

  • Page 163 and 164:

    - Train small local companies that

  • Page 165 and 166:

    Staff training Governorate (Municip

  • Page 167 and 168:

    - Lamp replacement by LED 10% 783 k

  • Page 169 and 170:

    City of Luxor (Governorate of Luxor

  • Page 171 and 172:

    Laws, Regulations and Decrees Laws

  • Page 173 and 174:

    lower GHG emissions. This action is

  • Page 175 and 176:

    Component 2: Develop Solar Water He

  • Page 177 and 178:

    - Municipality and Governorate - Go

  • Page 179 and 180:

    • The development of Green hotels

  • Page 181 and 182:

    - Reduction as related to BAU scena

  • Page 183 and 184:

    is a need to make use of green labe

  • Page 185 and 186:

    - Incentives for Generating Electri

  • Page 187 and 188:

    • Install PV Solar panels and SHW

  • Page 189 and 190:

    This includes: - Switch from AC/ He

  • Page 191 and 192:

    The development would require the f

  • Page 193 and 194:

    • Municipality determination to a

  • Page 195 and 196:

    Energy savings GWh/y - Lamp replace

  • Page 197 and 198:

    the workshop participants towards t

  • Page 199 and 200:

    I. Identification of the target aud

  • Page 201 and 202:

    From this study concerning the targ

  • Page 203 and 204:

    - Link to other opportunities and/o

  • Page 205 and 206:

    2.1.2. Template Proposed Communicat

  • Page 207 and 208:

    the installation of ordinary lamps

  • Page 209 and 210:

    - Staff training needs: Coordinatio

  • Page 211 and 212:

    - Coordinate with the road manageme

  • Page 213 and 214:

    2.2.2. Template Proposed Communicat

  • Page 215 and 216: 3.1. Template Identification of CAP
  • Page 217 and 218: expected in %. 2- Reduce carbon emi
  • Page 219 and 220: staff and household owners and mana
  • Page 221 and 222: Key Message: - Luxor is turning gre
  • Page 223 and 224: References Elkhayt, M. 2016. The Eg
  • Page 225 and 226: Climate Change Legislation in Egypt
  • Page 227 and 228: Table of Contents LIST OF TABLES ..
  • Page 229 and 230: 1. Introduction Al-Qurna is one of
  • Page 231 and 232: 2 3 (1) Heritage Sites (2) Agricult
  • Page 233 and 234: Consequently, the following will be
  • Page 235 and 236: - Tourism and Heritage problem Lack
  • Page 237 and 238: The introduction of the by road, Lu
  • Page 239 and 240: the constant stream of tourists has
  • Page 241 and 242: Uncoordinated designation for herit
  • Page 243 and 244: d) To mitigate visiting risks throu
  • Page 245 and 246: from the SCA tourist info. Center s
  • Page 247 and 248: - Awareness campaign for SCA staff
  • Page 249 and 250: Provide comfortable environment fri
  • Page 251 and 252: After minimising trips by 40 per ce
  • Page 253 and 254: Public-Private-Partnerships (availa
  • Page 255 and 256: to PV system. Conclusion: - A clean
  • Page 257 and 258: 5.1.4 Management of Agriculture was
  • Page 259 and 260: Phase 2: Continue with the rest of
  • Page 261 and 262: 5.1.5. Environmental public awarene
  • Page 263 and 264: • Spreading information and train
  • Page 265: Total cost of Project: 13,000 € D
  • Page 269 and 270: Component 1: Select and formulate t
  • Page 271 and 272: 6. Appendix: Luxor Governorate Stra
  • Page 273: Declared by H.E. the governor, Luxo
Global Climate Action
Make IT Green: Cloud computing and its contribution ... - Greenpeace
In how far can wind provide renewable energy? - Eindhoven ...
2012 Activity and sustainable development report - RTE
Buildings and Climate Change - DTIE
Sustainability Plan - University of Washington Tacoma
Hunter's presentation - 2012 International Straw Builder's Conference
Sun Life Financial is proud to sponsor this ... - The Natural Step
Seeing the Light - International Institute for Sustainable Development
Asia: Anagi stove, INFORSE project The - International Network for ...
South Africa's 21st Century Energy Plan? - WWF South Africa
The Journal of the International Energy Agency - IEA
habitat magazine - Australian Conservation Foundation
Drivers of Energy Demand Growth and Sustainable Response Options
Energy efficiency - “Pick the low-hanging fruit” - Collaborating ...
Business and the Sustainable Development Landscape
interim-report-unep-india-inquiry
SCIENCE