A DETAIL DESIGN 50% 2015-03-06<br />

B REVISED DETAIL DESIGN 50% FOR APPROVAL 15-05-2015<br />

C FINAL DETAILED DESIGN 29-05-2015<br />

D FOR BUILDING CONSENT 05-<strong>11</strong>-2015<br />

E TENDER NTT1 <strong>11</strong>-<strong>11</strong>-2015<br />

1 FOR CONSTRUCTION COORDINATION 01-04-2016<br />

2 FOR CONSTRUCTION 02-06-2016<br />

3 FOR CONSTRUCTION 23-06-2016<br />

Rev<br />

Revision Description<br />

Designed<br />

Drawn<br />

Checked<br />

Approved<br />

Date<br />

Sheet<br />

Scales<br />

SCALE @ A1=<br />

Original Size<br />

SCALE @ A1=<br />

Project Number<br />

DO NOT SCALE OFF<br />

THIS DRAWING<br />

CONTRACTOR MUST<br />

VERIFY ALL<br />

DIMENSIONS ON SITE<br />

BEFORE COMMENCING<br />

ANY WORK<br />

Project Title<br />

Christchurch City<br />

Status<br />

Drawing Number<br />

Revision<br />

18 WEDNESDAY APRIL <strong>11</strong> <strong>2018</strong><br />

Latest Christchurch news at www.star.kiwi<br />

SELWYN TIMES<br />

23/06/2016 3:29:15 p.m. C:\Revit\214010_Super stop CHCH Site layout_V2015_kmd.rvt<br />

05-05-2014<br />

This design is based on generally accepted practices and standards at the time it was prepared. No other warranty, expressed or implied, is made. It is prepared in accordance with the scope of work and for the purpose outlined in the contract dated:<br />

No responsibility is accepted for use of any part of this design in any other context or for any other purpose. This drawing is subject to copyright.<br />

FOR CONSTRUCTION<br />

214010<br />

AN ACCESSIBLE CITY-SUPERSTOPS<br />

MANCHESTER ST EAST -<br />

LOOKING NORTH EAST<br />

FOR CONSTRUCTION<br />

A-04-080<br />

3