Views
7 months ago

Getting Started

3 • THE BASIC PROCESS

3 • THE BASIC PROCESS PANEL Prompt Initial VA Cost Initial NVA Cost Initial Waiting Cost Initial Transfer Cost Initial Other Cost Report Statistics Description Initial cost value that will be assigned to the value-added cost attribute of the entity. This attribute accrues the costs incurred when an entity is spending time in a value-added activity. Initial cost value that will be assigned to the non-value-added cost attribute of the entity. This attribute accrues the costs incurred when an entity is spending time in a non-value-added activity. Initial cost value that will be assigned to the waiting-cost attribute of the entity. This attribute accrues the costs incurred when an entity is spending time in a wait activity; for example, waiting to be batched or waiting for resource(s) at a Process module. Initial cost value that will be assigned to the transfer cost attribute of the entity. This attribute accrues the costs incurred when an entity is spending time in a transfer activity. Initial cost value that will be assigned to the other cost attribute of the entity. This attribute accrues the costs incurred when an entity is spending time in another activity. Specifies whether or not statistics will be collected automatically and stored in the report database for this entity type. Queue module DESCRIPTION This data module may be utilized to change the ranking rule for a specified queue. The default ranking rule for all queues is First In, First Out unless otherwise specified in this module. There is an additional field that allows the queue to be defined as shared. TYPICAL USES • Stack of work waiting for a resource at a Process module • Holding area for documents waiting to be collated at a Batch module 45

GETTING STARTED WITH ARENA PROMPTS Prompt Name Type Attribute Name Shared Report Statistics Description The name of the queue whose characteristics are being defined. This name must be unique. Ranking rule for the queue, which can be based on an attribute. Types include First In, First Out; Last In, First Out; Lowest Attribute Value (first); and Highest Attribute Value (first). A low attribute value would be 0 or 1, while a high value may be 200 or 300. Attribute that will be evaluated for the Lowest Attribute Value or Highest Attribute Value types. Entities with lowest or highest values of the attribute will be ranked first in the queue, with ties being broken using the First In, First Out rule. Check box that determines whether a specific queue is used in multiple places within the simulation model. Shared queues can only be used for seizing resources (for example, with the Seize module from the Advanced Process panel). Specifies whether or not statistics will be collected automatically and stored in the report database for this queue. Resource module DESCRIPTION This data module defines the resources in the simulation system, including costing information and resource availability. Resources may have a fixed capacity that does not vary over the simulation run or may operate based on a schedule. Resource failures and states can also be specified in this module. TYPICAL USES • Equipment (machinery, cash register, phone line) • People (clerical, order processing, sales clerks, operators) 46

Getting Started with InfoSphere Data Architect
Getting Started with WebSphere Application Server
Getting Started - Ramsey County Parks and Recreation
Getting Started with InfoSphere Data Architect
Getting Started Guide
Getting Started Guide
Getting Started - Operating Systems
LTspice IV Getting Started Guide
Getting Started with WebSphere Application Server
98-375 BrainDumps Discount
Presentation slides [PDF] - Joint Steering Committee for ...
TransienT immuniTy simulaTors For ConDuCTeD DisTurBanCes
getting started with eventstudio - EventHelix.com
Telit Getting Started Guide - SemiconductorStore.com
Logistics MBA. Get Started. - Institute for Defense & Business
Just in time - Eurofer
The Terraform Book
4g pa design gets help 4g pa design gets help - AWR Corporation
to get the file
Chapter 1. Getting Started - Kodak
Painting Getting Started Craft Sheet - Play Resource
SonicWALL EX9000 Getting Started Guide - Ingram Micro
School Wellness Policy Getting Started - Connecticut State ...
PXI and PCI Getting Started - Egmont Instruments
Blueback Project Tracker Getting Started Guide - Ocean
M70-101 Latest Exam BrainDumps
Arena Material: chapter 5 - AS Nida
Simulation with Arena
Variables Guide
Simulation with Arena