02.03.2018 Views

020318_Hurghada SECAP_FINAL

You also want an ePaper? Increase the reach of your titles

YUMPU automatically turns print PDFs into web optimized ePapers that Google loves.

4. City of <strong>Hurghada</strong> – Governorate of the Red Sea Priority Action # 4 for <strong>SECAP</strong><br />

1. General presentation<br />

Title: GREEN GOVERNORATE BUILDINGS PLAN<br />

# 4<br />

Summary of the Action<br />

Current Status – Governorate Buildings in the city of <strong>Hurghada</strong> – Red Sea<br />

The Governorate of the Red Sea – City of <strong>Hurghada</strong> (municipality) owns many<br />

municipal buildings representing a total of 60,000 square meters in addition to<br />

349,000 square meters of education buildings.<br />

Details of these municipal buildings are as follows:<br />

• 20,000 square meters of offices, including the main Governorate’s<br />

buildings,<br />

• 40,000 square meters of offices in <strong>Hurghada</strong>’s City Council buildings,<br />

• 330,000 square meters of 66 schools, and<br />

• 19,000 square meters College of Education – a higher education<br />

institution.<br />

These Governorate’s buildings only (60,000 square meters) represent a<br />

potential 55,000 square meters of roofs to be equipped with solar PV to<br />

generate electricity. The Governorate already took early steps in this direction<br />

by installing 100 solar panels on the roof of its main building with a production<br />

capacity of 25 kWp.<br />

Location: City of <strong>Hurghada</strong>,<br />

Governorate of the Red Sea<br />

Start date: December 2017<br />

Project lifetime: 5 years<br />

End: December 2022<br />

Estimated cost €<br />

20 K€ technical support and<br />

training.<br />

10,564 K€ revolving fund for<br />

efficient equipment, LED lamps,<br />

solar PV, etc.<br />

All public buildings in the city of <strong>Hurghada</strong> consume 2.6 GWh/year (2015<br />

reference) forming 10 per cent of the total Governorate services’ consumption.<br />

This consumption is only composed of electricity for lighting, cooling and<br />

heating, office equipment (computer, copiers, etc.), elevator, etc. The electricity<br />

bill from Governorate buildings alone represents 93,463 € per year (2015), an<br />

equivalent of 1,930,000 EGP.<br />

General Objectives of the project<br />

The City of <strong>Hurghada</strong> wants to promote energy efficiency and renewable energy<br />

in public buildings through the development of a comprehensive plan to reduce<br />

energy consumption and consequently the GHG emissions. To that end, the<br />

Governorate wants to implement a “Green Municipal Buildings Plan” (GMBP)<br />

integrating sustainability measures and technologies to green buildings,<br />

improve energy efficiency and promote renewable energy solutions in the<br />

Governorate buildings.<br />

Status of the Action:<br />

• New<br />

• Planned<br />

• Following previous action.<br />

National Strategy, Policies, Laws and Programmes<br />

General:<br />

Vision and Strategy<br />

Egypt’s Vision 2030,<br />

140

Hooray! Your file is uploaded and ready to be published.

Saved successfully!

Ooh no, something went wrong!